Records from 2006 to 2025. Most recent: inspection, 18 November 2025.
Inspection history · 20
18 November 2025
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8282557
28 August 2025
Deficiency Check · Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8220426
22 August 2025
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8216280
22 October 2024
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8023508
14 May 2024
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7916627
11 September 2023
Periodic Inspection · Hull Examination · In-Service Inspection · Inclining Experiment · Internal Structural Exam · Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7789368
18 August 2023
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7774498
5 October 2022
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7562107
16 August 2021
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7288103
12 June 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6712075
15 April 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6666173
2 November 2018
Drydock Exam · COI Inspection · Administrative Inspection · Internal Structural Exam · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6573151
15 August 2018
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6511535
31 July 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6498005
20 March 2018
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6374667
15 February 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6355545
26 December 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6436068
28 November 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6313846
19 October 2016
COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6026039
9 September 2016
Drydock Extension
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5996206
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 November 2025
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Markings. Each lifejacket must be marked—(i) In block capital letters with the name of the vessel; and(ii) With Type I retro-reflective material approved under approval series 164.018. The arrangement of the retro-reflective material must meet IMO Resolution A.658(16).(4) Attachments and fittings. Lifejackets must have the following attachments and fittings:(i) Each lifejacket must have a lifejacket light approved under approval series 161.112 securely attached to the front shoulder area of the lifejacket.(ii) Each lifejacket must have a whistle firmly secured by a cord to the lifejacket.
Lifejackets throughout the vsl need proper stenciling, lights are expired, Clips not fully engaging. Correct to the satisfaction of the attending Marine inspector.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 19 December 2025
Resolved 22 December 2025
Resolution: New lifejacket lights, renewed retro-reflective material, corrected faulty clips.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 18 November 2025
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Additional equipment. Each vessel must carry the following equipment for the
line throwing appliance 1) The equipment on the list provided by the manufacturer with the approved appliance; and(2) An auxiliary line that—(i) Is at least 450 meters (1,500 feet) long;(ii) Has a breaking strength of at least 40 kiloNewtons (9,000 pounds-force); and(iii) Is, if synthetic, of a dark color or certified by the manufacturer to be resistant to deterioration from ultraviolet light. Auxiliary line not proved to have a breaking strength of 9,000 lbs. Satisfy to the attending marine inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2026
Resolved 29 December 2025
Resolution: Received invoice for line replacement. Invoice uploaded to documents.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 18 November 2025
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Each vessel must have posters or signs displayed in the vicinity of each survival craft and the survival craft's launching controls that—(a) Illustrate the purpose of controls;(b) Illustrate the procedures for operating the launching device;(c) Give relevant instructions or warnings;(d) Can be easily seen under emergency lighting conditions; and(e) Display symbols in accordance with IMO Resolution A.760(18). Rescue boat needs operating instructions. Satisfy to the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2026
Resolved 29 December 2025
Resolution: Vessel provided images of instructions and where its posted. Uploaded to documents tab.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 November 2025
Resolved
Portable fire extinguishers and their stations must be numbered in accordance with § 97.37-23 of this subchapter. Portable fire extinguishers not properly numbered in accordance with fire plan. Correct to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2026
Resolved 22 December 2025
Resolution: Portable fire extinguishers labelled with correct numbers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 February 2024
Resolved
Diesel Fuel Tanks: There must be no openings in the bottom, sides, or ends of a tank.
The vessel's emergency generator independent deisel fuel tank contains an inspection port on the aft-facing side of the tank. Provide sufficient documentation to indicate compliance. If the vessel cannot provide compliance documentation, plans shall be submitted to the Marine Safety Center (MSC) IAW MSC Guidelines for Independent Fuel Tanks plan review guide. Rectify deficiency within 90 days.
46CFR90.20(a)
46CFR58.50-10(a)(4)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 May 2024
Resolved 22 October 2024
Resolution: Cleared to the satisfaction of the attending MI.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 February 2024
Resolved
At each inspection for certification, periodic inspection, and at other times necessary: on all fire-extinguishing systems, all piping controls, valves, and alarms must be checked to ascertain that the system is in operating condition.
During the CO2 testing, the 88 second time delay was found to provide the delay for only 70 seconds. Rectify deficiency prior to the vessel's departure.
46CFR91.25-20(a)(3)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 February 2024
Resolution: Received technician report for Control Fire & Safety attesting to the satisfactory operation of the time delay, deficiency cleared.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 16 February 2024
Resolved
Each general emergency alarm signal must be an electrically operated bell, klaxon, or other warning device capable of producing a signal or tone distinct from any other audible signal on the vessel.
General alarms in the following spaces were found to be inoperable: (01) engine room ivo fuel tank; (01) in the aft/center of machinery space.
46CFR90.25-1(a)
46CFR113.25-12(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2024
Resolution: All general alarms were tested satisfactory, deficiency cleared.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 16 February 2024
Resolved
Where mechanical ventilation is provided for spaces other than cargo and similar spaces which are protected by a carbon dioxide extinguishing system, provision shall be made so that the ventilation system is automatically shut down with the operation of the system to that space.
Both aft port/starboard fire dampers located adjacent to the galley were found inoperable. The starboard damper in the main engine room did not completely seal. Rectify deficiencies prior to the vessel's departure.
46CFR95.15-35
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2024
Resolution: (03) deficient fire dampers operated satisfactory, deficiency cleared.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 February 2024
Resolved
Fire hydrants, nozzle, and other fittings must have threads to accommodate the hose connections.
Both #5 and #6 hydrant/hose connections were leaking excessively during operation. Rectify deficiency prior to the vessel's departure.
46CFR95.10-10(m)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2024
Resolution: Both hydrants were found operational without any leaking, deficiency cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 February 2024
Resolved
Each switchboard must be fitted with a drip shield unless the switchboard is a deck to overhead mounted type which cannot be subject to leaks or falling objects.
Half of the emergency generator switchboard was missing a drip shield.
46CFR90.25-1(a)
46CFR111.30-5(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2024
Resolved 20 February 2024
Resolution: Missing drip shield installed on emergency switchboard, deficiency cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 16 February 2024
Resolved
The following emergency lighting and power loads must be arranged so that they can be energized...At least one light in each space where a person may be maintaining, repairing, operating equipment, or transiting.
Emergency lighting was found inoperable ivo aft bulkhead accommodation space.
46CFR90.25-1(a)
46CFR112.15-1(f)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2024
Resolved 20 February 2024
Resolution: All emergency lighting was found operable, deficiency cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 February 2024
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended.
Mounting bracket holes were found on the forward trunk leading to the storage space which obstructed the space's watertight integrity.
46CFR92.10-15
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2024
Resolved 20 February 2024
Resolution: All mounting bracket holes were rectified, deficiency cleared.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 February 2024
Resolved
Means shall be provided for closing all other openings to the space protection from outside the space of a CO2 protected area. The construction shall be such that openings in the upper portion of the space can be closed off either by permanently installed means or by the use of canvas or other material which is normally carried by the vessel.
The forward bulkhead of the vessel's main engine room contains a large opening where the dredge cables run from inside to outside of the space which disrupts the integrity of the CO2 protected zone.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 March 2024
Resolved 22 February 2024
Resolution: Sliding doors were added to the openings to secure the CO2 protected space, deficiency cleared.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 16 February 2024
Resolved
The owner of a vessel subject to inspection under section 3301 shall-(1) ensure that such vessel is equipped with a vessel master key control and Signage requirements regarding the Coast Guard's Sexual Assault and Sexual Harassment Prevention and Response programs for commercial vessels.
Follow guidance in implementation IAW Coast Guard Policy Letters 23-04 and 23-06.
46USC3106
46USC111101
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 March 2024
Resolved 21 May 2024
Resolution: Reviewed correspondence attesting to master key control implementation, and reviewed signage and policy for Coast Guard sexual assault/harassment & response program for commercial vessels.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 October 2022
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Marine Inspector identified fuel leak on priming pump seal and oil leak on centrifuge filter, STBD Forward Generator.
46 CFR 58.10-10
46 CFR 58.10-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 October 2022
Resolved 10 October 2022
Resolution: Repaired pump seal.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 October 2022
Resolved
Fire pumps shall be fitted with a pressure gauge on the discharge side of the pumps. No gauge on discharge piping #1 fire pump and a non-functional gauge #2 fire pump.
46 CFR 95.10-5(e)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2022
Resolved 10 October 2022
Resolution: Vessel installed new gauges.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 October 2022
Resolved
An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Marine Inspector identified dead-end wires/junction box hanging from HPU for Aft dredge pump, open panel back of switchboard, an opening in the 480V shore tie power panel and loose LP-2 panel.
46 CFR 111.05-3(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 October 2022
Resolved 10 October 2022
Resolution: Vessel removed dead-end wires and installed screws in loose lighting panel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 October 2022
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Jacket Water leak on piping coming from Generator Head-tank and water pump leak port forward generator.
46 CFR 58.10-10
46 CFR 58.10-5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2022
Resolved 13 October 2022
Resolution: Installed new water pump and head tank.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 5 October 2022
Resolved
Weekly inspections and test:
Each survival craft rescue boat and launching appliance must be visually inspected to ensure its readiness for use.
Monthly Inspections:
Each lifesaving appliance,... must be inspected monthly using the checklists required under paragraph (b)(1)(i) of this section to make sure the appliances and the equipment are complete in good working order.
Vessel needs to provide a maintenance records for all lifesaving appliances.
46 CFR 199.190(b)(d)(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 October 2022
Resolved 10 October 2022
Resolution: Vessel added electronic records for life saving maintenance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 August 2021
Resolved
Fuel filters must be approved to ASTM 1201; Bowls for fuel filters were plastic; replace at the next drydock.
Action required: 705 - Other - as specified
Resolved 24 August 2021
Resolution: New metal bowls were installed on the filters.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 August 2021
Resolved
On vessels other than motorboats, a fixed CO2 or other approved system must be installed on paint lockers; paint locker nozzle was not secured insde the paint locker.
Action required: 10 - Deficiency Rectified
Resolved 16 August 2021
Resolution: CO2 nozzle was properly installed prior to the completion of the inspection.
Fire Fighting › Fire Pumps › Gland Sealing
Issued 20 March 2018
Resolved
1. Tighten/repack glands on general service/fire pumps.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 3 April 2018
Resolution: Witnessed proper operation of fire pumps.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 20 March 2018
Resolved
Repair ventilation louvers in EDG room- not closing completely.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 3 April 2018
Resolution: Witnessed proper operation of ventilation fire dampers
Deck/Cargo › Holds/Tanks › Watertight Door
Issued 20 March 2018
Resolved
3. Repair starboard forward Watertight Door on spud house.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 3 April 2018
Resolution: Verified proper repairs to WTD
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 20 March 2018
Resolved
4. Repair/renew flammable locker in spud house room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 3 April 2018
Resolution: Vessel made temp repairs, and produced work order/reciept for new locker on order.
Engineering › Bilge Water Management System › Piping
Issued 4 January 2017
Resolved
Discovered a pinhole in the bilge piping on the discharge side of the pump. Required a two foot section of piping to be cropped and renewed.
Action required: 705 - Other - as specified
Due 31 January 2017
Resolved 5 January 2017
Resolution: The piping was correctly cropped/renewed and pressure tested sat.
Electrical › Electric Supply System (service) › Battery Installation
Issued 4 January 2017
Resolved
The battery for emergency power to the bridge control station located outside the pilothouse was corroded and needed to be replaced.
Action required: 705 - Other - as specified
Due 31 January 2017
Resolved 5 January 2017
Resolution: The battery was replaced with a new, approved battery.
Electrical › Electric Generation Source (service) › Generator
Issued 19 October 2016
Resolved
The #1 and #2 ship's service generators were being serviced and were unavailable for required testing. The marine inspector will return to conduct testing.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 January 2017
Resolved 5 January 2017
Resolution: Both generators alarms and overspeeds were tested and all functioned satisfactory.
Electrical › Electric Supply System (service) › Cable
Issued 19 October 2016
Resolved
An electronics transformer in the electronic room was plugged in to a power strip. Required the transformer to be wired into the electrical system.
Action required: 705 - Other - as specified
Due 31 January 2017
Resolved 5 January 2017
Resolution: The power strip was removed and the wire was correctly installed.