Records from 1980 to 2026. Most recent: inspection, 22 June 2026.
Inspection history · 215
22 June 2026
SIP Inspection/Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8430516
13 January 2026
COI Inspection · Construction Oversight · SIP Inspection/Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8295421
16 December 2025
SIP Inspection/Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8286270
30 July 2025
SIP Inspection/Audit · MTSA Verification · COI Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8198278
21 May 2025
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8140692
26 February 2025
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8085472
6 November 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8031343
20 August 2024
In-Service Inspection · SIP Inspection/Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7961383
29 May 2024
SIP Inspection/Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7923840
4 April 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7889977
5 February 2024
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7679365
6 February 2023
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7632796
22 November 2022
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7598348
27 May 2022
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7459972
4 May 2022
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7443621
4 May 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7443985
16 February 2022
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7397136
1 December 2021
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7360477
17 August 2021
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7289349
13 May 2021
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7196707
1 March 2021
Administrative Inspection · MTSA Verification · Examination of Repairs · Damage Survey · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7148108
17 February 2021
COI Inspection · SIP Inspection/Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7141599
4 December 2020
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7108178
31 August 2020
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7036435
28 May 2020
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6962473
24 February 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6917554
27 January 2020
In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6896652
25 November 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6862188
12 September 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6809808
22 August 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6792259
15 May 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6697105
13 February 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6791783
12 February 2019
Damage Survey · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6624997
22 January 2019
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6613586
30 November 2018
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6589886
27 August 2018
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6524526
29 May 2018
SIP Inspection/Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6423573
8 May 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6409893
4 January 2018
MTSA Verification · Internal Structural Exam · Examination of Repairs · Administrative Inspection · Drydock Exam · COI Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6332079
24 October 2017
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6294087
28 July 2017
SIP Inspection/Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6226320
21 April 2017
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6146271
4 January 2017
Drydock Exam · Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6065697
14 December 2016
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6058686
26 October 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6030025
19 October 2016
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6033112
21 July 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5949305
16 April 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5860203
5 January 2016
Examination of Repairs · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5791027
22 October 2015
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5748740
6 October 2015
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5743677
30 August 2015
Examination of Repairs · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5234674
23 July 2015
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5193575
29 October 2014
Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5014173
15 August 2014
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4955806
11 August 2014
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4951345
23 May 2014
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4874100
26 July 2012
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4391210
10 January 2012
Internal Structural Exam · In-Service Inspection · SIP Inspection/Audit · Examination of Repairs · COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4218959
12 September 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4142677
1 August 2011
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4102041
7 January 2011
COI Inspection · SIP Inspection/Audit · In-Service Inspection · DAPI Audit · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3922382
7 January 2011
Deficiency Check · DAPI Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3923871
29 October 2010
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3894913
4 February 2010
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3675430
12 January 2010
COI Inspection · MTSA Verification · SIP Inspection/Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3662703
22 April 2009
Administrative Inspection · In-Service Inspection · SIP Inspection/Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3458239
5 December 2008
COI Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3384526
5 November 2008
SIP Initial Entry
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3357787
5 November 2008
SIP Inspection/Audit · Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3357807
23 July 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3277023
16 April 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3185502
14 December 2007
COI Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3115572
29 November 2007
In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3098284
29 October 2007
MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3089988
3 October 2007
Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3071942
16 January 2007
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2847289
10 August 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2743255
19 July 2006
In-Service Inspection · Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2711294
13 January 2006
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2564151
7 November 2005
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2529973
28 October 2005
Excursion Permit
Administrative · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 2525423
19 July 2005
In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2431145
1 March 2005
MTSA Verification
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2300774
13 December 2004
Administrative Inspection · In-Service Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2258086
12 July 2004
In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2130440
5 April 2004
Administrative Inspection
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2174209
8 January 2004
In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1979210
11 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1963237
30 July 2003
Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1854761
17 January 2003
In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1734228
11 December 2002
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1717510
8 July 2002
Periodic Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1642607
26 February 2002
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1489340
5 December 2001
Hull Examination · Internal Structural Exam
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1457037
27 July 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1068876
31 January 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1057840
23 January 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1057792
22 June 2000
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1413758
8 February 2000
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1424854
31 January 2000
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1045869
24 August 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1460335
31 January 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 807620
19 January 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1442782
5 November 1998
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1392987
6 August 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1468003
8 July 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1375420
31 January 1998
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 780251
26 January 1998
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1421447
25 January 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 141043
25 January 1998
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1453446
18 December 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1424504
4 April 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1095220
25 March 1997
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1105841
16 March 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 9663
27 December 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431729
20 December 1996
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1413085
3 October 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1441115
26 June 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1430231
22 February 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 48394
26 December 1995
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1402140
2 August 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1188213
21 April 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1168506
22 March 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1452019
23 December 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1449742
21 September 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1454126
28 June 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367080
20 June 1994
Examination of Repairs · Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1396113
22 May 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1401872
24 March 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1382725
14 January 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 851152
17 December 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1435423
21 September 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1454032
23 July 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 843261
22 June 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1443385
25 March 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1403609
17 February 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1143515
23 December 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 962238
24 September 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1255619
17 June 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1261173
28 May 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 956944
30 March 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1320350
26 March 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 946191
30 January 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1007056
17 December 1991
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1255263
5 December 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 948424
23 October 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 941726
20 August 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 941918
15 August 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1247598
23 July 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1308766
3 June 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1225554
23 May 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1234570
8 May 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1216620
8 April 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1234288
27 February 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1233345
26 February 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1236709
26 January 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 995619
25 October 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1232530
10 October 1990
Plan Review "T" Boat
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 931510
1 August 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1214960
1 August 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1221538
18 July 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1229738
18 April 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1225303
30 January 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1228024
19 January 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1223112
3 November 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1314983
24 October 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1210267
25 August 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1035011
9 August 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1038150
24 July 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 902230
20 June 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1040283
8 June 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 888869
22 May 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1205281
29 March 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1196238
27 January 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1206157
16 December 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1033894
12 September 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1041026
15 August 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1345027
1 July 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1207319
22 June 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 891402
21 April 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1343586
21 March 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 991030
24 December 1987
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1314634
18 November 1987
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1024112
27 October 1987
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1023402
16 October 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1020046
17 September 1987
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1007104
18 August 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1313793
30 July 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1027644
23 June 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019368
21 May 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1027200
14 April 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1002930
25 March 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019327
23 February 1987
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1007090
6 February 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1320165
26 January 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1319694
8 January 1987
Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1012634
24 December 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1312978
26 December 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1299812
17 June 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1288595
22 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1293707
12 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977817
9 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 980255
4 September 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282819
3 May 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1285081
13 March 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972274
13 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971349
13 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973851
21 October 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278091
14 September 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1274253
12 August 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1277428
23 April 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973804
11 February 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273585
22 January 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965223
22 December 1980
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278814
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2022
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter (H). On May 3, 2022, a fire occurred within the generator room resulting in significant damage to the machinery, electrical equipment, wiring, and structural fire protection within the surrounding area. Prior to repairs and the installation of new machinery and electrical equipment plans shall be provided to Marine Safety Center for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2023
Resolved 9 November 2023
Resolution: Cleared
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 February 2021
Resolved
The vessel is currently in a layup status for Boiler Repairs (Port Boiler) and Boiler Replace3ment on STBD Boiler along with some upper deck repairs.
Prior to getting the vessel underway, complete the replacement of the STBD Boiler and repairs to the PORT Boiler. Complete all required inspection intervals to the satisfaction of the USCG Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2021
Resolved 9 November 2023
Resolution: Completed
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 17 February 2021
Resolved
2.Currently all life rafts certificates have expired, vessel in maintenance period so prior to getting the vessel underway provide current life raft servicing reports.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 March 2021
Resolved 9 November 2023
Resolution: Completed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 February 2021
Resolved
3. Current fire protection report from [name withheld] has deficiencies that require correction, Galley equipment will not shut down upon activation of the fire protection. Correct prior to operating the galley.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2021
Resolved 9 November 2023
Resolution: Completed
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 17 February 2021
Resolved
4.No drills were witnessed today due to vessel in maintenance period, prior to carrying passengers, drills must be witnessed by the USCG.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 March 2021
Resolved 8 November 2023
Resolution: Completed
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 May 2020
Resolved
An abandon-ship drill and a fire drill, as described in 199.180, must be conducted on each passenger vessel at least weekly. Drills could not be conducted due to lack of crew on board resulting from local Covid-19 restrictions.
Conduct drills IAW 46 CFR 199.180, and provide SIP documentation/associated logs to satisfaction of CG Marine Inspector prior to movement.
46 CFR 199.250(a)
46 CFR 199.180
46 CFR 78.17-50
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 June 2020
Resolution: Witnessed drills.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 28 May 2020
Resolved
If a survival craft is recovered by electric power, the electrical installation, including the electric power-operated boat winch, must meet the requirements in subchapter J of this chapter. If a survival craft is recovered by any means using power, including a portable power source, safety devices must be provided that automatically cut off the power before the davit arms or falls reach the stops in order to avoid overstressing the falls or davits, unless the motor is designed to prevent such overstressing.
Provide proof of manufacturer-installed winch safety device, or install safety device & test to satisfaction of CG Marine Inspector prior to movement.
46 CFR 199.153(k)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 June 2020
Resolution: Witnessed installed safety devices.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 28 May 2020
Resolved
Each item of survival equipment with an expiration date must be replaced during the annual inspection if the expiration date has passed.
Rescue boat wire bridles have no markings or documentation to prove maximum static load and servicing. Correct to satisfaction of CG Marine Inspector prior to movement.
46 CFR 199.190(f)(3)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 June 2020
Resolution: Verified inspection & testing of bridles.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 May 2020
Resolved
Items of equipment, which are in use on vessels, previously approved by the Commandant but not complying with the latest specification requirements may be continued in use so long as they are maintained in good and serviceable condition to the satisfaction of the Officer in Charge, Marine Inspection, until replacement is deemed necessary by such officer or as specified in the regulations.
Hot water heater installation in crew galley/dishwashing service area has significant corrosion to electronics housing and vessel bottom.
Replace hot water heater with new/serviceable unit or electrically isolate and tag-out system to satisfaction of CG Marine Inspector within 14 days.
Action required: 705 - Other - as specified
Resolved 10 June 2020
Resolution: Verified relief valve replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 11 February 2020
Resolved
Doors, other than those which are normally locked shall be of the self closing type against a 3 and 1/2 degree list. Upon arriving at the vessel there were issues with the port and starboard doors admidships on the 2nd deck and with the starboard foward door on the 2nd deck. These were rectified while inspectors were onboard. There is remains an issue with the portside door leading to the engine room. This issue needs to be corrected by the end of the next maintenance period.
Action required: 705 - Other - as specified
Due 19 February 2020
Resolved 9 November 2023
Resolution: Completed.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 11 February 2020
Resolved
Ships position shall be continuously and automatically provided to all relevant radio communication equipment. The ship's position and MMSI number for the vessel were not currently displaying on either VHF reciever. (46 CFR 80.1083(f))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2020
Resolved 19 February 2020
Resolution: Vessel has linked both VHF units to MMSI numbers and GPS units.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 August 2018
Resolved
The vessel is not in compliance fully with 46CFR Part 16.230 (a)Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crew members on inspected vessels who: under 16.230 (a)(3) which requires random drug testing for personnel who are "specifically assigned the duties of warning, mustering, assembling, assisting, or controlling the movement of passengers during emergencies." The definition of Crew Member is under 46CFR 16.105 under crew member (#2). Provide a proposal to make the vessel in compliance with these requirements. The proposal will need to be to our office by Friday 31 August 2018.
Once proposal has been received and accepted the above will need to be complied with within 14 days.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 31 August 2018
Resolved 5 September 2018
Resolution: 33 additional stewards staff now in the drug testing program.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 29 May 2018
Resolved
Provide fire control plan for vessel to confirm boundary on portside of galley with opening in bulkhead.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2018
Resolved 5 June 2018
Resolution: A-0 boundary restored at the portside galley bulkhead opening with installation of a closed window.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 29 May 2018
Resolved
Clearly mark CO2 pull station for paint locker aft of galley
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2018
Resolved 6 June 2018
Resolution: CO2 station marked
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 29 May 2018
Resolved
Repair or replace reeefer aft of the galley. Remove all stowed equipment and goods on top of galley equipment.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2018
Resolved 6 June 2018
Resolution: Equipment properly stowed and reefer repaired.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 29 May 2018
Resolved
Relabel distribution board panel in galley with new equipment installed (ie. Reefer and hot box)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2018
Resolved 6 June 2018
Resolution: Panel board labeled with new equipment.
Construction/Loadline › Structures › Deck Plating
Issued 26 February 2018
Resolved
Newly installed deck covering in galley does not have appropriate documentation showing it meets the requirements of NVIC 9-97 (CH-1) 2.2.1. Provide sufficient documnetation to attending MI.
Action required: 705 - Other - as specified
Due 12 March 2018
Resolved 6 March 2018
Resolution: Rcvd appropriate documentation flooring in galley. See narative for additional details.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 26 February 2018
Resolved
Several Lifejackets found with insufficient Retroreflective material. Correct to satisfaction of attending MI.
Action required: 705 - Other - as specified
Due 12 March 2018
Resolved 5 March 2018
Resolution: Verified lifejackets had sufficient retroreflective material.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 26 February 2018
Resolved
Life Jacket stowage lockers rigged in such a way as to impede the release of Lifejackets and a portion of the cable broke during the course of our test. x2 stowage lockers still need to be re-rigged, required vessel to complete modifications to include new cables prior to 12Mar18.
Action required: 705 - Other - as specified
Due 12 March 2018
Resolved 5 March 2018
Resolution: New rigging installed and verified by attending MI.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 14 December 2016
Resolved
During response to small fire in storage locker. ID'd damage to electrical wiring (2 cables along beam) w/in space. Completely replace wiring w/ equivalent marine grade wiring to the damaged nonvital lighting system after properly locking/tagging system according to ship's safety procedures. Fix prior to use.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 December 2016
Resolved 14 December 2016
Resolution: Bluewater electric replaced 10 ft of braided CG approved Marine Grade wiring for the damaged overhead lighting in the storage locker to the satisfaction of CG Marine Inspector.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 14 December 2016
Resolved
Pump out bilges free of excess oily/water prior to sailing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 December 2016
Resolved 14 December 2016
Resolution: Bilge space w/in compartment pumped and cleaned to satisfaction of CG Marine Inspector.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 22 October 2015
Resolved
Stbd side bar on boiler deck. CO2 bottles are not properly secured. (Securing chains are there but not properly secured)
Condition: Improper Installation
Due 22 October 2015
Resolved 22 October 2015
Resolution: def corrected on the spot
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 October 2015
Resolved
Extension cord is in crew's lounge used for microwave. Need to remove extension cord.
Condition: Improper Installation
Due 22 October 2015
Resolved 22 October 2015
Resolution: Def corrected on the spot
Accommodation/Occupational Safety › Potable Water System › General
Issued 22 October 2015
Resolved
Galley sink portside has leaking drain on deck. Make permanent repairs.
Condition: Improper/Lack of Maintenance
Due 22 October 2015
Resolved 22 October 2015
Resolution: Def corrected on the spot
Fire Fighting › Fire Hydrants › Location/Position
Issued 22 October 2015
Resolved
Texas deck aft, fire station 13 is blocked with a portable bar. Remove/unblock fire station.
Condition: Placed in Improper Service
Due 22 October 2015
Resolved 22 October 2015
Resolution: def cleared on the spot
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 22 October 2015
Resolved
Refridge portside aft on boiler deck is not properly secured. Legs are bent. Make proper repairs.
Condition: Damaged By Earlier Event
Due 22 October 2015
Resolved 22 October 2015
Resolution: Def corrected on the spot
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 22 October 2015
Resolved
Port and Starboard fire doors fwd of head on boiler deck don't close and latch properly. Make repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 22 November 2015
Resolved 11 February 2016
Resolution: Cleared under original activity due to MISLE Deficiency error.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 7 January 2011
Resolved
DOT drug testing background checks not being completed as required by 49 CFR 40.25
Action required: 705 - Other - as specified
Due 7 February 2011
Resolved 7 February 2011
Resolution: Cleared by SECTOR DAPI.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 7 January 2011
Resolved
EAP display requirements posted but not up to date several companies listed were no longer in business.
Action required: 705 - Other - as specified
Due 7 February 2011
Resolved 7 February 2011
Resolution: Cleared by SECTOR DAPI.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 7 January 2011
Resolved
EAP training not being conducted or logged in members file.
Action required: 705 - Other - as specified
Due 7 February 2011
Resolved 7 February 2011
Resolution: Cleared by SECTOR DAPI.
Accommodation/Occupational Safety
Issued 25 January 1998
Resolved
PROVE PROPER OPERATION OF STARBOARD AFT DOORS ON 2ND DECK.
Condition: Unknown
Due 25 January 1998
Resolved 25 January 1998
Construction/Loadline
Issued 25 January 1998
Resolved
SUBMIT REPAIR PROPOSAL TO OCMI FOR DAMAGE SUSTAINED ON BOW AND STARBOARD SIDE OF MAIN DECK. MAKE FOREPEAK AVAILABLE WITH GAS FREE CERTIFICATE FOR MARINE INSPECTOR.
Condition: Unknown
Due 25 January 1998
Resolved 25 January 1998
Engineering
Issued 26 December 1995
Resolved
SUBMIT WELD PROCEDURES, QUALIFICATIONS, AND MATERIAL SPECS FOR EXPANSION JOINT ON MAIN STEAM LINE. PROVIDE 100% RADIOGRAPHY FOR JOINT OR EQUIVALENTPROCEDURE.
Condition: Unknown
Due 28 December 1995
Resolved 24 January 1996
Engineering
Issued 23 December 1994
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Engineering
Issued 23 December 1994
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Engineering
Issued 17 December 1993
Resolved
PROVE PROPER OPERATION OF LOW WATER ALARM ON STARBOARD BOILER.
Condition: Unknown
Due 17 December 1993
Resolved 17 December 1993
Navigation
Issued 17 December 1993
Resolved
REPAIR AND PROVE PROPER OPERATION OF SOUND POWERED TELEPHONE IN FIRE ROOM.
Condition: Unknown
Due 17 January 1994
Resolved 22 December 1993
Electrical
Issued 17 December 1993
Resolved
LABEL EMERGENCY LIGHTING IN ENGINE ROOM AND FIRE ROOM.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Engineering
Issued 17 December 1993
Resolved
INSTALL LAGGING ON MAIN STEAM LINE NEAR EMERGENCY BATTERIES AND OVER THROTTLE STATION.
Condition: Unknown
Due 17 January 1994
Resolved 22 December 1993
Electrical
Issued 17 December 1993
Resolved
REMOVE PORTABLE FANS FROM ENGINEROOM ON PORT AND STARBOARD SIDES AT OPENINGS IN BULKHEAD.
Condition: Unknown
Due 17 January 1994
Resolved 22 December 1993
Engineering
Issued 17 December 1993
Resolved
PROVE PROPER OPERATION OF LOW WATER CUT OUT AND FLAME SCANNERS ON PORT BOILER.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Engineering
Issued 17 December 1993
Resolved
PROVE PROPER OPERATION OF LOW WATER ALARM, LOW WATER CUT-OUT AND FLAME SCANNERS ON STARBOARD BOILER.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Accommodation/Occupational Safety
Issued 22 June 1993
Resolved
REPAIR HOLE IN INCLINED LADDER STBD SIDE FWD MAIN DECK AND REINSTALL INSULATION MISSING ON BACKSIDE OF LADDER.
Condition: Unknown
Due 22 June 1993
Resolved 22 June 1993
Fire Fighting
Issued 23 December 1992
Resolved
INSTALL MISSING INSULATION ON BULKHEAD AFT OF HOT WATER HEATERS, OVERHEAD ABOVE EMERGENCY BATTERIES, AND FIXED CO2 BOTTLES. INSTALL MISSING BOLTED INSERT IN BULKHEAD AFT OF HOT WATER HEATERS.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Engineering
Issued 23 December 1992
Resolved
DO NOT OPERATE THE PORT BOILER EXCEPT IN AN EMERGENCY AND THEN IT IS TO BE MONITORED CONTINUOSLY. PROVE PROPER OPERATION OF ALARMS AND SHUTDOWNS FOR PORT BOILER.
Condition: Unknown
Due 28 December 1992
Resolved 28 December 1992
Engineering
Issued 23 December 1992
Resolved
INSTALL CHAINS OR REMOTE MEANS TO CLOSE BOILER GUAGE GLASS VALVES.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Electrical
Issued 23 December 1992
Resolved
INSTALL COVERS ON FLOURESCENT LIGHTS IN BOW THRUSTER ROOMS AND FIREROOM.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Lifesaving
Issued 23 December 1992
Resolved
INSTALL 100 FEET OF PAINTER LINE ON THE TWO 25 MAN LIFEFLOATS AFT OF PILOT HOUSE.
Condition: Unknown
Due 28 December 1992
Resolved 28 December 1992
Construction/Loadline
Issued 23 December 1992
Resolved
MAKE STORAGE ROOM DOOR WEATHERTIGHT ON PORTSIDE OF THE TEXAS DECK.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Engineering
Issued 30 January 1992
Resolved
CORRECT THE BOILER MAKE UP FEED PIPING BETWEEN THE HOTWELL AND RESERVE FEEDTANK TO COMPLY WITH 46 CFR 56.60-25 (a) (i) AND (ii) OR INSTALL METALLIC PIPING.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Engineering
Issued 17 December 1991
Resolved
MAKE REPAIRS/ALTERATIONS TO PVC FEED WATER LINE TO MAINTAIN WATERTIGHT INTEGRITY OF COMPARTMENT.
Condition: Unknown
Due 17 December 1991
Resolved 17 December 1991
Construction/Loadline
Issued 17 December 1991
Resolved
REPAIR/REPLACE EXTERIOR DOORS WHERE WASTED AT BOTTOM EDGE.
Condition: Unknown
Due 17 December 1991
Resolved 17 December 1991
Electrical
Issued 23 July 1991
Resolved
CLEAN OIL FROM RUBBER MATS AND DECK IN GENERATOR (SHIPS SERVICE) ROOM.
Condition: Unknown
Due 23 August 1991
Resolved 27 July 1991
Electrical
Issued 23 July 1991
Resolved
REMOVE OR END IN JUNCTION BOX DE34AD ENDED ELECTRICAL CABLE LOCATED IN GALLEY ON STARBOARD SIDE OVERHEAD.
Condition: Unknown
Due 23 July 1991
Resolved 23 July 1991
Fire Fighting
Issued 23 July 1991
Resolved
REINSULATE WITH APPROVED MATERIALS BARE AREAS ON FIREROOM OVERHEAD.
Condition: Unknown
Due 23 July 1991
Resolved 23 July 1991
Lifesaving
Issued 23 July 1991
Resolved
REPAIR AFT GENERAL ALARM BELL LOCATED AFT IN MAIN SALON.
Condition: Unknown
Due 23 July 1991
Resolved 23 July 1991
Electrical
Issued 23 July 1991
Resolved
REPAIR LIGHT SWITCH COVER LOCATED IN ICE MACHINE ROOM.
Condition: Unknown
Due 23 July 1991
Resolved 23 July 1991
Electrical
Issued 23 July 1991
Resolved
REPAIR PLUG COVER LOCATED IN MAGNOLIA ROOM.
Condition: Unknown
Due 23 July 1991
Resolved 23 July 1991
Electrical
Issued 8 May 1991
Resolved
PROVIDE MEANS TO SHUT OFF EMERGENCY GENERATOR FUEL OIL SUCTION VALVE OUTSIDE THE EMERGENCY GENERATOR SPACE.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Electrical
Issued 8 May 1991
Resolved
INSTALL A 30 X 30 MESH FLAME SCREEN ON THE SHIPS SERVICE GENERATOR CRANKCASE VENT.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Electrical
Issued 26 January 1991
Resolved
INSTALL COVER FOR EMERGENCY BATTERIES BUS BAR.
Condition: Unknown
Due 26 January 1991
Resolved 26 January 1991
Construction/Loadline
Issued 26 January 1991
Resolved
MAKE SCULLERY AVAILABLE FOR INSPECTION UPON COMPLETION.
Condition: Unknown
Due 26 January 1991
Resolved 26 January 1991
Construction/Loadline
Issued 26 January 1991
Resolved
REPAIR HOLE IN BULKHEAD STBD SIDE OF MAGNOLIA SUITE.
Condition: Unknown
Due 26 January 1991
Resolved 26 January 1991
Construction/Loadline
Issued 26 January 1991
Resolved
PROVIDE ONE WAY LOCKING MECHANISM ON GIFT SHOP DOOR.
Condition: Unknown
Due 26 January 1991
Resolved 26 January 1991
Electrical
Issued 26 January 1991
Resolved
PROVIDE RED ROTATING GENERAL ALARM LIGHT FOR SHIPS SERVICE GENERATOR AND PROVE PROPER OPERATION OF SAME.
Condition: Unknown
Due 26 January 1991
Resolved 26 January 1991
Fire Fighting
Issued 18 July 1990
Resolved
REMOVE FIRE HOSE FROM FIRE STATION #5 IN ENGINE ROOM, DRAIN HOSE AND RESTOW. PROVE HYDRANT VALVE TIGHT. 46 CFR 76.10
Condition: Unknown
Due 18 July 1990
Resolved 18 July 1990
Electrical
Issued 18 July 1990
Resolved
REMOVE ALIGATOR CLIP AND RE-WIRE BATTERY TERMINAL POST WIRING ON OUTBOARD POST, 2ND BATTERY OUTBOARD IN BATTERY BOX. 46 CFR 77.05
Condition: Unknown
Due 18 July 1990
Resolved 18 July 1990
Electrical
Issued 18 July 1990
Resolved
REMOVE WIRE NUTS AND RE-WIRE CABLE IN ACCORDANCE WITH 46 CFR SUBCHAPTER J AND IEEE 45, CABLE IN OVERHEAD PORTSIDE AFT OF BARRICADE DECK.
Condition: Unknown
Due 18 July 1990
Resolved 18 July 1990
Engineering
Issued 18 July 1990
Resolved
CROP AND RENEW BOTH BOILER UPTAKES WHERE WASTED, HOLED, AND LEAKING WATER IN OVERHEAD OF BOILER ROOM, FORWARD PORT AND STARBOARD SIDE. 46 CFR 71.25-50
Condition: Unknown
Due 18 July 1990
Resolved 18 July 1990
Accommodation/Occupational Safety
Issued 18 July 1990
Resolved
CROP AND RENEW VENTILATION DUCTING WHERE WASTED AND HOLED IN OVERHEAD OF BOILER ROOM PORTSIDE FORWARD. 46 CFR 72.15
Condition: Unknown
Due 18 July 1990
Resolved 18 July 1990
Electrical
Issued 19 January 1990
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF VESSEL'S S/S #2 DIESEL GENERATOR. 46 CFR 111.12-5
Condition: Unknown
Due 19 January 1990
Resolved 19 January 1990
Electrical
Issued 24 October 1989
Resolved
PROVE PROPER OPERATION OF GENERATOR CYCLE METER ON EMERGENCY GENERATOR; 46 CFR 111.30-25(E)(2).
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Electrical
Issued 24 October 1989
Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Lifesaving
Issued 24 July 1989
Resolved
PROVIDE ONEHUNDRED AND ONE (101) ADULT PFD'S AND SIX (6) CHILDS PFD'S. THE NUMBER OF PERSONS ALLOWED ON BOARD IS REDUCED BY ONEHUNDRED AND ONE ADULTS AND SIX CHILDREN UNTIL THIS ITEM IS CLEARED.
Condition: Unknown
Due 24 July 1989
Resolved 24 July 1989
Lifesaving
Issued 22 May 1989
Resolved
PROVIDE 58 ADULT LIFE JACKETS TO TOTAL 1634 ABOARD THE VESSEL. THE VESSEL IS LIMITED TO CARRIAGE OF NOT MORE THAN 1576 TOTAL PERSONS UNTIL THIS ITEM IS CORRECTED. 46 CFR 75.40-10
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Navigation
Issued 22 May 1989
Resolved
REPLACE BULBS AND PROVE OPERATION OF POWER FAILURE AND OVERLOAD ALARM LIGHTS FOR NO. 1 STEERING PUMP IN WHEELHOUSE. 46 CFR 113.43
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Electrical
Issued 22 May 1989
Resolved
PROVIDE BLANK WHERE MISSING IN ELECTRICAL DISTRIBUTION PANEL STARBOARD GALLEY. 46 CFR 111.40
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Lifesaving
Issued 16 December 1988
Resolved
PROVIDE 26 CHILD PFD'S. NUMBER OF CHILDREN ALLOWED IS REDUCED BY 26 UNTIL THIS ITEM IS CLEARED. 46CFR75.40-10(A)
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
MAKE PORT PROPULSION BOILER AVAILABLE FOR FIRESIDE AND WATERSIDE INSPECTION46CFR61.05-10
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
MAKE STARBOARD PROPULSION BOILER AVAILABLE FOR FIRESIDE AND WATERSIDE INSP.46CFR61.05-10
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
CONDUCT ANNUAL HYDROSTATIC TEST OF PORT PROPULSION BOILER. 46CFR61.10-5(D)
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
CONDUCT ANNUAL HYDROSTATIC TEST OF STBD. PROPULSION BOILER. 46CFR61.10-5(A)
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
SET SAFETY VALVES FOR PORT PROPULSION BOILER. 46CFR61.05-20
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 16 December 1988
Resolved
SET SAFETY VALVES FOR STBD. BOILER. 46CFR61.05-20
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Fire Fighting
Issued 16 December 1988
Resolved
PROVIDE INFORMATION INDICATING HOW CO2 SHUTDOWN SWITCH TO BOILER ROOM IS TOBE HOOKED UP. ASSEMBLE AS PER APPROVED PLANS. 46CFR76.15-10
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Electrical
Issued 16 December 1988
Resolved
SECURE LOOSE BAKOLITE INSULATOR IN GALLEY PANNEL. 46CFR111.40
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Electrical
Issued 16 December 1988
Resolved
HARD WIRE A/C UNIT LOCATED IN CREWS LOCKER ROOM. 46CFR111.60
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Lifesaving
Issued 16 December 1988
Resolved
PROVIDE 17 ADULT PFD'S. NUMBER OF PASSENGERS ALLOWED IS REDUCED BY 17 ADULTS UNTIL THIS ITEM IS CLEARED. 46CFR75.40-10(A)
Condition: Unknown
Due 16 December 1988
Resolved 16 December 1988
Engineering
Issued 12 September 1988
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS IN STARBOARD BOILER FIREBOX TUBE.
Condition: Unknown
Due 12 September 1988
Resolved 12 September 1988
Lifesaving
Issued 22 June 1988
Resolved
REPLACE 234 ADULT AND 16 CHILDS PFD'S 46CFR71.25-15(3)
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Electrical
Issued 22 June 1988
Resolved
INSTALL BLANKS IN GALLEY SWITCHBOARD AND KEEP COVER CLOSED WHEN IN USE 46CFR111.01-1(B)
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Fire Fighting
Issued 22 June 1988
Resolved
REMOVE FOOD SERVICE TRAY FROM IN FRONT OF GALLEY HOOD EXTINGUISHING SYSTEM LOCAL ACTUATOR OR PROVIDE ALTERNALTE MEANS OF ACTUATING SAME. 46CFR71.25-20(A)(3)
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Navigation
Issued 22 June 1988
Resolved
INSTALL SELF-LOCKING NUTS ON STEERING GEAR LIMIT SWITCHES AND RUDDER ANGLE INDICATOR TRANSMITTER MSM VOL II CH 14(B)(1)(E)
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Accommodation/Occupational Safety
Issued 22 June 1988
Resolved
INSTALL INSECT SCREENS ON POTABLE WATER TANK VENT. PHS REGULATIONS
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Electrical
Issued 22 June 1988
Resolved
INSTALL SHAFT GUARD ON THE CHILLED WATER PUMP. 46CFR58.01-20
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Fire Fighting
Issued 22 June 1988
Resolved
RE-ATTACH FOG TIP CHAINS ON FIRE NOZZLE LOCATED AT STATION #2 & #8. 46CFR162.027-3(B)(1).
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Fire Fighting
Issued 22 June 1988
Resolved
REPLACE A SPARE BII FIRE EXTINGUISHER 46CFR71.25-20(A)(1).
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Deck/Cargo
Issued 22 June 1988
Resolved
RENEW CRACKED BLOCK ON BOTH PORT AND STBD GANGWAY ON BOW 46CFRR71.25-10(A)
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Electrical
Issued 22 June 1988
Resolved
REPLACE TRANSFORMER COVERS LOCATED IN THE SPACE UNDER THE PILOT HOUSE. 46CFR111.01-1(B)
Condition: Unknown
Due 22 June 1988
Resolved 22 June 1988
Lifesaving
Issued 21 March 1988
Resolved
THE NUMBER OF PERSONS ALLOWED IS REDUCED TO 1609 TOTAL PERSONS INCLUDING A MAXIMUN OF 160 CHILDERN AS PER 46CFR75.40-10(A) UNTIL 21 ADULT AND 2 CHILDERN PFD'S ARE PROVIDED AND INSPECTED BY AN ATTENDING USCG INSPECTOR.
Condition: Unknown
Due 21 March 1988
Resolved 21 March 1988
Navigation
Issued 17 September 1987
Resolved
INSTALL A MASTHEAD LIGHT AND STERNLIGHT IN LIEU OF THE EXISTING ALL-AROUND LIGHT ON THE AFT MAST OR PROVIDE A CERTIFICATE OF ALTERNATIVE COMPLIANCE
Condition: Unknown
Due 17 September 1987
Resolved 17 September 1987
Deck/Cargo
Issued 17 September 1987
Resolved
INSTALL FLAMESCREEN ON PORT FORWARD FUEL OIL TANK VENT AFT OF FUEL FILL VALVE
Condition: Unknown
Due 17 September 1987
Resolved 17 September 1987
Navigation
Issued 17 September 1987
Resolved
INSTALL NAVIGATION LIGHTS THAT MEET THE TECHNICAL SPECIFICATIONS OF THE RULES OF THE ROAD(ANNEX I), OR PROVIDE A CERTIFICATE OF ALTERNATIVE COMPLIANCE
Condition: Unknown
Due 17 September 1987
Resolved 17 September 1987
Electrical
Issued 21 May 1987
Resolved
CLEAR GROUNDS FROM 120 VOLT SIDE OF MAIN AND EMERGENCY SWITCHBOARDS.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987
Electrical
Issued 21 May 1987
Resolved
REPAIR OIL LEAK ON TURBOCHARGER ON NO. 1 SHIPS SERVICE GERERATOR.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987
Lifesaving
Issued 21 May 1987
Resolved
REPLACE LIFE BUOY LOCATED IN WAY OF PORT SIDE NAVIGATION LIGHT.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987
Electrical
Issued 21 May 1987
Resolved
PROVIDE PROPER METAL BANDING AROUND WIRE BUNDLE OVER REFRIGERATOR UNITS IN WAY OF BREEZE WAY ON MAIN DECK.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987
Electrical
Issued 21 May 1987
Resolved
INSTAL;L BLANKS IN OPEN SPOTS I CIRCUIT BREAKER BOX IN GENERATOR ROOM.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987
Engineering
Issued 25 March 1987
Resolved
BOILER MOUNTINGS (VALVES) FOR BOTH PORT AND STARBOARD BOILERS SHALL BE OPENED UP AND EXAMINED BY A COAST GUARD MARINE INSPECTOR 46 CFR 61.05-15. THIS SHALL BE ACCOMPLISHED AT THE NEXT REPAIR AVAILABILITY, BUT IN NO CASE LATER THAN 24DEC87.
Condition: Unknown
Due 25 March 1987
Resolved 25 March 1987
Lifesaving
Issued 26 January 1987
Resolved
PROVIDE NEW OR ACCEPTABLE REPLACEMENT LIFE PRESERVERS FOR THE APPROXIMATELY534 PFD'S ON BOARD.
Condition: Unknown
Due 26 January 1987
Resolved 26 January 1987
Fire Fighting
Issued 24 December 1986
Resolved
RESTORE INSULATION ON OVERHEAD OF BOILER ROOM AND MACHINERY SPACE AND BULKHEAD OF EMERGENCY GENERATOR ROOM TO BRING IN COMPLIANCE WITH REQUIREMENTS FOR A-60 STRUCTURAL FIRE PROTECTION BOUNDARIES.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Fire Fighting
Issued 24 December 1986
Resolved
PROVIDE SOME MEANS OF CLOSURE FOR GALLEY EXHAUST DUCT.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Construction/Loadline
Issued 24 December 1986
Resolved
PROVIDED APPROPRIATE CLOSURE DEVICES FOR MAN HOLE COVERS ON MAIN DECK.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Fire Fighting
Issued 24 December 1986
Resolved
PROVIDE MEANS TO REMOTELY CLOSE LOUVERED VENT FOR GENERATOR ROOM ON PORT SIDE.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Fire Fighting
Issued 24 December 1986
Resolved
REVISE INSTRUCTIONS FOR ACTIVATING FIXED CO2 FLOODING TO INCLUDE CLOSING/ SHUTTING OFF VENTS AND SECURING THE MACHINERY INSIDE.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Construction/Loadline
Issued 24 December 1986
Resolved
INSTALL PROPER CLOSURE DEVICES ON ALL VENT PIPES ON MAIN DECK AS PER 46 CFR72.15-15(A).
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Fire Fighting
Issued 24 December 1986
Resolved
PROVIDE APPROVED FIRE PLAN AND DISPLAY AS APPROPRIATE AS PER 46 CFR 71.65-5(D).
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Lifesaving
Issued 24 December 1986
Resolved
PROVIDE NEW OR ACCEPTABLE REPLACEMENT LIFE PRESERVERS FOR THE APPROXIMATELY534 PROVISIONAL PFD'S NOW ON BOARD.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Unknown
Issued 9 February 1985
Resolved
THE FOLLOWING DEFICIENCY PERTAIN TO THE VESSEL, NATCHEZ, DN563612 AND IS TO BE COMPLIED WITH BY 09MAR85.
Condition: Unknown
Due 9 February 1985
Resolved 9 February 1985
Unknown
Issued 9 February 1985
Resolved
RENEW INSULATION ON THE FIREROOM OVERHEAD TO RESTORE IT TO A CLASS A-50 BOUNDARY TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR. THIS ITEM TO BE COMPLETED PRIOR TO 09MAR85.
Condition: Unknown
Due 9 February 1985
Resolved 9 February 1985
Electrical
Issued 13 February 1984
Resolved
INSTALL COVERS ON ELECTRICAL PANELS ON FRONT OF BOTH BOILERS.
Condition: Unknown
Due 13 February 1984
Resolved 13 February 1984
Accommodation/Occupational Safety
Issued 13 February 1984
Resolved
STENCIL VENT LOUVER REMOTE SHUTDOWN FOR SHIP SERVICE GENERATOR ROOM.
Condition: Unknown
Due 13 February 1984
Resolved 13 February 1984
Fire Fighting
Issued 13 February 1984
Resolved
SUBMIT FOR APPROVAL BY 8TH CG DISTRICT (MMT) FIXED FIRE EXTINGUISHING FOR GENERATOR SPACE AND COMPLY WITH COMMENTS PERTAINING TO SUBJECT APPROVAL.
Condition: Unknown
Due 13 February 1984
Resolved 13 February 1984
Electrical
Issued 13 February 1984
Resolved
PROVE SATISFACTORY OPERATION OF BOTH REMOTE BILGE PUMP RUN INDICATOR LIGHTS
Condition: Unknown
Due 13 February 1984
Resolved 13 February 1984
Fire Fighting
Issued 13 February 1984
Resolved
INSTALL FIXED FIRE EXTINGUISHING SYSTEM IN SHIP SERVICE GENERATOR ROOM IN ACCORDANCE WITH: 46 CFR 76.05.
Condition: Unknown
Due 13 February 1984
Resolved 13 February 1984
Unknown
Issued 13 February 1984
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE VESSEL NATCHEZ, DN563612.
Condition: Unknown
Due 13 February 1984
Resolved 13 February 1984
Engineering
Issued 21 October 1983
Resolved
E1 MAKE PERMANENT REPAIRS TO STARBOARD BOILER FURNACE SATISFACTORY TO [name withheld] PRIOR TO 23OCT83.
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Engineering
Issued 21 October 1983
Resolved
MAKE PORT BOILER AVAILABLE FOR WATERSIDE INSPECTION 28SEP83. INSPECTED FIREAND WATERSIDES FOUND OIL IN W S AND 4 CRACKS IN FURNACE. CRACKS WERE VEED
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Unknown
Issued 21 October 1983
Resolved
UNTIL PERMANENT REPAIRS TO STARBOARD BOILER FURNACE ARE MADE STEAMER NATCHEZ WILL OPERATE ONLY WITH A TUG ACCOMPANYING THE VESSEL IN ACCORDANCE WITH
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Unknown
Issued 21 October 1983
Resolved
UNTIL PERMANENT REPAIRS TO STBD BOILER BURNACE ARE MADE VESSEL WILL OPERATEONLY WITH A TUG ACCOMPANYING THE VESSEL IN ACCORDANCE WITH NEW ORLEANS
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Unknown
Issued 21 October 1983
Resolved
(REQ. D1 CONTINUED) STEAM SHIP CO LETTER DATED 23SEP83 THIS VESSEL OPERA- TION ALLOWED UNTIL 27SEP83.
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Engineering
Issued 21 October 1983
Resolved
MAKE PORT BOILER AVAILABLE FOR WATERSIDE INSPECTION 28SEP83.
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Engineering
Issued 21 October 1983
Resolved
MAKE PERMANENT REPAIRS TO STARBOARD BOILER FURNACE SATISFACTORY TO [name withheld] PRIOR TO 23OCT83. FURNACE WAS PRESSED BACK INTO SHAPE SAT.
Condition: Unknown
Due 21 October 1983
Resolved 21 October 1983
Unknown
Issued 12 August 1983
Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL NATCHEZ, DN563612.
Condition: Unknown
Due 12 August 1983
Resolved 12 August 1983
Electrical
Issued 12 August 1983
Resolved
LINE EMERGENCY AND SHIP'S GENERATOR BATTERY BOXES WITH LEAD OR RENEW BOXES WITH AN APPROVED NON-CORROSIVE MATERIAL.
Condition: Unknown
Due 12 August 1983
Resolved 12 August 1983