MAURY USCG vessel records
← All vessels

PADRE ISLAND

PADRE ISLAND is a 1981 industrial vessel. The Coast Guard has recorded 73 inspections since 2016, most recently in December 2025, along with 76 deficiencies, 2 operational controls and 21 casualty investigations between 2001 and 2025.

Records from 2001 to 2025. Most recent: inspection, 11 December 2025.

Built
1981
Last inspected
11 December 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspection record

Last inspected 11 December 2025
…with no type recorded13
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8101783
WDB4436
Flag
UNITED STATES
Maury page id
psix-53313

Documentation record

Registered dimensions (L × B × D)267.4 ft × 52.1 ft × 21.0 ft
Registered tonnagegross 2,464 / net 1,860
ITC dimensions (L × B × D)266.1 ft × 52.0 ft × 21.5 ft
ITC tonnagegross 2,820 / net 846
BuilderSOUTHERN SHIPBUILDING · SLIDELL, LA, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 7 July 2026 · expires 31 August 2027
Service, as the file records itIndustrial Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2820 - Convention (Subpart B), Gross Ton
2464 - Regulatory (Subpart C or D), Gross Ton
846 - Convention (Subpart B), Net Ton
1860 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 73

11 December 2025 Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8282134
18 November 2025 MTSA/ISPS Verification · Administrative Inspection · Ballast Water Examination · COI Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8270337
6 October 2025 Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8246030
16 July 2025 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8187522
10 June 2025 In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8167413
4 May 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8128664
12 March 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8088519
25 February 2025 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8066888
29 January 2025 Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8071694
29 January 2025 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8074386
29 November 2024 Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8041197
11 August 2024 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7978883
11 August 2024 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7986851
10 July 2024 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7954971
20 May 2024 Administrative Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7915892
15 May 2024 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7913252
5 December 2023 Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7847282
13 July 2023 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7741215
14 February 2023 Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7633807
25 October 2022 Administrative Inspection · Examination of Repairs · Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7583702
12 October 2022 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7576085
23 July 2022 Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7514210
8 June 2022 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7492276
12 November 2021 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7349687
4 June 2021 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7215243
26 February 2021 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7146988
12 February 2021 Damage Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7140243
18 September 2020 MARPOL Annex I Examination · Drydock Exam · MARPOL Annex VI Survey · MTSA/ISPS Verification · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7061001
6 August 2020 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7025826
8 June 2020 Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6971507
16 April 2020 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6940066
19 March 2020 Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6929239
23 February 2020 In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6916884
28 January 2020 Damage Survey
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6897594
16 January 2020 Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6890021
18 December 2019 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6876307
16 December 2019 Annual Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6870990
23 November 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6861156
23 November 2019 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6923207
8 October 2019 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6830498
13 May 2019 Administrative Inspection · Examination of Repairs
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6683881
3 May 2019 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6676208
5 April 2019 Damage Survey · Administrative Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6658311
5 April 2019 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6668231
24 February 2019 Damage Survey
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6631281
19 February 2019 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6628256
19 February 2019 Special · Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6629882
19 February 2019 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6632534
12 December 2018 Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6596729
13 November 2018 MARPOL Annex VI Survey · In-Service Inspection · Deficiency Check · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6583275
9 August 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6506796
7 November 2017 MTSA/ISPS Verification · Administrative Inspection · Periodic Inspection · MARPOL Annex I Examination · Drydock Exam · VRP Review · Hull Examination · VRP Drill · MARPOL Annex IV Survey · Internal Structural Exam · MARPOL Annex VI Survey · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6300330
7 September 2017 Drydock Extension · Administrative Inspection
Administrative · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 6262388
24 May 2017 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6154064
24 May 2017 Examination of Repairs
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6154611
15 May 2017 Administrative Inspection · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6147202
17 March 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6106684
10 March 2017 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6102613
10 March 2017 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6107321
22 February 2017 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6093116
22 February 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6093359
18 January 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6072972
24 December 2016 Damage Survey · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6063044
17 November 2016 Deficiency Check · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6043911
26 October 2016 Deficiency Check · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6030810
26 October 2016 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6039186
19 October 2016 MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6026640
21 September 2016 Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6019960
14 July 2016 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5940899
1 July 2016 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5925759
1 April 2016 Deficiency Check · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5845225
3 March 2016 Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5826134
23 February 2016 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5820882

Deficiency record · 76

11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 December 2025 Resolved
Unless liferafts can be readily transferred for launching on either side of the ship, additional liferafts shall be provided so total capacity will accommodate 150% total persons on board. Vsl is not equipped with 150% total liferaft capacity on each side.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 9 February 2026
Resolved 9 February 2026
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 1 December 2025 Resolved
Before being assigned to shipboard duties, all persons employed or engaged on a seagoing ship which is required to comply with provisions of the ISPS code, shall receive approved security familiarization training. 02 members did not have adequate Security Awareness training for STCW Code.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2025
Resolution: Both ABs completed the online STCW course for security awareness. Completion certificates were visually validated.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 1 December 2025 Resolved
The validity of calibration certificates should be checked at IOPP renewal surveys. The accuracy of 15 ppm bilge alarms is to be checked by calibration and testing of the equipment conducted by a manufacturer or persons authorized by the manufacturer. OWS bilge monitor calibration was not IAW MEPC.107(49).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 February 2026
Resolved 9 February 2026
Resolution: MSU Texas City recieved third party certs. for OWS.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Ozone-depleting substances
Issued 1 December 2025 Resolved
Each ship with a rechargeable system with ozone-depleting substances shall maintain an ozone-depleting substances record book. Vsl missing ozone-depleting substance log.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2025
Resolution: Vessel's A/C system was replaced with Ozone friendly freon. Vessel doesn't have R 22 onboard so no record book is required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 December 2025 Resolved
All fuel pipes, pipe connections, and accessories must be readily accessible, protected against mechanical injury, and effectively secured against excessive movement and vibration by the use of soft nonferrous metal liners or straps.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2025
Resolution: Clamps were added to the high pressure fuel lines.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 18 November 2025 Resolved
In cargo ships of 1,600 tons gross tonnage and upwards the Administration shall ensure that the lightning of the alleyways, stairways, and exits is such that the access of all persons on board to the launching stations and stowage positions of liferafts is not impeded. 02 Stbd engine room emergency lights inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 December 2025
Resolution: Bulbs were replaced in emergency lighting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 July 2025 Resolved
CODE 60 - The main steering gear must be operable from the pilothouse by mechanical, hydraulic, electrical, or other means acceptable to the Commanding Officer, Marine Safety Center. This gear and its components must give full followup control of the rudder. MI received report from Operator that Follow-up steering was not working. Vessel was permitted to transit to the Fort Morgan anchorage to await repairs. Owner/Operator must notify local OCMI and receive authorization prior to any further vessel movement. Owner/Operator must submit tech report attesting the satisfactory repair of steering system to the satisfaction of the attending Marine Inspector. **UPDATE** Owner/Operator has requested to operate vessel bypassing the power failure alarm module which has been granted by the OCMI. Vessel must have support vessel within 1 nm at all times, and notify the OCMI immediately if conditions change. Owner/Operator must submit tech report attesting the satisfactory repair of steering system to the satisfaction of the attending Marine Inspector prior to clearance of 835. 46 CFR 58.25-70
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 July 2025
Resolved 28 July 2025
Resolution: Submitted ABS report as well as tech report attesting to the satisfactory repiars of steering system , ALL SAT.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 25 February 2025 Resolved
In a space described in § 113.25-9(a), where the general emergency alarm signal cannot be heard over the background noise, there must be a red-flashing light or rotating beacon, in addition to the general emergency alarm signal. Vessel had multiple general alarm lights not operating properly. Fix all lights not working through the vessel to the satisfaction of a Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2025
Resolved 12 March 2025
Resolution: Visual and audible alarms all operate as designed
08 - Alarms › N/A - No Subsystem › General alarm
Issued 25 February 2025 Resolved
Be located in passenger and crew quarters areas where they can alert persons in spaces where those persons may be maintaining, repairing, or operating equipment, stowing or drawing stores or equipment, or transiting, such as public spaces, work spaces, machinery spaces, workshops, galleys, emergency fire pump room, bow thruster rooms, storage areas for paint, rope, and other stores, underdeck passageways in cargo areas, steering gear rooms, windlass rooms, holds of roll-on/roll-off vessels, and, except those that are accessible only through bolted manhole covers, duct keels with valve operators. Multiple bells for the general alarm system throughout the vessel were found not to be operating properly. Repair / replace all general alarm bells not working to the satisfaction of a Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2025
Resolved 12 March 2025
Resolution: Audible and visual indicators for general alarm operate as designed
01 - Certificates & Documentation › 013 - Documents › Unattended Machinery Spaces (UMS) Evidence
Issued 25 February 2025 Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set points, the procedure to be followed, and the expected test result. Vessel crew was found to not be testing PSTP’s in accordance with on board approved manual due to lack of proper calibrated test equipment. Vessel will procure proper equipment or utilize approved third party company to demonstrate PSTP’s to the satisfaction of a Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: Proper testing equipment to meat requirements for completing PSTPs ordered and placed onboard.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 February 2025 Resolved
Each hand portable fire extinguisher shall be marked with a number and the location where stowed shall be marked with a corresponding number at least 1/2 inch high. Where only one type and size of hand portable fire extinguisher is carried, the numbering may be omitted. None of the vessels portable fire extinguishers on board are properly labeled. Label all portable extinguishers to the satisfaction of a Coast Guard Marine Inspector
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: All fire extinguishers have been labeled with numbering system and matching brackets.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 February 2025 Resolved
Where it is demonstrated that the installation of a stairway would be impracticable, a vertical ladder may be used as the second means of escape. Starboard forward pump room upper level emergency escape ladder is damaged and stowed in manner that is not accessible to all crew members in an emergency. Repair ladder and keep ladder stowed in the down position except where necessary for operations. Repairs shall be made to the satisfaction of a Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: Escape ladder redesigned and repaired for proper operation in emergency conditions
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 25 February 2025 Resolved
For inspection procedures of marine engineering equipment and systems, see subchapter F (Marine Engineering) of this chapter. The requirements of § 58.10-5 (a), (c), and (d) apply to diesel engine installations. Exhaust pipe installations must conform to the requirements of ABYC P-1. Protective guards shall be provided wherever persons might come in contact with the exhaust system where the temperature exceeds 200°F. Bow thruster engine and starboard pump room engine missing exhaust lagging. Provide proper lagging to the satisfaction of a Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: New exhaust lagging added to bow thruster engine
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 February 2025 Resolved
If more than one device is stowed in a location, the number of devices stowed must be indicated. Immersion suit stowage location did not have the total numbers marked. Properly mark immersion suit numbers at each stowage location to the satisfaction of a Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: All immersion suit storage locations properly labeled with accurate number of immersion suits
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 February 2025 Resolved
Each immersion suit or anti-exposure suit must be marked in such a way as to identify the person or vessel to which it belongs. Three immersion suits were found marked with the wrong vessel name. Properly mark immersion suits to the satisfaction of a Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: 03 immersion suits properly marked with vessel name and stored appropreiately
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 February 2025 Resolved
Containers, brackets, racks, and other similar stowage locations for lifesaving equipment must be marked with symbols in accordance with IMO Resolution A.760(18) indicating the device stowed in that location. Lifebuoy stowage location missing proper markings. Provide proper markings to lifebuoy stowage location to the satisfaction of a Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2025
Resolved 12 March 2025
Resolution: Lifebuoys are properly marked and stowed in assigned locations.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 25 February 2025 Resolved
Lockers or spaces containing self-contained breathing apparatus shall be marked “SELF CONTAINING BREATHING APPARATUS”. Lockers near bridge were missing proper markings. Properly mark all containers to the satisfaction of a Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 25 March 2025
Resolved 12 March 2025
Resolution: Proper markings placed on lockers
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 February 2025 Resolved
There shall be at least two means of escape from all general areas accessible to the passengers, if carried, or where the crew may be quartered or normally employed. At least one of these two means of escape shall be independent of watertight doors. All emergency escape scuttles for both engine rooms and pump rooms have areas of corrosion requiring attention to include holdback devices and knife edges. Repair or replace all emergency escape scuttles to the satisfaction of a Coast Guard Marine Inspector at next drydock but no later than 31DEC2025.
Action required: 705 - Other - as specified
Due 31 December 2025
Resolved 12 November 2025
Resolution: 04 new escape scuttles installed and chalk tested, sat.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 July 2022 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made. Vessel has 1/2" X 8" hole in STBD #2 wing tank. Submit plans to local OCMI for review berfore conducting repairs.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 28 July 2022
Resolution: MI received final damage survey report from vessel. ABS approved temporary repairs. MSD concurs with Class. Inspection completed. See documents for more info.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 12 November 2021 Resolved
Descale & Provide U/T in 10" x 10" grid & Pit Gauging report for suspect wasted areas in side shell as marked and identified from frames 14-25 Port Side Pump room & area IWO of Doubler behind switchboard to ensure wastage is not greater then 25%. Submit Repair Proposal for 3 wasted frames in that area.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 November 2021
Resolved 22 November 2021
Resolution: ABS witnessed Final Test of insert plate in the STBD Sideshell Plate in STBD Pump Room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 November 2021 Resolved
Repair Freshwater Expansion tank in STBD Pump room leaking in vicinity of Welding Machine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 22 November 2021
Resolution: New Tank installed
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 12 November 2021 Resolved
Descale and provide U/T shots iwo of vertical weld seam as marked in Port Engine Room.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 November 2021
Resolved 18 November 2021
Resolution: U/T Shots were satisfactory.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 November 2021 Resolved
Provide CO2 Warning signs at entrances to Protected Spaces.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 22 November 2021
Resolution: Signs have been posted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 12 November 2021 Resolved
C/R wasted Paint Locker Vent.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 18 November 2021
Resolution: Vent Pipe was repaired.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 12 February 2021 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Vessel has an approximately 1/8" hole in side shell: located 2 inches aft of frame 85 and 1.5inches above the main deck line on stbd side shell. Vessel shall implement temporary repair to the satisfaction of the attending ABS Surveyor under the delegation of Loadline Authority. Provide Coast Guard with ABS Report upon completion of temporary repair.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 February 2021
Resolved 13 February 2021
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 12 February 2021 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Vessel has an approximately 1/8" hole in side shell: located 2 inches aft of frame 85 and 1.5inches above the main deck line on stbd side shell. Vessel personnel shall provide proof of adequate integrity of the side shell in the surrounding area of the reported hole.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 March 2021
Resolved 26 February 2021
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 12 February 2021 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Vessel has an approximately 1/8" hole in side shell: located 2 inches aft of frame 85 and 1.5inches above the main deck line on stbd side shell. Vessel personnel shall provide a permanent repair proposal, affect permanent repairs approved by the Coast Guard, and satisfactorily test the repair.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 March 2021
Resolved 28 May 2021
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 18 September 2020 Resolved
A certification that the ship has passed an inspection must be entered into the ship's log by the inspecting technician. During inspection of the ship's radio equipment the technician noted that the vessel's AIS was inoperable due to not displaying the heading or rate of turn information. Provide technician's report attesting to the proper operation of the AIS as well as valid FFC certificates. 47 CFR 80.59
Action required: 17 - Rectify deficiencies prior to departure
Due 23 December 2020
Resolved 28 December 2020
Resolution: Sperry tech attended vsl and corrected the AIS. FCC docs issued.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 February 2020 Resolved
All vessels must submit Notice of Arrivals(NOA) within the following times: If voyage time is 96 hours or more, at least 96 hours before arriving at the port or place of destination; or less than 96 hours, before departure but at least 24 hours before arriving at the port or place of destination. Vessel did not submit NOA within the required timeframe.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 23 February 2020
Resolved 23 February 2020
Resolution: Vessel submitted NOA.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 January 2020 Resolved
Inspection for certification shall include an inspection of the structure. Several sea chest were noted to be severely wasted and in need of potential repair Prove adequate material thickness to the satisfaction of attending Marine Inspector at next drydock in September 2020.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 22 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 January 2020 Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Vessel does not have approved PSTPs. Vessel has submitted its PSTPs to MSC.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 April 2020
Resolved 22 December 2020
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 16 December 2019 Resolved
A protected space must be fitted with an approved available alarm that must sound automatically. Vessel's 30 second time delay did not function in correct time for FWD port and stbd pump rooms. 46 CFR 95.15-30. Correct prior to dredging operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 December 2019
Resolved 17 December 2019
Resolution: Vessel obtained and installed new time delays for the FWD CO2 room serving both port and stbd pump rooms. Vessel proved proper operation.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 December 2019 Resolved
Cylinders must be tested and renewed as required by 46 CFR 147.65. Cylinders must be rejected when they are severely corroded on the bottom 18 inches of the cylinder. Replace cylinders, hydrostatic test cylinders, or provide tech report attesting that wastage is within accepted tolerance. Correct prior to dredging operations. 46 CFR 91.25-20(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 December 2019
Resolved 18 December 2019
Resolution: Vessel replaced all CO2 cylinders in the FWD CO2 room.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 December 2019 Resolved
A vessel shall exhibit, in the fore part an all around white light. Vessel's primary anchor light is not working. No operating during night or low visibility. 33 CFR 83.30(a)(i)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 17 December 2019
Resolution: [name withheld] from ABS witnessed the satisfactory testing of the FWD anchor light.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 December 2019 Resolved
All enclosed spaces shall be properly vented. Ventilation motor for paint locker is inoperable. When deficiency is corrected, Marine inspector should ensure paint locker CO2 system pressure switch secures paint locker ventilation motor. 46 CFR 92.15-10(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel repaired ventilation system for paint locker.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 16 December 2019 Resolved
The general structural strength of the vessel shall be sufficient and info shall be provided to the commandant when requested. ABS, provide Coast Guard a report attesting to longitudinal strength of hopper coaming, regarding cracks and wastage. 46 CFR 42.13-5.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 22 December 2020
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 16 December 2019 Resolved
An audible and a visible alarm must activate in the pilothouse for steering gear failures. Vessel's steering gear alarm panel only displayed a visible alarm. Audible alarm was inoperable. 46 CFR 58.25-25(d).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel repaired steering failure alarm.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 December 2019 Resolved
Where natural ventilation is provided for spaces protected by a CO2 system, provisions shall be made for easily and effectively closing off the ventilation. The lower port engine room fire dampener did not fully close. Prove effective dampener closing to attending USCG MI. 4646 CFR 15.15-35(b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 16 December 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 December 2019 Resolved
Electrical installations on vessels shall be designed so that the safety of crew shall be ensured. Reset button on the #2 steering control panel was missing. Repair to the satisfaction of attending USCG MI. 46 CFR 111.05-15
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel installed a reset button.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 December 2019 Resolved
Fixtures shall not be used as connection boxes. Lighting fixtures in the stbd and port steering compartments were wired to provide power to a receptacle. Correct to the satisfaction of attending USCG MI. 46 CFR 111.75-20(a)(6)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel properly wired device into an outlet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 December 2019 Resolved
All marine engineering details and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with Subchapter F. Both propulsion shaft seals are leaking seawater significantly. Repair to the satisfaction of attending USCG MI. 46 CFR 90.20-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel tighten up their shaft seals.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 December 2019 Resolved
Means shall be provided for closing all other openings to the space protected by CO2 from outside such space. Cable penetrations in the upper stbd E/R are not sealed. Repair to the satisfaction of attending USCG MI. 46 CFR 95.15-35 (c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel sealed up their bulkhead penetrations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 December 2019 Resolved
The applicable standards established by the ABS Steel Vessel Rules may be used as the standard for design and construction for auxiliary machinery. Vessel's incinerator exhaust piping is severely corroded and has multiple holes. Repair to satisfaction of USCG MI. 46 CFR 58.01-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Repaired.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 December 2019 Resolved
Portable electrical cords may only be used for the connection of portable lamps or appliances. Non-permanent electrical wiring is installed for the port and stbd shaft seal pumps. Correct to the satisfaction of attending USCG MI. 46 CFR 111.60-5
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel puts wires into a JBox.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Other (MARPOL Annex VI)
Issued 16 December 2019 Resolved
The revised NOx Technical Code 2008 shall be applied in certification, testing and measurement procedures for the standards set forth in this regulation. Vessel modified pump engines in September 2019 and has documents from engine manufacture explaining the engines do not comply with EIAPP standards. Provide EAIPP and technical files to the satisfaction of attending USCG [name withheld]/13.8
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 22 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 December 2019 Resolved
Test procedures must be submitted to the Coast Guard Marine Safety Center for approval. Current test procedures onboard do not provide sufficient detail for testing machinery and equipment. Submit test procedures to CG Marine Safety Center for approval. 46 CFR 61.40-1
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 24 February 2020
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 16 December 2019 Resolved
All enclosed spaces within the vessel should be properly vented. All supply ventilation screens in machinery spaces are clogged with dirt and debris. Clean to the satisfaction of Marine Inspector. 46 CFR 92.15-10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Completed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 December 2019 Resolved
The general construction of the vessel shall be such to minimize fire hazards. Lack of overall general cleanliness is creating a fire hazard on upper level switchboard panels and wire runs and main engine piping and bulkheads in lower engine rooms. Clean to the satisfaction of Marine Inspector. 46 CFR 92.05-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Completed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 December 2019 Resolved
The general construction of the vessel shall be such to minimize fire hazards. All machinery space bilges are coated in oil, oily rags and debris. Clean to the satisfaction of Marine Inspector. 46 CFR 92.05-1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel completed general housekeeping.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 December 2019 Resolved
Inspection for certification shall include an inspection of the structure. The port engine room seachest and supporting gussets are wasted. Prove adequate material thickness to the satisfaction of attending Marine Inspector. 46 CFR 91.25-10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 23 January 2020
Resolution: Vessel provided a gauging report attesting to the seaworthiness of the hull plating; all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 December 2019 Resolved
Fiddley, funnel, or machinery space in an exposed position on the freeboard or superstructure deck shall be fitted with strong covers of steel and capable of being secured weathertight. Machinery E/R stacks had holes which were filled with silicone. Make repairs to the satisfaction of attending USCG MI. 46 CFR 42.15-35
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel repaired wasted area.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 December 2019 Resolved
All vessels shall be provided with satisfactory bilge pumping and piping capable of pumping from and draining any watertight compartment. Discharge piping in port shaft seal pump has a soft patch and has pin-hole leaks. Make repairs to the satisfaction of attending USCG MI. 46 CFR 56.50-50
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel repaired bilge piping.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 December 2019 Resolved
Electrical installations on vessels shall be such that the safety of crew and vessel will be assured from electrical hazards. The following electrical hazards were identified throughout the vessel: Port upper E/R crane power panel has a open stuffing tube and another stuffing tube is not properly secured. General service pump in the port E/R lower level has an improperly installed stuffing tube. Heat detector in upper port pump room is not properly mounted to bracket. Receptacle box is upper port pump room is not properly mounted to bulkhead. Breaker panel in the port pump room has a blank breaker which needs to be covered. Electrical cables in Port E/R above port SSDG are not supported sufficiently and heat detector is not properly mounted. Affix repairs to the satisfaction of attending USCG MI. 46 CFR 111.05-15(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 December 2019 Resolved
The inspection for certification shall be such as to insure the vessel in regards to piping and auxiliary equipment are in satisfactory condition and fit for service. Soft patch was installed on #1 raw water pump in the stbd lower pump room. Make permanent repairs to the satisfaction of attending USCG MI. 46 CFR 91.25-10
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 16 January 2020
Resolution: Vessel repaired soft patch with new pipe.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 December 2019 Resolved
Manual alternate control systems must be operable in an emergency and after a remote or automatic primary system failure. The air transfer valve failed to assume control of the port engine. Repair to the satisfaction of the attending USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 16 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 October 2019 Resolved
Vessel operator discovered damage to reduction gear during servicing. Effect repairs and provide technician's report attesting to repairs. Conduct operational testing in the presence of a CG Marine Inspector prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 October 2019
Resolution: Received service report from MSI for the Padre Island Stbd Propulsion Gearbox. All work completed and tested pierside. ABS [name withheld] was in attendance. All repairs performed to satisfaction.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 16 November 2018 Resolved
Certification of the engine conforming that it operates within the limits set forth in paragraph 3. Vessel is missing EIAPP certificate and engine technical files.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2018
Resolved 12 December 2018
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 13 November 2018 Resolved
Before the vessel leaves port and at all times during the voyage, each life saving appliance must be in working order and ready for use. Rescue boat would not start.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 November 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 November 2018 Resolved
In addition to emergency power sources required under part 112 of this chapter each vessel must have at least two electric generating sources. STBD E/R gensent had mechanical failure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2018
Resolved 21 November 2018
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 November 2018 Resolved
All fluid power and control system and components shall be tested to allowable working pressure. Valve stack in E/R STBD is leaking and has wire nuts installed on removed DCV.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2018
Resolved 16 November 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 November 2018 Resolved
All installations shall be of marine type engines suitable for intended service. STBD dredge pump engine has F/O leak on #1 CRL.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Due 13 November 2018
Resolved 16 November 2018
Engineering › Reduction Gearing/Clutches › Bearing
Issued 10 March 2017 Resolved
Received report vessel suffered failure of bearing in the STBD reduction Gear while underway. No repairs affecting the safety of the vessel with regard to machinery shall be made with out the knowledge of the [name withheld] repairs to STBD reduction gear. Provide OCMI with attending ABS surveyors report and tech reports. Conduct operational test in the presence of CG MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 March 2017
Resolution: Repair to STBD reduction gear complete. Received report from tech rep and ABS surveyor. Witnessed sat operational test of STBD reduction gear.
Construction/Loadline › Hull › Bottom Plating
Issued 22 February 2017 Resolved
Vessel's hull was breached by breach in bottom plating. Submit repair proposal to USCG, repair breach in accordance with repair proposal, and schedule inspection of repair to the satisfaction of the attending Coast Guard marine inspector.
Condition: Improper/Lack of Maintenance
Due 22 February 2017
Resolved 23 February 2017
Resolution: Temporary repair installed. Vessel permitted to operate with temporary repair until entrance of drydock period scheduled for September 2017.
Construction/Loadline › Hull › Hull Plating
Issued 24 December 2016 Resolved
Make temporary repairs to crack in vessel deck forward of the superstructure prior to transitting to Cape May, NJ.
Due 27 December 2016
Resolved 24 December 2016
Resolution: Drill stopped crack and welder doubler plate.
Construction/Loadline › Hull › Hull Plating
Issued 24 December 2016 Resolved
Submit a repair proposal for permanent repairs to crack in vessel deck to local Coast Guard OCMI and ABS Surveyors.
Due 24 January 2017
Resolved 21 January 2017
Resolution: Vessel cropped the damaged deck and inserted with new metal to the sat of CG MI and ABS.
Construction/Loadline › Penetrations › Weld
Issued 17 November 2016 Resolved
Hole in stbd jet pump suction line.
Action required: 705 - Other - as specified
Resolved 9 December 2016
Resolution: Received class report attesting to permanent repairs. All sat
Engineering › Feedwater/Condensate Water System › Piping
Issued 26 October 2016 Resolved
AF01- Make permanent repairs to 1/4" hole found in the pipe between the sea chest and the valve in the Port Engineroom. Provide repair proposal and ABS Survey to this office forreview and approval.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 November 2016
Resolved 10 November 2016
Resolution: The wasted section of pipe was cropped and renewed by an ABS certified welder, using similar materials, and tested under normal operating conditions with no leaks.
Engineering › Steering Gear System › Pump
Issued 19 October 2016 Resolved
Prove proper operation of #2 steering pump.
Action required: 705 - Other - as specified
Due 19 November 2016
Resolved 16 December 2016
Resolution: Received email with a tech report showing that proper repairs have been made to the steering gear.
Lifesaving › Immersion Suits › Serviceable
Issued 19 October 2016 Resolved
Replace 24 damaged immersion suits with new ones.
Action required: 705 - Other - as specified
Due 19 November 2016
Resolved 18 November 2016
Resolution: Received invoice of new immersion suits. All sat
Documentation › Logs/Records › Oil Record Book
Issued 19 October 2016 Resolved
47,227 gallons of oily water discharged to shore between 7/3/16 to 7/18/16 was not logged into ORB. Chief Engineer and Captain must ensure oily waste transfers are porperly logged into ORB.
Action required: 705 - Other - as specified
Resolved 26 October 2016
Resolution: Conducted on the spot training. Reminded officers they are responsible for the ORB, and it would be a detainable def in foreign countries.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 19 October 2016 Resolved
STBD pump room heat detector cap was ajar, retighten cap on heat detector.
Due 26 October 2016
Resolved 26 October 2016
Resolution: Picture sent in showing heat detector assembled.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 19 October 2016 Resolved
Port side pump room heat detector is zip=tied in place. Permenantly mount heat detector to satisfaction of CGMI.
Due 26 October 2016
Resolved 26 October 2016
Resolution: Picture sent in with heat detector permenantly mounted.
Engineering › Fuel Oil Storage/Transfer System › Manifold
Issued 19 October 2016 Resolved
Fuel oil bunker line does not have drip sampler installed. Install drip samplor to meet MARPOL Annux IV requirements, to satisfcation of CGMI.
Due 19 November 2016
Resolved 21 November 2016
Resolution: Vessel forwarded proper bunker line drip sampler information.
Construction/Loadline › Hull › Side Shell
Issued 21 September 2016 Resolved
AF01- Make repairs to 2" crack found on the port side, near frame 35. Provide repair proposal and dive survey results to this office.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 September 2016
Resolved 22 September 2016
Resolution: Vessel sent over dive survey results and ABS Class Report #8127541 attesting to the satisfactory temporary repair of the 2" crack.
Construction/Loadline › Hull › Bottom Plating
Issued 3 March 2016 Resolved
Discovered leaks from cracked hull bottom plate iwo frame 57 void, port hull. Cropped and renewed (6" x 27" x 1' plate).
Condition: Improper/Lack of Maintenance
Due 4 March 2016
Resolved 3 March 2016
Resolution: Repaired.
Engineering › Thrusters › Blade
Issued 24 February 2016 Resolved
Properly discover the extent of damage and conduct repairs to effect completeness to the vessel's bow thruster. Class/USCG to attest to completion of necessary repairs and any potential safety concerns to the vessel.
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 3 March 2016
Resolution: completed satisfactory repairs

Casualty record · 21

3 July 2001Major Marine Casualty · role: Involved in a Marine Casualty · activity 785
21 October 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3084425
2 February 2010Routine · role: Involved in a Marine Casualty · activity 3674018
13 March 2010Routine · role: Involved in a Marine Casualty · activity 3700393
28 March 2010Routine · role: Involved in a Marine Casualty · activity 3706514
8 June 2010Routine · role: Involved in a Marine Casualty · activity 3762115
6 December 2010Routine · role: Involved in a Marine Casualty · activity 3921232
17 April 2012Routine · role: Involved in a Marine Casualty · activity 4289264
25 April 2012Routine · role: Involved in a Marine Casualty · activity 4295516
31 May 2012Routine · role: Involved in a Marine Casualty · activity 4330290
12 September 2012Routine · role: Involved in a Marine Casualty · activity 4440717
17 March 2013Routine · role: Involved in a Marine Casualty · activity 4610095
1 July 2016Routine · role: Involved in a Marine Casualty · activity 5925759
26 October 2016Routine · role: Involved in a Marine Casualty · activity 6039186
22 February 2017Routine · role: Involved in a Marine Casualty · activity 6093116
19 February 2019Routine · role: Involved in a Marine Casualty · activity 6632534
5 April 2019Routine · role: Involved in a Marine Casualty · activity 6668231
23 November 2019Routine · role: Involved in a Marine Casualty · activity 6923207
19 March 2020Routine · role: Involved in a Marine Casualty · activity 6929239
11 August 2024Routine · role: Involved in a Marine Casualty · activity 7986851
29 January 2025Routine · role: Involved in a Marine Casualty · activity 8074386
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.