Inspection history · 113
25 November 2015
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5770238
28 September 2015
Administrative Inspection · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5755458
3 September 2015
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5234371
5 November 2014
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5058278
3 March 2014
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4814035
7 February 2014
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4813541
15 November 2013
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4753290
15 November 2013
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4796471
16 November 2012
Periodic Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4485693
9 October 2012
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4460109
10 September 2012
Damage Survey · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4437010
8 November 2011
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4233606
28 September 2011
Examination of Repairs
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4156420
27 July 2011
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4095874
3 June 2011
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4033081
6 December 2010
Internal Structural Exam · MTSA Verification · Drydock Exam · Cargo Tank Internal · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3905176
23 August 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3832066
3 June 2010
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3756698
26 May 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3761864
7 May 2010
Permit to Proceed
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3733026
19 April 2010
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3717131
2 April 2010
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3707827
19 March 2010
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3699030
29 September 2009
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3634956
16 January 2009
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3395142
14 October 2008
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3344534
11 August 2008
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3296246
27 July 2008
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3281106
12 June 2008
Examination of Repairs · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3239680
6 June 2008
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3228960
19 May 2008
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3210663
28 April 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3195222
28 April 2008
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3197774
23 November 2007
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3102958
15 November 2007
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3098914
24 October 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3086119
17 August 2007
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3030660
15 June 2007
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2960224
1 June 2007
Permit to Proceed · Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2949002
30 May 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2959351
11 April 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2906005
1 April 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2904559
9 March 2007
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2885074
23 February 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2876742
22 February 2007
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2875325
15 February 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2876099
29 December 2006
Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2854562
13 November 2006
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2819845
8 November 2006
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2843876
6 August 2006
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2737520
6 August 2006
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2759674
26 June 2006
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2691646
10 May 2006
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2645435
5 December 2005
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2545890
26 November 2005
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2540980
25 October 2005
MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2486279
25 October 2004
MTSA Verification · Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2227668
6 July 2004
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2123517
24 March 2004
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2030238
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1995649
6 October 2003
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1919859
5 September 2003
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1902881
9 July 2003
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1896836
5 March 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1769682
29 October 2002
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1704958
28 June 2002
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1642696
17 January 2002
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1479197
3 July 2001
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1067848
22 September 2000
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1054330
6 September 2000
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1429413
14 December 1999
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 816092
13 December 1999
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 813403
25 June 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 13554
24 February 1999
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 799966
11 July 1998
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 795284
7 October 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 74332
11 August 1997
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 782316
25 July 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 58035
11 March 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 73236
13 July 1996
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1090780
24 April 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 148370
26 September 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1442302
18 May 1995
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 453777
29 November 1994
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 866991
7 December 1993
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1159897
15 April 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 838979
7 December 1992
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 825849
9 March 1992
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1257400
12 November 1991
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1311426
23 August 1991
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1247861
7 August 1991
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1245412
17 July 1991
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 937677
4 March 1991
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 926983
13 December 1990
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1212224
3 November 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316603
31 May 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1035229
23 May 1989
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 462839
23 May 1989
Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1339028
14 November 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1203492
17 November 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 472081
6 November 1987
Hull Examination · COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1308983
28 May 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1030251
6 November 1986
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1330393
21 February 1986
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 985605
26 January 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 497029
3 November 1985
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 995010
11 September 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 304245
9 August 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1298811
11 December 1984
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 977532
4 November 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 969059
1 July 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272827
18 May 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 965379
9 February 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 967972
Construction/Loadline › Hull › Hull Plating
Issued 28 September 2015
No resolution recorded
D8 TBSIP Self-Reported Deficiency. Make permanent repairs to a 1/8” hole in the port stern corner of the stern void, 6 inches from the bottom.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 November 2015 — due date passed with no resolution recorded
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2014
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanent repair to 1.5 inch X 1/16 inch fracture in the #1 starboard wing tank bottom plate, 2 foot forwards of the aft bulkhead, and 2 foot inboard rom side shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 March 2014
Resolved 31 March 2014
Resolution: Shipyard cropped and renewed 47'' x 5'', 6'' x 10'' (2), 2'' x 4'' sections of plate and 6''8" x 7'' knuckle.
Construction/Loadline › Structures › Trunk
Issued 16 November 2012
Resolved
Make permanent repairs to the holed tank top IWO #1 port cargo tank. Barge is authorized to discharge its present cargo of VAM and proceed in an empty condition to TT Barge MM 183 for cleaning and subsequent repairs. Barge is not authorized to leave the Baton Rouge zone.
Action required: 705 - Other - as specified
Resolved 3 December 2012
Resolution: Cropped out and renewed (2) 30" x 6'' sections of the #1 cargo tank top. All repairs SAT.
Construction/Loadline › Hull › Side Shell
Issued 27 July 2011
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanent repairs to #1 stbd void 5' fwd of aft hatch 3' in from bilge knuckle. Fracture is approx. 5"x1/8"
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 4 September 2011
Resolved 27 September 2011
Resolution: Attended vessel in dry dock and witnessed satisfactory air test of repairs to hull.
Construction/Loadline › Hull › Hull Plating
Issued 23 August 2010
Resolved
FRACTURE ON BOTTOM PLATE AT #1 PORT WING TANK. 1 1/2" FROM CENTER LINE BHD AND APPROX. 6' FROM AFTER BHD. APPLY COLD PATCH FROM OUTSIDE (DIVERS) CONCRETE BOX OVER A 10" X 1/4" CRACK. (As reported by Kirby TBSIP Examiner [name withheld] via e-mail dated 11AUG2010)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 September 2010
Resolved 4 January 2011
Resolution: Observed repair, cleared deficiency.
Construction/Loadline › Hull › Side Shell
Issued 7 May 2010
Resolved
2" x 4" hole in stern box on stbd side 4 ft above bottom.
Action required: 705 - Other - as specified
Resolved 3 June 2010
Resolution: C/r 5''x18" cargo tank insert.
Deck/Cargo › Cargo Stowage › General
Issued 19 March 2010
Resolved
Vessel has a 1" fracture in the #1 stbd CT weld seam. Authorized Temp repair to complete cargo offload and proceed directly to shipyard for permenant repair.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 April 2010
Resolution: C/r 6''6"x43'' cargo tank top insert. See narrative for details.
[name withheld]
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 27 July 2008
Resolved
Pencil lead size damage found in #1p cargo tank top.
Action required: 705 - Other - as specified
Resolved 11 August 2008
Resolution: Insert 18" x 24" on #1 port and starboard cargo tank tops.
Deck/Cargo › Holds/Tanks › Coaming
Issued 12 June 2008
Resolved
Vsl has pinhole on deck longitudinal third from centerline on #2P Cargo Tank Top, approx 30 ft from forward bulkhead. Temp repair consists of epoxy. Vsl to make permanent repairs prior to onload of next cargo to satisfaction of local Coast Guard Marine Inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 18 June 2008
Resolution: Witnessed satisfactory pressure test of #2P cargo tank.
Deck/Cargo › Holds/Tanks › Hatch
Issued 19 May 2008
Resolved
16MAY08- recieved TBSIP temp repair report. 1/2" by 1" hole in #1 stbd aft hatch @ ladder. Installed concrete box. Permanent repairs required by 29JUN08.
Action required: 705 - Other - as specified
Due 29 June 2008
Resolved 6 June 2008
Resolution: Examined welds and witnessed satisfactory air tested welds of 2'' x 18” x 1/2" section of bottom plate in way of #1 stbd wing tank.
Construction/Loadline › Penetrations › Weld
Issued 15 November 2007
Resolved
Vessel reports pin hole #1 stbd hatch in floor.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 December 2007
Resolved 23 November 2007
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of an 18" x 24" x 3/8" bottom plate insert to the #1 stbd wing void.
Construction/Loadline › Hull › Hull Plating
Issued 24 October 2007
Resolved
Vessel has an inset and torn gunnel knuckle on the #3 port wing void that is temp repaired with epoxy.
Action required: 705 - Other - as specified
Due 1 December 2007
Resolved 23 November 2007
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of a 3'' x 3'' x 3/8" deck gunnel insert to #3 port wing void.
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 1 June 2007
Resolved
Vessel has a pin hole in the #2 starboard cargo tank top.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 15 June 2007
Resolution: A 2'' x 2'' x 3/8" insert was installed on the cargo tank raised trunk plate under the 3rd frame fwd of the #2 expansion dome and the 2nd angle to port of centerline.
Construction/Loadline › Hull › Side Shell
Issued 11 April 2007
Resolved
Make permanent repairs to the 11" X 1/2" fracture on the bow headlog, 3' from stbd corner, 1.5" from deck.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 April 2007
Resolved 11 April 2007
Resolution: Cropped and renewed 3/4" X 72" headlog plate, 3/8" X 5" X 72", and 2-8" X 24" in flanged brackets.
Deck/Cargo › Cargo Stowage › General
Issued 6 August 2006
Resolved
Prior to cargo, repair or replace sight glass on #2 starboard cargo tank.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 August 2006
Resolved 13 November 2006
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 26 June 2006
Resolved
Make temporary repairs to 6" fracture on the tank top of the #1 port cargo tank at the 8th rib near the centerline. Transit to Kinder Morgan Pasadena to offload cargo. Make permanent repairs to the satisfaction of a USCG Marine Inspector prior to loading cargo.
Action required: 705 - Other - as specified
Resolved 5 July 2006
Resolution: Witnessed satisfactory repairs and air test of 18" x 18" cargo tank insert.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 26 November 2005
Resolved
Vsl to transit to Houston for discharge. Complete permanent repairs to pinhole leak in deck plating (in #1 port tank) near centerline, after discharge, and prior to the loading of cargo. Item to be completed before the loading of cargo and cleared to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 December 2005
Resolved 5 December 2005
Resolution: Permanent repairs made and verified by MSO Houston/Galveston - see Activity #2545890.
Construction/Loadline › Hull › Hull Plating
Issued 6 July 2004
Resolved
Areas of port bow side shell and #2 stbd wing void side shell fractured as noted during owner survey.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 July 2004
Resolution: All areas inserted.
Construction/Loadline › Hull › Hull Plating
Issued 6 October 2003
Resolved
Fractures in way of bow deck, stern deck and port stern corner.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2003
Resolution: Gouged and welded.
Deck/Cargo › Holds/Tanks
Issued 17 January 2002
Resolved
FRACTURE IN #1 CARGO TANK.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 17 January 2002
Resolution: 24" X 18" X 3/8" INSERT.
Construction/Loadline › Hull › Hull Plating
Issued 17 January 2002
Resolved
24" FRACTURE IN HEADLOG.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 17 January 2002
Resolution: GOUGED AND WELDED
Construction/Loadline
Issued 6 September 2000
Resolved
MAKE REPAIRS TO WASTED TANK SUPPORT IN #1 PORT WING TANK. CROP AND RENEW ANGLE BRACKET IN #3 PORT WING TANK AND STERN VOID, AND TOP OF AFT VERTICAL FRAME IN #5 PORT WING TANK.
Condition: Unknown
Due 6 September 2000
Resolved 11 September 2000
Construction/Loadline
Issued 6 September 2000
Resolved
UNFINISHED WELD WORK IN BOW RAKE, #5 STARBOARD WING TANK AND STERN VOID. BLAST HULL CLEAN FOR DRY-DOCK INSPECTION AND CREDIT.
Condition: Unknown
Due 6 September 2000
Resolved 11 September 2000
Construction/Loadline
Issued 6 September 2000
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 6 September 2000
Resolved 11 September 2000
Deck/Cargo
Issued 7 December 1992
Resolved
Gas free and open for internal examination the vapor control piping.
Condition: Unknown
Due 7 December 1992
Resolved 7 December 1992
Deck/Cargo
Issued 17 July 1991
Resolved
CARGO TANK HIGH LEVEL ALARM SHUT DOWN SYSTEM MAY NOT BE USED UNTIL INSTALLATION IS COMPLETED PER APPROVED MSC PLANS AND OPERATION DEMONSTRATEDIN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR._x001C_ _x001C_
Condition: Unknown
Due 17 July 1991
Resolved 17 July 1991
Construction/Loadline
Issued 23 May 1989
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIR TO FRACTURE IN MAIN DECK STBD CARGO TANK. AFTER DISCHARGE OF CARGO IN THIS TANK, NO CARGO SHALL BE CARRIED UNTIL PERMANENT REPAIRS AR COMPLETED.
Condition: Unknown
Due 23 May 1989
Resolved 23 May 1989
Deck/Cargo
Issued 11 September 1985
Resolved
33CFR155.820(B) NO TEST RECORDS ON THE FIXED PIPING SYSTEMS.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985