Inspection history · 102
29 April 2024
Deficiency Check · Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7901388
13 January 2023
Deficiency Check · Drydock Exam · Annual Inspection · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7620951
16 March 2022
MARPOL Annex I Examination · MARPOL Annex VI Survey · Annual Inspection · Drydock Extension
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7394377
1 March 2021
MARPOL Annex I Examination · COI Inspection · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7158825
18 June 2020
MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6986069
11 December 2019
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6871452
25 September 2018
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6547977
9 August 2016
Internal Structural Exam · Examination of Repairs · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5967668
1 April 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5845177
9 June 2015
Permit to Proceed
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5148042
28 April 2014
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4846096
10 March 2014
Drydock Extension
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4813469
19 January 2012
Drydock Exam · Internal Structural Exam · Administrative Inspection · Annual Inspection · MTSA Verification · Commercial Dive Inspection · Deficiency Check
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 4227869
26 October 2011
Drydock Extension
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4176360
24 June 2011
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4172599
22 December 2010
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3915384
20 December 2010
Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3910453
30 August 2010
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3837773
19 August 2010
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3828125
19 January 2010
COI Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3657148
22 March 2009
MARPOL Annex VI Survey · Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3437990
16 January 2009
Annual Inspection · MTSA Verification · Drydock Extension · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3393479
19 September 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3330330
23 April 2008
Construction Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3181443
13 March 2008
MARPOL Annex I Examination · Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3157335
7 March 2007
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2883442
8 November 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2816806
27 October 2006
Hull Examination · Examination of Repairs · Internal Structural Exam · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2810773
17 April 2006
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2621908
20 January 2005
MARPOL Annex I Examination · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2277556
18 August 2004
Deficiency Check · In-Service Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2163428
8 June 2004
MTSA Verification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2093409
27 April 2004
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2042168
17 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1968205
12 December 2003
In-Service Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1965134
17 November 2003
In-Service Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1948032
12 May 2003
Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1791587
1 May 2002
Administrative Inspection
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1632677
5 February 2002
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1484238
7 January 2002
Periodic Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1476060
19 December 2001
Hull Examination · Internal Structural Exam
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1476666
2 April 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1469348
27 February 2001
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1373350
26 May 2000
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1417065
20 March 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1047652
29 February 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 815693
4 February 2000
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1458713
17 September 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 100228
10 June 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 810783
3 May 1999
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1426203
23 April 1999
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1400984
30 March 1999
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1116503
26 January 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1397074
17 November 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 810954
23 October 1998
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1446697
3 September 1998
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 757245
25 August 1998
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 209794
14 August 1998
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1130863
12 August 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1453504
19 February 1998
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458488
5 January 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 811403
7 November 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 166984
1 August 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 131158
17 July 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1453376
18 June 1997
Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1364205
21 May 1997
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1101160
10 March 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1099387
11 June 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 886253
25 April 1996
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1081261
3 April 1996
COI Inspection · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1078469
19 September 1995
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1181031
23 June 1995
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 879021
26 May 1994
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1170728
19 May 1994
COI Inspection · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 860274
1 June 1993
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1444723
20 April 1993
Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 839827
15 October 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 957571
29 April 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 958478
23 April 1992
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1262068
8 January 1992
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1259122
22 November 1991
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1248869
14 November 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1253231
29 July 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1000253
20 June 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1208189
18 April 1991
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 916036
3 April 1990
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 985292
13 October 1989
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 907556
2 August 1989
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 890303
18 July 1989
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1032685
14 June 1989
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1032725
26 May 1989
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1032444
21 March 1989
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 896217
14 April 1988
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1209772
24 March 1988
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 994633
17 April 1987
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1310378
22 October 1986
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1016693
29 August 1986
Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1028339
18 July 1986
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 988360
13 February 1986
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1295147
15 January 1986
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1303251
7 October 1985
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 985577
6 March 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 979319
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 23 May 2024
No resolution recorded
Piping subject to internal head pressure from oil in the tank must be fitted with positive shutoff valves located at the tank. Valves must...be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located.
One of the fuel valves does not have a remote shutoff and is temporarily tagged out until dry dock to get repaired.
46CFR90.20-1
46CFR56.50-60(d)(1)
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 29 April 2024
Resolved
Piping subject to internal head pressure from oil in the tank must be fitted with positive shutoff valves located at the tank. Valves must...be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located.
The starboard aft independent diesel fuel day tank was not outfitted with remote fuel shut-off valves. Rectify deficiency prior to the vessel's departure.
46CFR90.20-1
46CFR56.50-60(d)(1)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2024
Resolution: Two remote valves have been installed on the shutoff valves.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2024
Resolved
Fluid conditioner fittings which are made in accordance with the applicable standards listed in table 56.60-1(b) of this part and of materials complying with subpart 56.60 of this part, may be used within the material, size, pressure, and temperature limitations of those standards and within any further limitations specified in this subchapter.
The fuel filter located ivo the rolled forward diesel fuel hose did not meet marine standards.
46CFR90.20-1
46CFR56.15-5(b)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2024
Resolved 23 May 2024
Resolution: Fuel filter has been installed.
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 29 April 2024
No resolution recorded
Nonmetallic flexible hose must be in accordance with SAE J1942 and may be installed only in vital and nonvital fresh and salt water systems, nonvital pneumatic systems, lube oil and fuel systems, and fluid power systems...and may be used in lengths not exceeding 30 inches.
The nonmetallic flexible hose used as fuel lines for all (06) vessel winches exceeded 30 inches in length. Some lines exceeded five feet in length. This deficiency shall be rectified prior to the vessel's next credit drydock exam.
46CFR90.20-1
46CFR56.60-25(b)(2)
Condition: Invalid
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2024
No resolution recorded
Independent diesel fuel tank may not have openings in the bottom, sides, or ends of a tank.
The starboard aft independent diesel fuel day tank was outfitted with an inspection port on it's forward end. Rectify deficiency prior to the vessel's next credit drydock exam.
46CFR90.20-1
46CFR58.50-10(a)(4)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2024
Resolved
Each panelboard must have: a description of the load of each circuit.
Multiple breakers in the PP-206 distribution panel were not labeled.
46CFR90.25-1
46CFR111.40-11(b)(2)(ii)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2024
Resolved 23 May 2024
Resolution: Breakers have been labeled
01 - Certificates & Documentation › 011 - Ships Certificates › Engine International Air Pollution Prevention Certificate (EIAPP)
Issued 29 April 2024
No resolution recorded
The revised NOx Technical Code 2008 shall be applied in the certification, testing, and measurement procedures for the standards set forth in this regulation. The NOx technical Code regulation 2.3.4 requires that the technical files along with the EIAPP be kept on board throughout the engines life on board.
Technical files and EIAPPs for the 5 engines required to be listed on the IAPP supplement were not on board at the time of inspection. These are required for four John Deere Tier I engines listed on the IAPP supplement and the newly install Tier IV Caterpillar generator.
MARPOL VI/13.8
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
01 - Certificates & Documentation › 011 - Ships Certificates › International Air Pollution Certificate (IAPP)
Issued 29 April 2024
No resolution recorded
Each ship subject to regulation 6.1 that has rechargeable systems that contain ozone-depleting substances shall maintain an ozone-depleting substances record book. Theis record book may form part of an existing logbook or electronic record book as approved by the administration.
Entries in the ozone-depleting substances record book shall be recorded in terms of mass(kg) of substance and shall be completed without delay on each occasion, in respect of the following: 1. Recharge, 2. Repair or maintenance of equipment, 3. Discharge to atmosphere, 4. Discharge to reception facilities, 5. Supply of substances to ship.
MARPOL VI/12.6 & 12.7
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 March 2022
Resolved
The person in charge of the vessel shall ensure that the provisions of the COI are strictly adhered to. The COI requires the accommodations to be inspected twice daily, the smoke detection system tested weekly, and all inspections and tests logged. The inspections and tests have not been completed. Conduct inspections and tests as required and provide records.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 April 2022
Resolution: Received, reviewed and accepted records from [name withheld] indicating the crew is inspecting the accomodations and testing smoke detectors IAW the barge's COI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2022
Resolved
Electrical systems shall be installed IAW subchapter J. Multiple electrical equipment has been decommissioned. The Company has a lock-out/tag-out policy. The decommissioned equipment has not been locked out IAW company policy. Provide a corrective action plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 April 2022
Resolved 2 May 2022
Resolution: Received, reviewed and accepted documentation proving the deficiency has been rectified. See narrative for details.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 16 March 2022
Resolved
Where air pipes to ballast tanks extend above the freeboard deck, the exposed parts of the pipe shall be of substansial construction. The forward air pipe for the #2 port ballast tank has a hole wasted through at the deck, outboard side. Crop and renew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 April 2022
Resolved 2 May 2022
Resolution: Received, reviewed and accepted documentation proving the deficiency has been rectified. See narrative for details.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 18 June 2020
Resolved
Each vessel must have a line throwing appliance under approval series 160.040 and an auxiliary line of at least 450 meters. Vessel did not have sufficient charges or auxiliary line for line throwing appliance.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 19 August 2020
Resolved 19 August 2020
Resolution: Vessel purchased required equipment.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 December 2019
Resolved
It shall be the duty of the owner, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by regulations in this subchapter is provided, maintained, and replaced as indicated.
#1 fire pump found with leaking seal. Prove proper operation to the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 January 2020
Resolved 12 February 2020
Resolution: Pump seal replaced
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 December 2019
Resolved
Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10.
No portable extinguisher monthly inspection records could be produced. Provide monthly inspection record to the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 January 2020
Resolved 12 February 2020
Resolution: Equipment serviced and logs provided.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 11 December 2019
Resolved
All safety and relief valves for use on pressure vessels shall be set to relieve at a pressure which does not exceed the "maximum allowable working pressure.
Operator was unable to prove proper operation of 02 air receiver relief valves in the crane machinery space. Prove proper operation of relief valves.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2020
Resolved 12 February 2020
Resolution: Operator replaced relief valves with new.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 11 December 2019
Resolved
No more than 55 gallons of combustible liquids may be stowed in any machinery space.
Crane machinery space was found with more than 55 gallons of combustible oil. Remove excess oil from space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 January 2020
Resolved 12 February 2020
Resolution: Operator stated they would install a portable connex box on deck to store flamable and combustable liquids.
Engineering › Bilge Water Management System › Not Installed
Issued 21 February 2012
Resolved
Submit proposal for the installation of a fixed bilge system that provides suction from all watertight spaces, with the exception of those spaces serviced by ballast pumps and oil and water tanks. 46 CFR 56.50-50 / 56.50-55
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2012
Resolution: The vessel installed a fixed bilge pump for all watertight spaces.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 22 December 2010
Resolved
Identified wasted areas on the exterior bulkheads of the accommodation house. Areas are to be repaired/replaced IAW 46CFR 92.01-10. Accommodation house CG-835 temporarily addressed with doublers, per approval, Chief of Prevention. Permanent repairs to be executed @ next dry-dock, 15Nov2011. CG-835 shall be extended to reflect the aforementioned
Due 15 November 2011
Resolved 3 May 2012
Resolution: The vessel installed new ABS approved temp quarters (10-82) and removed wasted quarters.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 20 December 2010
Resolved
Vessel does not have adequate number of liferafts. Missing liferafts must be replaced to meet 46CFR119.261(b)(2). Vessel must not depart until liferafts are replaced.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 December 2010
Resolution: Liferafts replaced, accomodating crew as required.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 20 December 2010
Resolved
Galley found to have excessive grease and oil on deck. Space must be cleaned IAW 46CFR 92.20-15. Galley must be clean and clear of grease prior to the 23rd of December 2010.
Action required: 705 - Other - as specified
Due 22 December 2010
Resolved 22 December 2010
Resolution: Grease/cooking oil cleaned from deckspaces beneath galley cooking appliances and mess room food/utensil staging areas.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 20 December 2010
Resolved
Identified wasted areas on the exterior bulkheads of the accommodation house. Areas are to be repaired/replaced IAW 46CFR 92.01-10. Repairs shall be made in no more than thirty days.
Action required: 705 - Other - as specified
Due 20 January 2011
Resolved 22 December 2010
Resolution: Accommodation house CG-835 temporarily addressed with doublers, per approval, Chief of Prevention. Permanent repairs to be executed @ next dry-dock, 15Nov2011. CG-835 shall be extended to reflect the aforementioned parameters.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 19 August 2010
Resolved
Dry Dock dates were incorrectly enter upon issuing the COI .
Action required: 705 - Other - as specified
Resolved 19 August 2010
Resolution: Dry Dock dates were corrected and amended COI was issued by mail.
Fire Fighting › Structural - A Class Divisions › Main Galleys
Issued 22 March 2009
Resolved
Install Class A door in galley as per fire plan
Action required: 705 - Other - as specified
Resolved 12 June 2009
Construction/Loadline › Hull › Transverse Frame
Issued 22 March 2009
Resolved
R/R fracture on transverse bulkhead in bow rake
Action required: 705 - Other - as specified
Resolved 28 April 2009
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 22 March 2009
Resolved
Provide MSC stacking calculation w/ rails prior to inhabiting quarters.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2009
Resolution: Received MSC approval ltr for qrtrs.
Communications › Alarms/Indicators › General Alarm
Issued 22 March 2009
Resolved
Provide tie in for fire & general alarm systems prior to inhabiting quarters.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2009
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 22 March 2009
Resolved
Provide manufacturers tech specifications & EIAPP certificate prior to Int'l voyage or prior to 23 May 09
Due 23 May 2009
Resolved 28 April 2009
Documentation › Certificates/Documents › Annex VI Statement of Voluntary Compliance
Issued 22 March 2009
Resolved
Provide procedures for entering SECA areas prior to Int'l voyage or 23 May 09 whichever sooner.
Due 23 May 2009
Resolved 28 April 2009
Engineering › Fuel Oil Service System › Vent Pipe
Issued 16 January 2009
Resolved
Replace fuel vent on aft fuel tank.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 16 January 2009
Resolved
Replace fractured waste oil pipe outside crane room.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Engineering › Lubricating Oil Service System › Piping
Issued 16 January 2009
Resolved
Replace fractured lube oil line from aft lube oil storage tank to emergency generator.
Action required: 705 - Other - as specified
Resolved 23 March 2009
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 16 January 2009
Resolved
Label all liferings with the vessel's name.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Fire Fighting › Firemans Outfit › Axe
Issued 16 January 2009
Resolved
Label all fire axes with the vessel's name.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Accommodation/Occupational Safety › Potable Water System › General
Issued 16 January 2009
Resolved
Replace potable water supply and vent lines on aft tank.
Action required: 705 - Other - as specified
Resolved 23 March 2009
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 16 January 2009
Resolved
Replace missing drain plug on aft diesel tank coaming sysem and remove trash.
Action required: 705 - Other - as specified
Resolved 23 March 2009
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 16 January 2009
Resolved
Properly install fire suppression system and test to the satisfaction of the attending Marine Inspector. Add system to fire and safety plan. Vessel has a small portable box it uses for a paint locker that has an opening that need to be sealed up.
Action required: 705 - Other - as specified
Resolved 24 April 2009
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 16 January 2009
Resolved
Replace all door handles and crash bars on all temporary quarters.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Lifesaving › Lifebuoys › Stowage
Issued 16 January 2009
Resolved
Properly install lifering on fwd port bow.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 March 2007
Resolved
Due by COI anniversary: Upon further review of the plans and correspondence with MSC it has been determined that the three 12 man portable quarters which are to be permanent installation need to be welded to the deck. Currently, skid mounts (pedestals) and straps are securing the quarters. The quarters were approved by ABS, which can only approve permanent installation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 January 2008
Resolved 13 March 2008
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 9 November 2006
Resolved
Provide annual SOPEP review letter showing submittal to CG Marine Safety Center.
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 December 2006
Resolved 15 November 2006
Resolution: Provided annual SOPEP review letter showing submittal to the CG Marine Safety Center to the satisfaction of the attending Marine Inspector.
Fire Fighting › Nozzles › Condition
Issued 27 October 2006
Resolved
Renew or repair one 2.5 inch fire nozzle prior to sailing
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 December 2006
Resolved 15 November 2006
Resolution: Renewed fire nozzle to the satisfaction of the attending marine inspector
Construction/Loadline › Structures › Door
Issued 27 October 2006
Resolved
Make permenant repairs to lower level cabin weather tight door prior to sailing
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 December 2006
Resolved 15 November 2006
Resolution: Repaired lower cabin weather tight door to the satisfaction of the attending marine inspector
Deck/Cargo › Cargo Transfer (solid) › General
Issued 27 October 2006
Resolved
Provide certifications for both cranes in accordance with 46 CFR 91-25.25,46CFR 31.10-16 prior to there use.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2006
Resolved 13 March 2008
Engineering › Pressure Vessel › Marking and Stamping
Issued 27 October 2006
Resolved
Provide adequate test cetificates for pressure human occupancy vessels prior to use.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2008
Resolved 27 October 2006
Operations/Management › Equipment Service/Testing › EPIRB
Issued 20 January 2005
Resolved
EPIRB registered with wrong call sign.
Condition: Improper/Lack of Maintenance
Due 21 January 2005
Resolved 21 January 2005
Operations/Management › Equipment Service/Testing › EPIRB
Issued 20 January 2005
Resolved
EPIRB battery expired.
Condition: Improper/Lack of Maintenance
Due 21 January 2005
Resolved 21 January 2005
Operations/Management › Equipment Service/Testing › EPIRB
Issued 20 January 2005
Resolved
EPIRB hydrostatic release expired.
Condition: Improper/Lack of Maintenance
Due 21 January 2005
Resolved 21 January 2005
Communications › Alarms/Indicators › General Alarm
Issued 20 January 2005
Resolved
General alarm did not work in portable accomodations.
Condition: Unknown
Due 21 January 2005
Resolved 21 January 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 18 August 2004
Resolved
Install fixed CO2 system in paint locker.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2004
Resolution: Fixed CO2 system installed.
Accommodation/Occupational Safety › Potable Water System › General
Issued 18 August 2004
Resolved
Piping not approved for Potable water.
Action required: 705 - Other - as specified
Resolved 19 August 2004
Resolution: Approved Potable water piping installed.
Communications › Alarms/Indicators › Fire Alarm
Issued 18 August 2004
Resolved
Fire/ smoke detection system inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2004
Resolution: Alarm panel operational and detectors working.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 27 April 2004
Resolved
Modify Fire Control Plan to reflect deck arrangements - specifically fuel tank located next to crane well.
Due 27 June 2004
Resolved 27 August 2004
Resolution: Approved VCP.
Lifesaving › Embarkation Appliances/Stations › Side Ropes
Issued 27 April 2004
Resolved
Add safety rails and chains to starboard life raft station located on top of winch control room.
Due 27 June 2004
Resolved 14 June 2004
Resolution: Safety rails & chains added.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 27 April 2004
Resolved
Provide opening proper opening in safety rails to make for more efficient deployment of port life raft.
Due 27 June 2004
Resolved 14 June 2004
Resolution: Proper opening added.
Electrical › Electric Generation Source (service) › Generator
Issued 7 January 2002
Resolved
Prove proper operation of generator alarms and shutdowns.
Due 7 January 2002
Resolved 7 January 2002
Resolution: Corrected.
Fire Fighting › Fire Main
Issued 7 January 2002
Resolved
Prove proper operation of fire pump prior to departing. LEGACY COMPONENT DESC: Pressure
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 January 2002
Resolution: corrected on spot prior to departure
Fire Fighting › Miscellaneous Items
Issued 7 January 2002
Resolved
Install smoke detector in room P-4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 January 2002
Fire Fighting › Miscellaneous Items
Issued 7 January 2002
Resolved
Provide smoke/fire detection in upper portable housing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 January 2002
Resolution: Corrected on the spot
Fire Fighting › Fixed Fire Detection System
Issued 7 January 2002
Resolved
Provide annual service report for fixed fire detection in portable buildings.
Due 5 February 2002
Resolved 7 January 2002
Resolution: Owner provided missing copy of report.
Accommodation/Occupational Safety › Washroom/Toilet
Issued 7 January 2002
Resolved
Prove proper operation of water/toilets in portable buildings
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 January 2002
Resolution: Corrected with proper water pressure supplied.
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 7 January 2002
Resolved
Provide detailed proposal for additional 12 man temporary housing unit including location plan, securing and deck strength calculations.
Due 5 February 2002
Resolved 5 February 2002
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 7 January 2002
Resolved
Upon approval of proposal for additonal 12 man portable berthing, install and prove proper operation of plumbing, electrical, heat, a/c, smoke detection to the satisfaction of attending marine inspector. No personnel may occupy berthing until approval/inspection has been completed.
Action required: 705 - Other - as specified
Resolved 19 August 2004
Resolution: Portable quarters installation approved.
Accommodation/Occupational Safety
Issued 27 February 2001
Resolved
Prior to May 4, 2001, have two (2) ten (10) man portable berthing units inspected to the satisfaction of attending marine inspector. This will bring total compliment to 128 personnel.
Condition: Unknown
Due 27 February 2001
Resolved 27 February 2001
Electrical
Issued 29 February 2000
Resolved
PROVE PROPER OPERATION OF ALL TRIPS, AUDIO AND VISUAL ALARMS FOR THE EMERGENCY GENERATOR.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Electrical
Issued 29 February 2000
Resolved
PROVE PROPER OPERATION OF ALL AUDIO AND VISUAL ALARMS FOR BOTH MAIN GENERATOR SETS.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Electrical
Issued 4 February 2000
Resolved
TEST THE SHIP SERVICE GENERATORS ALARMS AND SHUTDOWNS.
Condition: Unknown
Due 4 February 2000
Resolved 4 February 2000
Electrical
Issued 4 February 2000
Resolved
CONDUCT SATISFACTORY TEST OF ALL EMERGENCY LIGHTING.
Condition: Unknown
Due 4 February 2000
Resolved 4 February 2000
Fire Fighting
Issued 4 February 2000
Resolved
PROVIDE SERVICE REPORT FOR GALLEY STOVE SUPRESSION SYSTEM.
Condition: Unknown
Due 4 February 2000
Resolved 4 February 2000
Fire Fighting
Issued 4 February 2000
Resolved
INSTALL APPROVED MEANS TO PROTECT PAINT LOCKER FROM FIRE.
Condition: Unknown
Due 4 February 2000
Resolved 4 February 2000
Deck/Cargo
Issued 4 February 2000
Resolved
REPLACE THE PRESSURE RELIEF VALVES ON FOUR AIR RECEIVER PRESSURE VESSELS, SO THEY RELIEVE BELOW OR AT THE MAWP.
Condition: Unknown
Due 4 February 2000
Resolved 7 February 2000
Documentation
Issued 23 April 1999
Resolved
PROVIDE DOCUMENTATION TO OCMI PORT ARTHUR OF CRANE CERTIFICATION/REGISTERS IAW 46 CFR 91.25-25.
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Engineering
Issued 23 April 1999
Resolved
HARD PIPE SUPPLY AND RETURN FUEL LINES FOR 500 KW GENERATOR. FLEXIBLE HOSEUSED GREATLY EXCEEDS 30 IN LIMIT.
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Construction/Loadline
Issued 23 April 1999
Resolved
PROPERLY INSTALL QUICK ACTING WATERTIGHT HATCH AT EGRESS FOR F/O X-FER ROOM. (MANHOLE COVER INSTALLED IN PLACE OF HATCH)
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Unknown
Issued 23 April 1999
Resolved
SECURE LIFEJACKET LOCKER ON BOW.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Lifesaving
Issued 23 April 1999
Resolved
PROVIDE GUARDS FOR HYDRAULIC PUMP UNIT (ROTATING MACHINERY) FWD, UNDER HELODECK.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Electrical
Issued 23 April 1999
Resolved
PROVIDE OPERATING INSTRUCTIONS FOR E-GENERATOR AND POST IN VICINITY OF SAME
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Electrical
Issued 23 April 1999
Resolved
PROVIDE/PROVE OPERATION OF EMERGENCY LIGHTS.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Lifesaving
Issued 23 April 1999
Resolved
PROVIDE EMBARKATION LADDERS AND LIGHTING AT LIFERAFT/EMBARKATION STATIONS.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Engineering
Issued 23 April 1999
Resolved
PROVE OPERATION OF E-GENERATOR DAYTANK REACH ROD. (FROZEN)
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Engineering
Issued 23 April 1999
Resolved
RE-STENSIL E-GENERATOR DAYTANK REACH ROD.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Electrical
Issued 23 April 1999
Resolved
PROPERLY WIRE JUNCTION BOX IN WINCH FLAT.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Lifesaving
Issued 23 April 1999
Resolved
PROVIDE FOR LIFELINES (SAFETY CHAINS) ABOUT MAIN DECK.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Construction/Loadline
Issued 23 April 1999
Resolved
PROPERLY INSTALL HATCH TO BOW STORAGE AREA ON MAIN DECK. (DOGS WILL NOT MOVE)
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Lifesaving
Issued 23 April 1999
Resolved
STENCIL "ATLANTIC HORIZON" ON ALL LIFEJACKETS.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Engineering
Issued 23 April 1999
Resolved
PROVIDE PRV ON WASTE OIL TANK ON DECK. (PRV INSTALLED SEIZED UP)
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Documentation
Issued 23 April 1999
Resolved
PROVIDE AND POST FIRE AND SAFTEY PLAN TO COGNIZANT OCMI FOR APPROVAL. VSL HAS ROUGH PLAN ONBOARD.
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Accommodation/Occupational Safety
Issued 23 April 1999
Resolved
PROVIDE FOR HOSPITAL SPACE IAW 46 CFR 92.20-35.
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Lifesaving
Issued 23 April 1999
Resolved
PROVIDE OARLOCKS FOR RESCUE BOAT.
Condition: Unknown
Due 10 May 1999
Resolved 10 May 1999
Fire Fighting
Issued 23 April 1999
Resolved
PROVIDE FOR INDEPENDENT FIRE PUMP IAW 46 CFR 95.10-5(F). VSL HAS TWO FIRE/BALLAST PUMPS, BUT WHEN BALLASTING, NEITHER PUMP MAY BE USED FOR FIREFIGHTING PURPOSES. BALLAST OPS MUST STOP AND VALVES RE-ALLIGNED PRIOR TO USE.
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Electrical
Issued 23 April 1999
Resolved
REMOVE UNUSED WIRING FROM ELECTRICAL SWITCHBOARD FOR 500 KW GENERATOR.
Condition: Unknown
Due 23 April 1999
Resolved 23 April 1999
Construction/Loadline
Issued 23 October 1998
Resolved
MAKE PERMANENT REPAIRS TO #1 VOID AND STBD BOW RAKE. REPAIR SIDE PLATE,INTERNALS AND TRANSVERSE BLKHD#3 BETWEEN BOW RAKE STBD VOID. TEMPORARY REPAIRS ARE MADE THIS DATE.
Condition: Unknown
Due 23 October 1998
Resolved 23 October 1998
Engineering
Issued 12 August 1998
Resolved
Make proper repairs to aft 500 KW generator set and prove proper operation to cognizant OCMI NLT 16OCT98.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Deck/Cargo
Issued 18 June 1997
Resolved
HAVE CRANE TESTED AND CERTIFIED BY AN APPROVED AGENCY.
Condition: Unknown
Due 18 June 1997
Resolved 18 June 1997
Unknown
Issued 18 June 1997
Resolved
PROVIDE PROOF OF A CHEMICAL TESTING PROGRAM IN ACCORDANCE WITH 46 CFR_x001C_ PART 16.
Condition: Unknown
Due 18 June 1997
Resolved 18 June 1997
Lifesaving
Issued 18 June 1997
Resolved
PROVIDE COAST GUARD APPROVED LIFE RAFT TO REPLACE "SURVIVA" 12 MAN LIFERAFT.
Condition: Unknown
Due 18 June 1997
Resolved 18 June 1997
Engineering
Issued 18 June 1997
Resolved
PROVE PROPER OPERATION OF OVERSPEED AND LOW LUBE OIL SHUTDOWNS ON THE 500KWGENERATOR ENGINE IN THE GENERATOR ROOM.
Condition: Unknown
Due 18 June 1997
Resolved 18 June 1997
Fire Fighting
Issued 3 April 1996
Resolved
PRIOR TO PLACING VESSEL IN SERVICE PLACE APPROVED HOSES, NOZZLES AND SPANNER WRENCHES AT ALL HOSE STATIONS.
Condition: Unknown
Due 4 April 1996
Resolved 25 April 1996
Accommodation/Occupational Safety
Issued 3 April 1996
Resolved
MAKE PERMANENT REPAIRS TO FRESH WATER SUPPLY PIPING WHERE FRACTURED AT FOOTVALVE.
Condition: Unknown
Due 4 April 1996
Resolved 8 April 1996
Construction/Loadline
Issued 3 April 1996
Resolved
RENEW ALL HULL MARKINGS AS NOTED BY ABS SURVEYOR ON LOAD LINE EXAM.
Condition: Unknown
Due 4 April 1996
Resolved 8 April 1996
Lifesaving
Issued 3 April 1996
Resolved
PRIOR TO OPERATION WITH MORE THAN 12 PERSONS ON BOARD PROVIDE AN ADDITIONAL12 SOLAS APPROVED ADULT PFD'S.
Condition: Unknown
Due 3 May 1996
Resolved 25 April 1996
Lifesaving
Issued 3 April 1996
Resolved
PRIOR TO PLACING VESSEL IN OPERATION PROVIDE APPROVED HYDRO RELEASE AND WEAK LINK FOR FORWARD 12 MAN LIFERAFT.
Condition: Unknown
Due 8 April 1996
Resolved 8 April 1996
Electrical
Issued 3 April 1996
Resolved
REPAIR AND PROVE PROPER OPERATION OF EMERGENCY LIGHTING.
Condition: Unknown
Due 3 April 1996
Resolved 3 April 1996
Fire Fighting
Issued 3 April 1996
Resolved
PRIOR TO PLACING VESSEL IN OPERATION REPLACE PORTABLE EXTINGUISHER ON STATION THROUGHOUT VESSEL WHERE MISSING.
Condition: Unknown
Due 4 April 1996
Resolved 8 April 1996
Lifesaving
Issued 3 April 1996
Resolved
PRIOR TO PLACING VESSEL IN OPERATION RENEW RING BUOYS WHERE WASTED OR [name withheld] LIGHTS FOUND INOPERATIVE.
Condition: Unknown
Due 4 April 1996
Resolved 8 April 1996
Engineering
Issued 3 April 1996
Resolved
PRIOR TO PLACING VESSEL IN OPERATION PROVE PROPER OPERATION OF EMERGENCY FUEL SHUT OFF(S)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 April 1996
Resolved 8 April 1996
Documentation
Issued 23 June 1995
Resolved
PROVIDE COPY OF SHIPBOARD OIL POLLUTION EMERGENCY PLAN AND U.S. COAST GUARDAPPROVAL LETTER WHEN RECEIVED FROM COMMANDANT (G-MEP).
Condition: Unknown
Due 23 June 1995
Resolved 23 June 1995
Documentation
Issued 23 June 1995
Resolved
SUBMIT FOR APPROVAL THE REQUIRED SHIPBOARD OIL POLLUTION EMERGENCY PLAN TO COMMANDANT (G-MEP-6) AND SUBMIT INFORMATION COPY TO OCMI BOSTON, MASSACHUSETTS.
Condition: Unknown
Due 10 July 1995
Resolved 18 July 1995
Lifesaving
Issued 23 June 1995
Resolved
STENCIL VESSEL NAME ON PFD'S AND IMMERSION SUITS.
Condition: Unknown
Due 23 June 1995
Resolved 27 July 1995
Engineering
Issued 23 June 1995
Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR OVERSPEED.
Condition: Unknown
Due 23 June 1995
Resolved 27 July 1995
Electrical
Issued 23 June 1995
Resolved
INSTALL RUBBER MATS IN FRONT OF FORWARD AND AFT SWITCHBOARDS.
Condition: Unknown
Due 23 June 1995
Resolved 27 July 1995
Fire Fighting
Issued 20 April 1993
Resolved
PROVIDE AN APPROVED PLAN SHOWING THE FIRE MAIN AND HOSE STATIONS. IF PLAN SHOWS THREE STATIONS, PROVIDE AN ACCEPTABLE HOSE AND NOZZLE AT THE THIRD STATION AND CONDUCT A HYDROSTATIC TEST OF THE NEW HOSE.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Fire Fighting
Issued 20 April 1993
Resolved
PROVIDE PROPER SPANNER WRENCHES AT ALL FIRE STATIONS.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Engineering
Issued 20 April 1993
Resolved
PROVE OPERATION OF THE REMOTE SHUTDOWN FOR THE FUEL OIL CENTRIFUGE.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Deck/Cargo
Issued 20 April 1993
Resolved
PROVIDE DOCUMENTATION OF QUADRENNIAL/ANNUAL CARGO GEAR (CRANE) INSPECTION.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Fire Fighting
Issued 20 April 1993
Resolved
REMOVE OR PROVIDE APPROVED PLANS AND PROVE OPERATION OF THE FIRE DETECTION AND ALARM SYSTEM LOCATED IN THE AFT GENERATOR ROOM.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Electrical
Issued 20 April 1993
Resolved
PROVIDE APPROVED PLANS FOR INSTALLATION OF WINCH ENGINE ALARM SYSTEMS.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Electrical
Issued 20 April 1993
Resolved
REMOVE OR PROVIDE APPROVED PLANS AND PROPERLY INSTALL WIRING FOR HEATERS INSTALLED THROUGHOUT THE VESSEL. WIRING MUST BE PROPERLY SUPPORTED USING METAL CABLE SUPPORTS AS SPECIFIED IN IEEE STANDARD 45, SECTION 20.5.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Electrical
Issued 20 April 1993
Resolved
PROVE OPERATION OF ALL ALARMS AND TRIPS (REQUIRED BY 46 CFR 111.12 AND SECTIONS 34 AND 35 OF ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS) FOR THE PRIME MOVER DRIVING THE TWO 320KW AND THE 600KW GENERATORS LOCATED IN THE CRANE HOUSE.
Condition: Unknown
Due 20 April 1993
Resolved 20 April 1993
Fire Fighting
Issued 23 April 1992
Resolved
PROVIDE TWO PROPER FIRE HOSES. DEMONSTRATE PROPER OPERATION OF FIRE HOSES TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINE INSPECTOR. UNTIL THIS REQUIREMENT IS ACCOMPLISHED NO CONSTRUCTION OPERATIONS ARE PERMITTED.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Documentation
Issued 23 April 1992
Resolved
POST NEW STABILITY LETTER FOR VESSEL SHOWING THE TWO REQUIRED LOAD_x001C_ LINES IN ACCORDANCE WITH USCG MARINE SAFETY OFFICE SAN FRANCISCO BAY LETTER16711/BETTY L DATED 14 FEBRUARY 1992.
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Lifesaving
Issued 18 April 1991
Resolved
SERVICE LIFERAFTS.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Engineering
Issued 18 April 1991
Resolved
PROVIDE HANDLE FOR AFT PORT SIDE MAIN DECK GENERATOR FUEL OIL SUPPLY SHUT OFF VALVE.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Engineering
Issued 18 April 1991
Resolved
MARK FUEL SHUT OFF VAVLES (AFT, CRANE HOUSE & BOW).
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Documentation
Issued 18 April 1991
Resolved
RENEW RADIO STATION LICENSE.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Documentation
Issued 18 April 1991
Resolved
RENEW CERTIFICATE OF FINANCIAL RESPONSIBILITY FOR WATER POLLUTION PRIOR TO 22 JUNE 1991.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Lifesaving
Issued 18 April 1991
Resolved
PLACE RETROREFLECTIVE MATERIAL ON LIFERINGS BY 01 JULY 1991.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Electrical
Issued 18 April 1991
Resolved
INSTALL AN EXPLOSIVE PROOF ELECTRICAL RECEPTACLE IN GENERATOR ROOM ABOVE BATTERY.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Navigation
Issued 18 April 1991
Resolved
SHOW PROPER OPERATION OF PORT RUNNING LIGHT.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Accommodation/Occupational Safety
Issued 18 April 1991
Resolved
RENEW TREATMENT SUPPLY FOR MSD. THIS ITEM TO BE COMPLETED PRIOR TO USING MSD.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Navigation
Issued 18 April 1991
Resolved
PROVIDE A 0-200 LB GAUGE FOR CRANE HOUSE AIR RECEIVER.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Engineering
Issued 18 April 1991
Resolved
INSTALL A SHUT OFF VALVE THAT CAN BE OPERATED FROM OUTSIDE THE BOW GENERATOR ROOM COMPARTMENT (REACH ROD).
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Fire Fighting
Issued 18 April 1991
Resolved
HAVE PORTABLE CO2 BOTTLES WITH HYDRO-TEST DATES OF OVER 5 YEARS RETESTED (HYDROED) OR REMOVED FROM THE VESSEL.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Accommodation/Occupational Safety
Issued 18 April 1991
Resolved
MEET MARPOL V REQUIREMENTS.
Condition: Unknown
Due 18 April 1991
Resolved 18 April 1991
Construction/Loadline
Issued 18 July 1989
Resolved
RETURN BARGE TO AS BUILT/INSPECTED CONDITION PRIOR TO USE IN INSPECTED SERVICE OR SUBMIT DRAWINGS TO U.S.C.G. MARINE SAFETY CENTER FOR APPROVAL PRIOR TO RETURN TO SERVICE
Condition: Unknown
Due 18 July 1989
Resolved 18 July 1989
Engineering
Issued 21 March 1989
Resolved
LABLE FUEL SHUT-OFF VALVE TO DAY TANK.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Accommodation/Occupational Safety
Issued 21 March 1989
Resolved
REPAIR OR REPLACE RELIEF VALVE TO AIR RECEIVER A60696 AND ENSURE IT RELEASES AT OR BLEOW THE MAWP (150PSI).
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Engineering
Issued 21 March 1989
Resolved
MOUNT CLOSING WRENCH TO DEAY TANNK FUEL SHUT-OFF VALVE ADJACENT TO VALVE.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Lifesaving
Issued 21 March 1989
Resolved
SERVICE TWO SIX-PERSON LIFE RAFTS ONBOARD USING A USCG APPROVED SERVICE FACILITY.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Electrical
Issued 21 March 1989
Resolved
PROVE OPERATION OF LOW LUBE OIL ALARM AND SHUT-DOWN, HIGH JACKET WATER TEMPALARM ASND OVERSPEED TRIP ON 600KW DIESEL GENERATOR.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Engineering
Issued 21 March 1989
Resolved
REPLACE FLAME SCREEN ON MAIN FORWARD FUEL TANK VENT.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Deck/Cargo
Issued 24 March 1988
Resolved
CLEAN FLAME SCREEN MAIN DECK STBD SIDE.
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988
Engineering
Issued 24 March 1988
Resolved
INSTALL GLASS ROD ON FUEL TANK SIGHT GLASSES BELOW CRANE, IN THE FWD HOUSE,AND ON THE MAIN DECK (PORT SIDE OF CRANE).
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988
Lifesaving
Issued 24 March 1988
Resolved
PROPERLY MOUNT RING BOUY LIGHTS FWD STBD AND PORT MIDSHIP.
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988
Electrical
Issued 24 March 1988
Resolved
REPAIR EXHAUST LEAK ON 50KW GENERATOR IN FWD HOUSE.
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988
Electrical
Issued 24 March 1988
Resolved
REPAIR EMERGENCY LIGHT ON CREW REC DECK BELOW CRANE.
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988
Documentation
Issued 24 March 1988
Resolved
PROVIDE OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988
Accommodation/Occupational Safety
Issued 29 August 1986
Resolved
REPAIR BROKEN RAIL LOCATED MIDSHIPS PORT SIDE.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Construction/Loadline
Issued 29 August 1986
Resolved
LEGIBLY INSCRIBE LOAD LINE MARKS ON PORT SIDE.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Construction/Loadline
Issued 18 July 1986
Resolved
REPAIR NO. 18 DEEP WEB FRAME BETWEEN NO.6 TO 8 SIDE LONGS FROM TOP IN #3 PORT TANK.
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Construction/Loadline
Issued 18 July 1986
Resolved
REPAIR IN NO. 6 PORT TANK NO, 3,4,AND 5TH SIE LONG BETWEEN FRAMES 32 AND 33
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Construction/Loadline
Issued 18 July 1986
Resolved
REPAIR IN NO. 6 PORT TANK NO. 4,5,6,7, AND 8 SIDE LONG BETWEEN FRAMES 33 AND 34.
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Construction/Loadline
Issued 18 July 1986
Resolved
REPAIR NO. 2 AND 3 SIDE LONG BETWEEN FRAMES 2 AND 3 STBD FWD RAKE.
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Construction/Loadline
Issued 18 July 1986
Resolved
NO.2 STBD TANK REPAIR NO. 4,5,AND 6 SIDE LONG BETWEEN FRAMES 10 AND 11.
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Construction/Loadline
Issued 18 July 1986
Resolved
TANK NO.6 STBD REPAIR NO.4 SIDE LONG BETWEEN FRAMES 33 AND 34, ALSO REPAIR NO.6 SIDE SHELL LONG BETWEEN FRAMES 34 AND 35.
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Construction/Loadline
Issued 18 July 1986
Resolved
REPAIR IN #6 PORT TANK NO.33 DEEP WEB FRAME BETWEEN NO.3 TO 5 SIDE LONGS.
Condition: Unknown
Due 18 July 1986
Resolved 18 July 1986
Lifesaving
Issued 13 February 1986
Resolved
1. REPOSITION AFT LIFERAFT TO ALLOW LAUNCHING BY HAND.
Condition: Unknown
Due 13 February 1986
Resolved 13 February 1986
Lifesaving
Issued 13 February 1986
Resolved
2. SERVICE AFT LIFERAFT.
Condition: Unknown
Due 13 February 1986
Resolved 13 February 1986
Electrical
Issued 13 February 1986
Resolved
3. PROVE OPERATION OF OVERSPEED TRIP FOR 500KW GENERATOR.
Condition: Unknown
Due 13 February 1986
Resolved 13 February 1986
Lifesaving
Issued 13 February 1986
Resolved
4.REPLACE STARBOARD BOW LIFERING, PORT MIDSHIP LIFERING; AND LINE TO PORT AFT LIFERING.
Condition: Unknown
Due 13 February 1986
Resolved 13 February 1986
Deck/Cargo
Issued 13 February 1986
Resolved
5. TEST OIL TRANSFER HOSE TO 1.5 TIMES MAXIMUM ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 13 February 1986
Resolved 13 February 1986
Navigation
Issued 6 March 1985
Resolved
REMOVE OR RELOCATE ALTERNATE STERNLIGHT SO AS TO HAVE NO OBSTRUCTION.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Unknown
Issued 6 March 1985
Resolved
INSTALL 30X30 MESH FLAME SCREEN IN WASTE OIL TANK VENT FORWARD.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Unknown
Issued 6 March 1985
Resolved
PROVIDE CONTAINMENT FOR ENGINE LUBE OIL TANK ON TOP OF CRANE HOUSE.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985