Inspection history · 106
26 January 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6129130
4 May 2016
Examination of Repairs · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5869171
4 March 2016
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5864479
8 October 2015
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5738444
7 July 2015
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5176927
26 June 2015
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5163845
24 March 2015
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5090134
26 February 2015
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5073795
13 June 2014
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4886144
16 January 2014
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4820967
21 February 2012
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4248467
21 February 2012
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4286748
5 January 2012
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4223119
16 September 2011
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4146707
2 September 2011
Damage Survey · Permit to Proceed
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4134525
21 July 2011
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4089045
14 June 2011
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4044266
9 June 2011
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4039741
16 December 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3939770
1 October 2010
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3859347
8 September 2010
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3844965
6 April 2010
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3707787
21 January 2009
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3397612
20 June 2008
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3242399
11 October 2007
COI Inspection · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · Hull Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3077438
13 July 2007
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3026728
30 April 2007
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2919030
16 April 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2908572
23 March 2007
Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2893583
21 February 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2875922
13 February 2007
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2882664
10 November 2006
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2820473
24 October 2006
MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2806852
5 September 2006
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2764028
29 August 2006
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2770638
23 August 2006
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2758387
22 June 2006
Examination of Repairs · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2688136
16 March 2006
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2622054
6 March 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2623906
24 January 2006
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2572307
23 January 2006
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2571275
7 January 2006
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2562610
14 November 2005
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2534358
13 June 2005
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2389342
18 April 2005
MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2336340
6 April 2005
COI Inspection · Examination of Repairs · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2327440
29 March 2004
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2039075
6 February 2004
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2001765
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1986746
3 March 2003
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1760862
14 January 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1733916
18 October 2002
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1694229
2 October 2002
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1697095
9 August 2002
Internal Structural Exam · Cargo Tank Internal
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1658975
12 May 2001
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1065247
27 July 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 483504
23 May 2000
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1049527
23 May 2000
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1051187
2 May 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 64675
6 August 1999
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1111516
30 April 1999
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1128055
20 September 1998
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 800656
10 September 1998
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 798785
9 September 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 129628
9 September 1998
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 800522
17 June 1998
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1131481
22 May 1998
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1471511
8 September 1997
Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1464053
22 July 1996
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1084767
12 May 1995
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1213779
16 March 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 534066
29 July 1994
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1173351
23 February 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 119091
30 July 1993
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1156757
5 August 1992
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1258216
2 April 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1271098
3 December 1991
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 941179
31 October 1991
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 938498
6 June 1991
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 537928
8 February 1991
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 901690
19 November 1990
Drydock Extension · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 989804
29 August 1990
Examination of Repairs · Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 915998
20 January 1990
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 921251
16 November 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 902812
21 April 1989
Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1348763
19 April 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 888167
6 January 1989
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1351449
29 December 1988
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1346349
11 February 1988
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 441946
31 December 1987
Hull Examination · COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1317330
30 September 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 481832
24 August 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1031967
25 June 1987
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1007497
8 April 1987
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1021150
22 March 1987
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 521114
26 November 1986
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1021276
7 August 1986
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 462597
4 March 1986
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1304907
30 January 1986
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1304528
3 January 1986
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 998128
21 March 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 980171
9 February 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 300343
9 October 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 535750
6 January 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970897
16 May 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1272331
30 April 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963420
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 26 June 2015
Resolved
Found pin hole on fwd corner of the #1 port cargo tank where it meets the deck plating. Completed temporary repairs. proceed to Port Arthur facility called Total for one time off load in order to complete permanent repairs. No cargo operations until permanent repairs are completed to the satisfaction of cognizant OCMI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 October 2015
Resolved 8 October 2015
Resolution: Examined and conducted satisfactory air test of repairs to #1 port cargo tank.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 24 March 2015
Resolved
2 inch crack found on between #1P/S cargo tank where the external framing meets the cargo tank top. Barge is to be towed to Tubal-cain shipyard for cleaning and permanent repairs. Repairs to be conducted to the satisfaction of attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 June 2015
Resolution: Inspected permanent repairs SAT.
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 13 June 2014
Resolved
All four buttons on port side stern showing significant signs of deterioration. Replace by date specified.
Action required: 705 - Other - as specified
Due 13 July 2014
Resolved 16 June 2014
Resolution: Received pictures of proper replacement of buttons on port side stern.
Construction/Loadline › Hull › Weld
Issued 5 January 2012
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanaent repair to epoxy patch on starboard stern void, 3' down from walking deck where corner wrapper and side shell meet.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 February 2012
Resolved 21 February 2012
Resolution: Sideshell re welded to corner wrapper and was satisfactorily air tested.
Construction/Loadline › Hull › Weld
Issued 2 September 2011
Resolved
Identified 8" x 1/4" fracture in the centerline weld seam of the #2 cargo tank. Temporary repairs made using splash zone. Vessel authorized to proceed to Exxon to discharge cargo and proceed directly to Southwest Shipyard to effect permanent repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 16 September 2011
Resolution: c/r 24'' x 24" insert air tested satisfactory cleared def.
Construction/Loadline › Hull › Side Shell
Issued 9 June 2011
Resolved
FOUND A 1/16" PINHOLE ON PT SIDESHELL @ THE 10' DRAFT, 4' AFT OF THE #5 PORT BULKHEAD IN STERN RAKE.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 July 2011
Resolved 14 June 2011
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of 2x2 repair-port stern.
Construction/Loadline › Hull › Hull Plating
Issued 8 September 2010
Resolved
LOCATED A 3" X 1/8" FRACTURE ON BOW VOID WALKING DECK, 8' FWD OF RAISED CARGO TANK TRUNK, 8' 8" INBOARD OF PORT BOW GUNWALE. INSTALLED EPOXY PATCH. (Minor damage reported from Kirby TBSIP Examiner [name withheld], via e-mail dated 02SEP10.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 October 2010
Resolved 1 October 2010
Resolution: see MISLE # 3859347
Construction/Loadline › Hull › Bottom Plating
Issued 16 April 2007
No resolution recorded
1/2" x 1" HOLE IN BOTTOM PLATE 3rd BAY FWRD FROM AFT HATCH. INSTALLED CEMENT BOX.
Action required: 705 - Other - as specified
Due 28 May 2007 — due date passed with no resolution recorded
Resolution: C/R # 4 PORT Deck gunelle 16'' x 2'' x3/8 & C/R #5 stbd btm plate 4''x 4'' x1/2" all test & soap repairs tested satisfactory.
Construction/Loadline › Hull › Bottom Plating
Issued 23 January 2006
Resolved
Repair 1/2" hole in bottom plate of the #2 port wing void 20' aft of fwd bulkhead 1" inboard of bilge lap.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 January 2006
Resolution: crop and renew a 2''x6'' section of bottom plate in way of the #2 port wing void. Witnessed satisfactory repair and air test.
Construction/Loadline › Hull › Side Shell
Issued 6 January 2006
Resolved
Make temporary repair to 1" fracture in the stern void on the centerline 5' below the main deck. Proceed to Exxon Baytown to offload cargo and return to Channel S/Y to make permanent repairs prior to loading cargo.
Action required: 705 - Other - as specified
Resolved 10 January 2006
Resolution: Witnessed satisfactory air test of an 18"x18" insert in the stern.
Construction/Loadline › Hull › Hull Plating
Issued 6 February 2004
Resolved
Stbd stern corner crushed / fractured.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2004
Resolution: 5'' x 8'' x 3/4" wrapper insert.
Construction/Loadline
Issued 9 September 1998
Resolved
PROCEED AS WEATHER PERMITS TO HOUSTON AND DISCHARGE CARGO. UPON COMPLETIONMAKE PERMANENT REPAIRS TO BENT EXTERNAL FRAMES, STBD SIDE, IN WAY OF #4 CARGO TANK. TO BE COMPLETED PRIOR TO LOADING CARGO._x001C_
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Documentation
Issued 3 December 1991
Resolved
PROVIDE COPY OF APPROVED PLANS FOR THE CARGO TANK ELECTRIC OVERFILL PROTECTION SYSTEM WHEN RECIEVED FROM THE MARINE SAFETY CENTER.
Condition: Unknown
Due 3 December 1991
Resolved 3 December 1991
Unknown
Issued 19 November 1990
Resolved
MAKE PERMANENT REPAIRS TO CRACKED RUB-BAR IN WAY OF 1ST FRAME FWD OF AFT MANHOLE AND IN WAY OF AFT BULKHEAD OF THE #2 STBD WING VOID.
Condition: Unknown
Due 19 November 1990
Resolved 19 November 1990
Unknown
Issued 19 November 1990
Resolved
PUMP OUT WATER (APPROX 4") FROM #2 WING VOID AND HAVE A COAST GUARD INSPECTOR RE-EXAMINE VOID.
Condition: Unknown
Due 19 November 1990
Resolved 19 November 1990
Unknown
Issued 19 November 1990
Resolved
MAKE PERMANENT REPAIRS TO 4 SMALL HOLES IN DECK PLATING ON STERN VOID IN WAY OF CENTER CLEAT, 3 ON STBD SIDE AND 1 ON PORT SIDE; TEMPORARY REPAIRS TO BE MADE PRIOR TO MOVING BARGE.
Condition: Unknown
Due 19 November 1990
Resolved 19 November 1990
Unknown
Issued 19 November 1990
Resolved
PUMP OUT WATER (APPROX 1") FROM STERN VOID.
Condition: Unknown
Due 19 November 1990
Resolved 19 November 1990
Unknown
Issued 19 November 1990
Resolved
MAKE PERMANENT REPAIRS TO BROKEN LADDER FOR CATWALK (ON BOW).
Condition: Unknown
Due 19 November 1990
Resolved 19 November 1990
Construction/Loadline
Issued 16 November 1989
Resolved
REMOVE TEMPORARY PATCHES AND MAKE PERMANENT REPAIRS TO THE PUNCTURED AREAS ON THE STERN VOID DECK TOP AT THE VESSELS NEXT GAS FREEING OR NO LATER THAN16DEC89.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Deck/Cargo
Issued 16 November 1989
Resolved
PROVIDE EVIDENCE OF SATISFACTORY ANNUAL HYDROTEST AT THE REQUIRED PRESSURE, OF THE CARGO PIPING.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Construction/Loadline
Issued 19 April 1989
Resolved
PRIOR TO NEXT CARGO LOADING AND NO LATER THAN 28 APRIL, 1989 MAKE PERMANENTREPAIRS TO PATCHED AREA ON PORT SIDE BOTTOM BOW RAKE.
Condition: Unknown
Due 19 April 1989
Resolved 19 April 1989
Engineering
Issued 29 December 1988
Resolved
DEMONSTRATE PROPER OPERATION OF DIESEL PUMP ENGINE REMOTE STOP AT DISCHARGEPORT PRIOR TO CARGO DISCHARGE.
Condition: Unknown
Due 29 December 1988
Resolved 29 December 1988
Navigation
Issued 3 January 1986
Resolved
MAKE PERMANANT REPAIRS TO NAVIGATION LIGHT STANDS.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986
Construction/Loadline
Issued 3 January 1986
Resolved
MAKE PERMANANT REPAIRS TO 6" TEAR IN PORT BOW WRAPPER AND ASSOCIATED INTERNALS.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986
Construction/Loadline
Issued 3 January 1986
Resolved
PAINT OUT LOADLINE MARKS.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986
Deck/Cargo
Issued 3 January 1986
Resolved
REPAIR TACHOMETER ON CARGO PUMP.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986
Deck/Cargo
Issued 3 January 1986
Resolved
REPAINT WARNING SIGN, EMERGENCY SHUT DOWN SIGN.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986
Construction/Loadline
Issued 3 January 1986
Resolved
REPAINT DRAFT MARKS, NAMES AND HOMEPORT.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986
Accommodation/Occupational Safety
Issued 3 January 1986
Resolved
MAKE PERMANANT REPAIRS TO CENTERLINE CATWALK.
Condition: Unknown
Due 3 January 1986
Resolved 3 January 1986