Records from 2016 to 2026. Most recent: inspection, 3 July 2026.
Inspection history · 102
3 July 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8426657
8 March 2026
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8322696
2 March 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8318977
24 February 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8314813
23 February 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8314764
23 February 2026
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8318353
27 January 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8302063
14 January 2026
Administrative Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8296116
2 January 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8289585
22 December 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8286235
17 October 2025
Administrative Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8254374
13 August 2025
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8209623
7 July 2025
Deficiency Check · Vessel Attendance · Examination of Repairs · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8231417
12 June 2025
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8158295
1 June 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8148965
26 May 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8144179
26 April 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8120462
7 April 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8106150
3 March 2025
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8087076
7 February 2025
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 8170227
10 January 2025
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8060621
5 January 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8057570
3 November 2024
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8270803
13 October 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8018241
1 October 2024
Drydock Exam · Internal Structural Exam · Administrative Inspection · COI Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8017107
23 September 2024
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8007473
8 September 2024
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7998536
1 August 2024
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7971962
16 July 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7960937
15 June 2024
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7935223
23 January 2024
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7853039
8 January 2024
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7846230
7 January 2024
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7848020
22 December 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7841639
8 December 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7836370
14 November 2023
Annual Inspection · MARPOL Annex IV Survey · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7824341
10 October 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7805763
12 September 2023
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7848783
10 September 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7788547
6 June 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7704212
13 March 2023
Annual Inspection · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7649912
28 February 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7642955
2 February 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7630783
28 December 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7613662
5 December 2022
Administrative Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7604673
1 December 2022
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7846084
30 November 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7601729
29 November 2022
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7600969
25 November 2022
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7600199
10 November 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7592490
1 November 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7587210
20 September 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7604680
25 August 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7543319
24 August 2022
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7554836
4 August 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7524523
13 July 2022
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7505402
8 July 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7557575
4 July 2022
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7497871
3 July 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7547598
1 February 2022
Administrative Inspection · In-Service Inspection · Drydock Exam · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7388704
26 October 2021
Drydock Extension
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7339668
16 September 2021
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7313338
20 July 2021
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7261780
21 April 2021
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7179567
23 February 2021
Administrative Inspection · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7144624
11 January 2021
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7122443
2 November 2020
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7088610
22 July 2020
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7013743
16 July 2020
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7007446
9 June 2020
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6971691
14 April 2020
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6939231
26 March 2020
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6961724
21 February 2020
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6912846
5 December 2019
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6867629
15 September 2019
Drydock Exam · Administrative Inspection · COI Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6814558
17 August 2019
Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 7370809
23 July 2019
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6765694
2 April 2019
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6654760
19 February 2019
Annual Inspection · ISM SMC Audit
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6629392
20 November 2018
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6702837
30 October 2018
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6570860
29 April 2018
Examination of Repairs · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6403704
25 March 2018
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6685311
8 February 2018
Damage Survey · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6352331
5 January 2018
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6365745
3 January 2018
Administrative Inspection · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6299961
27 November 2017
ISM Oversight · Damage Survey · ISM SMC Audit · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6313020
1 November 2017
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6299265
21 June 2017
In-Service Inspection · Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6166943
9 June 2017
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6177313
17 May 2017
Damage Survey · Administrative Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6149870
7 April 2017
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6152016
1 March 2017
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6099308
31 January 2017
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6080079
11 January 2017
Annual Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6061633
10 October 2016
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6005625
16 August 2016
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 5988301
3 July 2016
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 5941358
10 June 2016
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 5915057
3 June 2016
ACP Handover Survey
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 5895872
7 March 2016
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 5828074
25 January 2016
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 5803293
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 September 2025
Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks. However, hold-back arrangements fitted with remote release devices of the fail safe type may be utilized. Attending marine inspectors noted self closing fire doors throughout the vessel with strings, objects preventing doors from remaining closed which is creating an increased risk to vessels integrity.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2025
Resolved 10 October 2025
Resolution: Vessel removed holdback arrangements, ABS witnessed verification
09 - Working and Living Conditions › 091 - Living Conditions › Provisions quality
Issued 22 September 2025
Resolved
The condition of the food stores, galleys, pantries, mess and other spaces of the catering department on board shall be free of contamination of food and water. Attending MI's noted that the deck grating in the freezer spaces had been permanently installed preventing the stewards department from removing excessive spilled food debris. Remove permanent arrangements and resume regular cleaning.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2025
Resolved 1 October 2025
Resolution: RO: ABS Taishi Nagata San, attended, cleared and tested, all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 September 2025
Resolved
The purpose of the regulation is to maintain and monitor the effective of the fire safety measures the ship is provided with. For this purpose the, the following functional requirements shall be met. Fire protection systems and fire fighting systems and appliances shall be maintained ready for use. Attending MI's noted the protective glass in the engine control room over the CO2/Halon pull handles was broken.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2025
Resolved 1 October 2025
Resolution: RO: ABS Taishi Nagata San, attended, cleared and tested, crew replaced broken glass, all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Sickbay
Issued 22 September 2025
Resolved
The hospital accommodation shall not be used for other than medical purposes. The arrangement of the lighting should ensure the comfort and facilitate the treatment of the occupants. Attending MI noted that the lighting in the hospital space head was extinguished, additionally the head and bathtub were being utilized for storage. Remove and restore the space to its intented purpose.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2025
Resolved 25 September 2025
Resolution: Vessel changed lighting and removed storage items.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 18 September 2025
Resolved
General Emergency Alarm location #180 was inoperable during testing.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2025
Resolved 2 October 2025
Resolution: RO: ABS Taishi Nagata San, attended, cleared and tested, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 September 2025
Resolved
Ship service switchboard had grounds present at: TRANSFORMER "T-4-GROUND DETECTION B0 and EMERGENCY 120V.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2025
Resolved 9 December 2025
Resolution: Inspector verified repairs made to switchboard after installation of new breakers.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 September 2025
Resolved
Various general machinery alarm visual blue beacons were inoperable in the following locations: port steering room, STBD steering room, and STBD pump room. General machinery alarm blue visual beacon in STBD motor room was continuously illuminated. Port motor room was missing MCS 2JV yellow alarm beacon.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 10 October 2025
Resolution: Vessel replaced alarms, ABS witnessed testing.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 18 September 2025
Resolved
Supply ventilation #S17 remote shutoff was inoperable from 1st platform ESTOP in port pump room and starboard pump room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 2 October 2025
Resolution: RO: ABS Taishi Nagata San, attended, cleared and tested, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 18 September 2025
Resolved
Posted lifesaving instructions of life raft launching instructions, life jacket donning, immersion suit donning, and rescue boat launching instructions were missing at muster locations and rescue boat station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 22 September 2025
Resolution: Vessel posted instructions
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 18 September 2025
Resolved
Aspirin in rescue boat first aid kit was expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 27 September 2025
Resolution: Vessel replaced with new aspirin.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 September 2025
Resolved
Electrical connection on deck above wheelhouse for stbd antenna grounding wire was disconnected. Electrical connections aft of bridge wheelhouse for windshield wiper was wrapped in a plastic bag without a junction box. Potential dead end wire was found exposed in the bosun locker left of the WTD.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 25 September 2025
Resolution: Vessel repaired electrical connections in appropriate junction boxes.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 18 September 2025
Resolved
Containments on 01 deck were missing chains for mechanical drain plugs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 26 November 2025
Resolution: Vessel installed drain plugs with chains at deck containments.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 September 2025
Resolved
#3 MDG was missing local JW temp gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 25 September 2025
Resolution: Vessel replaced local gauge.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 September 2025
Resolved
Paint locker’s release station for the fixed fire fighting system was missing a placard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 25 September 2025
Resolution: Vessel placed placard for operating instructions.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 September 2025
Resolved
Fireman’s suit pants were sized up to XL and inadequate to fit all crew sizes. Procure XXL fireman suit pants to fit ensemble.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 28 November 2025
Resolution: Received correct size FFE suit pants.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 September 2025
Resolved
Ground detection lights at 120VAC emergency generator switchboard were extinguished and unable to indicate ground.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 26 November 2025
Resolution: Upon replacement of correct bulbs with sockets by OEM technician (Blacklock), ground detection lights were examined and found satisfactory by ABS
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 18 September 2025
Resolved
Catwalk grating beneath starboard canard/thruster room ladder well platform was unsecured and a fall risk for personnel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 2 October 2025
Resolution: RO: ABS Taishi Nagata San, attended, cleared and tested, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 18 September 2025
Resolved
Ships stores in port and starboard canard/thruster spaces had loose material stored in shelving units without adequate securing brackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 2 October 2025
Resolution: RO: ABS Taishi Nagata San, attended, cleared and tested, all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 18 September 2025
Resolved
Catwalk beneath port steering room ladder well was warped and to be addressed during vessels next scheduled repair availability.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2025
Resolved 8 March 2026
Resolution: Vessel replaced catwalk grating.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 15 December 2024
No resolution recorded
Fire control plans are required onboard and shall be up to date with approved installations. Conflicts between ABS approved FCP (2019)and current FCP conditions onboard. Provide approved updated Fire Control Plan reflecting - Current space categorization, bulkhead and deck specific fire integrity standards, and fire boundary doors and ensure the vessel is compliance with the relevant required structural fire protection regulations.74SOLAS(2020)II-2/15.2.4.1
Action required: 15 - Rectify deficiencies by next port
Due 15 January 2025 — due date passed with no resolution recorded
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 December 2024
Resolved
Design verification tests must verify that automated vital systems are designed, constructed, and operate in accordance with all applicable requirements of 46 CFR part 62 and the test procedures must be approved by the Coast Guard. DVTP provided for testing of emergency generator switchboard upgrade was not Coast Guard approved.
**Attending MI witnessed all tests as indicated on EDG DVTP Revision 2. Revision 2 was submitted to ABS for review.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2025
Resolved 13 August 2025
Resolution: EDG DVTP approved and op tested by ABS dated 01AUG2025.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 December 2024
Resolved
Periodic Safety Test Procedures must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer over-ride arrangements, interlocks, and safety controls. Procedures do not match current configuration onboard USNS VICTORIOUS. It is a version used for all of the TAGOS fleet which vessels configurations are not currently the same.Audit PSTP, Update PSTP, Provide a Coast Guard approved ship specific PSTP for testing witnessed by the Coast Guard. 46 CFR 61.40-6 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2025
Resolved 18 September 2025
Resolution: Conducted PSTPs from iaw Rev 13 PSTPs and MSC approval letter 16710 on May 12, 2025. Verified crew conducted tests iaw approval procedures to the satisfaction of OCMI.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 December 2024
Resolved
Periodic Safety Test techniques must not simulate monitored system conditions by mis-adjustment, artificial signals, or improper wiring unless the test would damage equipment or endanger personnel. Generator jacketwater high temperature alarm was tested with a jumper simulating a monitored system condition. Provide a calibrated means to conduct the test in a heat bath per the approved PSTP.46 CFR 61.40-10 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2025
Resolved 13 August 2025
Resolution: Vessel outfitted calibrated J/W hot pot to test PSTPs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 December 2024
Resolved
The machinery shall be of a design and construction for the service for which they are intended. #3 Ship Service Diesel Generator prime mover engine block has stripped out bolts to secure bearing that are unable to be repaired and require replacement of engine block to operate. Block on order with a 4 month lead time. Complete repairs and prove proper operation prior to vessels next 6 month availability.74SOLAS(2004) II-1/26.1
Action required: 705 - Other - as specified
Due 15 June 2025
Resolved 13 August 2025
Resolution: Vessel renewed #3 SSDG prime mover engine block via third party.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 October 2024
Resolved
Piping systems installed on ships and barges shall have the necessary pumps, valves, regulation valves safety valves, relief valves, flanges, fittings, pressure gages, liquid level indicators, thermometers, for safe efficient operation of the vessel. It was self reported that the fuel oil coolers on all four propulsion generators are inoperable. It was discovered that fuel fittings have been capped off and valves closed, in addition to non compliant hoses and fittings being utilized.
Make repairs to all fuel oil coolers and associated hardware and fittings in order to restore them to original operatinal capacity.
Action required: 17 - Rectify deficiencies prior to departure
Due 13 October 2024
Resolved 15 December 2024
Resolution: Fuel Oil Coolers were serviced during 2024 drydock and are fully operational as designed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2024
Resolved
Vessel reported that it was experiencing a "Port Propulsion Motor Field Loss" alarm. Ships crew consulted with OEM for additional troubleshooting. OEM advised that continued operation could result in additional field coil failures. Until this condition is restored and verified by OEM, RO or the USCG vessel is to remain in port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2024
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 21 November 2023
Resolved
Where "A" class divisions are penetrated, the penetrations shall be suitably insulated to same level of the division. MIs noted cable penetration in overhead of access trunk 1-36-0 (ladderwell leading to bridge (control station)) that was not sealed. This is an A-60 boundary and division rating was not maintained. Cabling penetration shall be sealed with proper fire stop (A-60) rating prior to departure from port.
46 CFR 92.07-1(c)
74SOLAS(2014)II-2/9.3.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2023
Resolution: Repairs verified by ABS
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 November 2023
Resolved
Scope of USCG inspection for annual credit shall evaluate the structure of the ship and its satisfactory condition and fit for service. MIs noted wastage (hole in deck) ivo Port engine room ventilation trunk on uppermost deck. Hole is located on inboard aft corner of the ventilation trunk, in the corner of the containment receptacle. Temporary repair (Belzona patch) shall be completed prior to departure from port. Permanent repairs extended to 2024 ROH in November.
46 CFR 91.25-10
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2024
Resolved 2 May 2024
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 21 November 2023
Resolved
All washbasins, and showers shall be equipped with adequate plumbing to include hot running water. MIs noted that 1 of the 3 installed hot water heaters onboard was inoperable, impacting hot water supply to the Port fwd zone (Galley and some berthing spaces). Repairs shall be completed to restore hot water supply prior to departure.
46 CFR 92.20-25(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 December 2023
Resolution: System configured to provide hot water via cross connects and new heater on order
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 21 November 2023
Resolved
All ships of 3000 gross tonnage and upwards shall carry a 3 GHz radar or second 9 GHz radar. MIs noted defective 440V power supply breaker to the S-Band radar impacting ability to operate. Repairs shall be complete to restore function of radar prior to departure.
74SOLAS(2014)V/19.2.7.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 November 2023
Resolution: Verified repairs via ABS
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 21 November 2023
Resolved
Fittings for clean agent (Haloncarbon) fire suppression systems shall be securely supported to protect against damage. MIs noted wasted sealing gland and exposed wiring on cable fitting for fixed Halon fire suppression system located in Fan Room 1-40-1. Sealing gland shall be repaired to restore cabling protection of enclosed connection.
46 CFR 95.16-10(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 November 2023
Resolution: The above was repaired with insulation tape (Mfr. Furukawa Elec, F-Co tape) by service company. Upon completion of repair, examined and found satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 21 November 2023
Resolved
Means of communication and calling must be a reliable means of voice communication and must be independent of the vessel's electrical system. MIs noted issues with sound levels and function of the installed sound powered phone system onboard for communications between control stations (Bridge + ECR) and deep well machinery spaces. Additional damage control circuit installed with sound powered headsets for mitigation. System shall be groomed and upgraded as necessary to restore full operation at upcoming maintenance period in May 2024 (VRA).
46 CFR 113.30-3(b)
Action required: 705 - Other - as specified
Due 31 May 2024
Resolved 2 May 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 November 2023
Resolved
Condition of ship and its equipment shall be maintained. MIs noted the port fire pump pressure gauge on the bridge was inaccurate and requires recalibration. Repairs due w/in 30 days.
74SOLAS(2020)I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 November 2023
Resolution: Upon completion of calibration by shore service company, the pressure gauge was examined under fire pump operation and found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2023
Resolved
Condition of ship and its equipment shall be maintained. MIs noted wasted air line on port bow requiring renewal of piping. Replacement due w/in 30 days.
74SOLAS(2020)I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 November 2023
Resolution: The affected service air pipe was repaired by crop and renewed, examined and found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 21 November 2023
Resolved
Fire detection and alarm systems shall be kept in good working order to ensure performance standards. FCP details smoke detector required in port laundry room but none are installed in the space. Ship management shall conduct investigation into how space does not have a detector installed and submit report to local OCMI on history of detection in the space. Mitigation plan to be submitted for preventative measures and monitoring of space until new detection is installed during May 2024 VRA. Company report and repair timeline due to local OCMI w/in 30 days.
74SOLAS(2014)II-2/14.2.1.1.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2024
Resolved 2 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2023
Resolved
Condition of ship and its equipment shall be maintained for safety and fitness to proceed to sea. MIs noted hydraulic leaks on port steering gear (both pumps #1 and #2). Leaks shall be corrected w/in 30 days.
74SOLAS(2020)I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 November 2023
Resolution: The affected valve block was replaced with crew, examined and no LO leakage observed.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 15 April 2023
Resolved
Each self-propelled vessel over 150 gross tons when engaged on an international voyage must have an efficient daylight signaling lamp. Port receptacle for daylight signaling lamp is corroded and unable to be used. Satisfactory repairs/replacement due within 30 days.
46 CFR 111.75-18
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 May 2023
Resolution: Repaired receptacle and confirmed working order.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 15 April 2023
Resolved
Inspectors not limited from requiring inspections to assure seaworthiness of vessel. MI noted cracked weld in CLFA bulkhead in way of door to MCS/AMP Room passageway. Area is subject to previous class 3 structural failures due to design of the vessel. Temporary repairs shall be made to the cracked weld (Belzona patch), with permanent repairs due at next maintenance period (October 2023).
46 CFR 91.27-15(a)
Action required: 705 - Other - as specified
Due 31 October 2023
Resolved 29 July 2023
Resolution: Repairs verified by ABS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 April 2023
Resolved
Periodic safety tests must demonstrate the proper operation of primary and alternate controls to include flooding safety. Port hull - one valve (#44 - 6-96-10) that will only operate manually. 3 valves operate but don't indicate open in automation. Starboard hull - two valves operate, but don't indicate open in automation. OEM recommends valve actuator replacement for faulty remote controls. Satisfactory repairs due w/in 30 days.
46 CFR 61.40-6(a)
Waiver granted and extended to 31JUL2023.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2023
Resolved 29 July 2023
Resolution: Repairs verified by ABS
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 April 2023
Resolved
At each inspection, inspector shall examine machinery areas to ensure no accumulation of oil which might create a fire hazard. MIs noted accumulation of oil on bulkhead adjacent to air receivers in engine room. Area shall be cleaned and investigate possible source of oil ivo air receivers. Suspect source to be air receiver blow down piping, and subsequent oily waste inside air receiver. Air receiver shall be opened for inspection and cleaning as necessary. Cleaning and investigation due prior to departure.
46 CFR 91.25-45(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2023
Resolved 30 April 2023
Resolution: Verified that air receiver was investigated and new filter installed.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 2 June 2022
Resolved
Bulkheads at exposed ends of enclosed superstructures shall be of an acceptable level of strength. Noted crack in CLFA forward bulkhead, adjacent to MCS entrance.
ICLL(1988)Reg. 11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2022
Resolved 10 June 2022
Resolution: Regarding the crack on bulkhead, please be reported that upon removal of paint, the bulkhead condition was examined with chief engineer & contractor, and found NO crack/fracture.
Existing welds were intermittent weld for joining of transverse structural
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 June 2022
Resolved
Bulkheads and doors of spaces separating control stations from cargo & machinery spaces shall be "A" class & maintained. Following fire doors require adjustment:
1. Fire door from CLFA to AMR (self-closing)
2. Access trunk door (2-128-1) door frame damage
46 CFR 92.07-10(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2022
Resolved 24 June 2022
Resolution: Verified by USCG MIs
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 2 June 2022
Resolved
Multiple cables should be supported in metal hangers or trays or clips/straps should be used for cable support (2 screw type). Noted following areas of electrical cabling runs supported by plastic zip-ties:
1. Electrical cabling on aft bridge bulkhead over egress routes
2. New cabling run to Port Canard Controls
3. AMR electrical cabling ivo air receiver & bulkhead.
46 CFR 111.60-5(a)(1)
IEEE 45-2002-(25-5)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2022
Resolved 24 June 2022
Resolution: Verified by USCG MIs
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 June 2022
Resolved
The general construction of the vessel shall be such as to minimize fire hazards... Found multiple hydraulic leaks on port and stbd steering gear units.
46 CFR 92.05-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2022
Resolved 24 June 2022
Resolution: Verified by USCG MIs
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 2 June 2022
Resolved
All required fire pump remote control locations must include... A firemain pressure indicator. Found F/M pressure gauge on the bridge OOC.
46 CFR 62.35-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2022
Resolved 24 June 2022
Resolution: Verified by USCG MIs
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 2 June 2022
Resolved
Engine Order Telegraph (EOT): There must be an audible signal at each instrument. The signal at both locations must sound continuously. Found the stbd EOT does not sound on the bridge.
46 CFR 113.35-5(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2022
Resolved 24 June 2022
Resolution: Verified by USCG MIs
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 3 April 2021
Resolved
Every ship of 400 gross tonnage shall be provided with a tank or tanks of adequate capacity to receive oil residues which can't be dealt with otherwise iaw the requirements of this annex. Starboard OWS is inoperable due to excess leaks from tank top gasket. The use of the STBD OWS is prohibited until approved repairs are conducted to OEM specification.
Action required: 705 - Other - as specified
Resolved 2 May 2021
09 - Working and Living Conditions › 092 - Working Conditions › Loading and unloading equipment
Issued 3 April 2021
Resolved
Hydraulic system shall be so designed that proper functioning of any unit shall not be affected by the back pressure in the system. Both Port & Starboard deck cranes were found with excessive hydraulic leaks. Repair hydraulic leaks and demonstrate crane operation to the satisfaction of attending USCG marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 May 2021
Resolution: Both cranes hydraulic leaks were addressed and sorrounding areas cleaned.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 September 2019
Resolved
Fire screen door 1-56-2 was found cracked at the door closure mounting. Temporary repairs are to be made prior to getting underway (completed) and permanent repairs are to be completed within 30 days.
*Update* 12/15/2019 - Vessel requested extension until July, 2020 due to parts availability. Crack was drill stopped and satisfactory temp repairs conducted. Temp repairs witnessed by MI and door remains fully functional. Extension granted.
*Update* 23JUL2020- Vessel ordered incorrect door, temp repairs holding. To allow for mission requirements and parts requisition extended to 25DEC2020.
Action required: 705 - Other - as specified
Due 24 December 2019
Resolved 1 November 2021
Resolution: Deficiency was accepted by Class on April 2021. Finding #922.2
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 19 February 2019
Resolved
An audible and visual alarm must activate in the pilot house upon failure of electrical power, low lube oil level, phase failure and overload. Alarms were disabled at the local control panels both port and starboard units. The bridge alarms and automation system did not function as designed.
Action required: 30 - Ship detained
Resolved 13 March 2019
Resolution: Repairs were made to the steering alarm system and returned to previously approved drawing specificaiton. A satisfactory function check was conducted, all alarams worked as required locally, on the bridge, and in the engine control room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 February 2019
Resolved
The pneumatic control system for remote operation of ballast and main cooling water valves presents a hazard to the seaworthiness of the ship and crew in case of failure. The remote operated ballast sea suction valves were disconnected and are not fitted with manual local controls.
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Resolved 13 March 2019
Resolution: All valves were reconnected and tested. All valve indicators work with exception of the starboard ballast valve, which will remain closed until proper repairs can be made. All valves will be replaced at the next drydock shceduled for Sep 2019.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 February 2019
Resolved
Submit amended Periodic Safety Test Procedures to the Marine Safety Center that include all required alarms.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 March 2019
Resolution: Updated PSTPs to include steering alarms were submitted to the Marine Safety Center.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 February 2019
Resolved
Air operated remote valves must be provided with self-indicating lines at the control boards which indicate the position of the valves. The port fire main suction valve position indicator was found corroded and disconnected.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 March 2019
Resolution: Indicators worked as required. Operational test conducted.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 19 February 2019
Resolved
No person may operate an ocean going ship unless it is fitted with approved 15 parts parts per million filtering equipment. The vessels starboard oily water separator was not functioning and could not be tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 March 2019
Resolved 13 March 2019
Resolution: A satisfactory function test was conducted for both the port and starboard OWS/ OCMs. All sat. ABS also witnessed proper function.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 19 February 2019
Resolved
Loudspeakers must located and provide intelligible and audible one-way communication throughout the ship. The loudspeaker outside the chief engineers stateroom was
not functioning.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 March 2019
Resolution: All loud speakers were tested and functioned as designed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 February 2019
Resolved
Each fire hose and hydrant must have a combination solid stream and water spray nozzle. Multiple nozzles throughout the ship did not operate as designed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2019
Resolved 13 March 2019
Resolution: All vari-nozzles were maintenanced and functioned as required.
09 - Working and Living Conditions › 092 - Working Conditions › Loading and unloading equipment
Issued 19 February 2019
Resolved
The safety of the stores cranes was brought to the attention of the marine inspector and not in a safe condition to operate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 March 2019
Resolved 23 July 2019
Resolution: Stores cranes were repaired and function as designed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 February 2019
Resolved
Holed areas and wasted steel was identified in various locations on the ventilation intake and exhaust on deck and in stack.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2019
Resolved 23 July 2019
Resolution: Permanent repairs were made to holed areas identified, wasted steel was renewed in areas identified.
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 19 February 2019
Resolved
Rescue boats must be stowed in a position suitable for launching and recovery. The fast rescue boat was not ready to be launched from the manual release station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 March 2019
Resolved 13 March 2019
Resolution: Rescue boat cable and manual operation pull cables were serviced and functioned as required. The rescue was found in a position that was ready for releasing.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 19 February 2019
Resolved
Provide gaging report for both the first shot of each anchor chain. There is wastage present on the anchor chain that appears to be beyond allowance.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 March 2019
Resolved 13 March 2019
Resolution: Gaguing report was recieved, the shots on deck were found to be within ABS rules for allowable wastage. The company plans on replacing shots as needed during next drydocking.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead strength
Issued 19 February 2019
Resolved
Install missing bulkhead panel located in the ships laundry.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 March 2019
Resolution: Panel was replaced and found to be secured into place.
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 19 February 2019
Resolved
Prove proper operation of the manual release system for the fast rescue boat.
Action required: 10 - Deficiency Rectified
Resolved 13 March 2019
Resolution: Fast rescue boat was found to be ready for release and in good order.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 19 February 2019
Resolved
Safety management system shall be maintained IAW the provisions of the ISM code. Bases on SMS related deficiencies, an external SMS audit is required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 March 2019
Resolved 13 March 2019
Resolution: ABS conducted an external audit on 27-28FEB. The results of the audit are documented in Activity # 6632305
Construction/Loadline › Penetrations › Pipe Flange
Issued 29 April 2018
Resolved
During MRA Period, a cooling water pipe was found with a pin-hole leak. The pipe was cropped and renewed by Hosei per ABS requirements.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2018
Resolved 2 May 2018
Resolution: Corrected by ABS.
Engineering › Sea-water System (primary cooling) › Valve
Issued 10 February 2018
Resolved
Replace leaky isolation butterfly valves (4), clean sea strainers (2) and test sea water pressure at both ASW pumps for the PORT pump room. Cofferdam required to isolate sea chest.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 February 2018
Resolution: Provided proof via pictures of system operation and valve replacement.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 10 February 2018
Resolved
Troubleshoot and fix intermittent problem with PCU #5 and PCU #7. Marshall tech to provide full report of findings.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2018
Resolution: Marshall tech report corrected the problem.
Construction/Loadline › Structures › Machinery Space Opening
Issued 10 January 2018
Resolved
Aft Centerwell hatch does not close and cannot be opened. Repair to ensure full closure and watertight integrity.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 January 2018
Resolution: ABS witnessed repairs and testing of door.
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 January 2018
Resolved
Make permanent repairs to the #3 generator jacket water-cooling line that is leaking.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 January 2018
Resolution: Correction witnessed by ABS
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 January 2018
Resolved
Approximately 70% of the hospital medications are expired. Provide non-expired, valid medications.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 January 2018
Resolution: New medications provided. ABS witnessed.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 5 January 2018
Resolved
Unauthorized modifications to STBD OWS piping. IOPP survey required to be completed by Class to inspect OWS system, piping, and arrangements to ensure all arrangements meet Class Approval and match approved plans. Provide report to USCG FEACT.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 January 2018
Resolution: ABS witnessed corrections. Found plans on board and approved correction.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 5 January 2018
Resolved
No 4 Generator High Jacket Water Alarm foes not alarm/appear at Main Control.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2018
Resolution: Satisfactory test witnessed by ABS
Engineering › Pressure Vessel › Relief Valve
Issued 5 January 2018
Resolved
No 2 AMR Control Air Bottle (Middle bottle) pressure relief valve did not reseat properly. Repair or replace.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2018
Resolution: Relief valve replaced and examined by ABS
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 5 January 2018
Resolved
Port Bridge Wing, STBD rudder angle indicator did not operate.
Due 20 January 2018
Resolved 23 January 2018
Resolution: Tech came on board and corrected issue.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 5 January 2018
Resolved
STBD Rudder Angle Indixcator at STBD Steering was inaccurate by 5 degrees.
Due 20 January 2018
Resolved 23 January 2018
Resolution: Tech came on board and corrected issue.
Engineering › Steering Gear System › Pump
Issued 5 January 2018
Resolved
Port Aft Steering Pump gauges did not operate, needles were broken off.
Due 5 February 2018
Resolved 23 January 2018
Resolution: Gauges were replaced and operated correctly.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 5 January 2018
Resolved
Ensure all fire doors close properly, AMR Door does not shut.
Due 5 January 2018
Resolved 5 January 2018
Resolution: Cleared while on board. 03 doors were fixed and shut properly
Engineering › Pressure Vessel › Relief Valve
Issued 5 January 2018
Resolved
"Dry Air" Pressure Vessel relief valve did not operate. Lock out/Tag out pressure vessel until fixed.
Due 5 February 2018
Resolved 16 January 2018
Resolution: Relief valve replaced and examined by ABS
Electrical › Electrical Distribution System (service) › Cable
Issued 5 January 2018
Resolved
Remove dead end wires on bridge.
Due 5 January 2018
Resolved 5 January 2018
Resolution: 03 wires removed
Communications › Internal Communications System › Sound-powered Telephone
Issued 5 January 2018
Resolved
Repair sound powered phone cable on bridge
Due 5 January 2018
Resolved 5 January 2018
Resolution: Cable repaired. Phone operates properly
Construction/Loadline › Hull › Transverse Frame
Issued 18 December 2017
Resolved
Reevaluate existing structural modification for Frame 74 and perform a structural stress analysis by a certified naval architect or structural engineer that identifies structural issues found onboard vessel follwing frame 74 modification. Correct to the satisfaction of the OCMI.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 28 February 2018
Resolved 19 November 2019
Resolution: Visual inspection of the repairs conducted on frame 74 and attached the ship-specific element and fatigue assessment technical report (NSWCCD-65-TR-2019/07) dated September 2019 ot vessel MISLE file.
Construction/Loadline › Hull › Transverse Frame
Issued 6 December 2017
Resolved
Make permanent repairs to 8" crack in corner of FM 74 port side behind ladder to 01 deck affecting main control and port lube oil tank.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Steel was replaced and extra bracket was added to reduce stress at corner
Construction/Loadline › Hull › Transverse Frame
Issued 6 December 2017
Resolved
Make permanent repairs to crack in corner of FM 74 stbd side IWO 01 deck and above 2" insert.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Steel was replaced and extra bracket was added to reduce stress at corner
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 December 2017
Resolved
Make permanent repairs to an 8" salt water suction pipe in the stbd AMR that is holed/wasted and has several soft patches as temporary repairs.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Resolution: Salt water pipe replaced and tested by ABS
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 December 2017
Resolved
Make permanent repairs to a 5" salt water pipe in the #5 void space that has a soft patch after space flooded entirely.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Salt water pipe replaced and tested by ABS
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 6 December 2017
Resolved
Make permanent repairs to soft patch on the 5" jacket water cooler piping for No. 1 & 2 generators in the engine room.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Salt water pipe replaced and tested by ABS
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 December 2017
Resolved
Make permanent repairs to the soft patch on the #1 ASW pump suction piping in stbd pump room.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Salt water pipe replaced and tested by ABS
Accommodation/Occupational Safety › Potable Water System › General
Issued 6 December 2017
Resolved
Make permanent repairs to the potable water sodt patch in the "A" storeroom.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Pipe replaced and insulated. Witnessed and tested by ABS
Engineering › Fuel Oil Service System › Heater
Issued 6 December 2017
Resolved
Make permanent repairs to the fuel oil leak to the generator heater in the engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: Leaking elbow was removed, replaced and tested by ABS
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 December 2017
Resolved
Require 100% gauging of all salt water cooling piping on the stbd side machinery spaces OR provide a suitable method to ensure satisfactory condition of piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: 100% visual testing agreed as acceptable as gauging was not effective, inspection was completed by crew under supervision of port engineer [name withheld]
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 December 2017
Resolved
Require spot gauging to all port side AMR and pump room salt water piping OR provide a suitable method to ensure satisfactory condition of piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2018
Resolution: 100% visual inspecting conducted by crew and overseen by Port Eng [name withheld]
Construction/Loadline › Structures › Superstructure
Issued 6 December 2017
Resolved
Gauge the port and stbd stacks; 5 shots for each side and 5 shots for each aft corner close to the seams.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Resolution: Received gauging report
Communications › Alarms/Indicators › General Alarm
Issued 6 December 2017
Resolved
Repair and test general alarms that are inoperable for 1-5-0, 1-6-0, aft bosn locker & port gangway.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Resolution: Tested all general alarms on deck
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 December 2017
Resolved
Properly demonstrate operation of all bilge alarms.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Resolution: All alarms tested with ABS. Retested select voids and spaces
Electrical › Electrical Distribution System (emergency) › Bus Bar Connection
Issued 6 December 2017
Resolved
Properly repair broken solder joints behind fuses inside the emergency shutdown relay panel for supply ventilation.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 5 January 2018
Resolution: Technician repaired panel
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 6 December 2017
Resolved
Remove jumper for #3 relay in emergency shutdown relay panel.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 5 January 2018
Resolution: Technician repaired panel
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 6 December 2017
Resolved
Remove jumpers in emergency shutdown relay panel and replace faulty relay #7.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 5 January 2018
Resolution: Technician made repairs
Fire Fighting › Ventilation Systems › Ducts
Issued 6 December 2017
Resolved
Replace wasted overhead ventilation ducting in engine room overhead.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 4 January 2018
Resolution: Inspected repaired vent ducting in engine room.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 6 December 2017
Resolved
Repair 02 broken manual closures for ventilation in engine room overhead.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 4 January 2018
Resolution: Tested manual closures in engine room
Fire Fighting › Structural - Horizontal Zones › General
Issued 6 December 2017
Resolved
Repair all cable penetrations through watertight bulkheads that are not watertight.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 4 January 2018
Resolution: Penetrations inspected and made watertight
Fire Fighting › Combustible Materials › Insulation
Issued 6 December 2017
Resolved
Restore all insulation to original in #5 void space after flooding.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 4 January 2018
Resolution: Insulation replaced
Deck/Cargo › Cargo Heating › General
Issued 6 December 2017
Resolved
Repair all heaters that were flooded in the #5 void space.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 4 January 2018
Resolution: Heaters were not being used and were not replaced
Fire Fighting › Ventilation Systems › Operating Controls
Issued 6 December 2017
Resolved
Properly close all weather deck ventilation closures and replace gaskets as needed.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 5 January 2018
Resolution: Gaskets were replaced/repaired as needed
Fire Fighting › Fire Main › Valves
Issued 6 December 2017
Resolved
Replace leaky ball valve in port pump room and repair fire station leak in packing gland.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 5 January 2018
Resolution: Leaky ball valve replaced
Fire Fighting › Ventilation Systems › Fans
Issued 6 December 2017
Resolved
Replace wasted natural ventilation 1-62-2 on 01 weather deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 5 January 2018
Resolution: Replaced vent and surrounding wasted steel
Fire Fighting › Structural - B Class Divisions › Doors
Issued 6 December 2017
Resolved
Ensure WTD 3-90-2 is watertight and tested.
Action required: 705 - Other - as specified
Due 6 January 2018
Resolved 4 January 2018
Resolution: Door was adjusted and chalk tested
Operations/Management › Vessel Safety Management › Company Verification/Review/Evaluation
Issued 6 December 2017
Resolved
Training given to the crew is inadequate for crew members authorized to use SHIP CLIP/SAMMS, resulting in improper use/misues, Provide training to all crew members authorized to use SHIP CLIP/SAMMS. ISM CODE 6.3
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 7 February 2018
Resolution: Corrected.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 6 December 2017
Resolved
Spare parts in SHIP CLIP system do not properly align with what is needed onboard. Some systems are lacking completed inventory of spare parts, others have spare parts listed, but could not be found. Other systems have spare parts requested but are delayed, and in other instances the parts received have not matched the parts requested. ISM CODE 10.1
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 7 February 2018
Resolution: Corrected.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 6 December 2017
Resolved
Critical spare parts and consumables are not issued in a timely manner after requested.
ISM CODE 10.1
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 7 February 2018
Resolution: Corrected.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 6 December 2017
Resolved
Multiple sea water piping leaks were not addressed as a systematic failure of wasted piping, but rather fixed with temporary patches. ISM CODE 7
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 7 February 2018
Resolution: Corrected.
Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 6 December 2017
Resolved
Shore-based support and resources requested by crew were not given urgent attention.
ISM CODE 3.3
Action required: 705 - Other - as specified
Due 18 December 2017
Resolved 7 February 2018
Resolution: Corrected.
Operations/Management › Vessel Activity › Other
Issued 27 November 2017
Resolved
USNS Victorious will proceed directly from Busan, Korea to Sasebo, Japan. Vessel is not allowed to divert for any operations/exercises while en route. Vessel will remain at port in Sasebo, Japan until all repairs and deficiencies have been satisfactorily witnessed by an attending marine inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 4 January 2018
Resolution: Vessel arrived in Japan.
Navigation › Electronic Positioning › Radio Direction Finding Device
Issued 1 November 2017
Resolved
Make necessary repairs to AIS. Repairs and operational testing to be completed to the satisfaction of OCMI prior to departure from next MRA period.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2017
Resolved 4 January 2018
Resolution: AIS power supply replaced. All sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 31 January 2017
Resolved
The Kidde fixed CO2 fire-fighting system installed for the paint/flammable liquid locker was found to be unsatisfactory. Numerous items and multiple parts are needed to bring the system back into service. Repair system and retest to ensure compliance.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 February 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 31 January 2017
Resolved
Seven (15-pound) CO2 and one (5-pound) CO2 fire extinguishers have exceeded their hydrostatic testing date. Hydrostatically test all applicable extinguishers according to NFPA or replace all applicable fire extinguishers in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 31 January 2017
Resolved
One (15-pound) CO2 fire extinguisher was not serviceable. Remove from the vessel and replace in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Portable CO2 Fire Extinguisher › Pressure
Issued 31 January 2017
Resolved
Two (15-pound) CO2 fire extinguishers were found with insufficient charge. Recharge or replace in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 31 January 2017
Resolved
One (15-pound) CO2 fire extinguisher had a damaged hose and horn. Replace in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 31 January 2017
Resolved
One (10-pound) ABC fire extinguisher was found with insufficient charge. Recharge or replace in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 31 January 2017
Resolved
Two (10-pound) ABC fire extinguishers have exceeded the required 6-year maintenance. Complete required maintenance or replace in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2017
Resolution: Corrected and attested by ABS.
Fire Fighting › Grease Extraction Hood › General
Issued 31 January 2017
Resolved
Thermostat Detroit Switch on the galley Gaylord Hood was not calibrated. Properly calibrate switch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 February 2017
Resolution: Repaired and attested by ABS.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 11 January 2017
Resolved
Pressure switch for the automatic shutdown for the ventilation fans for AMR Space associated with the Halon Primary Firefighting System does not secure the ventilation fans in the event the Halon System is actuated. Troubleshoot and make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Corrected by ABS.
Communications › Alarms/Indicators › General Alarm
Issued 11 January 2017
Resolved
General Alarm Bell on 01 Deck, forward was not audible at ambient noise condition. Troubleshoot and make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Corrected prior to CG team departed.
Communications › Alarms/Indicators › General Alarm
Issued 11 January 2017
Resolved
General Alarm Bell on starboard stack was inoperable. Troubleshoot and make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Corrected prior to CG team departed.
Communications › Alarms/Indicators › General Alarm
Issued 11 January 2017
Resolved
General Alarm actuator switch at port gangway was inoperable. Troubleshoot and make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Corrected prior to CG team departed.
Communications › Alarms/Indicators › General Alarm
Issued 11 January 2017
Resolved
General Alarm Bells located on 01 Deck, forward and 01 Deck, aft near paint locker were not stenciled “General Alarm”. Properly stencil General Alarm Bells.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Corrected prior to CG team departed.
Fire Fighting › Miscellaneous Items › B Class Division Penetrations
Issued 11 January 2017
Resolved
Smoke curtains were worn, revealing holes throughout. Replace worn smoke curtains.
Action required: 705 - Other - as specified
Due 11 April 2017
Resolved 4 March 2017
Resolution: Attested by ABS.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 11 January 2017
Resolved
Paint locker CO2 fixed fire-fighting cylinder missing due to damage incurred during drydock. Replace cylinder and properly service.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 February 2017
Resolution: Repaired and attested by ABS.
Documentation › Logs/Records › Oil Record Book
Issued 11 January 2017
Resolved
Oil Record Books from December 10, 2014 to July 2, 2016 are missing. If found, notify FEACT immediately.
Action required: 705 - Other - as specified
Resolved 1 March 2017
Resolution: Corrected.
Engineering › Bilge Water Management System › Piping
Issued 11 January 2017
Resolved
Found fixed piping, portable hose arrangement, & air diaphragm pump used to transfer bilge water from various voids & spaces throughout vessel (both hulls). Fixed piping & portable hose arrangement are not on any approved piping plan. The transfer operation is not addressed in the vessel’s SMS. Submit updated piping plan to MSC & ABS for approval or remove all unapproved piping & hose arrangements
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Removed and attested by ABS.
Engineering › Fuel Oil Service System › Piping
Issued 11 January 2017
Resolved
Found fuel leaks on all fixed fuel piping located on all 4 propulsion generator’s fuel filter assembly. Repair or replace.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 February 2017
Resolution: Repaired and attested by ABS.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 11 January 2017
Resolved
Based on items 2, 3, 4, and 5, CG recommends External SMS Audit of vessel’s safety and environmental systems. Notified ABS; intends to submit PR-17.
Action required: 705 - Other - as specified
Due 11 April 2017
Resolved 27 February 2017
Resolution: Attested by ABS.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 11 January 2017
Resolved
Found a deformed damper fin in the engineroom ventilation damper located on the port side in the engineroom. This issue was discovered during the vessel’s drydock and allegedly cleared by ABS in Subic, PI. Repair deformed fin.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2017
Resolved 3 February 2017
Resolution: Repaired and attested by ABS.
Lifesaving › Lifebuoys › Serviceable
Issued 11 January 2017
Resolved
Found the lifeline on both port and stbd bridgewing lifebuoys to be deteriorated. Renew lifelines.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2017
Resolution: Corrected and attested by ABS.
Stability › Watertight Integrity › General
Issued 11 January 2017
Resolved
Watertight door 3-90-2 (open/close) actuator to port A storeroom was inoperable (damaged).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2017
Resolution: Corrected prior to CG team departed.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 11 January 2017
Resolved
Found loose battery connection for the emergency generator starting circuit.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2017
Resolution: Corrected prior to CG team departed.
Construction/Loadline › Hull › Bottom Plating
Issued 11 October 2016
Resolved
Crop and renew holed side-shell located portside inboard side below Port canard.
Action required: 705 - Other - as specified
Due 12 December 2016
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Structures › Machinery Space Opening
Issued 11 October 2016
Resolved
Permanently repair port and stbd side E/R ventilation closures. To include repair holes and installation of gaskets.
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Penetrations › Valve Flange
Issued 11 October 2016
Resolved
Show proper operation of all valve reach-rod assemblies showing signs of rust and wear.
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Structures › Cofferdam
Issued 11 October 2016
Resolved
Properly repair and NDT cracked weld and washed-out welds located in port F/O tank near Frame 40.
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Structures › Ventilators
Issued 11 October 2016
Resolved
Make proper repairs to ventilation fan casing located in engine room
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Hull › Hull Plating
Issued 11 October 2016
Resolved
Properly install sounding-tube striker plates where existing striker plates are inadequate
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Hull › Hull Plating
Issued 11 October 2016
Resolved
Provide USCG with UT Gauging Report
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Hull › Weld
Issued 11 October 2016
Resolved
Provide USCG with approved ABS welding procedures; to include Pipe Welding and list of qualified welders
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Hull › Weld
Issued 11 October 2016
Resolved
Provide USCG with bearing clearance tolerances for tail-shafts
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Lifesaving › Launching Appliances › Davit
Issued 11 October 2016
Resolved
Complete 110% weight of the rescue boat davit. Complete to satisfaction of the [name withheld] may attend on behalf of the USCG
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 11 October 2016
Resolved
Hydrostatically test all pressure vessels to 125% of MAWP to satisfaction of the [name withheld] may attend on behalf of the USCG
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.
Construction/Loadline › Penetrations › Pipe Flange
Issued 10 October 2016
Resolved
MI's identified structural stress fractures on bulkhead 74, 90, 96, 140 and 166. Based on preliminary inspection, ABS and USCG will allow repair efforts to commence. However these repairs are not permanent until following measure are met. Submit plans to MSC and ABS for permanent repair. MSC and ABS may require additional information to include engineering analysis and load calculation.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 12 January 2017
Resolved 19 November 2019
Resolution: Visual inspection of the repairs conducted on frames listed above and attached the ship-specific element and fatigue assessment technical report (NSWCCD-65-TR-2019/07) dated September 2019 ot vessel MISLE file.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 March 2016
Resolved
Several inspection and multiple engineering analyses have identified high stress areas susceptible to structural failure throughout the T-AGOS Class.
Crowley and Military Sealift Command shall consolidate engineering studies and develop systematic approach to permanently repair areas of structural concern. All repair plans shall be submitted for approval to the satisfaction of the OCMI.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 1 June 2016
Resolution: Crowley and Military Sealift Command have consolidated engineering studies and imputed into vessels maintenance tracking system (SAMMS).
Repair plans have been submitted for known cracks. Any additional cracking discovered shall require a repair pla
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 March 2016
Resolved
2. Develop a structural monitoring plan for all identified areas of high stress/concern. All high stress areas shall be made available for inspection at each CG annual and Class Survey.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 1 June 2016
Resolution: 2. Structural monitoring plan for all identified areas of high stress/concern has been developed. Annual requirement for inspection has been imputed into SAMSS.
All high stress areas shall be made available for inspection at each CG annual and Class
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 March 2016
Resolved
3. Temporary repairs shall be made to the satisfaction of ABS and [name withheld] analysis and permanent repairs shall be completed by the next for-credit dry dock.
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Corrected by ABS.