Records from 1988 to 2026. Most recent: inspection, 23 July 2026.
Inspection history · 262
23 July 2026
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8445527
29 May 2026
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8383515
27 May 2026
Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8382066
14 May 2026
Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8369083
13 May 2026
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8372211
28 February 2026
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8318541
18 February 2026
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8312260
13 January 2026
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8295463
20 November 2025
COI Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8264420
3 September 2025
Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8226290
24 August 2025
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8217661
24 August 2025
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8229555
24 July 2025
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8194251
23 July 2025
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8196413
24 June 2025
Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8166295
24 June 2025
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8186633
22 May 2025
Deficiency Check · Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8140959
3 May 2025
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8128726
3 May 2025
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8129568
13 February 2025
Deficiency Check · Damage Survey · Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8079266
15 December 2024
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8047669
4 December 2024
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8043410
19 November 2024
COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8036515
8 July 2024
Examination of Repairs · Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7952975
4 April 2024
Administrative Inspection
Administrative · USCG East District (dp) · USCG East District (CGD-E) · Activity 7889995
1 April 2024
Internal Structural Exam · Drydock Extension
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7886851
1 April 2024
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7886856
16 November 2023
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7821822
10 August 2023
Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7764563
11 July 2023
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7739817
24 June 2023
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7722516
24 June 2023
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7825153
15 June 2023
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7718661
15 June 2023
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7822261
10 May 2023
Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7685132
1 May 2023
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7678511
2 April 2023
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7661154
16 March 2023
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7651763
14 March 2023
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7650585
16 February 2023
Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7637336
6 December 2022
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7604961
6 December 2022
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7814184
17 November 2022
COI Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7590351
7 November 2022
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7590470
4 November 2022
In-Service Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7590032
13 September 2022
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7557880
30 August 2022
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7546847
18 August 2022
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7536974
22 July 2022
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7513407
20 July 2022
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7511931
13 July 2022
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7505468
19 May 2022
Special
Type not classified · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7454634
19 May 2022
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7459151
18 May 2022
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7448971
16 May 2022
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7452181
14 April 2022
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7431561
17 February 2022
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7395836
1 December 2021
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7373456
29 November 2021
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7358769
26 November 2021
Special
Type not classified · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7358341
19 November 2021
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7348680
7 April 2021
Hull Examination · Special · Internal Structural Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7180100
7 December 2020
MTSA Verification · Deficiency Check · Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7107794
31 October 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7100445
23 October 2020
Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7083062
23 October 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7090066
17 September 2020
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7025492
21 July 2020
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7011898
11 June 2020
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6956683
8 June 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6979873
19 April 2020
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6940957
17 April 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6942225
12 March 2020
MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6899795
12 March 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6934191
24 February 2020
Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6917598
20 February 2020
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6912408
18 February 2020
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6910980
17 February 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6919410
18 December 2019
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6836320
27 November 2019
Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6866263
24 November 2019
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6893140
15 November 2019
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6856416
19 September 2019
Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6741499
18 June 2019
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6656611
26 April 2019
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6670929
21 April 2019
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6670328
17 January 2019
MTSA Verification · Periodic Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6566418
7 January 2019
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6606745
18 October 2018
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6512559
26 September 2018
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6568641
25 September 2018
Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6550589
19 July 2018
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6449593
10 April 2018
MTSA Verification · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6384147
20 February 2018
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6357725
7 November 2017
Examination of Repairs · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6314825
30 August 2017
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6206896
22 May 2017
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6117090
23 January 2017
COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6075499
7 December 2016
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6030935
27 October 2016
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6032501
22 October 2016
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6029871
20 October 2016
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6067199
24 August 2016
Re-Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5954612
18 May 2016
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5851387
17 February 2016
MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5816765
29 October 2015
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5761326
1 September 2015
Internal Structural Exam · Hull Examination · Spot Check · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5232418
9 August 2014
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4975580
3 June 2014
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4878395
16 May 2014
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 4862475
1 May 2014
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4848385
26 January 2012
Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4231974
6 December 2011
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4202489
18 July 2011
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 4087307
5 July 2011
Periodic Inspection · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4069969
21 February 2011
MTSA Verification · Periodic Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3954792
2 February 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3938262
20 January 2011
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3929816
1 November 2010
Periodic Inspection · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3882272
4 September 2010
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3842270
24 March 2010
Examination of Repairs · Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3701401
18 February 2010
Drydock Extension
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3681514
21 January 2010
MTSA Verification · Periodic Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3658560
2 January 2010
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3669454
18 December 2009
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3653510
9 December 2009
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3648150
3 December 2009
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3644210
2 December 2009
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3643493
16 July 2009
Periodic Inspection · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3536344
14 May 2009
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3474658
13 May 2009
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3475522
10 May 2009
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3472019
16 April 2009
COI Inspection · MARPOL Annex IV Survey · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3453640
2 March 2009
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 3426528
29 January 2009
Periodic Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3400489
20 January 2009
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3396931
3 September 2008
DAPI Audit
Administrative · USCG East District (dp) · USCG East District (CGD-E) · Activity 3316891
24 April 2008
MTSA Verification · COI Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3186155
2 January 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3146316
20 November 2007
Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3105322
22 June 2007
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 2970154
4 June 2007
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 2952515
2 April 2007
MTSA Verification · Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2899909
20 February 2007
Drydock Extension
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 2874618
26 October 2006
Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2810385
24 October 2006
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 2812487
11 September 2006
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 2980813
27 June 2006
Examination of Repairs · Damage Survey
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2692949
3 May 2006
COI Inspection · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2638439
27 October 2005
Periodic Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2535151
10 May 2005
MTSA Verification · COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2353771
22 March 2005
Examination of Repairs
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2322840
17 February 2005
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2300435
19 November 2004
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2251496
6 October 2004
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2215612
5 April 2004
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2037591
8 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1961086
30 October 2003
Periodic Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1946838
8 April 2003
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1777451
10 December 2002
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1717165
20 May 2002
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1613526
2 April 2002
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1600396
27 September 2001
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1437956
26 June 2001
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1406963
5 April 2001
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1470308
19 January 2001
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1466739
23 October 2000
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1457841
10 October 2000
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1418777
30 September 2000
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 39065
13 August 2000
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 150923
20 July 2000
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1379136
29 May 2000
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 139510
13 April 2000
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1413699
3 February 2000
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1399273
4 November 1999
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1418620
4 August 1999
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1421736
3 May 1999
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1429130
5 March 1999
Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 788942
4 March 1999
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 80180
1 March 1999
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1473415
16 November 1998
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1430611
17 August 1998
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1421552
18 May 1998
COI Inspection · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1431965
5 May 1998
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 164080
27 March 1998
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 787836
15 May 1997
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 84240
30 April 1997
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1098516
31 January 1997
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1103673
25 November 1996
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 871688
9 September 1996
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1263144
30 May 1996
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1088442
29 May 1996
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 169909
29 May 1996
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1086282
6 May 1996
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1083112
29 February 1996
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 885371
6 February 1996
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 873128
29 January 1996
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 4152
29 January 1996
Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 883141
7 December 1995
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 877260
4 December 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 6781
4 December 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1187190
15 November 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 879089
14 November 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 120749
2 November 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 881866
1 November 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 882248
13 October 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 167811
30 September 1995
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 85205
24 September 1995
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 64669
11 September 1995
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1192001
13 July 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1188038
8 June 1995
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1185456
2 May 1995
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 59617
7 March 1995
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 864867
22 February 1995
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1427006
16 December 1994
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1151111
14 September 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 136794
13 September 1994
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1177570
15 June 1994
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1327900
12 May 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 55162
15 March 1994
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 854853
7 February 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 35853
7 December 1993
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1162860
20 September 1993
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 839994
23 August 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 660724
29 June 1993
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 846132
22 June 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 62071
10 May 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 660721
1 May 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 84789
28 March 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 44246
21 March 1993
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 18177
19 March 1993
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 42609
19 March 1993
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1146240
28 October 1992
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1243432
25 October 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 106460
19 September 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 46883
17 August 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 17607
12 August 1992
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1248086
26 June 1992
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1269553
19 May 1992
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1267984
14 May 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 90040
6 April 1992
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 948003
25 February 1992
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 959857
13 January 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 102154
21 November 1991
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1247064
5 November 1991
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 938455
22 October 1991
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 942690
20 September 1991
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1247862
22 May 1991
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1235683
26 January 1991
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 921808
20 December 1990
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 914952
31 May 1990
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 922286
12 January 1990
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 908545
4 January 1990
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1212959
7 November 1989
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1231819
27 October 1989
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 898951
8 August 1989
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1209928
11 July 1989
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1351217
30 June 1989
Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1207545
12 June 1989
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1033811
30 September 1988
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1044019
29 June 1988
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1338126
20 June 1988
Initial Certification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1209941
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 29 May 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. Vessel represnetative reported a pinhole leak was found on the discharge side of the fire main piping.
Crew shall conduct repairs and provide evidence of successful repair to the local USCG office.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 May 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 May 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
Following the report of a loss of control on starboard engine throttle, conduct inspection of starboard throttle and associated components. Report findings to attending Marine Inspector prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 May 2026
Resolved 27 May 2026
Resolution: Technician inspected thorttle and associate components, all sat.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 1 March 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness.
CG was notified stating the fire pump discharge piping failed during testing. Conduct repairs, test and conduct satisfactory sea trials to the satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 March 2026
Resolution: Replaced in kind with 150% MAWP tested and operationally tested piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 February 2026
Resolved
All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Bow thruster sensor had a major leak. Conduct repairs and test to the satisfaction of attending CG Marine Inspector prior to using the bow thruster engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2026
Resolved 12 March 2026
Resolution: Oil sensor replaced, all testing sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 February 2026
Resolved
All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Starboard SSDG was found with oil pan leaking even after tightening all the bolts. Conduct repairs and test to the satisfaction of attending CG
Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2026
Resolved 12 March 2026
Resolution: Base pan bolts tightened. Testing sat following 12 hour run, no leaks detected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 February 2026
No resolution recorded
All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Bow thruster output shaft is leaking oil. Conduct repairs at next drydock (NOV 2026) and test to the satisfaction of attending CG Marine Inspector
Action required: 705 - Other - as specified
Due 30 November 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 November 2025
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering) of this chapter. Starboard MDE was found with an air leak on the start air regulator. Make repairs and test to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2025
Resolved 11 December 2025
Resolution: New regulator installed, test sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2025
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness. Coast Guard was notified that the CARTERET lost propulsion on the STBD MDE while turning in the basin in Cedar Island Ferry Terminal. Must conduct repairs and test to the satisfaction of attending CG Marine Inspector prior to getting underway with cars/passengers.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 May 2025
Resolved
Vessel shall be regulated to standard of ABS rules for steel vessels in regards to main propulsion system. System was not capable of being used as designed with dual propulsion, repair and test to satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 3 May 2025
Resolved 3 May 2025
Resolution: Throttle control board was replaced, sea trials were conducted satisfactorily.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 February 2025
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the OCMI. Received report that while engaging the bow thruster, there is a loud bang and no thrust. Troubleshoot, make repairs and test to the satisfaction of attending CG Marine Inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 March 2025
Resolved 17 February 2025
Resolution: NCDOT crew conducted repairs. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 December 2024
Resolved
A survey shall be made every time a defect is discovered which affects the safety of the vessel. Currently the autopilot for steering system is inoperable.
The autopilot is to be isolated from the steering system gear
while the vessel is in operation until effective repairs are conducted and witnessed by the attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2025
Resolved 23 July 2025
Resolution: Autopilot system has been removed from the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 December 2024
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. Vessel captain reported the #2 steering pump went out while in auto pilot from Swan Quarter to Ocracoke.
Conduct repairs with as designed materials/equipment. Conduct sea trials with no passengers. Vessel is authorized a "dead head" transit to Cedar Island for repairs if needed. Notify marine inspector once repairs are completed and sea trails are satisfactorily.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 December 2024
Resolution: Completed satisfactory sea trials after control fuse and DCV were renewed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 November 2023
Resolved
The annual inspection is a prerequisite of the re-issuance of a certificate of inspection. Vessel's COI expiration date lapsed prior to annual inspection. Conduct inspection prior to carrying passengers.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 April 2024
Resolution: Completed annual inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 July 2023
Resolved
A survey either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting, or other equipment. The crew reported abnormal black smoke coming from the #2 SSDG. Determine cause of the excessive smoke, make proper repairs if needed, and report findings to the Coast Guard, prior to the carriage of passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 July 2023
Resolved 11 July 2023
Resolution: Received, reviewed, and accepted maintenance findings and masters attestation that the #2 SSDG was running as designed and operationally tested satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 June 2023
Resolved
A survey either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting, or other equipment. Crew reported a small fire was found and extinguished on the vessel bow thruster, during loading on this date at approximately 16:18. Lock out tag out and electrically isolate the bow thruster. Determine the extend of damage and make proper repairs. Ensure a record is made in the vessels official logbook advising the master/s of the inoperative equipment.
All findings and repairs are to be reported and carried out to the satisfaction of the attending Coast Guard inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 28 June 2023
Resolution: MI Attended vessel, maintenance department found cause of fire was shorted wire on knife edge. Crew was able to extinguish fire prior to any damage. Wiring harness was replaced bow thruster function sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 April 2023
Resolved
A survey either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting, or other equipment. During morning checks the crew discovered the vessel's port main diesel engine would not clutch in as designed.
Trouble shoot the port engines failure to clutch in as designed, make proper repairs, and provide the manufactures technicians report to the satisfaction of the Coast Guard. Including a satisfactory operational underway test prior to the carriage of passengers or cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2023
Resolved 2 April 2023
Resolution: Company satisfied all the requirements and condition of CG-835. See AN 7661154
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 March 2023
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. Vessel master made a report stating during morning checks the port MDE will not engage. Vessel is currently moored in Ocracoke and awaiting for Cedar Island maintenance dept to arrive via ferry.
NCDOT must provide repair report stating the cause and correction to the vessel. Vessel master will notify MSD Fort Macon as conditions change.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2023
Resolution: Vessel capt. notified DMI and stated the throttle output control sensor on the transmission switchboard went out. NCDOT maintenance dept. replaced sensor and crew tested at pier. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 December 2022
Resolved
A survey either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting, or other equipment. During morning checks the crew discovered the vessel's emergency diesel generator was not taking the ships electrical load as designed. Master reported the vessel had vibration during operations, a diver was scheduled, attended, and found approximately 8" bent blade tip and dings on the remaining blades and hub on the port propeller. Along with a 10' piece of line.
Carry out an damage survey on the hull and replace any damaged components to the satisfaction of the Coast Guard. Including a satisfactory steering verification prior to the carriage of passengers or cargo.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 December 2022
Resolved 16 February 2023
Resolution: Vessel had been placed in service for normal operations.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 4 November 2022
Resolved
A survey either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting, or other equipment. During fueling the crew discovered the vessel's starboard aft fuel fill stand pipe was cracked. The NCDot Ferry division took the vessel out of service to evaluate and have gas free for repairs. Proper repairs shall be to the satisfaction of the Coast Guard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 November 2022
Resolved 7 November 2022
Resolution: NCDOT welders repaired pin hole leak at the base of the fill pipe. Dye penetrant was applied to the new weld and pipe was subject to pressure test of 2.5 PSI. Test and Inspection SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 13 September 2022
Resolved
PASSENGER VESSELS OVER 500GT MUST CARRY ON EACH SIDE OF THE VESSEL AT LEAST ONE RESCUE BOAT. VSL HAS ONLY ONE RESCUE BOAT INSTALLED. VSL MUST PROVIDE SECOND RESUCE BOAT OR AN APPROVED EXEMPTION LETTER FROM THE OCMI. 46 CFR 199.202
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2022
Resolved 4 October 2022
Resolution: Recvd approved exemption ltr from PDH
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 18 August 2022
Resolved
Doors in bulkheads requiring to be class A-0 shall be of solid or hollow steel or equivalent metal construction capable of meeting the requirement of class A-0 bulkheads. The fire door between galley and berthing not properly closing.
Action required: 705 - Other - as specified
Due 25 August 2022
Resolved 19 August 2022
Resolution: NCDOT Maintenace Dept. repaired door and provided proof door is closing properly. All SAT.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 18 August 2022
Resolved
Nonmetallic flexable hose in vital systems must meet SAE J1942. The inlet fuel line between the strainer and pump on E-GEN does not meet the requirement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2022
Resolved 31 August 2022
Resolution: Received objective evidence from NCDOT maintenance supervisor that the F/O supply for the EDG has been replaced with an SAE-J1942 approved hose.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 August 2022
Resolved
All installations shall be of marine type engines suitable for intended service. The oil pressure guage for EDG and #1 SSDG are inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2022
Resolved 31 August 2022
Resolution: Received objective evidence from NCDOT maintenance supervisor that the F/O supply for the EDG has been replaced with an SAE-J1942 approved hose, and the L/O psi gauge for the EDG and #1 SSDG is operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 July 2022
Resolved
Operating generators must provide a continuous and uninterrupted source of power for the ship's service load under normal operational conditions. Vessel reported #1 generator is not producing current. Vessel must conduct satisfactorily sea trials under full operating load and provide proof generator systems are in proper working order to the satisfaction of the marine inspector before carrying passengers.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 July 2022
Resolution: Vessel repaired #1 SSDG. Faulty voltage regulator. Changed out part and tested system under load. All SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 July 2022
Resolved
Operating generators must provide a continuous and uninterrupted source of power for the ship's service load under normal operational conditions. Vessel reported #1 generator secured itself from over voltage. Vessel must conduct satisfactorily sea trials under full operating load and provide proof generator systems are in proper working order to the satisfaction of the marine inspector before carrying passengers.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 July 2022
Resolution: NCDOT maintenance repaired #1 SSDG. See Deficinecy Documents for details.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 July 2022
Resolved
A survey either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting, or other equipment. The crew reported an overheat on the #2 ships diesel generator, identified while conducting morning vessel checks in Ocracoke. Trouble shoot and make proper repairs to the satisfaction of the Coast Guard.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 13 July 2022
Resolved 13 July 2022
Resolution: Received, reviewed, and accepted objective evidence from maintenance and master the outstanding item was resolved. Defective thermostat and pump was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 May 2022
Resolved
Operator reported that the starboard main engine had an active fuel leak. Provide causal factors attributing to cause and corrective actions taken to rectify. Vessel must be cleared by a USCG marine inspector before returning to service. Vessel has been granted a onetime approval to dead head from Swan Quarter to Cedar Island for repairs iaw 46CFR71.40-1.
Action required: 705 - Other - as specified
Due 27 May 2022
Resolved 24 May 2022
Resolution: Received, reviewed, and accepted the objective evidence from NCDot maintenance and captains attestation satisfying the requirement. The OEM fuel lines and clamps were properly installed and tested satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 May 2022
Resolved
Master reported the crew discovered a ruptured fuel oil line on the port main engine while operating with passengers, in route from Swan Quarter to Ocracoke. Determine the cause and complete proper repairs to the satisfaction of the Coast Guard, prior to carriage of passengers or vehicles.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 May 2022
Resolved 17 May 2022
Resolution: Maintenance disassembled parts in the vicinity of the leak, they identified missing brackets which allowed lines to be damaged. Both fuel lines were replaced with new and both brackets properly installed as designed. The engine was operationally tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 April 2022
Resolved
A survey shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. The starboard main engine suffered a rupture on the cooling water expansion joint while underway with passengers on board. Make effective repairs and prove proper operation to the attending Marine Inspector. Prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 April 2022
Resolution: Cooling water expansion joint was renewed.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 17 February 2022
Resolved
Where ventilation is provided for spaces protected by a carbon dioxide extinguishing systems provisions shall be made for easily and effective closing off the ventilation. MI's noted fire damper inoperable during operational test.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 February 2022
Resolution: Fire dampers are now operable. Corrected on the spot issued 10C
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 17 February 2022
Resolved
It is the intent of this subpart to provide such markings as are necessary for the guidance of the persons on board in case of emergency. Markings are missing on the E/R supply ventilation dampers.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 17 February 2022
Resolution: Marking for fire damper was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 November 2021
Resolved
[name withheld] @ 1242 that vessel was experiencing shaft bearing over heat on stbd shaft. Vessel reduced RPMs to allow shaft to stay with in temp range until moored. Vessel is allowed to transit to Cedar Island for repairs/troubleshooting IAW 46CFR70.20-1.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 December 2021
Resolution: Received, reviewed and accepted corrective actions to the satisfaction of the CG. See AN 7373456 for details
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 19 November 2021
Resolved
Replace cargo net on stern of vessel in accordance with 46CFR72.40-5(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 December 2021
Resolved 23 November 2021
Resolution: Cargo net replaced, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 November 2021
Resolved
Jacket water pump has leaking pipe. Vessel authorized for 01 time transit for maintenance. Repair in accordance with 46CFR70.20-1
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 November 2021
Resolved 23 November 2021
Resolution: Jacket water pump replaced, all sat.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 19 November 2021
Resolved
PA system speaker is inoperable near EDG space. Repair in accordance with 46CFR78.17-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 December 2021
Resolved 17 March 2022
Resolution: PA system speeaker was verified by MI's during Re-inspection on 17Mar22. Actvity #7395836
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 November 2021
Resolved
Co2 firefighting systems for bow thruster and EDG spaces were not installed properly. Hoses were not tighted enough. Service in accordance with 46CFR76.15
Action required: 10 - Deficiency Rectified
Due 19 November 2021
Resolved 19 November 2021
Resolution: Hoses were tightened in with MI present.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 17 December 2020
Resolved
Replace portable ladder for rescue boat.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 December 2020
Resolved 29 December 2020
Resolution: Ladder was replaced with new.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 December 2020
Resolved
Rescue boat cradle release mechanism missing pin.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 17 December 2020
Resolution: Pins for the cradle mechanism were installed and the rescue boat is cradled correctly.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 December 2020
Resolved
Provide non skid for rescue boat cradle boarding ladder.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2020
Resolved 29 December 2020
Resolution: Non skid was installed.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 17 December 2020
Resolved
Provide attestation from the master for fire drill and man overboard drill.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 December 2020
Resolved 17 December 2020
Resolution: The vessel crew conducted fire drill and man overboard drill. Rcvd attestation from the vessel Master.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 December 2020
Resolved
Replace worn out damaged cleats IVO man overboard ladder.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2020
Resolved 29 December 2020
Resolution: The cleats were replaced with metal ones.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 17 December 2020
Resolved
Replace damaged tiles on the bridge port and starboard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2020
Resolved 31 December 2020
Resolution: Tiles were properly replaced.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 23 October 2020
Resolved
Make repairs to port/fwd bow underside tranverse frame and flat bar IVO striking area from reported marine casualty with M/V Sea Level this date. Repairs to be carried out at the next scheduled drydock (31Jan21). To the satisfaction of the attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2021
Resolved 5 October 2021
Resolution: 5 longitudinal brackets removed and installed. Visual and NDT inspections complete.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 October 2020
Resolved
INSTALL NEW ELECTRICAL WIRING, DUE TO UV DAMAGE/CRACKED.
UPPER AND LOWER MAST HEAD LIGHT WIRING
EMBARKATION LIGHT WIRING
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2020
Resolved 29 October 2020
Resolution: Installed new electrical wiring.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 October 2020
Resolved
REMARK ALL CHILD LIFEJACKETS WITH NAME OF VSL, FADED.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 1 October 2020
Resolution: CREW REMARKED CHILD LIFE JACKETS SAT.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 1 October 2020
Resolved
REMOVE ALL DOOR HOLD BACKS PRIOR TO CARRING PASSENGERS.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 1 October 2020
Resolution: HOLD BACKS REMOVED.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 1 October 2020
Resolved
WHILE CONDUCTING RESCUE BOAT DRILL IT WAS NOTED THAT, THE FOWARD CREW MEMBER COULD NOT ZIP THE LIFE VEST DUE TO IMPROPER DONNING AND SIZE OF VEST.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 1 October 2020
Resolution: CONDUCTED TRAINING WITH CREW FOR DONNING AND SIZING LIFEJACKETS.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 1 October 2020
Resolved
AUX SPACE FRESH WATER TANK WASTED, REPLACE WITH NEW.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 October 2020
Resolution: New tank installed.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 1 October 2020
Resolved
AUX SPACE HOT WATER TANK WASTED/ REPLACE WITH NEW.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2020
Resolved 23 October 2020
Resolution: Water tank heater was installed and properly installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 October 2020
Resolved
STBD MDE MARINE GEAR HOSE DAMAGED TO GAUGE. REPLACE WITH NEW.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2020
Resolved 14 October 2020
Resolution: Gauge hose was renewed and properly tested.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 October 2020
Resolved
PRIMARY FIRE PUMP WILL NOT ENTERGIZE, ELECTRICAL COOLING FAN REMOVED. FIRE PUMP TESTED SAT. MAKE PERMANENT REPAIRS AS PER APPROVED SYSTEM.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 October 2020
Resolved 8 October 2020
Resolution: M/I attended vessel verified proper installation and operation of the fire pump. The repairs were made to the satisfaction of the attending inspector.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 21 July 2020
Resolved
Determine the cause of the emergency diesel generator not operating as designed.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 July 2020
Resolved 21 July 2020
Resolution: The deficiency was satisfactory rectified. See narrative for details.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 11 June 2020
Resolved
The C/E DDE did not meet the manning requirements of the COI, CPREV provided 90 days to prove requirements.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 June 2020
Resolved 18 June 2020
Resolution: The OCMI by direction, rescinded the requirement until further final detemination can be made.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage of rescue boats
Issued 11 June 2020
Resolved
The rescue boat davit release arm was bent.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 18 June 2020
Resolved 18 June 2020
Resolution: Pictures provided and statement of proper operations provided by vessel REP.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 June 2020
Resolved
The port MDE overspeed was not operating as designed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 June 2020
Resolved 11 June 2020
Resolution: The overspeed solenoid was replaced and proved to operate as designed post repairs.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 June 2020
Resolved
The bow thruster CO2 bottle bracket was loose.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 11 June 2020
Resolved 11 June 2020
Resolution: Tighten by crew verified by attending inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 11 June 2020
Resolved
The aux space pilot valve hose to CO2 bottle was found loose.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 11 June 2020
Resolved 11 June 2020
Resolution: Tighten by crew verified by attending inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 June 2020
Resolved
09 five gallon buckets of oil was noted in the aux space, not in an approved container or tank.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 July 2020
Resolved 18 June 2020
Resolution: Buckets removed until flame locker or other means provided.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 11 June 2020
Resolved
The port MDE inboard turbo line gasker was noted as starting to leak.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 June 2020
Resolved 11 June 2020
Resolution: Gasket was replaced by crew and tested satisfactory.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 June 2020
Resolved
The port SSDG oil pan gasket is leaking.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 June 2020
Resolved 18 June 2020
Resolution: Tightened bolts, as per report from vsl REP
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 March 2020
Resolved
Bow thruster CO2 pressure switch missing screw causing cover to be open.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received objective evidence of SAT. repairs iwo photo, new screw installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 March 2020
Resolved
10 gallons of flammable liquid stored in engine room, 10 one gallon tea jugs filled with lube oil found in engine room improperly stored.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received objective evidence of SAT. repairs iwo photo, new oil was poored into holding tank as designed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 12 March 2020
Resolved
Fr34 e-escape hatch leaking water. New gsk installed and adjusted. determine if deck is warped.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received objective evidence of SAT. repairs iwo e-mailed statement
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 12 March 2020
Resolved
Port side bow thruster room ventilation leaking water through ducking. Determine cause and submit a repair plan.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received objective evidence of SAT. repairs iwo photo
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 March 2020
Resolved
Aft fire station hose leaking at coupling to fire main.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received objective evidence of SAT. repairs iwo e-mailed statement
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 12 March 2020
Resolved
Following COI CAPT called MI to report wasted oil fill pipe stbd stern of vsl that discharged oil into the water when filling oil tank. CAPT was informed to notify NRC and to determine condition of wasted pipe and to submit a repair plan.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2021
Resolution: Wasted pipe cropped and renewed. New pipe visual inspection and NDT complete.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 December 2019
Resolved
The CO2 hose reel pilot valve was found loose.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 18 December 2019
Resolved 18 December 2019
Resolution: To the satisfaction of the attending inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 December 2019
Resolved
The bow thruster CO2 bottle bracket was loose.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 18 December 2019
Resolved 18 December 2019
Resolution: To the satisfaction of the attending inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 December 2019
Resolved
The steering motor controller box door had loose securing hardware.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 18 December 2019
Resolution: To the satisfaction of the attending inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 September 2019
Resolved
Sanitation r/w piping in aux space leaking near sea chest.
Action required: 705 - Other - as specified
Due 26 September 2019
Resolved 25 September 2019
Resolution: Objective evidence provided
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 September 2019
Resolved
Engine room CO2 hose reel cracked hose.As ID'd Jun 2019
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2019
Resolved 15 November 2019
Resolution: Objective evidence provided, cleared.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 June 2019
Resolved
Bow thruster fixed CO2 piping system was found disconnected.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2019
Resolved 18 June 2019
Resolution: Crew installed the disconnected piping and verified installation of all others onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 18 June 2019
Resolved
Rescue boat craddle pin retaining clip was wasted and fell off during testing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2019
Resolved 18 June 2019
Resolution: Crew inspected all pins and installed new clip and washer. Tested and verified installed correctly.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 18 June 2019
Resolved
Loose gear was unstowed in the crew quarters.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 June 2019
Resolved 19 September 2019
Resolution: Gear stowed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 18 June 2019
Resolved
Forward main deck latch was loose and door not adjusted properly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 19 September 2019
Resolution: Added to new CG 835 dated 19Sept2019
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 18 June 2019
Resolved
#1 main deck fire hose nozzle is not operating as designed. (Nozzle is leaking)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 June 2019
Resolved 19 September 2019
Resolution: Tested SAT
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 18 June 2019
Resolved
Chiller (A/C) #1 and #2 are not working as designed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 June 2019
Resolved 19 September 2019
Resolution: TESTED SAT
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 June 2019
Resolved
#1 SSDG air filter to turbo hose elbow is cracked and damaged.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 3 July 2019
Resolution: Recieved, reviewed, and accepted confirmation the condition was satisfactory completed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 June 2019
Resolved
The semi-portable CO2 hose reel hose is damaged (cracked)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2019
Resolved 19 September 2019
Resolution: ADDED TO CG 835 date 19 SEPT 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 June 2019
Resolved
The engineers control room has conflicting breaker rating (breaker is higer than max labeled rating)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2019
Resolved 19 September 2019
Resolution: Checked with no issues
19 SPT 19.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 June 2019
Resolved
The engine room switch board has conflicting breaker rating (breaker is higer than max labeled rating)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2019
Resolved 19 September 2019
Resolution: Checked with no issues
19 SPT 19.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 June 2019
Resolved
The bow thruster prime mover is missing lagging.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 20 July 2019
Resolved 19 September 2019
Resolution: INSTALLED
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 June 2019
Resolved
The emergency diesel generator rooms fixed CO2 system piping was found loose at the bottle connection.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2019
Resolved 18 June 2019
Resolution: Crew tighten the fitting and verified all others on fixed system.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 18 June 2019
Resolved
The emergency diesel generator battery trays had excessive battery acid collecting in the bottoms.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 June 2019
Resolved 19 September 2019
Resolution: CLEANED
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 June 2019
Resolved
The emergency switchboard has conflicting breaker rating (breaker is higer than max labeled rating)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2019
Resolved 19 September 2019
Resolution: Checked with no issues
19 SPT 19.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 June 2019
Resolved
The port bow vehicle deck in vicinity of the loading ramp is wasted and holed. Determine extent and provide plan to address.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2019
Resolved 19 September 2019
Resolution: ADDED to dry-dock package
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 18 June 2019
Resolved
The engine room bilge strainer was partially covered by oil absorbant rags blocking the strainer from operating as designed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2019
Resolved 18 June 2019
Resolution: Crew removed all absorbant rags in the bilge area around the strainer and verified all others were clear.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 June 2019
Resolved
#1 and #2 MDE's air filter hose to turbos are cracked and damaged.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 3 July 2019
Resolution: Recieved, reviewed, and accepted confirmation the condition was satisfactory completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 June 2019
Resolved
#1 SSDG high pressure fuel oil lines bracket was loose and missing securing hardware.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2019
Resolved 18 June 2019
Resolution: Crew installed bolt in the bracket and secured the HP F/O lines. Verified all others on board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 June 2019
Resolved
Starboard MDE exhaust bracket was unlagged. (read over 400)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 3 July 2019
Resolution: Recieved, reviewed, and accepted confirmation the condition was satisfactory completed.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 18 June 2019
Resolved
The chiller lines in MSD space and throughout vessel was missing lagging. Causing overloading of A/C compressors and condensation throughout vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 July 2019
Resolved 19 September 2019
Resolution: Checked with no issues
19 SPT 19.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 June 2019
Resolved
Engine room stair well light lens is damaged (cracked)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 3 July 2019
Resolution: Recieved, reviewed, and accepted confirmation the condition was satisfactory completed.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 1 April 2019
Resolved
Both air receivers were inspected and found corroded beyond the acceptable limits.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 May 2019
Resolved 9 May 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 March 2019
Resolved
Replace turbo hose and clean oil mist on the #1 SSDG.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 March 2019
Resolved 1 April 2019
Resolution: Attending inspector verified the condition was corrected satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 March 2019
Resolved
The #1 and #2 SSDG's have loose high pressure fuel oil pipping.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 March 2019
Resolved 1 April 2019
Resolution: Attending inspector verified the condition was corrected satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 March 2019
Resolved
The #1 MDE has an exhaust leak near the outboard side of turbo.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 March 2019
Resolved 1 April 2019
Resolution: Attending inspector verified the condition was corrected satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 March 2019
Resolved
The #1 MDE aft turbo exhaust lagging is missing and other parts not installed properly.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 March 2019
Resolved 1 April 2019
Resolution: Attending inspector verified the condition was corrected satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 March 2019
Resolved
The #2 MDE (air) supply hose is damaged.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 March 2019
Resolved 1 April 2019
Resolution: Attending inspector verified the condition was corrected satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 27 March 2019
Resolved
The keel coolers have pet cocks installed that are not authorized.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 March 2019
Resolved 15 November 2019
Resolution: MIs to verify at next inspection 12/18/2019
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 October 2018
Resolved
Vessels emergency fire pump was not able to obtain proper presure as designed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 October 2018
Resolved 15 November 2019
Resolution: Verified at prevous inspection all SAT
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 18 October 2018
Resolved
Main egress hatch from engine room was not watertight and had loose dogging hardware.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2018
Resolved 15 November 2019
Resolution: Provided objective evidence.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 October 2018
Resolved
Fwd fire hose nozzle was not working properly.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 October 2018
Resolved 18 October 2018
Resolution: Changed out with new nozzle.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 October 2018
Resolved
Vessel sea chest vent (firemain) piping has a pin hole leak in #2 void space.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2018
Resolved 15 November 2019
Resolution: MIs verified during prevous inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 September 2018
Resolved
A fitting on the port MDE's engine mounted primary fuel filter failed causing a fuel leak; this is the second failure of the housing in two weeks. Replace the fuel filter housing.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 September 2018
Resolution: Replaced defective components; operational test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 19 July 2018
Resolved
Renew frayed rescue boat cable. Cable is due for the 4 year renewal
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 July 2018
Resolved 25 July 2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 19 July 2018
Resolved
Renew broken detached vent plug STBD mid void.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 July 2018
Resolved 25 July 2018
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 27 October 2016
Resolved
Starboard propeller damaged, struck submerged object. Repair to satisfaction of attending marine inspector.
Action required: 705 - Other - as specified
Due 31 October 2016
Resolved 28 October 2016
Resolution: Starboard propeller replaced with spare.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Valve
Issued 22 October 2016
Resolved
Gate valve stuck closed causing engine to over heat. Gate came off of stem.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2016
Resolved 22 October 2016
Resolution: Removed gate valve and repaired. All SAT.
Engineering › Fuel Oil Service System › Piping
Issued 20 October 2016
Resolved
The Fuel supply line between the primary and secondary fuel filters sustained a crack at the fitting connected to the filter.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 October 2016
Resolved 21 October 2016
Resolution: Fuel Supply line was replaced in kind and tested satisfactory.
Construction/Loadline › Structures › Scuttle
Issued 3 June 2014
Resolved
Renew emergency escape hatch/scuttle IWO E/R (main deck).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2015
Resolved 29 February 2016
Resolution: Received notification from DD-Nags Head that outstanding deficiency was cleared during vessels dry-dock.
Engineering › Bilge Water Management System › Piping
Issued 3 June 2014
Resolved
Properly label location of the bilge pump prime valve above deck plate.
Action required: 705 - Other - as specified
Due 20 August 2014
Resolved 7 August 2015
Construction/Loadline › Structures › Door
Issued 3 June 2014
Resolved
Renew bent door and frame at the next scheduled DD.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 September 2015
Resolved 29 February 2016
Resolution: Recieved notification from DD-Nags Head that outstanding deficiency was cleared during vessels dry-dock.
Engineering › Bilge Water Management System › Piping
Issued 1 May 2014
Resolved
C&R wasted section of bilge discharge piping IWO port E/R.
Action required: 705 - Other - as specified
Due 2 May 2014
Resolved 2 May 2014
Engineering › Sea-water System (primary cooling) › Piping
Issued 1 May 2014
Resolved
C&R wasted/holed section of A/C R/W suction piping.
Action required: 15 - Rectify deficiencies by next port
Due 2 May 2014
Resolved 2 May 2014
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 8 February 2012
Resolved
Renew resilient mounts IWO Generator control boxes.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 March 2012
Resolved 31 October 2012
Resolution: Attending inspectors verified condition of resilient mounts for SSDG control boxes.
Electrical › Electric Generation Source (service) › Panelboard
Issued 8 February 2012
Resolved
Renew Hertz Meter IWO #2 SSDG
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 March 2012
Resolved 31 October 2012
Resolution: Attending inspectors verified condition/operation of Hertz meter IWO #2 SSDG.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 8 February 2012
Resolved
Renew #2 fire extinguisher bracket IWO bridge deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 February 2012
Resolved 20 July 2012
Communications › Internal Communications System › Sound-powered Telephone
Issued 8 February 2012
Resolved
Repair Aft Sound Powered Phone.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 February 2012
Resolved 20 July 2012
Lifesaving › Launching Appliances › Winch
Issued 8 February 2012
Resolved
Adjust Davit cable limit switch, Limit switch stops rescue boat to low to be stowed in the cradle.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2012
Resolved 13 July 2012
Construction/Loadline › Hull › Hull Plating
Issued 24 March 2010
Resolved
Port Aft above keel coolers guard is area of concern, pitted, clean do UT Shots
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Area wsa cleaned and UT Shots done, Sat.
Construction/Loadline › Hull › Weld
Issued 24 March 2010
Resolved
Clean and inspect Port Main Engine exhaust doubler.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Port Main Engine Exhaust doubler cleaned and inspected.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 24 March 2010
Resolved
Blast entire top of Port Sea Chest inspect and do UT shots. Pad Welds authorized for problem areas.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Pad welds completed on problem areas.
Construction/Loadline › Structures › Ventilators
Issued 24 March 2010
Resolved
Replace all broken bolts on Port Fwd vent cover in bottom of overhang.
Action required: 705 - Other - as specified
Resolved 24 March 2010
Resolution: All broken bolts were replaced.
Construction/Loadline › Hull › Side Shell
Issued 24 March 2010
Resolved
Clean and inspect ding Port Fwd side shell.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Area cleaned and inspected, sat.
Construction/Loadline › Hull › Side Shell
Issued 24 March 2010
Resolved
Mechanically clean and inspect dent Stbd side Fwd Aft of Bow Thruster.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Area cleaned and inspected, sat.
Construction/Loadline › Structures › Trunk
Issued 24 March 2010
Resolved
Clean and inspect Stbd Aft vent trunk.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Starboard Aft vent trunk cleaned and inspected, sat.
Construction/Loadline › Structures › Ventilators
Issued 24 March 2010
Resolved
Replace doubler on Stbd Main Exhaust.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Starboard Main Exhaust doubler was replaced.
Engineering › Steering Gear System › Rudder Bearing
Issued 24 March 2010
Resolved
Remove and replace both Port and Stbd Rudder Bearing.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Both Port and Starboard Rudder Bearings replaced.
Construction/Loadline › Hull › Weld
Issued 24 March 2010
Resolved
Missing weld on overhead above vent trunk.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Weld redone on overhead above vent trunk.
Construction/Loadline › Hull › Hull Plating
Issued 24 March 2010
Resolved
Pressure wash Center Line Vertical Keel outboard both Port and Stbd.
Action required: 705 - Other - as specified
Resolved 27 April 2010
Resolution: Area was pressure washed, sat.
Stability › Watertight Integrity › General
Issued 18 February 2010
Resolved
Make permanent repairs to ventilation system to the Bow Thruster comaprtment for both Forward and Aft ventilation trunks.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 30 April 2010
Resolution: Repairs were made to the ventilation system to the Bow Thruster Compartment for both Forward and Aft Ventilation Trunks
Stability › Watertight Integrity › General
Issued 18 February 2010
Resolved
Make repairs to the Bow Thruster sea chest vent line in Void #3.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 30 April 2010
Resolution: Repairs were made to Bow Thruster sea chest vent line in Void #3.
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2010
Resolved
Mechanically clean, UT and repair all identified areas from ISE completed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 30 April 2010
Resolution: Area was cleaned and UT shots were done, any problem areas were repaired.
Construction/Loadline › Hull › Weld
Issued 18 February 2010
Resolved
Mechanically clean and repair all weld seams as identified during ISE completed on 18 Feb 2010.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 18 February 2010
Resolution: Area was cleaned and repairs were made to all weld seams.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 18 February 2010
Resolved
Make repairs to tanks iaw Manufacture’s recommendations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 30 April 2010
Resolution: Repairs were completed on the tanks.
Stability › Watertight Integrity › General
Issued 18 February 2010
Resolved
Properly seal all wiring passing through Watertight bulkheads utilizing the Rox-Blox.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 30 April 2010
Resolution: All wiring was properly sealed.
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2010
Resolved
Make Engine room and MSD compartment bilge plating and associated framing and structure accessible for inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 February 2010
Resolved 24 March 2010
Resolution: All deck plating in Engine Room and MSD compartment were pulled up.
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 December 2009
Resolved
Renew wasted section of 2" shaft cooling piping due to wastage and hole. Piping is in way of 10" crossover pipe.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 December 2009
Resolved 21 January 2010
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 December 2009
Resolved
Remove, inspect and test both port & starboard sea chest valves due to leakage. Test in the presence of a Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2009
Resolved 21 January 2010
Engineering › Sea-water System (primary cooling) › Valve
Issued 9 December 2009
Resolved
Hydrostatically test crossover piping (10") to 1.5 times the MAWP from sea valve to sea valve including all attached sub-piping and valves. Test in the presence of a Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2009
Resolved 21 January 2010
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 December 2009
Resolved
Remove hard fouling IWO seachest and seachest cross-over piping.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 December 2009
Resolved 14 December 2009
Resolution: Corrected
Engineering › Steering Gear System › Pump
Issued 3 December 2009
Resolved
Trouble shoot and correct slow response/travel time IWO #1 steering pump. Travel from 30-35 degrees is 26 seconds. # 2 pump is 9 seconds. Correct to the satisfaction of the attending marine inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 21 January 2010
Construction/Loadline › Structures › Superstructure
Issued 16 July 2009
Resolved
Crop and renew damaged section of port Bulwark at the next scheduled DD to the satisfaction of the attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 February 2010
Resolved 21 January 2010
Construction/Loadline › Structures › Machinery Space Opening
Issued 16 July 2009
Resolved
Crop and renew wasted/worn engine room escape hatch at the next scheduled dry-dock to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 February 2010
Resolved 24 May 2010
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 3 September 2008
Resolved
No Proof of MIS report submission. No proof of contract with consortium.
Due 2 October 2008
Resolved 24 September 2008
Resolution: Documents and Information sent, company now in compliance.
Communications › Alarms/Indicators › Propeller Speed Indicator
Issued 2 April 2007
Resolved
Install shaft speed and direction indicators IAW 46 CFR 113.37.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 December 2007
Resolved 22 July 2009
Resolution: Installed.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 26 October 2006
Resolved
Prove proper operation of main engine alarms.
Action required: 705 - Other - as specified
Due 26 November 2006
Resolved 22 May 2007
Resolution: Resolved.
Engineering
Issued 9 September 1996
Resolved
DEMONSTRATE PROPER OPERATION OF STBD MAIN ENGINE OVER-SPEED CONTROL.
Condition: Unknown
Due 9 September 1996
Resolved 11 September 1996
Engineering
Issued 29 May 1996
Resolved
CORRECT E-MICPXCESSIVE WATER LEAK IN STARBOARD PROPELLER SHAFT STUFFING BOX, SHAFT LINER DETERIORATION NOTED. CORRECT PRIOR TO CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Fire Fighting
Issued 29 May 1996
Resolved
PEPLACE CRACKED FLEX LOOP ON THE FIXED CO2 SYSTEM IN THE EMERGENCY GENERATOR SPACE. TO BE COMPLETED PRIOR TO CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Engineering
Issued 29 May 1996
Resolved
REPAIR AND PROVE PROPER OPERATION OF THE AIR BOX SHUT DOWN SOLINOID ON THE STARBOARD MDE. TO BE COMPLETED PRIOR TO CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 February 1996
Resolved
DEMONSTRATE PROPER OPERATION OF NO. 2 GENERATOR LOW LUBE OIL SHUTDOWN.
Condition: Unknown
Due 29 February 1996
Resolved 1 March 1996
Engineering
Issued 29 February 1996
Resolved
REPAIR/REPLACE STARTER CABLE TO STBD SIDE M/E, WHERE INSULATION REMOVED/SEPARATED.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Engineering
Issued 4 December 1995
Resolved
COMPLETE FULL DIAGNOSTIC TESTS OF STBD MAIN ENGINE AND PROVIDE WRITTEN REPORT OF FINDINGS TO U. S. COAST GUARD. VESSEL MAY NOT OPERATE WITH PASSENGERS UNTIL REPORT SUBMITTED AND UNDERWAY OPERATIONAL TEST COMPLETED TO SATISFACTION OF ATTENDING U. S. COAST GUARD INSPECTOR.
Condition: Unknown
Due 8 December 1995
Resolved 8 December 1995
Engineering
Issued 15 November 1995
Resolved
PRIOR TO OPERATING WITH PASSENGERS, PROVIDE U. S. COAST GUARD WITH WRITTEN DOCUMENTATION EXPLAINING CAUSE AND CORRECTIVE ACTION ASSOCIATED WITH STBD MAIN ENGINE CASUALTY.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Engineering
Issued 7 March 1995
Resolved
PROVE OPERATION OF STARBOARD MAIN DIESEL ENGINE LUBE OIL ALARM AND OVERSPEED IAW ABS SECTION 34.
Condition: Unknown
Due 7 March 1995
Resolved 7 March 1995
Electrical
Issued 7 March 1995
Resolved
PROVIDE DOCUMENTATION FOR EMERGENCY GENERATOR HIGH TEMPERATURE ALARM IAW 46CFR 112.
Condition: Unknown
Due 7 March 1995
Resolved 7 March 1995
Electrical
Issued 7 March 1995
Resolved
PROVE OPERATION OF #2 SHIPS GENERATOR LUBE OIL SHUTDOWN IAW 46 CFR 111.
Condition: Unknown
Due 7 March 1995
Resolved 7 March 1995
Engineering
Issued 16 December 1994
Resolved
MAKE REPAIRS TO STARBOARD ENGINE ORDER TELEGRAGH WRONG WAY VISUAL INDICATORIAW 46 CFR 113.35-5, PRIOR TO 12/28/94. SOUND POWERED PHONE WILL BE USED INCONJUNCTION WITH ENGINE ORDER TELGRAPH UNTIL REPAIRS ARE MADE.
Condition: Unknown
Due 16 December 1994
Resolved 16 December 1994
Accommodation/Occupational Safety
Issued 13 September 1994
Resolved
MAKE PERMANENT REPAIRS TO LEAKING A/C CHILL WATER MANIFOLD IN ENGINE ROOM ACCESS SPACE.
Condition: Unknown
Due 13 September 1994
Resolved 13 September 1994
Lifesaving
Issued 15 March 1994
Resolved
PROVIDE 30 ADULT PFD'S, VESSEL RESTRICTED TO 177 TOTAL PERSONS UNTIL PROVIDED.
Condition: Unknown
Due 15 March 1994
Resolved 15 March 1994
Engineering
Issued 7 December 1993
Resolved
MAKE OPERABLE PORT MAIN DIESEL ENGINE THROTTLE CONTROL AT GOVERNOR WITHOUT USE OF IMPROPERLY INSTALLED SPRING.
Condition: Unknown
Due 7 December 1993
Resolved 7 December 1993
Engineering
Issued 7 December 1993
Resolved
MAKE OPERABLE BOTH MAIN DIESEL ENGINE OVERSPEEDS.
Condition: Unknown
Due 7 December 1993
Resolved 7 December 1993
Lifesaving
Issued 19 May 1992
Resolved
MAKE OPERABLE THE GENERAL ALARM ON THE MAIN DECK FORWARD.
Condition: Unknown
Due 19 May 1992
Resolved 19 May 1992
Navigation
Issued 19 May 1992
Resolved
THE CALLING CIRCUIT FOR THE MACHINERY SPACE SOUND POWERED PHONE IS IMPROPERLY POWERED BY 110V.
Condition: Unknown
Due 19 May 1992
Resolved 19 May 1992
Electrical
Issued 19 May 1992
Resolved
INSTALL EMERGENCY LIGHTING IN THE BOW THRUSTER ROOM.
Condition: Unknown
Due 19 May 1992
Resolved 19 May 1992
Navigation
Issued 5 November 1991
Resolved
PLACE A CURRENT COPY OF THE RULES OF THE ROAD ON BOARD VESSEL.
Condition: Unknown
Due 5 November 1991
Resolved 5 November 1991
Engineering
Issued 5 November 1991
Resolved
RENEW THE SIX INCH PIPE NIPPLE ON THE OILY WASTE DISCHARGE ON PORT SIDE.
Condition: Unknown
Due 5 November 1991
Resolved 5 November 1991
Lifesaving
Issued 5 November 1991
Resolved
RENEW TWO RING BUOYS.
Condition: Unknown
Due 5 November 1991
Resolved 5 November 1991
Engineering
Issued 5 November 1991
Resolved
RENEW FLAME SCREEN FOR LUBE OIL TANK IN ENGINE ROOM.
Condition: Unknown
Due 5 November 1991
Resolved 5 November 1991
Navigation
Issued 20 September 1991
Resolved
MAKE OPERABLE THE ENGINE ORDER TELEGRAPH WRONG DIRECTION ALARM AND INDICATOR AT BOTH LOCATIONS.
Condition: Unknown
Due 20 September 1991
Resolved 20 September 1991
Electrical
Issued 20 September 1991
Resolved
PERMANENTLY WIRE AND INSTALL HEATER IN BOW THRUSTER SPACE OR REMOVE.
Condition: Unknown
Due 20 September 1991
Resolved 20 September 1991
Engineering
Issued 20 September 1991
Resolved
INSTALL VALVES ON THE FUEL OIL CONTAINMENT DRAINS.
Condition: Unknown
Due 20 September 1991
Resolved 20 September 1991
Construction/Loadline
Issued 20 December 1990
Resolved
HATCH COVER GASKETS ON DECK
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Electrical
Issued 20 December 1990
Resolved
REPLACE LIGHT BULBS IN STEERING COMPARTMENT WITH 60 WATT TYPE AND RENEW LIGHT GLOBES AND GUARDS
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Navigation
Issued 20 December 1990
Resolved
REPLACE BOW THRUSTER PROPELLER_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Construction/Loadline
Issued 20 December 1990
Resolved
REPLACE ALL SEA VALVES AND SKIN VALVES_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Navigation
Issued 20 December 1990
Resolved
COTTER PIN ON DOUBLE NNT RUDDER STEERING ASSEMBLY BOLTS TO THE SATISFACTIONOF THE COGNIZANT [name withheld] VESSEL BACK IN SERVICE BUT NOT LATERTHAN 20JAN91._x001C_ _x001C_
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Navigation
Issued 20 December 1990
Resolved
COTTER PINON DOUBLE NUT STEERING RUDDER INDICATOR ARM BOLTS TO THE SATISFACTON OF THE COGNIZANT OCMIPRIOR TO PLACING VESSEL BACK IN SERVICE BUT NOT LATER THAN 20JAN91_x001C_ _x001C_
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Navigation
Issued 20 December 1990
Resolved
REPLACE RUDDER AND RUDDER POSTS_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 December 1990
Resolved 20 December 1990
Engineering
Issued 31 May 1990
Resolved
MAKE OPERATIONAL OR REMOVE THE OVERSPEED TRIP ON THE BOW THRUSTER ENGINE.
Condition: Unknown
Due 31 May 1990
Resolved 31 May 1990
Engineering
Issued 31 May 1990
Resolved
MAKE OPERATIONAL THE PORT SHAFT TACH LOCATED ON THE BRIDGE AND IN THE ENGINE ROOM.
Condition: Unknown
Due 31 May 1990
Resolved 31 May 1990
Navigation
Issued 31 May 1990
Resolved
MAKE OPERATIONAL THE WRONG DIRECTION ALARM FOR BOTH MAIN ENGINES ON THE PROPULSION TELEGRAPH LOCATED IN THE BRIDGE AND ENGINE ROOM.
Condition: Unknown
Due 31 May 1990
Resolved 31 May 1990
Electrical
Issued 7 November 1989
Resolved
MAKE THE FUEL SHUTOFF VALVE FOR THE EMERGENCY GENERATOR OPERABLE FROM OUTSIDE THE SPACE.
Condition: Unknown
Due 7 November 1989
Resolved 7 November 1989
Navigation
Issued 27 October 1989
Resolved
PROVIDE SUITABLE INSTRUCTIONS FOR THE NEWLY INSTALLED AUTO PILOT SYSTEM AND HAVE POSTED IN THE PILOT HOUSE.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Navigation
Issued 27 October 1989
Resolved
PROVE SATISFACTORY OPERATION OF NEWLY INSTALLED AUTO PILOT SYSTEM, INCLUDING UNDERWAY TEST OF STEERING GEAR.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Navigation
Issued 30 June 1989
Resolved
OPERATE STEERING GEAR UNDER ALL POWER MODES AND EXAMINE OPERATING CONDITIONOF ALL CONTROL LINKAGES AND MECHANISMS. REPORT RESULT OF STEERING GEAR TESTTO USCG MSO HMRMS PRIOR TO CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989
Engineering
Issued 30 June 1989
Resolved
RESEARCH AND PROVIDE REPAIR PROPOSAL FOR PORT TAILSHAFT POSSIBLE MISALIGN- MENT PROBLEM. PROVIDE REPAIR PROPOSAL AND CORRECT PRIOR TO CARRYING PASSEN-GERS FOR HIRE.
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989
Navigation
Issued 12 June 1989
Resolved
MAKE OPERATIONAL THE CALL BELL FOR THE FORWARD MAIN DECK SOUND POWERED TELEPHONE.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Engineering
Issued 12 June 1989
Resolved
PROVIDE DOCUMENTATION OF PROPER OPERATIONAL TEST OF MAIN DIESEL ENGINE OVERSPEEDS.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Documentation
Issued 20 June 1988
Resolved
PROVIDE A DOCUMENTATION CERTIFICATE.
Condition: Unknown
Due 20 June 1988
Resolved 20 June 1988
Lifesaving
Issued 20 June 1988
Resolved
CONDUCT A FIRE AND BOAT DRILL.
Condition: Unknown
Due 20 June 1988
Resolved 20 June 1988
Documentation
Issued 20 June 1988
Resolved
PROVIDE A C.G. STABILITY LETTER.
Condition: Unknown
Due 20 June 1988
Resolved 20 June 1988