Documentation record
Registered dimensions (L × B × D)50.0 ft × 20.0 ft × 7.2 ft
Registered tonnagegross 64 / net 43
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGLENDALE BOAT WORKS INC · CHANNELVIEW, TX, UNITED STATES · built 1972
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBELLE RIVER, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 11 April 2026 · expires 30 April 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it64 - Regulatory (Subpart C or D), Gross Ton
43 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 37
16 October 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8253993
11 June 2025
Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 8157848
17 October 2024
Annual Inspection · Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8020943
4 October 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7803371
19 July 2022
COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7511310
24 July 2021
Type not recorded
No type recorded · Station Freeport · USCG Heartland District (CGD-H) · Activity 7267391
20 May 2020
MTSA Verification · Administrative Inspection · Initial Certification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6956597
1 April 2015
MTSA Verification · Industry Initiated Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5095415
24 March 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4824782
16 May 2012
MTSA Verification · Industry Initiated Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4313284
14 February 2012
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4252560
2 February 2012
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4237484
18 November 2010
Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 3894160
12 May 2010
Industry Initiated Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3742293
11 June 2009
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3678334
8 January 2009
Administration
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3390985
7 November 2008
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3364684
7 June 2008
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3231848
11 January 2008
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3128840
13 June 2007
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2965753
26 July 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2725282
11 July 2006
MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2709333
1 November 2004
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2232295
8 September 2004
MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2190472
8 March 2004
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2020634
28 December 2003
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1973623
26 December 2003
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1970336
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978959
5 September 2003
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1902881
21 March 2003
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1775578
6 November 2002
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1702046
25 November 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1491697
12 October 2001
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1482121
10 January 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 50605
18 July 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 30853
8 May 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 277945
26 December 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 186715
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 17 October 2024
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to the propulsion engine or generator prime mover. The valve must be operable from a safe place outside the place where the valve is installed.
Fuel shut-off valves were inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 October 2024
Resolution: Reattached cables to remote fuel valve shutoff.
05 - Radio Communications › N/A - No Subsystem › Reserve source of energy
Issued 17 October 2024
Resolved
Whenever radiotelephone capability is required by this Act, a vessel's radiotelephone equipment shall be
maintained in effective operating condition.
Primary VHF-FM radio inoperable on emergency power.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 October 2024
Resolution: Installed new bridge batteries and recieved a new bridge to bridge certificate.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 17 October 2024
Resolved
Safe operation and servicing of the device so that any discharge meets the applicable requirements of 159.93.
Marine Sanitation Device is leaking and missing hose clamps.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 October 2024
Resolution: Installed hose clamps and replaced vent hose.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 17 October 2024
Resolved
The vessel has been both in satisfactory service insofar as structural adequacy is concerned and does not cause the structure of the vessel to be questioned by either the OCMI, or TPO engaged to perform an audit or survey.
Cable penetration in port aft bulkhead of engine room to potable water tank leaking water.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2024
Resolved 12 November 2024
Resolution: Vessel rep [name withheld], provided photo documentation of the cables through bulkhead being sealed with a silicone type material.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 October 2024
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.
Port engine cable frayed and loose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2024
Resolved 13 November 2024
Resolution: Vessel rep [name withheld], provided photo of correction to port engine loose and frayed cable. All sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 October 2024
Resolved
If a dedicated storage cabinet is provided it must be secured to the vessel so that it does not move.
Paint locker was not secured to the deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2024
Resolved 19 November 2024
Resolution: Received photo documentation from vessel rep [name withheld], showing flammable locker secured to the vessel, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 October 2024
Resolved
A fixed fire pump must be capable of :
Delivering water simultaneously from the two highest hydrants, or from both branches of the fitting if the highest hydrant has a Siamese fitting, at a pitot-tube pressure of at least 344 kilopascals (kPa) (50 pounds per square inch (psi), and a flow rate of at least 300 liters per minute (lpm) (80 gallons per minute (gpm).
Fire pump was missing gauge to read pressure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2024
Resolved 12 November 2024
Resolution: Received photo documentation of corrected fire pump pressure gauge. All sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 October 2024
Resolved
Storage areas are kept free from accumulation of combustible and flammable materials insofar as practicable.
Missing dryer lint trap.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2024
Resolved 13 November 2024
Resolution: Vessel rep [name withheld], provided photo documentation of rectified deficiency showing lint trap installed. All sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 July 2022
Resolved
The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Vessel name was not permanently affixed. Fix to the satisfaction of the Coast Guard.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 August 2022
Resolved 30 August 2022
Resolution: Name was permanently attached to hull in contrasting color.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 25 July 2022
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. Vessels main engine oil pressure alarms were not functioning. Fix to the satisfaction of the Coast Guard.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 2 August 2022
Resolved 1 August 2022
Resolution: Main engine oil alarm functioned correctly
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 July 2022
Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid. The fuel filters were not properly sealed, and was actively leaking fuel. Fix to the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 2 August 2022
Resolved 1 August 2022
Resolution: Fuel filters were replaced and proerply sealed; no longer leaking
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 25 July 2022
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space. Vessel did not have adequate emergency lighting. Fix to the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 2 August 2022
Resolved 1 August 2022
Resolution: Emergency lighting was replaced and vessel demonstrated sufficient lighting
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 July 2022
Resolved
Electrical equipment must be marked with its respective current and voltage ratings. Individual circuit breakers on switchboards and distribution panels must be labeled with a description of the loads they serve. Engine room distribution panel was not properly labeled. Fix to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2022
Resolved 1 August 2022
Resolution: Distribution panel was labeled correctly
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 July 2022
Resolved
Towing vessels are required to have logs in accordance with applicable regulations. Official vessel logbook was missing items required to be recorded. Fix to the satisfaction of the Coast Guard.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2022
Resolved 1 August 2022
Resolution: Company provided training to crew that going forward, items must be logged in TVR.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 25 July 2022
Resolved
Each towing vessel must have means to monitor amount of thrust at each operating station. Starboard main engine tachometer in wheelhouse was not functional. Fix to the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2022
Resolved 8 August 2022
Resolution: Received report of functioning tachometer
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 25 July 2022
Resolved
The VHF-FM radio must be installed at each operating station and connected to a functioning battery backup. Radio did not have a functioning battery backup. Fix to the satisfaction of the Coast Guard.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2022
Resolved 1 August 2022
Resolution: Witnessed proper function of VHF, tech provided report.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 25 July 2022
Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel is not compromised. Towing vessel had water in compartment not designed for ballast. Fix to the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2022
Resolved 1 August 2022
Resolution: Compartment was pumped out of any liquid; replaced gasket on hatch cover leading to space.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 19 July 2022
Resolved
THE COI INSPECTION WILL ENSURE THAT THE VESSEL IS IN SATISFACTORY CONDITION AND FIT FOR THE SERVICE FOR WHICH IT IS INTENDED, AND THAT IT COMPLIES WITH THE APPLICABLE STATUTES AND REGULATIONS FOR SUCH VESSELS. VESSEL WAS NOT IN SATISFACTORY CONDITION FOR INTITIAL SUBCHAPTER M CERTIFICATION. PREPARE VESSEL FOR COI INSPECTION TO THE SATISFACTION OF THE COAST GUARD.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 2 August 2022
Resolved 5 August 2022
Resolution: COI issued/ effective.