MAURY USCG vessel records Sign in
← All vessels

PETERSBURG

PETERSBURG is a 1963 tank ship. The Coast Guard has recorded 137 inspections since 1982, most recently in March 2022, along with 209 deficiencies, 2 operational controls and 5 casualty investigations between 2005 and 2016.

Records from 1982 to 2022. Most recent: inspection, 1 March 2022.

Built
1963
Last inspected
1 March 2022
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

6329044 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
368102000 (licence lapsed)
Maury page id
psix-44504

Inspections, by type

…with no type recorded66
Years with a record 37 calendar years (1982–2022)
The 137 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it27469 - Regulatory (Subpart C or D), Gross Ton
27049 - Convention (Subpart B), Gross Ton
18685 - Regulatory (Subpart C or D), Net Ton
17361 - Convention (Subpart B), Net Ton
48992 - Dead Weight, Ton
62150 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WJDCMMSI 368102000 · expired · compulsorily equipped · granted 20 May 1997, cancelled 22 July 2007
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 8

Inspection history · 137

1 March 2022 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7404093
30 April 2021 Administrative Inspection · Load Line/Change of Employment · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7186637
10 November 2020 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7126828
7 July 2020 In-Service Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7018157
21 February 2020 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6932352
29 August 2019 Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6798485
18 June 2018 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6447776
11 June 2018 Deficiency Check · Drydock Exam · Periodic Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6441293
5 March 2018 Initial Construction-Excluding Oversight · In-Service Inspection · Plan Review (Other than "T") · Administrative Inspection · Internal Structural Exam · MTSA/ISPS Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6371475
7 December 2017 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6320974
4 October 2017 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6277456
9 March 2017 Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6102013
7 September 2016 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5996684
18 August 2016 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5977399
20 May 2016 Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5892814
21 August 2014 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4961195
24 July 2012 Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4389444
11 February 2011 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4033162
1 November 2010 Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3918043
25 January 2010 MTSA/ISPS Verification · Annual Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3665940
20 January 2010 Liferaft Servicing
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3674992
6 May 2008 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3200192
10 December 2007 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3113211
14 September 2007 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3064475
21 June 2007 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2979954
8 September 2006 In-Service Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2776894
13 February 2006 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2593544
10 January 2006 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 2563807
10 August 2005 Ballast Water Examination · COI Inspection · MTSA/ISPS Verification
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2457812
8 August 2005 MARPOL Annex V Examination · MARPOL Annex I Examination · Cargo Tank Internal · Hull Examination · Deficiency Check · MTSA/ISPS Verification · Internal Structural Exam
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 2419153
25 February 2005 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2319145
9 July 2004 MTSA/ISPS Verification · Annual Inspection · Administrative Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2129602
3 June 2004 MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2087480
29 January 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996745
12 December 2003 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 1962909
9 October 2003 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1924313
11 July 2003 Internal Structural Exam · Annual Inspection · Hull Examination · MARPOL Annex V Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 1816319
30 January 2003 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1742112
14 August 2002 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1664740
15 February 2002 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1617406
13 September 2001 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1617411
7 September 2001 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1617364
23 August 2001 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1617410
22 August 2001 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1617386
15 August 2001 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1366527
25 July 2001 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1075020
18 February 2001 Damage Survey
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1387002
25 October 2000 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1055237
5 August 2000 Hull Examination · Deficiency Check · COI Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1361675
30 March 2000 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1050071
14 March 2000 Drydock Extension
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1403078
1 March 2000 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 815422
23 September 1999 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1032897
23 September 1999 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1339839
31 August 1999 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1116740
23 August 1999 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 781206
20 August 1999 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 778866
4 August 1999 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1369302
22 July 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 88684
1 March 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 454458
13 January 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 4177
10 January 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 55119
1 January 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 169891
28 December 1998 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 809388
4 September 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 53841
3 August 1998 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1375362
29 June 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 164266
21 January 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1388440
3 December 1997 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 134342
3 November 1997 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1433291
23 October 1997 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 778740
27 May 1997 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1442608
15 May 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 13427
10 May 1997 COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1446494
20 April 1995 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1437009
18 March 1995 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 128915
14 March 1995 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 781
9 March 1995 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 859944
4 August 1994 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1463847
3 November 1993 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1168162
30 August 1993 COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1147921
30 August 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1268693
28 April 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1268604
31 March 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 954833
13 September 1991 Examination of Repairs · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1254346
1 August 1991 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 683120
6 March 1991 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 932627
9 October 1990 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 904671
2 October 1990 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 911153
27 October 1989 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1232740
16 February 1988 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1031195
17 September 1987 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1316941
6 September 1987 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1323310
9 March 1987 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 442500
9 March 1987 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1317403
3 March 1987 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1008162
17 February 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1012437
11 February 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1322262
29 January 1987 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1320900
27 November 1986 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1330123
25 November 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 470998
18 September 1986 MARPOL Annex I Examination
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1311360
23 April 1986 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 521762
18 February 1986 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1295090
5 February 1986 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1304653
21 January 1986 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 534125
16 January 1986 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1295149
20 December 1985 Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1300003
14 December 1985 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1299760
10 December 1985 COI Inspection · Credit Drydock
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1300352
6 November 1985 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 988476
21 October 1985 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 992182
15 October 1985 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 504659
27 September 1985 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 304426
20 September 1985 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 991455
6 September 1985 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 496884
6 September 1985 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 988171
9 July 1985 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 440403
9 July 1985 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1291138
20 March 1985 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 443977
20 March 1985 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1287948
15 March 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 979511
18 January 1985 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1288577
21 December 1984 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1288502
9 December 1984 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 515139
17 November 1984 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1284638
9 November 1984 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 975441
18 July 1984 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 448426
27 June 1984 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 512898
12 June 1984 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 534417
17 February 1984 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1279600
1 April 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273670
1 February 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272288
1 February 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281662
23 December 1982 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 968535
31 March 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1277715
27 January 1982 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1273504

Deficiency record · 209

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 4 August 2020 Resolved
Where the operating rods pass through a deck, gastight stuffing boxes shall be fitted. Multiple reach rod stuffing boxes were identified as unsecured and ullage gaskets found to deteriorated. All cargo tanks shall be verified as gas tight by attending MI prior to the onload of any cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 March 2022
Resolution: Vessel scrapped on 01JUN2021 in Brownsville, TX.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 4 August 2020 Resolved
Grade B or C liquids. Cargo tanks in which Grade B or C liquids are to be transported shall be fitted with either individual pressure-vacuum relief valves which shall extend to a reasonable height above the weather deck or shall be fitted with a venting system consisting of branch vent lines connected to a vent header which shall extend to a reasonable height above the weather deck and be fitted with a flame arrester or a pressure-vacuum relief valve. All cargo tank PV valve shall be tested to verify proper lifting setting on both pressure and vacuum sides prior to the onload of any cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 March 2022
Resolution: Vessel scrapped on 01JUN2021 in Brownsville, TX.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 4 September 2019 Resolved
All pressure vessels must be provided with protective devices. 1st Stage Heater for main propulsion does not have relief valve installed. Install pressure relief valve downstream and tag open valve between heat exchanger and Pressure relief valve until it can be properly installed. 46 CFR 54.15-5 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 November 2019
Resolved 1 October 2019
Resolution: Safety Relief Valve installed on 1st stage heater.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 4 September 2019 Resolved
Anesthetics, drugs, and medicines must be stowed and dispensed in accordance with the DHHS Publication No. (PHS) 84-2024. Medical locker in hospital space contained expired medicine. Remove all expired medicine. 46 CFR 147.105
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 September 2019
Resolved 1 October 2019
Resolution: Expired medicine removed and replaced.
Deck/Cargo › Inert Gas System › Deck Distribution System
Issued 5 March 2018 Resolved
VESSEL FOUND WITH UPWARDS OF A DOZEN HOLES IN THE INERT GAS SUPPLY PIPING. VESSEL SHALL NOT USE THE INTERT GAS SYSTEM UNTIL PROPER REPAIRS ARE MADE. 46 CFR 32.53-10 (b) *voluntary compliance IAW MARAD/USCG MOU
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 5 March 2018 Resolved
VESSEL FOUND WITH HOLES IN BOTH PORT AND STBD CARGO MANIFOLD CONTAINMENTS. VESSEL SHALL NOT TRANSFER OIL OR HAZARDOUS MATERIAL WITHOUT PROPER CONTAINMENTS IN PLACE.33 CFR 155.310 *voluntary compliance IAW MARAD/USCG MOU
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 5 March 2018 Resolved
VESSELS INERT GAS SYSTEM DECK SEAL FOUND HEAVILY DETERIORATED AND HOLED. VESSEL SHALL CONDUCT PROPER REPAIRS PRIOR TO USING THE INERT GAS SYSTEM. 46 CFR 32.53-10 (b) *voluntary compliance IAW MARAD/USCG MOU
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Construction/Loadline › Structures › Ventilators
Issued 5 March 2018 Resolved
VESSEL FOUND WITH SOFT PATCHES ON THE #2 PUMP ROOM SUPPLY FAN DUCT & PEDESTAL. VESSEL SHALL ENSURE PROPER REPAIRS ARE CONDUCTED PRIOR TO LOADING/DISCHARGING FLAMMABLE/COMBUSTABLE LIQUIDS. 46 CFR 170.005(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Fire Fighting › Fixed Deck Foam System › Piping
Issued 5 March 2018 Resolved
VESSEL FOUND WITH FIBERGLASS PATCH ON THE FIRE MAIN AT STATION . VESSEL SHALL CONDUCT PERMANENT REPAIRS AT THE UPCOMING DRY-DOCK. 46 CFR 31.10-18(e)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Construction/Loadline › Hull › Hull Plating
Issued 5 March 2018 Resolved
DURING THE INTERNAL STRUCTURAL EXAM, FOUND THE FOLLOWING AREAS IN NEED OF REPAIR: -MAIN DECK SCUPPER HOLED AT FR.69-70 PORT SIDE -DEEP PIT FOUND IN #2C BOTTOM PLATE AT FR.93-94 BETWEEN THE 2ND AND 3RD LONGITUDINALS STBD FROM CENTER -DEEP PITS FOUND IN #3C BOTTOM PLATE AT FR.92-93 BETWEEN THE 1ST AND 2RD LONGITUDINALS STBD FROM CENTER -ACCESS LADDER TO #1 PORT WBT DEEP TANK WASTED -DETERIORATED PLATING IDENTIFIED AT STBD SEA CHEST IN THE ENGINE ROOM AT FR. 45-46 -PORT SIDE SHELL PLATING AT FR.34-41 PORT BETWEEN TANK TOP AND 4TH STRINGER CORRODED PAST ALLOWABLE LIMIT -STBD SIDE SHELL PLATING AT FR.39-41 & 44-46 NEAR SEA CHEST IN THE ENGINE ROOM CORRODED PAST ALLOWABLE LIMIT -STBD SIDE SHELL PLATING AT FR.49-55 IN THE FIRE ROOM NEAR TANK TOP CORRODED PAST ALLOWABLE LIMIT -PORT SIDE SHELL PLATING AT FR.55-58 IN THE FIRE ROOM NEAR TANK TOP CORRODED PAST ALLOWABLE LIMIT -PORT SIDE SHELL PLATING AT FR.17-18 CORRODED PAST ALLOWABLE LIMIT-STBD SIDE SHELL PLATING AT FR.18-20 CORRODED PAST ALLOWABLE LIMIT 46 CFR 31.10-21(c)
Action required: 705 - Other - as specified
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Construction/Loadline › Hull › Hull Plating
Issued 5 March 2018 Resolved
TO COMPLETE INTERNAL STRUCTURAL EXAM, THE FOLLOWING AREAS NEED TO BE ENTERED AND INSPECTED; -AFT PEAK TANK -7C TANK -PUMP ROOM BOTTOM PLATING 46 CFR 31.10-21
Action required: 705 - Other - as specified
Resolved 3 August 2018
Resolution: item cleared during dry dock exam ACT#6441293
Fire Fighting › Fire Main › Condition
Issued 18 August 2016 Resolved
Secure leaking from fire pump overboard relief valve packing.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 9 March 2017
Resolution: Packing replaced, tested pump.
Fire Fighting › Combustible Materials › Insulation
Issued 18 August 2016 Resolved
Re-fasten lagging on steam drain in main space near g/s fire pump.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 9 March 2017
Resolution: Lagging re-fastened.
Construction/Loadline › Hull › Bracket
Issued 18 August 2016 Resolved
Weld bracket for bilge injection valve mount.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 9 March 2017
Resolution: Bracket welded.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 18 August 2016 Resolved
Properly secure all high pressure cylinders in machinery spaces.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 9 March 2017
Resolution: Cylinder brackets provided.
Construction/Loadline › Structures › Deck Plating
Issued 18 August 2016 Resolved
Repair wasted deck plate in port forward lower deck main space overhead.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 5 September 2019
Resolution: Verified there was no wasted deck plate in this area.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 August 2016 Resolved
Provide metallic ties for wire runs on bulkhead near aux diesel generator.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 9 March 2017
Resolution: Metallic ties provided.
Documentation › Logs/Records › Oil Record Book
Issued 18 August 2016 Resolved
Sign page 49 or Oil Record Book.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 9 March 2017
Resolution: ORB signed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 18 August 2016 Resolved
Repair damaged deck rail at the starboard bow
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 22 September 2016
Resolved 9 March 2017
Resolution: Rails repaired.
Lifesaving › Inflatable Liferafts › Servicing
Issued 21 August 2014 Resolved
Provide proof of annual liferaft servicing by a qualified facility.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 June 2015
Fire Fighting › Fire Main › Condition
Issued 21 August 2014 Resolved
Make permanent repairs to the fire main at the forward slide joint.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 June 2015
Fire Fighting › Fixed Deck Foam System › Piping
Issued 21 August 2014 Resolved
Make repairs to leaking foam main flange outboard of FS#4 on the stbd side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 June 2015
Construction/Loadline › Markings › Load Line Mark
Issued 21 August 2014 Resolved
Make load line markings permanent IAW the ILLC.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 June 2015
Deck/Cargo › Inert Gas System › IGS Blower
Issued 21 August 2014 Resolved
Renew both expansion joints on the IG system lines (located just past blowers).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 October 2017
Resolution: New non-metallic joints installed at last drydock.
Deck/Cargo › Inert Gas System › Venting System
Issued 12 October 2011 Resolved
Make permanent repairs to the PV breaker on the cargo deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2013
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 11 February 2011 Resolved
Conduct annual lifeboat and davit inspection and provide proof of inspection prior to departure from San Francisco Bay.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 July 2013
Resolution: Documentation of lifeboat and davit inspection provided.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 January 2010 Resolved
Complete overdue annual inspection.
Action required: 705 - Other - as specified
Due 28 January 2010
Resolved 28 January 2010
Resolution: Completed annual oversight inspection with several long-term requirements issued.
Electrical › Electric Generation Source (emergency) › Generator
Issued 25 January 2010 Resolved
Demonstrate proper operation of emergency diesel generator.
Action required: 705 - Other - as specified
Due 25 January 2010
Resolved 25 January 2010
Resolution: Attending ABS surveyor witnessed proper operation of the emergency diesel generator.
Communications › Radio Communications › EPIRB
Issued 25 January 2010 Resolved
Replace expired hydrostatic release on EPIRB.
Action required: 705 - Other - as specified
Due 5 February 2010
Resolved 25 January 2010
Resolution: Operator replaced hydrostatic release with new release.
Documentation › Certificates/Documents › Cargo Ship Safety Construction Certificate
Issued 25 January 2010 Resolved
Complete all required statutory surveys currently outstanding with ABS.
Action required: 705 - Other - as specified
Due 30 June 2010
Resolved 18 June 2010
Resolution: ABS stated all surveys are current
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 25 January 2010 Resolved
Complete all required statutory surveys currently outstanding with ABS.
Action required: 705 - Other - as specified
Due 30 June 2010
Resolved 18 June 2010
Resolution: At completion of this inspection vessel is no longe part of ACP and ABS will not be issuing a Cargo Ship Safety Equipment Certificate.
Electrical › Electrical Distribution System (service) › Cable
Issued 10 August 2005 Resolved
Connect dead end wire to cargo pump bearing temperature sensor and vapr monitor in pump room.
Due 22 August 2005
Resolved 8 November 2005
Resolution: System has been completed and all wires properly connected.
Deck/Cargo › Cargo Stowage › General
Issued 10 August 2005 Resolved
Prove proper operation of #1 port and stbd cargo tank high level alarms.
Due 22 August 2005
Resolved 8 November 2005
Resolution: All Cargo tank high level alarms operated satisfactorily.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 10 August 2005 Resolved
Prove proper operation of ODME. ODME printer does not work. Troubleshoot "sea valve open" fault.
Due 22 August 2005
Resolved 8 November 2005
Resolution: Verified proper operation of printer and fault indication corrections.
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 10 August 2005 Resolved
Hydro test O2 bottles in ships hospital.
Due 22 August 2005
Resolved 26 October 2005
Resolution: Bottles hydro tested at DOT approved facility in Singapore.
Lifesaving › Launching Appliances › Davit
Issued 10 August 2005 Resolved
Conduct a 1.1 weight test of lifeboat davits/falls/brakes.
Due 22 August 2005
Resolved 4 November 2005
Resolution: Conducted weight test on all lifeboat system equipment.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 10 August 2005 Resolved
Have all portable and fixed fire fighting gear annually serviced. Provide documentation.
Due 22 August 2005
Resolved 7 November 2005
Resolution: Witnessed satisfactory testing of fixed systems and verified proper maintenance of portable fire fighting equipment.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 10 August 2005 Resolved
Hydrostatically test all cargo hoses and piping to 1.5 times MAWP.
Due 22 August 2005
Resolved 7 November 2005
Resolution: Witnessed hydro test of cargo and OPDS piping systems. OPDS hoses are still within required date according to vessel records and not required at this time.
Engineering › Steam Boiler (propulsion) › Valve, Relief
Issued 10 August 2005 Resolved
Test Safety devices on propulsion machinery.
Due 22 August 2005
Resolved 9 November 2005
Resolution: Completed Machinery examination testing all propulsion system safety devices per automation procedures.
Engineering › Steam Boiler (propulsion) › Combustion Air System
Issued 10 August 2005 Resolved
Hydro test port & stbd boilers.
Due 22 August 2005
Resolved 25 October 2005
Resolution: Port and Stbd boiler hydro tested to 1.25 times MAWP.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 10 August 2005 Resolved
Make port & stbd boilers ready for internal exam.
Due 22 August 2005
Resolved 15 September 2005
Resolution: Port and Stbd boiler completed fire side and water side examinations.
Engineering › Pressure Vessel › Piping
Issued 10 August 2005 Resolved
Hydro test high pressure steam piping.
Due 22 August 2005
Resolved 26 October 2005
Resolution: Completed satisfactory hydro of all steam lines subject to boiler pressure.
Engineering › Pressure Vessel › Relief Valve
Issued 10 August 2005 Resolved
Conduct hydro, safety reliefs, and internal examinatio nof Low Pressure boiler.
Due 22 August 2005
Resolved 9 November 2005
Resolution: This item was completed by ABS on behalf of USCG. No inspector present for the testing. Verified procedures and limitations with ABS surveyor to ensure all USCG concerns were addressed.
Documentation › Markings/Placards › Oil Discharge Placard
Issued 10 August 2005 Resolved
Post oil discharge placard at ovbd discharge of OWS.
Due 22 August 2005
Resolved 9 November 2005
Resolution: Placards posted.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 10 August 2005 Resolved
Conduct automation procedure #2 I (loss of control power).
Due 22 August 2005
Resolved 9 November 2005
Resolution: Witnessed satisfactory test of item #2I
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 10 August 2005 Resolved
Conduct boiler automation procedure #IV E (automatic bus transfer).
Due 22 August 2005
Resolved 9 November 2005
Resolution: Witnessed satisfactory test of procedure # IV E.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 10 August 2005 Resolved
Conduct boiler automation procedure #2 H. Current procedure can not be conducted as written. Procedures need to be revised or removed.
Due 22 August 2005
Resolved 9 November 2005
Resolution: Procedure has been removed from the Test Procedures.
Engineering › Steering Gear System › Follow-up Assembly
Issued 10 August 2005 Resolved
Post change over procedures & diagram for emergency steering.
Due 22 August 2005
Resolved 9 November 2005
Resolution: Procedures were posted.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 10 August 2005 Resolved
Provide calibration certificate for OWS monitor.
Due 22 August 2005
Resolved 9 November 2005
Resolution: Both monitors calibrated by licensed factory rep.
Engineering › Pressure Vessel › Relief Valve
Issued 10 August 2005 Resolved
Conduct internal inspection and safety valve test on DC Heater (Bal 1097J).
Due 22 August 2005
Resolved 7 November 2005
Resolution: DC Heater relief valve tested during automation testing. Internally inspected prior to boiler operation.
Engineering › Pressure Vessel › Relief Valve
Issued 10 August 2005 Resolved
Conduct internal inspection and safety valve test on Steam Generator (AB243).
Due 22 August 2005
Resolved 7 November 2005
Resolution: Valve was shop tested in presence of ABS. Boiler is not operational at this time so mounted test not feasible.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 8 August 2005 Resolved
Submit plans to install 30 second timer for fixed CO2 system protecting paint locker adjacent to steering flat.
Condition: Design Flaw
Due 31 December 2005
Resolved 10 January 2006
Resolution: Requirement not supported by regulations. Item cleared with no action required or made by vessel operator.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 July 2004 Resolved
COMPLETE FIREFIGHTING EQUIPMENT ANNUAL SERVICING.
Due 11 August 2004
Resolved 11 August 2004
Electrical › Electric Supply System (service)
Issued 9 October 2003 Resolved
SAAB circuit indicator for high alarm panel nonfunctioning properly.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 9 October 2003
Resolution: Contact and wiring replaced.
Deck/Cargo › Holds/Tanks
Issued 11 July 2003 Resolved
Make permanent repairs to #1 cargo tank high alarm pre-check circuit. LEGACY COMPONENT DESC: Liquid Level Gauging
Condition: Improper/Lack of Maintenance
Due 10 August 2003
Resolved 9 October 2003
Communications › Radio Communications › EPIRB
Issued 30 January 2003 Resolved
Place on board the vessel a functioning and registered EPIRB. Vessel is restricted to no more than 3 miles from shore for the Island of Guam.
Action required: 705 - Other - as specified
Resolved 3 February 2003
Lifesaving
Issued 15 August 2001 Resolved
Relocate bow liferaft to a position that will enable ease of deployment in the event of emergency.
Condition: Unknown
Due 19 October 2001
Resolved 14 August 2002
Resolution: Liferaft moved.
Engineering
Issued 18 February 2001 Resolved
Replace spool piece between non-metallic expansion joint and sea valve on vessel's main condenser overboard line.
Condition: Unknown
Due 13 March 2001
Resolved 13 March 2001
Construction/Loadline
Issued 5 August 2000 Resolved
Make permanent repairs to battery room deck and bulkheads where wasted.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Fire Fighting
Issued 5 August 2000 Resolved
Properly close cableway through the deck of the cargo control room, under the SAAB cabinet.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Fire Fighting
Issued 5 August 2000 Resolved
Renew all portable fire extinguisher brackets which are not the brackets required for each particular fire extinguisher. See extinguisher label forproper bracket number.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Engineering
Issued 5 August 2000 Resolved
Install guard or insulation on all steam lines on maindeck where personnel transit and temperature of pipe surface 150 degrees F. or higher, includingsteam supply and return to and from all deck winches.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Electrical
Issued 5 August 2000 Resolved
Make permanent repairs after determintion of reason for "alligator clips" installed as jumpers in OPDS cabinet in cargo control room.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Electrical
Issued 5 August 2000 Resolved
Rewire jacket water alarm on emergency generator to act as an alarm only, not a shutdown.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Fire Fighting
Issued 5 August 2000 Resolved
Post system instructions for all fixed CO2 systems.
Condition: Unknown
Due 5 August 2000
Resolved 5 August 2000
Deck/Cargo
Issued 4 August 1999 Resolved
PROVE PROPER OPERATION OF IGS PLANT INCLUDING ALL ALARMS AND SHUTDOWNS.
Condition: Unknown
Due 4 August 1999
Resolved 4 August 1999
Construction/Loadline
Issued 4 August 1999 Resolved
CROP AND RENEW WASTED AND HOLED DECK DRAIN SCUPPER PIPE WHICH PASSES THROUGH #3 PORT CARGO TANK DURING THE VESSEL'S NEXT DRYDOCK PERIOD, BUT NO LATER THAN 30APR00.
Condition: Unknown
Due 4 August 1999
Resolved 4 August 1999
Engineering
Issued 4 August 1999 Resolved
REPAIR STBD SUPERHEATER TEMPERATURE GAUGE.
Condition: Unknown
Due 4 August 1999
Resolved 4 August 1999
Electrical
Issued 4 August 1999 Resolved
CONDUCT AND LOG THE 6-MONTH - 12-HOUR LOAD TEST ON EMERGENCY BATTERY BANK.
Condition: Unknown
Due 4 August 1999
Resolved 4 August 1999
Accommodation/Occupational Safety
Issued 4 August 1999 Resolved
PROVE PROPER OPERATION OF REMOTE VENTILATION CIRCUIT FOR E/R, LOCATED ON POOP DECK, STBD PASSAGEWAY.
Condition: Unknown
Due 4 August 1999
Resolved 4 August 1999
Engineering
Issued 4 August 1999 Resolved
CALIBRATE ALL BOILER CONTROL STATION GAUGES.
Condition: Unknown
Due 4 August 1999
Resolved 4 August 1999
Unknown
Issued 3 August 1998 Resolved
INSTALL CAP/PLUG AT L/O HAND PUMP DISCHARGE AFT OF MAIN SWITCHBOARD
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
COMPLETE INSTALLATION OF CONSTAVOLT CHARGER LOCATED BEHIND MAIN SWITCHBOARD.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROVIDE RESULTS OF FOAM ANALYSIS.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR S/W LEAKS AT NEW EVAP INSTALLATION
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
INSTALL LIMIT SWITCHES ON BOTH LIFEBOAT DAVITS.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
ENSURE SMOKE DETECTION SYSTEM MEETS THE REQUIREMENTS SET FORTH IN 46 CFR 113.70-5C.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR HAND RAIL IN E/R ON THE MAIN DECK LEVEL AFT OF THE L/O GRAVITY TANK STBD SIDE.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROVE PROPER OPERATION OF HEAT SENSOR LOCATED IN HYDRAULIC ROOM (JUST AVOVESTEERING ROOM)
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROPERLY STENCIL EDG FUEL CUT-OFF VALVES
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPLACE GASKET ON WTD AFT PASSAGEWAY 01 DECK & ADJUST INBOARD DOG ON SAME WTD.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REMOVE DEAD END WIRES AT F/S 18
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPLACE WORN BOLTS & NUTS AT DECK FLANGE @ IGS BYPASS
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROPERLY INSTALL VENT LOUVRES ON O2 DECK (P/S)
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
STENCIL CO2 ACTIVATION DIRECTIONS AT PAINT LOCKER ON O2 DECK
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPLACE COVER & PROPERLY INSTALL SWITCH FWD OF VENT @ IGS SCRUBBER
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROPERLY INSTALL FLAME SCREEN AT DEG F/O TANK VENT
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
INSTALL PLUGS IN IGS LINE AT O3 DECK FWD PORT SIDE
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
INSTALL PLUG W/CHAIN ON DIESEL FILL VALVE AT O3 DECK
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR HOLES IN PORTLIGHTS IN THE FOLLOWING LOCATIONS: RADIO ROOM, CREWS LOUNGE, FWD OFFICE STBD SIDE OF O2 DECK & SHIP'S OFFICE
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REMOVE ANTENNA LEAD & REPAIR HOLE IN AFT BULKHEAD IN THE RADIO ROOM
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR HOLE ON DECK AT THE PORT BRIDGE WING
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
COMPLETE INSTALLATION, PROPERLY LABEL & PROVE OPERATION OF SSB
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR/REPLACE SECTION OF O1 DECK AT AFT PASSAGEWAY PORT SIDE OUTBOARD OF GALLEY.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR/REPLACE LOWER HANDRAIL OUTBOARD OF PORT CHAIN HAWSER
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR/PROVE OPERATION OF IGS ALARMS & AUTOMATION PROCEDURES
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR INBOARD GRABRAILS ON PORT & STBD LIFEBOATS
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR DETERIORATED AREAS IN SCRUBBER INLET HOUSING IWO SEAL PUMP SUPPLY WATER INLET & GAS RECIRC LINE INLET
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
REPAIR L/O LEAKS AT NEW L/O FILTER INSTALLATION FOR BOTH STEAM TURBINE GENERATORS
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROVE PROPER OPERATION OF HEAT SENSOR LOCATED IN PORT BOSN STORES
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
PROVE PROPER OPERATION OF SMOKE DETECTOR IN BOILER UPTAKE.
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Unknown
Issued 3 August 1998 Resolved
INSTALL ALARM/MONITOR FOR ZONE 9 ON PANEL IN CARGO CONTROL ROOM
Condition: Unknown
Due 3 August 1998
Resolved 10 August 1998
Documentation
Issued 3 August 1998 Resolved
PROVIDE UPDATED FIRE/SMOKE DETECTION PLANS FOR MSO APPROVAL.
Condition: Unknown
Due 3 August 1998
Resolved 3 August 1998
Engineering
Issued 27 May 1997 Resolved
UPON COMPLETION OF BURNER MANAGEMENT TESTS DURING SEA TRIALS BY SEABOARD CONTROLS TECHNICIANS NOTIFY COGNIZANT OCMI TO VERIFY AND TEST SYSTEM TO THESATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 5 June 1997
Resolved 10 June 1997
Deck/Cargo
Issued 27 May 1997 Resolved
REPLACE MUSHROOM TOP VENTILATOR EXHAUST TO STBD EXHAUST VENT FROM CARGO PUMP ROOM AT NEXT DRYDOCK.
Condition: Unknown
Due 27 May 1997
Resolved 27 May 1997
Navigation
Issued 27 May 1997 Resolved
UPON COMPLETION OF UPCOMING SEA TRIALS PROVIDE NEW COMPASS DEVIATION CARD.
Condition: Unknown
Due 5 June 1997
Resolved 17 June 1997
Deck/Cargo
Issued 27 May 1997 Resolved
PRIOR TO THE TRANSFER OF ANY CARGO SHOW THE PROPER OPERATION OF CARGO PUMP EMERGENCY SHUTDOWNS.
Condition: Unknown
Due 27 May 1997
Resolved 27 May 1997
Construction/Loadline
Issued 27 May 1997 Resolved
PRIOR TO OPERATING OPDS BOAT CRANE ENSURE CRANE MEETS ABS REQUIREMENTS AND PROVIDE VALID CARGO GEAR CERTIFICATE FOR SAME.
Condition: Unknown
Due 27 May 1997
Resolved 27 May 1997
Deck/Cargo
Issued 27 May 1997 Resolved
DEMONSTRATE PROPER OPERATION OF IGS PRIOR TO CARGO OPERATIONS.
Condition: Unknown
Due 27 May 1997
Resolved 27 May 1997
Navigation
Issued 27 May 1997 Resolved
SUBMIT PROPOSAL TO OCMI PRIOR TO 15JUN97 TO PROVIDE FOR UNOBSTRUCTED VIEW FROM BRIDGE. UNTIL APPROVAL IS RECIEVED VESSEL IS TO MAINTAIN BOW LOOKOUT WHILE UNDERWAY.
Condition: Unknown
Due 1 July 1997
Resolved 7 August 1997
Deck/Cargo
Issued 27 May 1997 Resolved
SHOW PROPER OPERATION OF CARGO PUMP EMERGENCY SHUTDOWNS.
Condition: Unknown
Due 27 May 1997
Resolved 5 September 1997
Accommodation/Occupational Safety
Issued 27 May 1997 Resolved
SUBMIT PROPOSAL TO COGNIZANT OCMI FOR REPAIRS TO BOTH SILLS OF FIRE DOORS FM MACHINERY SPACE (DC HTR LEVEL) TO ACCOMODATIONS PASSAGEWAY.
Condition: Unknown
Due 18 June 1997
Resolved 7 August 1997
Deck/Cargo
Issued 10 May 1997 Resolved
Make permanent repairs to cargo pumproom exhaust vent prior to cargo transfer. 46CFR32.60-20
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Electrical
Issued 10 May 1997 Resolved
Install belt guard for emergency generator. _x001C_ _x001C_ _x001C_ 46 CFR 58.01-20
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Electrical
Issued 10 May 1997 Resolved
Repair electrical grounds on emergency generator switchboard. _x001C_ _x001C_ _x001C_ 46 CFR 111.30-29
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Electrical
Issued 10 May 1997 Resolved
Install wooden handholds behind the emergency generator switchboard. _x001C_ _x001C_ _x001C_ 46 CFR 111.30-9(e)
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Electrical
Issued 10 May 1997 Resolved
Demonstrate low lube oil shutdown for emergency generator. _x001C_ _x001C_ _x001C_ 46 CFR 112.50(h)
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Engineering
Issued 10 May 1997 Resolved
Provide onboard "gags" for S/S Boiler._x001C_ _x001C_ _x001C_ 46 CFR 52.01-120(a)(9)
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Engineering
Issued 10 May 1997 Resolved
Demonstrate audible alarm for oily water seperator at 15ppm._x001C_ _x001C_ _x001C_ MARPOL 73/78 Annex 1 Reg 9 and 33 CFR 151.10(b)(5)
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Electrical
Issued 10 May 1997 Resolved
Demonstrate proper operation of high and low remote fuel oil cut-out valvesfor emergency generator daytank._x001C_ _x001C_ 46 CFR 58.01-25
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Accommodation/Occupational Safety
Issued 10 May 1997 Resolved
Remove locking device for emergency escape trunk exit._x001C_ _x001C_ _x001C_ 46 CFR 92.10-20
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Engineering
Issued 10 May 1997 Resolved
Demonstrate proper operation of relief valves for control air, ship's service air, and aux diesel air receivers._x001C_ _x001C_ 46 CFR 61.10-5(i)
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Electrical
Issued 10 May 1997 Resolved
Install a test switch at the emergency generator switchboard to simulate a failure of normal power source._x001C_ _x001C_ 46 CFR 112.45-5
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Navigation
Issued 10 May 1997 Resolved
Show proper operation of GPS. 33CFR164.41
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Deck/Cargo
Issued 10 May 1997 Resolved
Show proper operation of cargo pump emergency shutdowns prior to transfer. 33CFR157.80
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Deck/Cargo
Issued 10 May 1997 Resolved
Show proper operation of ODME prior to transfer of cargo. MARPOL I/19
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Deck/Cargo
Issued 10 May 1997 Resolved
Show proper operation of IGS prior to transfer of cargo. 46CFR32.53-5
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Deck/Cargo
Issued 10 May 1997 Resolved
Show proper operation of cargo tank high level alarms prior to transfer of cargo. 33CFR155.480
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Deck/Cargo
Issued 10 May 1997 Resolved
Provide O2 and combustible gas portable instruments prior to cargo transfer. 46CFR32.53-65
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Navigation
Issued 10 May 1997 Resolved
Provide compass deviation table. 33CFR164.35(c)
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Navigation
Issued 10 May 1997 Resolved
Provide auto pilot alarm. 33 CFR 157.440
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Navigation
Issued 10 May 1997 Resolved
Provide unobstructed view from conning station of sea surface. 33CFR164.15
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Engineering
Issued 10 May 1997 Resolved
Vessel required to be fully manned until design verification of boiler installation (Marine Safety Center) and Burner Management Procedures (MSO Houston-Galveston) are Coast Guard approved. _x001C_ 46 CFR 61.40
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Lifesaving
Issued 10 May 1997 Resolved
Prior to using OPDS boat crane, ensure crane meets ABS requirements and provide valid Cargo Gear Certificate for same. _x001C_ _x001C_ 46 CFR 31.10-16
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Fire Fighting
Issued 10 May 1997 Resolved
Conduct flow test of the foam system in the presence of a Coast Guard Marine Inspector. Results to be forward to Coast Guard Marine Safety Center.
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Fire Fighting
Issued 10 May 1997 Resolved
Repair as original, all fire doors from machinery spaces to meet class "A" division for structural fire protection. _x001C_ _x001C_ 46 CFR 32.57
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Unknown
Issued 10 May 1997 Resolved
Provide onboard "Standard Discharge Connection" for machinery slop oil. _x001C_ _x001C_ _x001C_ 33 CFR 155.430
Condition: Unknown
Due 10 May 1997
Resolved 10 May 1997
Construction/Loadline
Issued 20 April 1995 Resolved
MAKE STRUCTURAL REPAIRS TO ITEMS IN WORKLIST DATED 20APR95.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Engineering
Issued 20 April 1995 Resolved
OPEN AND MAKE AVAILABLE FOR CG INSPECTION ALL BOILER MOUNTS.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Lifesaving
Issued 20 April 1995 Resolved
END FOR END PORT AND STBD LIFEBOAT FALLS AND CONDUCT WEIGHT TEST.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Deck/Cargo
Issued 20 April 1995 Resolved
RENEW PORT AND STARBOARD ANCHOR CHAINS.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Construction/Loadline
Issued 20 April 1995 Resolved
PROVIDE HULL GAGING REPORTS FOR APRIL, 95 DRYDOCK PERIOD TO [name withheld], ALABAMA.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Lifesaving
Issued 20 April 1995 Resolved
SERVICE ALL LIFERAFTS.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Electrical
Issued 4 August 1994 Resolved
HYDROSTATIC TEST OF NEWLY INSTALLED STEAM PIPING TO SHIP SERVICE STEAM GENERATORS. TO BE COMPLETED PRIOR TO NEXT ACTIVATION OR COI.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Electrical
Issued 4 August 1994 Resolved
PERFORM COMPLETE TEST OF STEAM SERVICE GENERATOR'S I.A.W. 46 CFR 111.10 SUBCHAP J AND ABS REQUIREMENTS PRIOR TO NEXT ACTIVATION OR COI.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994 Resolved
ENSURE PROPER INSTALLATION OF 750 GALLON GASOLINE FUEL TANK TO MAIN DECK AREA AND NOT IN A HAZARDOUS LOCATION. TO BE DONE PRIOR TO NEXT ACTIVATION OR COI.
Condition: Unknown
Due 4 August 1995
Resolved 25 August 1994
Lifesaving
Issued 30 August 1993 Resolved
PROVIDE PERMANENT INSTALLATION FOR NEW 16 MAN LIFERAFT.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Navigation
Issued 30 August 1993 Resolved
DEMONSTRATE PROPER OPERATION OF SOUND POWERED PHONE SYSTEM, PRIOR TO ACTIVATION.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Deck/Cargo
Issued 30 August 1993 Resolved
DEMONSTRATE SATISFACTORY TESTING OF CARGO HOSES ON REELS #1-8 PRIOR TO NEXTACTIVATION OR PRIOR TO LOADING/OFF LOADING CARGO.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Deck/Cargo
Issued 30 August 1993 Resolved
PROVIDE INCLINOMETER IN WORKING ORDER FOR BRIDGE AREA PRIOR TO NEXT ACTIVATION.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Electrical
Issued 30 August 1993 Resolved
REMOVE ALL DEAD END ELECTRICAL WIRING ON MAIN DECK.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Documentation
Issued 30 August 1993 Resolved
PROVIDE UPDATED OIL TRANSFER PROCEDURES TO REFLECT INSTALLATION OF OPDS PRIOR TO LOADING OR OFFLOADING CARGO.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Deck/Cargo
Issued 30 August 1993 Resolved
DEMONSTRATE PROPER OPERATION OF HIGH LEVEL ALARMS PRIOR TO ACTIVATION.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Deck/Cargo
Issued 30 August 1993 Resolved
DEMONSTRATE PROPER FAIR LEAD TO PORT WINCH FROM BOOM SNATCH BLOCK.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Documentation
Issued 30 August 1993 Resolved
PROVIDE SECOND PART OF OIL RECORD BOOK PRIOR TO NEXT ACTIVATION.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Deck/Cargo
Issued 30 August 1993 Resolved
PROVIDE PROOF THAT EXISTING ANCHOR CHAINS MEET STRENGTH REQUIREMENTS IN ABSRULES PRIOR TO NEXT ACTIVATION.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Deck/Cargo
Issued 30 August 1993 Resolved
DEMONSTRATE PROPER OPERATION OF CARGO DISCHARGE MONITOR PRIOR TO NEXT ACTIVATION.
Condition: Unknown
Due 30 August 1993
Resolved 30 August 1993
Documentation
Issued 30 August 1992 Resolved
RE-SUBMIT TO MARINE SAFETY CENTER FOR APPROVAL AND REVIEW, VESSEL'S TRIM AND STABILITY BOOK. PROVIDE VESSEL WITH AN UPDATED SEGREGATED BALLAST OPERATION MANUAL.
Condition: Unknown
Due 30 August 1992
Resolved 30 August 1992
Construction/Loadline
Issued 30 August 1992 Resolved
PROVIDE COAST GUARD APPROVED PLANS FOR VENTING AND PIPING OF VESSEL SEGREGATED BALLAST TANKS.
Condition: Unknown
Due 30 August 1992
Resolved 30 August 1992
Construction/Loadline
Issued 13 September 1991 Resolved
PROVE PROPER OPERATION OF MACHINERY SPACE OILY WATER SEPARATOR PRIOR TO ACTIVATION OF VESSEL.
Condition: Unknown
Due 13 September 1991
Resolved 13 September 1991
Electrical
Issued 13 September 1991 Resolved
INSTALL AND DEMONSTRATE PROPER OPERATION OF EMERGENCY GENERATOR LOW LUBE OIL SHUTDOWN PRIOR TO VESSEL ACTIVATION.
Condition: Unknown
Due 13 September 1991
Resolved 13 September 1991
Deck/Cargo
Issued 27 October 1989 Resolved
REPLACE ALUMINUM CARGO AND FUEL TANK HATCH COVERS WITH ONES CONSTRUCTED OF STEEL OR IRON.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Construction/Loadline
Issued 27 October 1989 Resolved
PROVIDE COAST GUARD APPROVED PLANS FOR VENTING AND PIPING OF VESSEL SEGREGATED BALLAST TANKS.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Lifesaving
Issued 27 October 1989 Resolved
AAREPLACE AS ORIGINAL VESSEL,S LIFEBOAT DAVITS WINC CASINGS.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Documentation
Issued 27 October 1989 Resolved
RE-SUBMIT TO MARINE SAFETY CENTER FOR ALPPROVAL AND REVIEW, VESSEL,S TRIM AND STABILITY BOOK. PROVIDE VESSEL WITH AN UPDATED SEGREGATED BALLAST OPERATION MANUAL.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Construction/Loadline
Issued 27 October 1989 Resolved
PROVIDE PLAN LAY OUT OF GAUGINGS IN WAY OF ENG. ROOM , FOREPEAK, FOCASTLE, CHAIN LKR, BALLAST TANKS AND DOUBLE BOTTOMS. REPLACE AS ORIGINAL WASTED OR HOLED STEEL.(BEYOND 30%.) COMPLETE REPAIR AND AIR TEST OF PORT MAIN ENG. RMSEA CHEST.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Construction/Loadline
Issued 27 October 1989 Resolved
REPAIR AS ORIGINAL DETIORATED WEBS, STACHIONS, ANGLES, LONGS FRAMING AND MOUNTS IN WAY OF ENGINE ROOM AND BOILER RM/SHAFT ALLEY BILGES.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Deck/Cargo
Issued 27 October 1989 Resolved
MAKE WELD PICKUPS IN WAY OF CARGO TANKS.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Engineering
Issued 29 January 1987 Resolved
INSTALL FLAME SCREEN FOR LUBE OIL TANK VENT IN ENGINE ROOM.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Fire Fighting
Issued 29 January 1987 Resolved
REPAIR AFT FIRE PUMP OVERBOARD DISCHARGE VALVE REACH ROAD SUPPORT.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Engineering
Issued 29 January 1987 Resolved
REPAIR EMERGENCY BILGE SUCTION VALVE IN LOWER FORWARD ENGINE ROON.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Unknown
Issued 29 January 1987 Resolved
PROVE PROPER OPERATION OF BOTH VESSEL'S AIR RECEIVERS PRESSURE RELIEF VALVES.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Unknown
Issued 29 January 1987 Resolved
CROP AND RENEW BILGE SUCTION LINE LOWER FORWARD ENGINE ROOM IN WAY OF SOFT PATCH.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Unknown
Issued 29 January 1987 Resolved
CROP AND RENEW CARGO PUMP COOLING IN FORWARD LOWER ENGINE ROOM IN WAY OF SOFT PATCH.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Unknown
Issued 29 January 1987 Resolved
CROP AND RENEW FORWARD FIRE PUMP PRESSURE RELIEF VALVE DRAIN RETURN TO PUMP SUCTION AND STRAINER BODY.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Electrical
Issued 29 January 1987 Resolved
REPAIR EMERGENCY GENERATOR DAY TANK FILL LINE.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Accommodation/Occupational Safety
Issued 29 January 1987 Resolved
REPAIR DRAIN LINE IN WAY OF SOFT PATCH OUTBOARD OF FOAM TANK.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Deck/Cargo
Issued 29 January 1987 Resolved
MAKE PERMANENT REPAIRS TO TORN WELD AT THE BASE OF PURGE PIPE ON #2C CARGO TANK.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Deck/Cargo
Issued 29 January 1987 Resolved
CONDUCT TEST OF TRANSFER PIPING TO 1 1/2 MAWP IN ACCORDANCE WITH 33 CFR 156.170 AND PROVIDE DOCUMENTATION OF SAME.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Navigation
Issued 29 January 1987 Resolved
INSTALL AND PROVE PROPER OPERATION OF A HEADING INDICATOR AT THE EMERGENCY STEERING STATION, AS PER 81 SOLAS AMENDMENT TO REG. 3 CHAPTER V.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Fire Fighting
Issued 29 January 1987 Resolved
PROVIDE [name withheld] WITH A COPY OF MANUFACTURERS ANALYSIS REPORT OF VESSEL'S FIXED FOAM SYSTEM.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Electrical
Issued 29 January 1987 Resolved
REPACK CABLE PENETRATION IN ENGINE ROOM AFT BULKHEAD.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Deck/Cargo
Issued 5 February 1986 Resolved
MAKE PERMANENT REPAIRS TO THE #4 CARGO LINE IN WAY OF THE HOLE IN THE LINE APPROXIMATELY SEVEN FEET INBOARD OF THE MANIFOLD VALVE. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE COGNIZANT O.C.M.I.
Condition: Unknown
Due 5 February 1986
Resolved 5 February 1986
Navigation
Issued 14 December 1985 Resolved
REPAIR TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINE INSPECTOR THE3 CM RADAR UNIT. REPAIRS ARE TO BE COMPLETED AT THE VESSEL'S NEXT U.S. PORTAND NOT LATER THAN 22 DEC. 1985.
Condition: Unknown
Due 14 December 1985
Resolved 14 December 1985
Navigation
Issued 10 December 1985 Resolved
REPAIR AND PROVE OPERATION OF DOPPLER SPEED LOG.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Deck/Cargo
Issued 10 December 1985 Resolved
MAKE PERMANENT REPAIRS TO THE PORT INERT GAS FAN AND CONDUCT OPERATIONAL TEST.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Engineering
Issued 10 December 1985 Resolved
REPAIR PORT, STBD, AND CENTER FUEL OIL SETTLER-SUCTION REMOTE SHUT OFF VALVES.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Deck/Cargo
Issued 10 December 1985 Resolved
TEST OVERSPEED TRIP ON NUMBER TWO CARGO PUMP PRIOR TO PLACING IN SERVICE.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Accommodation/Occupational Safety
Issued 10 December 1985 Resolved
REPAIR QUARTERS VENT SHUTDOWN ON BRIDGE.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Electrical
Issued 10 December 1985 Resolved
PROVIDE EVIDENCE OF ADEQUATE DECK LIGHTING IN ACCORDANCE WITH 33 CFR 155.790.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Accommodation/Occupational Safety
Issued 10 December 1985 Resolved
MAKE PERMANENT REPAIRS TO STEAM HEAT LINE IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Deck/Cargo
Issued 10 December 1985 Resolved
REMOVE OR REPAIR EMERGENCY CARGO PUMP SHUTDOWN IN CARGO CONTROL ROOM.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Deck/Cargo
Issued 10 December 1985 Resolved
CALIBRATE OR REPLACE CARGO PUMP GAUGES.
Condition: Unknown
Due 10 December 1985
Resolved 10 December 1985
Navigation
Issued 27 September 1985 Resolved
VESSEL ENTER SAN FRANCISCO BAY CALIFORNIA WITHOUT A SECOND INDEPENDENTLY OPERATING RADAR. VESSEL IS IN EXCESS OF 10,000 GROSS TONS.
Condition: Unknown
Due 27 September 1985
Resolved 27 September 1985
Navigation
Issued 27 September 1985 Resolved
FAILURE TO NOTIFY COTP SAN FRANCISCO BAY CALIFORNIA OF NON-OPERATING RADAR PRIOR TO ENTERING PORT.
Condition: Unknown
Due 27 September 1985
Resolved 27 September 1985
Navigation
Issued 20 September 1985 Resolved
MAKE PERMANENT REPAIRS TO THE 3CM RADAR UNIT PRIOR TO DEPARTURE FROM YOUR NEXT U.S. PORT. REPAIRS TO BE TO THE SATISFACTION OF THE COGNIZANT OCMI AND COMPLETED NOT LATER THAN 20 OCT 85.
Condition: Unknown
Due 20 September 1985
Resolved 20 September 1985
Engineering
Issued 6 September 1985 Resolved
MAKE PERMANENT REPAIRS TO EMERGENCY FEED PUMP AND PROVE PROPER OPERATION.
Condition: Unknown
Due 6 September 1985
Resolved 6 September 1985
Engineering
Issued 6 September 1985 Resolved
MAKE PERMANENT REPAIRS TO #3 FEED PUMP AND PROVE PROPER OPERATION.
Condition: Unknown
Due 6 September 1985
Resolved 6 September 1985
Engineering
Issued 6 September 1985 Resolved
MAKE PERMANENT REPAIRS TO #1 FEED PUMP AND PROVE PROPER OPERATION.
Condition: Unknown
Due 6 September 1985
Resolved 6 September 1985
Unknown
Issued 1 April 1983 Resolved
(REQ. D1A CONTINUED) MOTORS.
Condition: Unknown
Due 15 April 1983
Resolved 1 April 1983
Unknown
Issued 1 April 1983 Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE VESSEL, PETERBURG DN291990
Condition: Unknown
Due 1 April 1983
Resolved 1 April 1983
Engineering
Issued 1 April 1983 Resolved
PRIOR TO 15APR83 RENEW THE NINE (9) RETAINING BOLTS TO THE STERN TUBE PACK-ING BOX WHICH HAVE NOT BEEN RENEWED SINCE LAST DRYDOCK.
Condition: Unknown
Due 1 April 1983
Resolved 1 April 1983
Engineering
Issued 1 April 1983 Resolved
IF ADDITIONAL BOLTS TO STERN TUBE PACKING BOX SHOULD SHEAR, [name withheld], SHALL BE NOTIFIED IMMEDIATELY.
Condition: Unknown
Due 1 April 1983
Resolved 1 April 1983
Engineering
Issued 1 April 1983 Resolved
STATUS REPORTS SHALL BE SUBMITTED TO [name withheld] ON 1MAY83, 1JUN83 ANDA FINAL STATUS REPORT ON 1OCT83.
Condition: Unknown
Due 1 April 1983
Resolved 1 April 1983
Navigation
Issued 1 April 1983 Resolved
PRIOR TO DEPARTING BATON ROUGE DEMONSTRATE THAT THE RUDDER MOVEMENT, IS WITHIN THE MINIMUM TIME REQUIREMENT FOR BOTH PORT AND STARBOARD STEERING
Condition: Unknown
Due 1 April 1983
Resolved 1 April 1983
Unknown
Issued 1 February 1983 Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL PETERBURGS, DN291990.
Condition: Unknown
Due 1 February 1983
Resolved 1 February 1983
Accommodation/Occupational Safety
Issued 1 February 1983 Resolved
MAINTAIN TEMPORARY REPAIRS TO DECK RAILING. THEN MAKE PERMANENT REPAIRS ATDRYDOCKING.
Condition: Unknown
Due 1 February 1983
Resolved 1 February 1983
Unknown
Issued 1 February 1983 Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL PETERBURGS, DN291990.
Condition: Unknown
Due 1 February 1983
Resolved 1 February 1983
Accommodation/Occupational Safety
Issued 1 February 1983 Resolved
MAINTAIN TEMPORARY REPAIRS TO DECK RAILING. THEN MAKE PERMANENT REPAIRS ATDRYDOCKING.
Condition: Unknown
Due 1 February 1983
Resolved 1 February 1983

Casualty record · 5

25 February 2005Routine · role: Involved in a Marine Casualty · activity 2319145
15 December 2006Routine · role: Involved in a Marine Casualty · 1 injured · activity 2844666
21 June 2007Routine · role: Involved in a Marine Casualty · 1 injured · activity 2979954
14 September 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3064475
7 September 2016Routine · role: Involved in a Marine Casualty · activity 5996684
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.