HERO is a 1998 passenger vessel (inspected). The Coast Guard has recorded 28 inspections since 2016, most recently in May 2026, along with 20 deficiencies and 4 casualty investigations between 2003 and 2022.
Records from 2003 to 2026. Most recent: inspection, 13 May 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Registered dimensions (L × B × D)126.0 ft × 29.0 ft × 12.5 ft
Registered tonnagegross 89 / net 60
ITC dimensions (L × B × D)126.0 ft × 29.0 ft × 12.5 ft
ITC tonnagegross 310 / net 93
BuilderC & G BOAT WORKS INC · BAYOU LA BATRE, AL, UNITED STATES · built 1998
DocumentationValid · issued 1 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it89 - Regulatory (Subpart C or D), Gross Ton 310 - Convention (Subpart B), Gross Ton 60 - Regulatory (Subpart C or D), Net Ton 93 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Repair the following:
-Hairline crack (approx. 03 inches) on the starboard side shell within the rudder room above the deepest draft waterline.
-Wasted bottoms of back deck rail stanchion pockets within rudder room.
46 CFR 177.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2026
Resolved 3 June 2026
Resolution: Received satisfactory documentation from POC that welders had attended, gouged/ rewelded the hairline crack and recapped the bottoms of the affected deck rail stanchion pockets.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 May 2025Resolved
An interconnected detection and alarm system must: be installed such that the actuation of alarm in one area results in both audible and visual alarms in all areas required by 46 CFR 181.405(c) or 118.400(d), vsl had detectors in crew accommodation, audible in hall/galley was heard, but no visual w/in the crew accommodation. Make system meet visual regulation.
46 CFR 181.450(a)(2)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2025
Resolved 12 May 2025
Resolution: Vessel rep provided video proof of visual (strobe) alarms in crew accommodation areas.
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. – Crack in overhead deck above #3 MDE above exhaust.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2024
Resolved 31 July 2024
Resolution: Welder came out to vessel preformed a repair of the crack. Then used NDT method (dye pen) to test weld.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 June 2023Resolved
Electrical equipment must be installed and maintained to protect passengers, crew, and vessel from electrical hazards, fire, and shock.
Junction box in engineroom was melted and had grease build up.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2023
Resolved 6 July 2023
Resolution: Junction box was replaced with new one.
Vessel must be ready for inspection of the hull structure and it's appurtenances. Found crack above #3 MDE. Crack extends along overhead deck and connecting beams with water intrusion.
46 CFR 176.802(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 August 2022
Resolution: Visually inspected temporary repair and welds. Will need to be permanently repaired at next drydock.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 August 2022Resolved
Nonmetallic hose used on wet exhuast system must be sufficient to prevent collapsing and be double clamped.
Flexible hose on #2 MDE wet exhaust system is cracked and leaking. Needs to be replaced.
46 CFR 172.430(c)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 August 2022
Resolution: Visually inspected replaced hose, sat.
Vessel must be ready for inspection of the hull structure and it's appurtenances. Found crack above #3 MDE. Crack extends along overhead deck and connecting beams with water intrusion. Vessel temporarily repaired cracks. Due to the amount of damage, vessel will need to crop and renew during next scheduled drydock.
46 CFR 176.802(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 May 2023
Resolved 8 June 2023
Resolution: The area was cropped/ renewed to the satisfaction of the attending Marine Inspector. Dye penetrant was utilized as satisfactory NDT.
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel sustained multiple gashes in the port side hull area after striking a Single well structure. Vessel sustained a 2ftx3ft hole in port side bow.
46 CFR 177.100
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2022
Resolution: Inspection team completed an inspection of the inserts and witnessed the dye pen, all Sat.
Vessel allided with platform causing structural damage to port bow. DMIs observed significant damage to the hull, handrails and deck on the vessel's port bow.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2021
Resolved 28 October 2021
Resolution: CGMI's inspeted all welds and witnessed satisfactory NDT.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 21 May 2019Resolved
On Emergency Power, Radar did not energize. Radar shall energize on Emergency Power. Vessel replace battery.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 May 2019
Resolved 22 May 2019
Resolution: Crew tighten loose electrical cables onto emergency power batteries. Radar worked under emergency power. Deficiency cleared on the spot.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 21 May 2019Resolved
Vessel shall have sufficient railing. Vessel Rescue Zone Hatch broke off. Vessel shall reweld.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 22 May 2019
Resolved 22 May 2019
Resolution: Vessel rewelded hatch onto the vessel and provided photo via email of completion.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 19 June 2018Resolved
Found fractured welds and pinholes in the watertight bulkheads in the following locations: inside the forward hold on both the starboard and port side of the hold and in the steering room on the starboard side quarter; these need NDT to located the extent of the crack as well as be rewelded prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 June 2018
Resolved 19 June 2018
Resolution: Conducted NDT and had a welder come out to reweld fractured areas, Duty MI went to observe and verified welds were corrected.
Stability › Watertight Integrity › General
Issued 19 June 2018Resolved
Found cable penetrations through watertight bulkdheads in frame #8 and #32, seal in holes where the cables penetrate the bulkheads to make them watertight.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 June 2018
Resolved 19 June 2018
Resolution: Duty MI went out to verify stuffing had been placed into the througholes in the watertight bulkheads to maintain watertight integrity.
Engineering › Lubricating Oil Service System › Valve
Issued 19 June 2018Resolved
Found oil leak on the #1 MDE at engine valve cover
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2018
Resolved 28 June 2018
Resolution: The valve cover gasket was replaced and the leak was secured, all sat.
Found deadend wires in the MSD space and in the wing void space where the sewage valve is located; remove or cap off deadend wires.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2018
Resolved 19 June 2018
Resolution: Duty MI went onboard to verifty wires had been capped off.
during a propulsion test, the MI inspector noticed excessive water leaking out of the shaft packing on the #3 MDE shaft. Shaft packing needs to be tightened
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2018
Resolved 19 June 2018
Resolution: Duty MI went out to verify the shaft was no longer leaking during a propulsion test.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 19 June 2018Resolved
the batteries in all 3 waterlights attached to the port side lifefloats were not proper type of battery.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2018
Resolved 19 June 2018
Resolution: Duty MI went onboard to verify the proper batteries had been installed in the waterlights.
found outlet covers falling off of the outlets on the #1, #3 and #4 MDE
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2018
Resolved 28 June 2018
Resolution: The receptacle outlets were replaced on the #1, #3, and #4 MDE, and found to be satisfactory.
Electrical › Electric Generation Source (service) › Switch
Issued 19 June 2018Resolved
Found broken swithces and openings in the ballast and blige motor control boxes
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2018
Resolved 19 June 2018
Resolution: Duty MI went onboard to verify controls and openings were replaced to eliminate a possible electrical hazard
Engineering › Pressure Vessel › Foundation
Issued 19 June 2018Resolved
Inspector could not internally examine the 2 unfired pressure vessels at the 5 year period so CG inspector made the recommendation to provide a means to inspect internally or conduct a hydrostatic test IAW 46 CFR 61.10-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 July 2018
Resolved 19 June 2018
Resolution: Duty MI was able to inspect the pressure vessel internally to the satisfaction of the MI.
10 February 2003Routine · role: Transiting Vicinity of Primary Subject · activity 1742544
6 March 2014Routine · role: Involved in a Marine Casualty · activity 4811740
30 September 2021Routine · role: Involved in a Marine Casualty · activity 7396315
22 April 2022Routine · role: Involved in a Marine Casualty · activity 7443008
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
GULF HERO (2003). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.