MAURY USCG vessel records
← All vessels

DODGE ISLAND

Built
1980
Last inspected
11 April 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspection record

Last inspected 11 April 2026
…with no type recorded12
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7917800
WDB4450
Flag
UNITED STATES
Maury page id
psix-53903

Documentation record

Registered dimensions (L × B × D)266.1 ft × 52.0 ft × 21.5 ft
Registered tonnagegross 2,404 / net 1,800
ITC dimensions (L × B × D)266.1 ft × 52.0 ft × 21.5 ft
ITC tonnagegross 2,820 / net 846
BuilderSOUTHERN SHIPBUILDING · SLIDELL LA, UNITED STATES · built 1980
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 3 August 2026 · expires 30 September 2027
Service, as the file records itIndustrial Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2820 - Convention (Subpart B), Gross Ton
2404 - Regulatory (Subpart C or D), Gross Ton
846 - Convention (Subpart B), Net Ton
1800 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 60 inspections, each with its date, unit and type; 65 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 4 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 4

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

R.S. WEEKS Industrial Vessel · MISLE 51234 · 18 August 2023 · activity 7774498SMITH HUNTER Towing Vessel · MISLE 203914 · 18 August 2023 · activity 7774498REIMAGINE Passenger (Uninspected) · MISLE 461880 · 18 August 2023 · activity 7774498MON TA Towing Vessel · MISLE 1164426 · 18 August 2023 · activity 7774498

Inspection history · 60

11 April 2026 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8346081
18 January 2026 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8298006
25 July 2025 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8194314
3 July 2025 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8174775
6 April 2025 Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8106293
18 March 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8095899
17 March 2025 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8095902
3 February 2025 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8090298
9 January 2025 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8060491
6 November 2024 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8031699
25 October 2024 Load Line/Change of Employment · Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8024775
18 October 2024 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8021311
30 August 2024 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7992835
6 February 2024 Exemption
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7861791
15 December 2023 Damage Survey · Uninspected Other · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7840656
18 August 2023 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7774498
23 May 2023 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7694504
10 March 2023 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7649066
23 February 2023 Damage Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7640795
17 February 2023 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7659966
26 January 2023 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7638435
4 January 2023 In-Service Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7616880
7 December 2022 Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7609998
2 December 2022 Plan Review (Other than "T") · Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7612210
18 May 2022 Damage Survey · In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7453990
17 March 2022 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7413337
1 February 2022 Annual Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7389313
10 November 2021 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7324133
25 August 2021 Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7296528
25 August 2021 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7296894
3 August 2021 Examination of Repairs · In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7276531
21 June 2021 Damage Survey · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7231310
20 June 2021 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7271427
23 February 2021 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7144928
15 September 2020 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7090279
15 August 2020 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7033537
13 August 2020 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7035542
18 June 2020 Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6979871
1 April 2020 MARPOL Annex I Examination · MTSA/ISPS Verification · Drydock Exam · MARPOL Annex VI Survey · Internal Structural Exam · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6934218
17 March 2020 Administrative Inspection
Administrative · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6927892
20 December 2019 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6877331
3 December 2019 COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6863349
31 October 2019 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6846563
8 October 2019 Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6830497
6 September 2019 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6805480
3 September 2019 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6802652
11 June 2019 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6710524
9 May 2019 Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6680129
3 May 2019 Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6675801
25 January 2019 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6615267
9 January 2019 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6615028
6 January 2019 Administrative Inspection · Annual Inspection · DAPI Audit · MTSA/ISPS Verification · Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6611425
21 May 2018 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6437079
5 March 2018 Administrative Inspection · Internal Structural Exam · Examination of Repairs · Drydock Exam · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6365838
2 January 2018 Administrative Inspection · Periodic Inspection · DAPI Audit · MTSA/ISPS Verification · Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6339414
20 January 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6074021
4 January 2017 Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6065276
19 April 2016 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5857717
29 March 2016 Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5843099
25 January 2016 DAPI Audit · Annual Inspection · Deficiency Check · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5802773

Deficiency record · 65

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 May 2023 Resolved
Starboard main engine suffered an exhaust fire. Repairs to be conducted at Pilot Town anchorage to satisfaction of attending marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 May 2023
Resolution: DMI reviewed repairs completed to the exhaust on the stbd engine. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 January 2023 Resolved
No. 2 drive shaft sheared and is inoperable. Vessel to proceed on the No. 1 main engine to shipyard for emergency repairs.
Action required: 66 - Prior to drilling or production operations
Due 26 January 2023
Resolved 17 February 2023
Resolution: Vessel entered Dreyten's shipyard, Charleston, SC for emergency repair.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 January 2023 Resolved
All piping, valves, and fitting shall meet the applicable requirements of subchapter F (Marine Engineering). Stbd fire main piping, first flange off the fire pump, has cracked and a temporary glass patch repair has been installed. Repair to subchapter F standards.
Due 5 January 2023
Resolved 6 January 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 June 2021 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery must be at least equivalent to the standards established by the ABS Steel Vessel Rules; vessel experienced a cracked head on #6 cylinder on STBD Engine.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2021
Resolution: Ship's crew replaced #6 Powwer pack and ABS tested engine sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 August 2020 Resolved
The Coast Guard received report of a generator failure onboard your vessel. Your vessel is required to have at least two electric generating sources. Make repairs and test the generator to the satisfaction of the marine inspector. Submit report to the Coast Guard for review and approval.
Action required: 60 - Rectify deficiencies prior to movement
Due 17 August 2020
Resolved 21 August 2020
Resolution: Manufactor technician and ABS attended the vessel to fix generator and clear deficiency. ABS report accepted in lieu of Coast Guard attendance. Generator operating successfully under load.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 December 2019 Resolved
Where a fixed fire extinguishing system protects a space it must sound an alarm automatically for at least 20 seconds before carbon dioxide is discharged. Vessel's time delays in port and stbd pump rooms were not operating at approved times. 46 CFR 95.15-30(b)(1)
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 3 December 2019
Resolved 4 December 2019
Resolution: Vessel recieved two new time delays and proved proper operation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 December 2019 Resolved
Where pipes extend above the free-board deck, the exposed parts of the pipe shall be of substantial construction. Identified numerous "spill" deck goose neck vents and void sounding tubes that are wasted. Make permanent repairs at next dry dock. 46 CFR 42.15-50
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: Replaced all goose neck piping and vents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 December 2019 Resolved
Where pipes extend above the free-board deck, the exposed parts of the pipe shall be of substantial construction. Discovered small hole in fwd goose neck. Vessel made temporary repairs. Make permanent repairs at next dry dock. 46 CFR 42.15-50
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: Replaced goose neck vent.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 3 December 2019 Resolved
Load line markings shall be plainly visible. Vessel's load line markings are not plainly visible. 46 CFR 42.13-40
Action required: 10 - Deficiency Rectified
Due 2 January 2020
Resolved 4 December 2019
Resolution: Load line marking was painted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 December 2019 Resolved
Opening in free board decks shall be protected by a companionway of equivalent strength and weather-tightness. FWD deck wire penetration was found broken. 46 CFR 42.15-40(b)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 20 December 2019
Resolution: FWD deck wire penetration has been repaired.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 December 2019 Resolved
Bulkheads at exposed ends of enclosed superstructures shall be of efficient construction. Deck light on fwd bulkhead of port pumproom was not watertight. 46 CFR 42.15-5
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 2 January 2020
Resolved 4 December 2019
Resolution: Vessel remounted light with new bolts, gasket material, and silicone.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 December 2019 Resolved
Emergency lighting shall be at survival craft launching, and embarkation stations. Found inoperable emergency light on stbd side survival craft embarkation station. 46 CFR 112.15-1(g)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 2 January 2020
Resolved 3 December 2019
Resolution: Vessel replaced light bulb in emergency light. All sat.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 December 2019 Resolved
Vessel shall carry a copy of Volume III of the International Aeronautical and Maritime Search and Rescue Manual. Vessel does not have a copy of IAMSAR Manual on board. 74 SOLAS (14) V/21.2
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 20 December 2019
Resolution: Vessel has a copy of the IAMSAR Manual aboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 3 December 2019 Resolved
Openings in freeboard decks other than hatchways, machinery space openings, manholes, and flush scuttles shall be protected by an enclosed superstructure. Identified a hole to the left of the port engine room WTD. The crew welded a doubler plate over the hole as a temporary repair. Make permanent repairs at the next drydock. 46 CFR 42.15-40(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: Made perminent repairs to the WTD structure.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 December 2019 Resolved
The inspection for certification shall include an inspection of machinery, and equipment to ensure that it is in satisfactory condition and fit for the service for which it is intended. The port generator fresh water cooling piping is severely corroded. De-scale and prove adequate thickness of piping or replace at next drydock. 46 CFR 91-25-10
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: Replaced corroded fresh water cooling piping on port generator.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 3 December 2019 Resolved
Bilge and ballast piping systems must be so arranged as to prevent oil or water from the sea or ballast spaces from passing into cargo holds or machinery spaces. Port engine room ballast water piping is severely corroded. De-scale and prove adequate thickness of piping or replace at next drydock. 46 CFR 56.50-50(h)
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: Replaced corroded port engine room ballast water piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 December 2019 Resolved
The inspection for certification shall include an inspection of machinery, and equipment to ensure that it is in satisfactory condition and fit for the service for which it is intended. The port engine room OCM has S/W corrosion due to leak. Clean and repair S/W leak on OCM to the satisfaction of the attending CGMI. 46 CFR 91-25-10
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 3 December 2019 Resolved
Each valve must close with a right-hand (clockwise) motion of the handwheel or operating lever as seen by one facing the end of the valve stem. Port engine room bilge suction valves for hopper void numbers one and two missing valve handles. Replace valve handles. 46 CFR 56.20-9(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 January 2020
Resolved 20 December 2019
Resolution: Inspected the installation of two new valve handles for the port engine room bilge suction valves for hopper void numbers one and two; all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
he inspection for certification shall include an inspection of machinery, and equipment to ensure that it is in satisfactory condition and fit for the service for which it is intended. Water fountain in the port upper engine room is not mounted and not permanently wired. Repair to the satisfaction of the attending CGMI. 46 CFR 91-25-10
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Stbd generator low lube oil alarm wiring spliced. Rewire to the satisfaction of the attending CGMI. 46 CFR 111.05-3 (a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 3 December 2019 Resolved
Bilge and ballast piping systems must be so arranged as to prevent oil or water from the sea or ballast spaces from passing into cargo holds or machinery spaces. Stbd engine room ballast water piping is severely corroded. De-scale and prove adequate thickness of piping or replace at next drydock. 46 CFR 56.50-50(h)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 June 2020
Resolution: Replaced wasted bilge and ballast piping.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Stbd main engine oil level sensor exposed wiring. Re-wire to the satisfaction of the attending CGMI. 46 CFR 111.05-3(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 3 December 2019 Resolved
Except as provided in paragraph (a)(3) of this section, no person may operate an oceangoing ship of 400 gross tons and above but less than 10,000 gross tons, excluding a ship that carries ballast water in its fuel oil tanks, unless it is fitted with approved 15 parts per million (ppm) oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast. Chief Engineer could not provide operating or testing procedures. 33 CFR 155.360(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 December 2019 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapors, gases or liquids whose temperature exceeds 150 °F., shall be suitably insulated where necessary to preclude injury to personnel. Stbd Boiler exposed piping. Replace missing insulation. 46 CFR 56.50-1(k)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2020
Resolved 20 December 2019
Resolution: Stbd boiler insulation has been renewed; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 December 2019 Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering). Port jet pump engine has J/W expansion leak. Make permanent repair to the satisfaction of the attending CGMI. 46 CFR 90.20-1(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2020
Resolved 20 December 2019
Resolution: Inspected the port jet pump engine J/W expansion repair; all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Port Jet pump engine air start solenoid exposed wiring and not permanently mounted. 46 CFR 111.05-3(a)
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 December 2019 Resolved
Manual alternate control systems must— (1) Be operable in an emergency and after a remote or automatic primary control system failure. The air transfer valve failed to assume local control of the port engine. Repair to the satisfaction of the attending CGMI.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Water fountain in the port upper engine room is not mounted and not permanently wired. 46 CFR 111.05-3 (a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 December 2019 Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards. Port Generator guard for rotating machinery loose. Repair to the satisfaction of the attending CGMI. 46 CFR 58.01-20
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 December 2019 Resolved
At each inspection for certification and periodic inspection, the inspector shall examine the tank tops and bilges in the machinery spaces to see that there is no accumulation of oil which might create a fire hazard. Port Generator inboard fuel injector line o-ring fuel leak. Repair to the satisfaction of the attending CGMI. 46 CFR 91.25.45(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Port engine room general alarm junction box wiring exposed. Repair to the satisfaction of the attending CGMI. 46 CFR 111.05-3(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Port engine room center post start stop electrical box exposed wiring. Repair to the satisfaction of the attending CGMI. 46 CFR 111.05-3(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
08 - Alarms › N/A - No Subsystem › General alarm
Issued 3 December 2019 Resolved
Required alarms in high ambient noise areas must be supplemented by visual means, such as rotating beacons, that are visible throughout these areas. Red beacons must only be used for general or fire alarm purposes. Port engine room emergency notification lights dirty and not visible. Clean to the satisfaction of the attending CGMI. 46 CFR 62.25-20(D)(2)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 December 2019 Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering). Port main engine J/W Leak. Repair to the satisfaction of the attending CGMI. 46 CFR 90.20-1(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Port engine room upper, found dead end wire IWO pump room J. Box #2. Repair to the satisfaction of the attending CGMI. 46 CFR 111.05-3(a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Port engine room upper, sink grinder plugged in using permanently installed extension cord not rated for load. Repair to the satisfaction of the attending CGMI. 46 CFR 111.05-3(a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 3 December 2019 Resolved
Where pipes and scuppers are carried through watertight or oiltight bulkheads, decks or tank tops, or are carried through fire control bulkheads and decks, the integrity of the structure shall be maintained. Stbd engine room upper, CO2 room bulkhead penetration not watertight. Repair to the satisfaction of the attending CGMI. 46 CFR 56.50-1(a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 December 2019 Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering). Stbd generator crankcase breather disconnected. Repair to the satisfaction of the attending CGMI. 46 CFR 90.20-1(a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019 Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Stbd generator control box wiring exposed. Repair to the satisfaction of the attending CGMI. 46 CFR 111.05-3(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 January 2019 Resolved
Port main engine is inoperable. Make repairs and tests to the satisfaction of the attending marine inspector or attending ABS surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 January 2019
Resolution: Port Maine Engine repaired, received class report from attending surveyor on behalf of USCG.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 15 January 2019 Resolved
Public address system is inoperable. Make repairs and tests to the satisfaction of the attending marine inspector or attending ABS surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 January 2019
Resolution: Public address system is repaired, received report from Class Surveryor.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 January 2019 Resolved
Provide a copy of approved periodic testing and safety procedures described in 46CFR61.40.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2019
Resolved 18 June 2020
Resolution: Vessel was able to provide approved PSTPs.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 January 2019 Resolved
Conduct and record periodic testing and safety procedures.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2019
Resolved 30 June 2020
Resolution: Conducted PSTP's and approved MSC reviewed proceedures.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 January 2019 Resolved
Ensure all emergency lighting and associated equipment is installed IAW 46CFR97.37-25 and in accordance with the approved fire control plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2019
Resolved 12 February 2019
Resolution: Lighting and associated equipment installed iaw approved fire control plan.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 January 2019 Resolved
Provide additional emergency lighting in crew areas to ensure safe egress conditions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2019
Resolved 12 February 2019
Resolution: Additional emergency lighting installed.
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 12 January 2018 Resolved
Port Generator is overdue for maintenance in accordance with SMS maintenance tracking system, (Enterprise). Address all past due maintenance to the satisfaction of the attending MI or ABS surveyor, IAW SOLAS CH. IX and ISM Code 10.2
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 January 2018
Resolution: Received report from CAT Tech attesting to operation, def cleared after reveiwing report and brief to OCMI/COTP.
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 12 January 2018 Resolved
Starboard generator is sparking at startup. Identify cause and make repairs to the satisfaction of the USCG MI and/or ABS surveyor, IAW 46 CFR 111.01-1(a)(1)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 January 2018
Resolution: Engine starter was replaced and flywheel gear teeth were dressed up. Engine started multiple times without repeat of sparking.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 12 January 2018 Resolved
Oily Water Separator overboard valve does not change position/close when 15 PPM alarm occurs on Oil Content Meter. Identify cause and make all repairs to the satisfaction of USCG MI and/or ABS Surveyor prior to operating the OWS, IAW 33 CFR 155.380 and MARPOL Annex 1/14.6
Action required: 705 - Other - as specified
Resolved 14 January 2018
Resolution: Repaired control system fault, OWS operational test performed.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 12 January 2018 Resolved
Relief valves on port and starboard (top tanks) air receivers do not reseat after opening. Repair/replace to the satisfaction of the attending USCG MI and/or ABS Surveyor IAW 46 CFR 61.10-5(i).
Due 26 January 2018
Resolved 22 January 2018
Resolution: Vessel received and installed new relief valves on air receivers. Inspector did not do a pressure relief due to dredging operations. Manually lifted valve steam, relief valve did release air and properly re-seat @150psi
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 12 January 2018 Resolved
Remove dead-end wire IWO starboard fuel shutoff valve actuator to the satisfaction of the attending USCG MI and/or ABS Surveyor, IAW 46 CFR 111.60-19
Due 26 January 2018
Resolved 14 January 2018
Resolution: Wire for stbd drag arm valve jet valve was removed and dead ended in junction box in starboard pump room. Additionally, bulkhead penetration for the wire was plugged using threaded plug by vessel crew.
Navigation › Piloting/Steering › Advance/Transfer
Issued 12 January 2018 Resolved
Port rudder angle indicator in the engine room showing incorrect reading. Repair/replace to the satisfaction of the attending USCG MI and/or ABS Surveyor, IAW 46 CFR 113.40
Due 26 January 2018
Resolved 14 January 2018
Resolution: Rudder angle indicator repaired and tested in presence of ABS surveyor.
Engineering › Steam Boiler (auxiliary/waste heat) › Water Level Indicator
Issued 12 January 2018 Resolved
Low water level alarm on boiler is inoperable. Repair to the satisfaction of the attending USCG MI and/or ABS Surveyor, IAW 46 CFR 63.15-7
Due 26 January 2018
Resolved 14 January 2018
Resolution: Low water level alarm/trip was repaired and tested in presence of ABS surveyor.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 4 January 2017 Resolved
Verify and/or replace any damaged or crimped CO2 flexible hoses on all CO2 manifolds to satisfaction of local USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 February 2017
Resolved 20 January 2017
Resolution: Inspected fixed CO2 flex hoses and reviewed tech report from Hiller Fire Systems Inc; all sat cleared (01) CG-835.
Engineering › Diesel Engine (propulsion-reduction gear) › Air-flex Clutch
Issued 29 March 2016 Resolved
Vessel must repair renew air-flex clutch
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2016
Resolved 31 March 2016
Resolution: Vessel replaced clutch. Witnessed op test, all sat. [name withheld]
Operations/Management › Pollution › Control of Garbage
Issued 3 February 2016 Resolved
Provide a waste management plan that meets the requirements of 33 CFR 151.57. In addition, properly post a garbage placard in a prominent location in accordance with 33 CFR 151.59.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 3 February 2016 Resolved
Provide a currently corrected Light List Volume III in accordance with 33 CFR 164.33(a)(2)(ii). Vessel is using an uncorrected 2012 Light List volume III.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 3 February 2016 Resolved
Ventilation closures for port and starboard engine rooms would not close.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 February 2016
Resolved 3 February 2016
Resolution: Damper bolts and arms were serviced and operate. MSU Savannah
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 February 2016 Resolved
Installed Oily Water Seperator three way valve was not functional.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 3 February 2016 Resolved
Portion of a branch line for the installed CO2 system in the starbord upper engine room was damaged and not supported.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 3 February 2016 Resolved
Emergency lighting not sufficient for crewmembers to escape from port or starboard engine room.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Fire Fighting › Ventilation Systems › Operating Controls
Issued 3 February 2016 Resolved
Ventilation e-stops not labeled at port engineroom exit.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 3 February 2016 Resolved
CO2 nozzles above both main engines are caked with dirt.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Stability › Unintentional Flooding › General
Issued 3 February 2016 Resolved
Starboard service pump leaking approx 2 gallons hour.
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 25 January 2016 Resolved
Thermocouple j-boxes aboves both main engines, missing covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 January 2016 Resolved
Multiple light fixtures in starboard engine room are missing covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 March 2016
Resolved 4 March 2016
Resolution: Corrected.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.