Records from 1995 to 2026. Most recent: inspection, 6 March 2026.
Documentation record
Registered dimensions (L × B × D)96.5 ft × 30.0 ft × 9.4 ft
Registered tonnagegross 286 / net 194
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHALTER MARINE SERVICES INC · LOCKPORT, LA, UNITED STATES · built 1974
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORTLAND, OR
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 29 April 2026 · expires 30 April 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it286 - Regulatory (Subpart C or D), Gross Ton
194 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 32
6 March 2026
Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8327091
2 February 2026
Drydock Exam · Internal Structural Exam · Administrative Inspection · Vessel Attendance
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8306256
7 November 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8262709
29 October 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8026643
15 October 2024
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8019458
5 August 2024
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7974728
30 January 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7858899
12 November 2023
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7823888
14 November 2022
Initial Certification
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7592815
4 May 2021
TPO Audit · Initial Certification
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7271879
25 April 2018
Industry Initiated Exam · MTSA Verification
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6399562
27 May 2014
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4872121
9 April 2013
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4567288
22 March 2013
MTSA Verification · Industry Initiated Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4557061
23 March 2011
Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 3970916
2 August 2010
Administration
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3814233
4 May 2010
MTSA Verification · Deficiency Check · Industry Initiated Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3729880
27 November 2009
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3706420
29 October 2009
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3626974
9 November 2006
MTSA Verification
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2817565
11 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1964471
10 November 2003
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1945725
17 June 2003
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1822383
21 May 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 135286
12 January 2000
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 103134
4 August 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 85054
4 August 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 230325
20 May 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 77948
1 February 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 67850
1 February 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 229521
9 April 1995
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 107594
9 April 1995
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 225478
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 7 November 2025
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover...The valve must be operable from a safe place outside the space where the valve is installed. Marine inspector observed broken wire causing the emergency fuel shutoff valve for the port side main engine to be inoperable. Replace the wire and ensure shutoff valve can be operated from outside the engine room. 46 CFR 143.260(b)(d)
Action required: 10 - Deficiency Rectified
Due 7 November 2025
Resolved 7 November 2025
Resolution: Replaced fuel shutoff wire and provided photos of correction the same day as the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 November 2025
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must:(1) Be maintained to ensure proper operation. Marine inspector observed an exhaust leak on the stbd side main engine. Rectify exhaust leak to satisfaction of MI.
46 CFR 143.205(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 November 2025
Resolved 6 March 2026
Resolution: Verified installation and witnessed operational test of engine, all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 30 January 2024
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. Inspector noted small gap on the door gasket located port side main deck. Vsl rep is required to rectify the deficiency.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 13 February 2024
Resolution: Vessel rep rectified the small gap found on the door gasket, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 January 2024
Resolved
Each lifebuoy on a towing vessel must be marked in block capital letters with the name of the vessel. Inspector noted markings and retroreflective materials peeling off. Vsl rep is required to rectify the deficiency.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 13 February 2024
Resolution: Vessel rep installed new marking and retroreflective matericals, all sat.