Inspection history · 54
23 January 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7627005
12 July 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7256340
27 April 2021
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7184025
23 January 2020
MTSA Verification · COI Inspection · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6897592
7 January 2020
Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6882078
31 January 2019
Deficiency Check · MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6618013
15 December 2018
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6598154
12 April 2018
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6390767
12 April 2018
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6393445
14 December 2017
MTSA Verification · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6324204
30 August 2017
Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6254876
13 December 2016
MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection · MTSA Verification · Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6055673
15 March 2016
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5833355
7 January 2015
COI Inspection · MARPOL Annex I Examination · Drydock Exam · MARPOL Annex VI Survey · Internal Structural Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5049269
13 March 2014
Annual Inspection · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4810670
27 September 2012
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4475983
21 September 2012
Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4444243
18 September 2012
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 4444078
16 February 2012
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4245604
1 February 2010
Drydock Extension · Drydock Exam · COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3673939
25 February 2009
MARPOL Annex I Examination · Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3423549
11 January 2008
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3126176
21 August 2007
Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3033824
4 May 2007
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2922078
27 April 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2929910
27 December 2006
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2846675
1 May 2006
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2634870
10 April 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2621165
21 February 2006
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 2589258
22 June 2005
MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2404668
20 June 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2396698
17 February 2005
Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2294330
25 January 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2280502
13 September 2004
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2263232
3 June 2004
Re-Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2087050
5 November 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1956850
12 February 2003
Annual Inspection · Internal Structural Exam · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1743376
20 November 2002
MARPOL Annex I Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1739523
26 February 2002
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1488212
15 September 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1071370
29 January 2001
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 825276
22 September 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1369850
7 April 2000
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1442995
3 March 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1046645
27 March 1999
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 139672
23 February 1999
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 800349
13 June 1998
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 174480
13 March 1998
Re-Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1439982
14 August 1997
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 783205
1 March 1997
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1357898
12 November 1996
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1959
29 April 1996
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1081304
21 March 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 71588
2 February 1995
Hull Examination · Construction Oversight · Initial Certification
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1465190
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 April 2021
Resolved
Submit repair proposal to be approved by USCG marine inspector and affect permanent repairs to the wastage identified in the bottom plating of the #3 Center Void tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 May 2021
Resolution: Repairs made.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 April 2021
Resolved
Barge reported water ingress into the #3 Center void tank. Provide damage survey assessment to identify cause of ingress and provide detailed repair plan to be approved by USCG marine inspector.Barge is restricted from cargo operations until permanent repair is complete.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 April 2021
Resolution: Temporary Repair Complete.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 January 2020
Resolved
Complete internal structural exam prior to carrying cargo to the satisfaction of attending Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 26 February 2019
Resolved
Condition after survey STBD FWD Rake possible hole or fracture in plating. Gas free for inspection.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2019
Resolved 27 February 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 26 February 2019
Resolved
Life lines missing or unable to be secured properly. Fix missing lifelines and replace missing components on life line system.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2019
Resolved 27 February 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 26 February 2019
Resolved
Condition after survey found multiple voids with missing or loose studs. Voids 1 PORT, PORT and STBD AFT RAKE, 3 PORT and Center RAKE FWD all have missing or loose studs. Replace studs and tighten loose studs on voids.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2019
Resolved 27 February 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 26 February 2019
Resolved
Condition after survey found PORT and Center AFT tank found with approximately 5 feet of water. Remove water as per stability letter. All voids are to remain dry.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2019
Resolved 27 February 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 15 December 2018
Resolved
Manholes shall be closed by substantial covers capable of being maade watertight. Manhole covers throughout the main deck are missing several studs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2019
Resolved 7 January 2019
Resolution: Studs installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 15 December 2018
Resolved
All vessels must have draft marks plainly and legibly visible. The draft marks need to be painted so they are clearly visible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2019
Resolved 7 January 2019
Resolution: Draft Marks are painted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 December 2018
Resolved
The name of the vessel must be marked on some clearly visible part of the port and starboard bow. The vessel's name needs to be painted so it is clearly visible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2019
Resolved 7 January 2019
Resolution: Vessel name has been painted.
Construction/Loadline › Hull › Bottom Plating
Issued 13 April 2018
Resolved
Provide a valid marine chemist certificate for safe entry into the stbd voids and make the stbd voids availabe for inspection to the satisfaction of the attending USCG Marine Inspector. 46 CFR 91.30-1
Action required: 705 - Other - as specified
Due 16 April 2018
Resolved 14 April 2018
Resolution: USCG Marine Inspectors conducted a damage survey/internal structure exam of all stbd tanks/voids; all sat.
Construction/Loadline › Hull › Weld
Issued 30 August 2017
Resolved
1S outboard void, cracked welds at the 2nd bottom long from centerline two transverse FRs fwd from entry point & at the 1st bottom long from centerline two transverse FRs fwd from entry point: Grind & re-weld.
Aft rake, port side, at intersection of the first vertical side-shell frame from aft and first deck longitudinal inboard from the port side-shell: cracked weld. Grind and re-weld.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2017
Resolved 25 September 2017
Resolution: Weld repairs were completed satisfactorily.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 16 March 2016
Resolved
Repaint draft marks, vessel name and hailing port in contrasting color.
Condition: Improper/Lack of Maintenance
Due 16 April 2016
Resolved 21 March 2016
Resolution: All markings have been re-painted.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 March 2016
Resolved
Repair 03 broken stanchions on starboard side (11th from fwd & 9th/10th from aft).
Condition: Improper/Lack of Maintenance
Due 16 April 2016
Resolved 21 March 2016
Resolution: All have been repaired.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 March 2016
Resolved
Repair broken/damaged/frail rail courses around barge as needed.
Condition: Improper/Lack of Maintenance
Due 16 April 2016
Resolved 21 March 2016
Resolution: All have been repaired.
Construction/Loadline › Structures › Manhole
Issued 16 March 2016
Resolved
Repair approximately 14 broken securing studs from various void space manhole covers.
Condition: Improper/Lack of Maintenance
Due 16 April 2016
Resolved 21 March 2016
Resolution: Studs have been replaced.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 16 March 2016
Resolved
Adjust starboard navigation light to display proper visibility.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 16 March 2016
Resolution: Corrected on the Spot
Construction/Loadline › Hull › Side Shell
Issued 21 September 2012
Resolved
#2 Port Wing Void: 1st bay from fwd; portside; 1st & 2nd side longitudinal from top tripped and torn. Tripping bracket on #4 side longitudinal from top tripped. C/R areas identified to the satisfaction of attending CG Marine Inspector NLT 21 Oct 2012.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 October 2012
Resolved 27 September 2012
Documentation › Certificates/Documents › International Load Line Certificate
Issued 21 September 2012
Resolved
Original International Load Line Certificate missing from vessel. Obtain and provide on-board the vessel NLT 21 Oct 2012 to the satisfaction of the attending CG marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 October 2012
Resolved 21 September 2012
Documentation › Certificates/Documents › International Load Line Certificate
Issued 21 September 2012
Resolved
Proof of 2012 annual ABS Load Line survey missing from vessel. Provide proof of survey through the endorsement section of the Load Line certificate to the satisfaction of the attending CG marine inspector prior to operating seaward of the boundary line.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 September 2012
Construction/Loadline › Hull › Longitudinal Frame
Issued 18 September 2012
Resolved
Vessel has passed drop dead date of 24 Aug 12 for an ISE; prior to conducting cargo operations a current ISE exam is required.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 September 2012
Resolution: ISE conducted to the satisfaction of the attending CG marine inspector.
Construction/Loadline › Structures › Manhole
Issued 1 February 2010
Resolved
CM01 - Void space #3 center not inspected due to low oxygen level. Space to be made ready for internal inspection at next dry dock exam.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 22 March 2010
Resolution: Inspected void space # 3- ALL SAT.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 1 February 2010
Resolved
CM02 - #1 Stbd Bay 1- C/R damaged portions of fwd bulkhead at side shell and btw SSL 1 & SSL 3. Make repairs at next dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 22 March 2010
Resolution: Inspected repairs for damaged portions of FWD bulkhead.
Construction/Loadline › Hull › Stiffener
Issued 1 February 2010
Resolved
CM03 - #1 Stbd Bay 1 - C/R brackets at SSL #1 & SSL #2. C/R SSL #1 & SSL #2 from fwd bulkhead aft 2 feet. Conduct repairs at next dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 22 March 2010
Resolution: Examined repairs. ALL SAT.
Construction/Loadline › Hull › Hull Plating
Issued 1 February 2010
Resolved
CM04 - #1 Stbd Bay 2 - C/R inset side shell plating in way of Frame #1 and below SSL #1. Conduct repairs at next dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 22 March 2010
Resolution: Examined repairs. ALL SAT.
Construction/Loadline › Hull › Girder
Issued 1 February 2010
Resolved
CM05 - #2 Stbd Bay 6 - C/R Frame iwo SSL #7 & C/R Transverse Deck Beam iwo SSL #7.
Conduct repairs at next dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 22 March 2010
Resolution: Examined repairs. ALL SAT.
Navigation
Issued 22 September 2000
Resolved
Prove proper operation of navigational lights. Vsl is restricted to daylight operations until cleared by USCG.
Condition: Unknown
Due 22 September 2000
Resolved 3 October 2000
Documentation
Issued 23 February 1999
Resolved
IAW 46CFR91.55 & 46CFR110.25 SUBMIT PLANS FOR YOUR "TAYLOR" CONTAINERIZED ELECTRICAL POWER GENERATING SYS. TO USCG FOR APPROVAL.PLANS TO BE SUBMITTEDTO USCG MSC;400 SEVENTH ST.S.W. WASH DC 20590YOUR POC AT ACTNY IS LT.OBER [phone withheld] PLAN REVIEW MAYBE CODUCTED BY ABS AS AN OPTION USING NVIC10-82
Condition: Unknown
Due 1 May 1999
Resolved 1 April 1999
Navigation
Issued 23 February 1999
Resolved
INSTALL BUNTING IN FWD AND AFT NAV LIGHT BATTERY BOXES
Condition: Unknown
Due 23 March 1999
Resolved 1 April 1999
Construction/Loadline
Issued 13 March 1998
Resolved
VESSEL IS TO PROCEED TO A SUITABLE FACILITY TO MAKE READY FOR AN ISE TO BE CONDUCTED BY A CG MARINE INSPECTOR. ENSURE ALL BARGE INTERNALS ARE CERTIFIED BY A MARINE CHEMIST TO BE "SAFE FOR ENTRY". CONFIRM LOCATION AND DATE OF INSPECTION PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 17 March 1998
Resolved 17 March 1998
Construction/Loadline
Issued 1 March 1997
Resolved
Make permanent repairs to fractured weld at turn of bilge in forward starboard rake.
Condition: Unknown
Due 2 March 1997
Resolved 1 March 1997
Navigation
Issued 1 March 1997
Resolved
Vessel allowed to make a one time trip to SEALAND BERTH 92 for repairs.
Condition: Unknown
Due 2 March 1997
Resolved 1 March 1997
Navigation
Issued 1 March 1997
Resolved
Replace broken port forward solar panel and fax proof of purchase to ACTNY Prevention and Compliance Branch. Also fax servicing reports of BII portable fire extinguishers for power pack container.
Condition: Unknown
Due 2 March 1997
Resolved 1 March 1997
Documentation
Issued 1 March 1997
Resolved
Vessel is currently operating without a Ship Oil Pollution Emergency Plan. Route has been restricted to lakes bays and sounds until compliance.
Condition: Unknown
Due 1 March 1997
Resolved 1 March 1997
Construction/Loadline
Issued 1 March 1997
Resolved
Gas free and make accessible to marine inspector forward and aft rakes P/C/S for inspection.
Condition: Unknown
Due 2 March 1997
Resolved 1 March 1997