Inspection history · 44
17 July 2026
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8448365
19 March 2026
Examination of Repairs · Vessel Attendance
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8328994
26 September 2025
Internal Structural Exam · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8242177
3 March 2025
In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8087391
18 February 2025
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8082211
9 December 2024
Internal Structural Exam · Deficiency Check · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8044383
7 October 2024
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8015522
5 September 2024
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7997438
5 September 2024
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8009462
15 September 2023
Administrative Inspection · Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7775904
26 June 2023
Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7726816
7 May 2023
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7683304
16 November 2022
Hull Examination · Examination of Repairs · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7608226
2 November 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7589097
27 October 2022
In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7583699
25 May 2022
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7585221
29 September 2021
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7321828
3 August 2021
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7275377
25 March 2021
Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7162284
28 May 2020
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6962903
22 October 2019
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6842240
1 October 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6826405
12 June 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6712303
23 May 2019
Deficiency Check · DAPI Audit · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6691560
19 April 2019
Construction Oversight · Examination of Repairs · Deadweight Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6668122
15 November 2018
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6583399
9 November 2018
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6578412
17 August 2018
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6515233
17 August 2018
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6515782
7 August 2018
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6503693
7 August 2018
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6617491
8 May 2018
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6410101
7 May 2018
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6408670
2 May 2018
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6404154
8 January 2018
Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6367251
12 December 2017
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6325028
11 October 2017
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6285960
1 August 2017
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6277325
24 July 2017
DAPI Audit · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6219739
12 May 2017
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6144804
25 April 2017
Examination of Repairs · Damage Survey · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6131959
12 April 2017
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6123307
18 November 2016
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6043449
27 April 2016
DAPI Audit · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5864692
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 September 2025
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Port side diesel fuel tank venting hose has a tear. Repair to satisfaction of USCG.
46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 September 2025
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. STBD side diesel fuel intake hose has a fuel leak. Repair to satisfaction of USCG.
46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 September 2025
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. STBD engine #3 has an exhaust leak. Repair to satisfaction of USCG.
46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 September 2025
Resolution: Rectified
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 December 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. An inset with crack was identified in the starboard hull outboard quarter. The puncture was filled with weld. This repair was not approved or authorized. Crop and renew to good metal 18" x 18".
46 CFR 176.700.
Action required: 705 - Other - as specified
Resolved 31 January 2025
Resolution: Damage was repaired with an 18" x 18" side shell patch.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 October 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Repair fuel oil leak at sight glass on Port Fuel tank
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2024
Resolved 23 October 2024
Resolution: Rectified to the satisfaction of the Coast Guard
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 October 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Locate and repair coolant leak on Starboard Forward Main Diesel Engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2024
Resolved 23 October 2024
Resolution: Rectified to the satisfaction of the Coast Guard
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to : Minimize accidental personnel contact with energized parts. Install protection to 24 volt lugs where exposed as manufacturer intended.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2024
Resolved 24 October 2024
Resolution: Rectified to the satisfaction of the attending Marine Inspector
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 October 2024
Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray. Secure batteries in fixed trays and secure covers to prevent splash, spray or accidental contact.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2024
Resolved 24 October 2024
Resolution: Rectified to the satisfaction of the Coast Guard
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 7 October 2024
Resolved
All machinery to include piping must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Provide missing pipe clamps and adjust existing clamps to protect personnel from injury and system failure.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2024
Resolved 24 October 2024
Resolution: Rectified to the satisfaction of the attending Marine Inspector
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 7 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. Replace missing light bulb in Starboard fuel space.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2024
Resolved 23 October 2024
Resolution: Rectified to the satisfaction of the Coast Guard
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 September 2024
Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Suspected exhaust leak on the starboard aft engine turbo and associated pipping. Remove lagging and make available for inspection the exhaust pipping on port engine. If leak identified make gas tight the exhaust pipping to the satisfaction of the attending marine inspector. Prior to the carriage of passengers.
46 CFR 182.430 (b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 September 2024
Resolution: Vessel removed lagging for further inspection no leak detected. Laggin reinstalled.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 September 2024
Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant Officer in Charge, Marine Inspection, but must not be fewer than the minimum number required by Table 181.500(b) and other provisions of this section. Two portable fire extinguishers were used to address a fire in the port engine room. Provide two new/service fire extinguishers to restore the fire extinguishers in locations which were used, prior to the carriage of passengers.
46 CFR 181.500 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 September 2024
Resolution: Two new fire extinguisher provided.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 5 September 2024
Resolved
The design of all exhaust systems must ensure minimum risk of injury to personnel. Protection must be provided in compliance with § 177.970 of this chapter at such locations where persons or equipment might come in contact with an exhaust pipe. Lagging from turbos and associated exhaust was removed to inspect for damage on the port aft engine. Install lagging on turbo and associated exhaust of the port engine to the satisfaction of the attending marine inspector. Prior to the carriage of passengers.
46 CFR 182.430 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 September 2024
Resolution: New lagging proivided and installed.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 September 2024
Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. During inspection of the port aft engine turbo MI found the clamp on exahaust side of the turbo loose. Clamp was unable to be tightened enought to prevent exhaust leaking out. Install new clamp to prevent leaking of exhaust gas and properly support exhaust pipping.
46 CFR 182.430 (b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 September 2024
Resolution: New spacer and clamp installed on turbo exahust pipping interfaces. No leaks detected.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 September 2023
Resolved
For fixed-gas fire extinguishing systems, the inspections and tests required by Table 176.810(b) of
this section, in addition to the tests required by 46 CFR 147.60 and 147.65. The owner or managing
operator must provide satisfactory evidence of the required servicing to the marine inspector. Fixed gas system annual servicing report was not on-board nor was the operator able to provide the report to MI during annual COI inspection. Provide report to MI for review, prior to passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2023
Resolution: Received fire servicing report for port and stbd CO2 system; all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 September 2023
Resolved
Fixed gas extinguishing systems: System design and installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the Commandant. Time delay on the port & stbd fixed CO2 extinguishing system is less than 30 seconds. Per the fire system servicing report, port and stbd side time delay is at 29 seconds. Provide servicing report meeting the 30 seconds standard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2023
Resolved 15 September 2023
Resolution: Closed deficiency with evidence of servicing certifate from other defs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 September 2023
Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. Port bilge pump has chafing on inlet flex hose requiring replacement. Replace with appropriate flex line.
46CFR182.500(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 October 2023
Resolution: Hose to bilge pump replaced and chafing guard added; all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 September 2023
Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting
with the roll and pitch of the vessel, and free from exposure to water splash or spray. Battery banks in port
engine room are not secured. Place batteries in
designated area/trays and secure via a mechanism that prevents batteries from shifting. 46CFR183.350(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 October 2023
Resolution: Batteries in engine room secured, preventing shifting; all sat
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 15 September 2023
Resolved
A lighting fixture must be installed as follows:
(1) Each fixture must comply with § 183.200 (Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions.) Aft port light fixture light-bulb is broken. Replace light-bulb. 46CFR183.410(c)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 October 2023
Resolution: Lightbulb in light fixture replaced; all sat.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 September 2023
Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may
be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. Stbd fuel tank void has excessive oil in bilge. Clean up area appropriately. 46CFR176.830(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 October 2023
Resolution: Oil in generator room bilge cleaned up; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 15 September 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of lifesaving equipment and systems, including the following: Inspection of each inflatable liferaft to determine that it has been serviced as required by § 185.730 of this chapter. No servicing certificate was provided to attending MI. Provide liferaft servicing certificates no latter than 18SEP2023.
Action required: 705 - Other - as specified
Resolved 18 September 2023
Resolution: Servicing certificate for three liferafts was porvided; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 15 September 2023
Resolved
The master of the vessel shall ensure that: Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative. On-board records indicated no EPIRB test in June and July 2023. 46CFR185.728(a)
Action required: 10 - Deficiency Rectified
Resolved 15 September 2023
Resolution: Discussed with operator requierment for EPIRB testing.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 September 2023
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be
located at the operating station and the other at the access to the propulsion machinery space. Portable light at operating station is dead. 46CFR183.430
Action required: 10 - Deficiency Rectified
Resolved 15 September 2023
Resolution: Battery was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 June 2023
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection. Vessel's starboard, outboard main engine coupling sheered where the drive shaft attaches to the engine, causing the jet to become inoperable. Replace part and prove proper operation of propulsion within 2 weeks.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2023
Resolution: Vulcan coupling and guards installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 October 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Bridge 220v panel missing mounting hardware.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 April 2023
Resolved 7 May 2023
Resolution: Mounting hardare was reinstalled properly.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 October 2022
Resolved
The regulations in this part provide a means to minimize the use of intoxicants by merchant marine personnel and to promote a drug free and safe work environment. Proof of consortium enrollment was expired.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 April 2023
Resolved 1 December 2022
Resolution: Received copy of consortium enrollment certificate.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 October 2022
Resolved
An adult life jacket must be provided for each person carried on board a vessel. In addition, a number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided. Vessel was missing 06 adult lifejackets and 01 child.
Action required: 10 - Deficiency Rectified
Resolved 27 October 2022
Resolution: Vessel rep replaced missing lifejackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 August 2021
Resolved
The exhaust pipe cooling water system must comply with the requirements of this paragraph. Minor leaks/drips observed on the #1 MDE exhaust intake cooling line.
46 CFR 182.425(b)
Action required: 10 - Deficiency Rectified
Resolved 3 August 2021
Resolution: Repairs made to exhaust intake cooling line. Repairs SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 3 August 2021
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Guard is missing on the #1 MDE flywheel.
46 CFR 177.960
Action required: 10 - Deficiency Rectified
Resolved 3 August 2021
Resolution: Missing guard has been replaced.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 3 August 2021
Resolved
Each door, hatch, or scuttle, used as a means of escape, must be capable of being opened by one person, from either side, in both light and dark conditions. Port side emergency escape route door binds when opening and closing.
46 CFR 177.500 (h)
Action required: 10 - Deficiency Rectified
Resolved 3 August 2021
Resolution: Satisfactory repairs made to the door. Door tested SAT.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 August 2021
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Remove or place dead end wire located above the sewage tank on port side void #2.
46 CFR 183.340
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 August 2021
Resolved 12 August 2021
Resolution: Dead end wire was placed into an enclosure.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 August 2021
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Emergency fuel shut off cables are ran through a small hole in the overhead which is causing corrosion from dissimilar metals and chaffing the cable.
46 CFR 176.800
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 August 2021
Resolved 12 August 2021
Resolution: Cable run through deck was made by installing a rubber grommet to protect the cable.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019
Resolved
Replaced both port and starboard time delay bottles. Both trips at around 24 seconds on a 30 second bottle
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2020
Resolution: both bottles have been replaced and tested sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019
Resolved
Install correct CO2 warning labels on both port and starboard engine room hatches. Current sign state that there is a wintergreen scent which this vessel doesn’t have
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2020
Resolution: vessel has installed correct warning signs
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019
Resolved
Prove both port and starboard fwd ventilations closers
close all the way.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2019
Resolution: Vessel repaired both fwd ventilations closer, tested all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019
Resolved
Replace cracked CO2 flex hose on the Starboard side
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2020
Resolution: vessel has new hose installed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019
Resolved
Remove zip ties that are current used to hold the
Starboard fwd vent closer open with approved device
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2019
Resolution: Vessel removed zip ties and installed steel wire rope, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 April 2019
Resolved
Provide final approval for "loss of power" QFA to CG inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2019
Resolved 12 June 2019
Resolution: Received QFA approval from MSC.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 19 April 2019
Resolved
Provide final approval of stability analysis to CG marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2019
Resolved 1 October 2019
Resolution: Vessel has RCVD and posted new Stability lettter
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 August 2018
Resolved
Vessel is allowed to temporary operate with portable fire pump installed. Vessel shall train and document all crew members on the operation of portable fire pump prior to being crew members on-board the vessel. All repairs to the fire pump prime mover shall be to the satisfaction of the CG Marine Inspector attending.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2018
Resolved 17 August 2018
Resolution: Replacement engine has been provided.
Engineering › Bilge Water Management System › Pump
Issued 2 May 2018
Resolved
Port bilge pump was not operational, prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2018
Resolution: Verified proper operation of the port bilge pump.
Fire Fighting › Fire Hoses › Condition
Issued 2 May 2018
Resolved
Main deck fire hose was leaking and unservicable, renew hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2018
Resolution: Verified firehose was replaced.
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 May 2018
Resolved
Conduct Drill prior to the commencement of the season.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2018
Resolution: Got vessel underway to conduct man overboard, abandon ship and fire drill all sat,
Construction/Loadline › Penetrations › Pipe Flange
Issued 2 May 2018
Resolved
Provide a metallic valve for the non-metallic potable water hose bulkhead penetrations on the fwd and aft port engine room bulkheads.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2018
Resolved 7 May 2018
Resolution: Verified that both penetrations were provided with a metallic valve on both sides of the bulkhead.
Electrical › Electric Supply System (service) › Battery Installation
Issued 2 May 2018
Resolved
Provide non-reactive trays for batteries in the both engine rooms and the generator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2018
Resolved 7 May 2018
Resolution: Verified installation of battery trays.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 2 May 2018
Resolved
Provide appropriate CO2 storage and discharge location warning notices.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2018
Resolved 7 May 2018
Resolution: Verified CO2 storage and discharge spaces were appropriately marked.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 2 May 2018
Resolved
Provide a flame screen for the port fuel tank vent.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2018
Resolved 7 May 2018
Resolution: Verified installation of a flame screen for the port fuel tank vent.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 11 October 2017
Resolved
Starboard engine room cover held back with a bungee cord.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 20 March 2018
Resolution: Removed bungee cord, sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 11 October 2017
Resolved
Engines and power ventilation were not operating at the time of the test. Demonstrate operation of the engine and power ventilation shutdowns to the attending CG Marine Inspector. 46 CFR 181.410(b)(10) Correct at next Annual inspection.
Action required: 705 - Other - as specified
Due 7 December 2017
Resolved 20 March 2018
Resolution: Verified done & demonstarted this date, sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 24 July 2017
Resolved
Replace port side inboard eng. Exhaust cooling bellows.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 July 2017
Resolution: Vessel has replaced bellows
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 24 July 2017
Resolved
Clean and inspect all main eng. Exhaust cooling bellows.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 10 August 2017
Resolution: Verified all main eng cooling bellows properly cleaned.
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 July 2017
Resolved
Remove dead end wires in starboard eng. Room and replace cover
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 24 July 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 24 July 2017
Resolved
Properly install exhaust insulation in starboard eng. Room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 10 August 2017
Resolution: Verified installation of exhaust insulation in stbd engine room.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 24 July 2017
Resolved
Replaced cracked hose on starboard side outboard eng. Room that runs from the eng to the cooling water exhaust.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 10 August 2017
Resolution: Verified replacement of starboard outboard cooling water hose.
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 24 July 2017
Resolved
Fix oil leak on starboad aft main eng.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 10 August 2017
Resolution: Verified aft stbd engine no longer leaking oil.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 18 November 2016
Resolved
Flexible nonmetallic hose must be installed with approved end fittings. Provide proper hoses and attachments for the vessel's sewage and potable water piping.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 12 April 2017
Resolution: Allowed by Sector Juneau Determination. Alterations or repairs will be required to be done IAW current regs.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 November 2016
Resolved
Each connection to a conductor shall be made in and enclosure. Make all bilge pumps, floats, and miscellaneous salt and fresh water pump wiring connections in an enclosure.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 12 April 2017
Resolution: Allowed by Sector Juneau Determination. Alterations or repairs will be required to be done IAW current regs.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 November 2016
Resolved
Each conductor shall be installed with metal supports not more than 24" apart. Provide supports for conductors in the #3 Port Void overhead.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 11 May 2017
Resolution: Done, sat.
Engineering › Bilge Water Management System › Piping
Issued 18 November 2016
Resolved
Each flexible hose designed for use with hose clamps shall utilize two clamps at both ends. Provide an additional clamp for the port bilge suction hose.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 11 May 2017
Resolution: Done, sat.