MAURY USCG vessel records
← All vessels

HELLER HIGHWATER

HELLER HIGHWATER is a 1981 tank barge. The Coast Guard has recorded 76 inspections since 1986, most recently in May 2026, along with 51 deficiencies — 2 with no resolution recorded — and 3 casualty investigations between 2000 and 2017.

Records from 1986 to 2026. Most recent: inspection, 14 May 2026.

Built
1981
Last inspected
14 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

Flag
UNITED STATES
Maury page id
psix-54670

Inspections, by type

…with no type recorded11
Years with a record 37 calendar years (1986–2026)
The 76 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)214.3 ft × 62.8 ft × 14.8 ft
Registered tonnagegross 1,730 / net 1,730
ITC dimensions (L × B × D)205.9 ft × 65.0 ft × 14.8 ft
ITC tonnagegross 1,447 / net 655
BuilderTACOMA BOATBUILDING CO. · TACOMA, WA, UNITED STATES · built 1981
Hull materialSteel
PropulsionNone
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portJUNEAU, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 1 July 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1730 - Regulatory (Subpart C or D), Net Ton
655 - Convention (Subpart B), Net Ton
1730 - Regulatory (Subpart C or D), Gross Ton
1447 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspected as a tow unit · 4

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

ARCTICABORG Towing Vessel · MISLE 1479685 · 30 October 2017 · activity 6302906ARIES Towing Vessel · MISLE 186472 · 4 December 2006 · activity 2834850MILLENNIUM STAR Towing Vessel · MISLE 10651 · 11 September 2000 · activity 147704LUCINDA SMITH Towing Vessel · MISLE 138840 · 22 March 1994 · activity 2263

Inspection history · 76

14 May 2026 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8373283
28 February 2026 Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8314587
13 June 2025 MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8157276
26 March 2024 MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7879646
12 June 2023 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7713523
21 April 2023 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7681818
7 February 2023 Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7636279
28 June 2022 Administrative Inspection · Periodic Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7482535
4 June 2022 Bulk Liquid Transfer Monitor
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7468334
27 November 2021 Bulk Liquid Transfer Monitor
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7357931
17 February 2021 Drydock Exam · Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7134363
19 May 2020 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6956021
26 March 2019 Cargo Tank Internal · COI Inspection · MARPOL Annex I Examination · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6649841
15 March 2019 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6643476
17 August 2018 Construction Oversight
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6518771
13 March 2018 Internal Structural Exam · Damage Survey · Administrative Inspection · Drydock Exam · Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6370814
3 January 2018 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6330257
30 October 2017 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6302906
6 April 2016 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5848353
29 February 2016 Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5824886
23 December 2015 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5786532
3 December 2014 COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5025243
5 May 2014 Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4854666
10 March 2014 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4809942
11 December 2013 In-Service Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4676139
11 December 2013 In-Service Inspection · Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4768219
30 July 2013 Internal Structural Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4663425
7 February 2012 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4222814
18 July 2011 Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4078972
7 July 2010 In-Service Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3634268
9 January 2010 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3662076
12 February 2009 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3415580
6 August 2008 Internal Structural Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3291175
27 February 2008 Periodic Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3150435
4 April 2007 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2896053
4 December 2006 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2834850
5 October 2006 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2794417
16 June 2006 Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2678974
8 March 2006 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2589216
20 December 2005 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2554389
12 January 2005 COI Inspection · MTSA Verification
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2272707
2 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1957814
28 October 2003 Annual Inspection · MARPOL Annex I Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1933783
11 August 2003 Internal Structural Exam · Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1869329
31 July 2002 Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1651007
6 August 2001 Deadweight Survey · COI Inspection · Hull Examination · Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1412333
11 September 2000 Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 147704
8 August 2000 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1420381
10 November 1998 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 805918
24 September 1998 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 799465
14 August 1998 COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1459445
9 September 1996 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1262954
15 August 1996 COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1357693
5 November 1994 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1181848
25 July 1994 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1177077
22 March 1994 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2263
7 October 1993 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1136077
3 June 1993 Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 11822
30 December 1992 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 830233
5 November 1992 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 953523
9 April 1992 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 949503
9 April 1992 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1258487
6 January 1992 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 946857
17 December 1991 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 945309
6 August 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1253807
6 August 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1382468
7 November 1990 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1234633
24 November 1989 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 916822
5 September 1989 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1199204
29 March 1989 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 887132
22 December 1988 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1036177
13 December 1988 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 895965
30 January 1987 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1001839
24 December 1986 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1000996
14 October 1986 Credit Drydock
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1009620
13 August 1986 Permit to Proceed
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 988734

Deficiency record · 51

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 March 2024 Resolved
Each panelboard must have: A circuit directory that has: The circuit designation of each circuit. MI observed circuits labeled as "spare" in the on position. Address open circuits, or re-name directory.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 11 April 2024
Resolution: Recevied photographic evidence of correction
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 March 2024 Resolved
No flexible cord may be used. MI observed non-permanent extension cord utilized in cargo pump room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 11 April 2024
Resolution: Recevied photographic evidence of correction
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 March 2024 Resolved
Electrical installations on vessels must ensure protection of crew and the vessel from electrical hazards. MI observed a section of cable near stbd cargo pump bundled by cable ties.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 11 April 2024
Resolution: Recevied photographic evidence of correction
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 12 June 2023 No resolution recorded
Excessive wastage found in cargo tank bottom of #5 cargo tanks port and starboard. Cargo piping valve and spool piece for #5 tanks shall be removed and blanked. Piping shall be maintained in that condition until dry dock repairs of the cargo tank have been completed. 46 CFR 31.10-21(c)
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 April 2023 No resolution recorded
If, during an internal structural examination, cargo tank internal examination, or underwater survey, damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be drydocked or otherwise taken out of service to further assess the extent of the damage and to effect permanent repairs. Excessive wastage found in cargo tank bottom of #5 cargo tanks port and starboard. Areas to be cropped and renewed at next dry dock. 46 CFR 31.10-21 (c)
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 April 2023 Resolved
If, during an internal structural examination, cargo tank internal examination, or underwater survey, damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be drydocked or otherwise taken out of service to further assess the extent of the damage and to effect permanent repairs. Excessive wastage found in cargo tank bottom of #5 cargo tanks port and starboard. Wasted areas to be coated by 19MAY2023. 46 CFR 31.10-21(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2023
Resolved 12 June 2023
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 28 June 2022 Resolved
Piping subject to internal head pressure from oil in the tank must be fitted with positive shutoff valves located at the tank and must be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located. 800 gallon diesel tank for generator does not have the required remote control located outside of the compartment. Cite: 46 CFR 56.50-60(d)(1)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2022
Resolved 30 August 2022
Resolution: Verified installation of fuel oil shutoff for generator fuel tank
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 28 June 2022 Resolved
Every oil tanker of 150 gross tonnage and above shall be provided with an Oil Record Book Part II (Cargo/Ballast Operations). Vessel has not been maintaining an Oil Record Book Part II. Cite: MARPOL 73/78 Annex I, Reg. 36.1
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 28 June 2022
Resolution: Going forward vessel o/o will fill out the ORB Part I and II for relevant entries.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 28 June 2022 Resolved
Every oil tanker of 150 gross tonnage and above shall be provided with an Oil Record Book Part I (Machinery Space Operations) and shall be completed on each occasion specified in Reg. 17.2. Vessel has not made entries in their Oil Record Book Part I since 24JAN2020. Cite: MARPOL 73/73 Annex I, Reg. 17.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 28 June 2022
Resolution: o/o will fill out out the ORB Part I and II for relevant entries.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 28 June 2022 Resolved
For each ship subject to MARPOL Annex VI surveys and certification, details of fuel oil for combustion purposes delivered to and used on board shall be recorded by means of a bunker delivery note which shall contain at least the information specified in Appendix V of MARPOL Annex VI and must be retained for a period of three years after the fuel oil has been delivered on board. Vessel does not have the past three years of bunker delivery notes. Cite: MARPOL 73/78 Annex VI, Reg. 18.5; Appendix V
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2022
Resolved 30 August 2022
Resolution: Verified bunker delivery notes onboard
14 - Pollution Prevention › 146 - MARPOL Annex VI › Quality of fuel oil
Issued 28 June 2022 Resolved
The bunker delivery note shall be accompanied by a representative sample of the fuel oil delivered. The sample is to be sealed and signed by the supplier's representative and the master of officer in charge of the bunker operation on completion of bunkering operations and retained under the ship's control until the fuel oil is substantially consumed, but in any case for a period not less than 12 months from the time of delivery. Vessel did not have the past 12 months of fuel oil samples. Cite: MARPOL 73/78 Annex VI, Reg. 18.8.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2022
Resolved 30 August 2022
Resolution: Verified bunker samples on board
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 26 March 2019 Resolved
CG001/46CFR31.10-17(a)/46CFR31.05-10(c)/701c - VESSEL MUST UNDERGO AN ANNUAL INSPECTION WITHIN 3 MONTHS BEFORE OR AFTER EACH ANNIVERSARY DATE. LATEST COI ISSUED ON 02JAN2018 WITH AN EXPIRATION DATE OF 03DEC2019, WHICH CORRESPONDS TO THE ANNIVERSARY DATE. LAST INSPECTION COMPLETED ON 02JAN2018, WITH FIRST ANNUAL INSPECTION DUE 3 MONTHS BEFORE OR AFTER 03DEC2018. VESSEL SURPASSED 3 MONTH PERIOD GRANTED BY REGULATION BEYOND ANNUAL INSPECTION DUE DATE, THEREBY INVALIDATING THE COI. IN ACCORDANCE WITH 46CFR31.05-10(c), THE VESSEL'S COI HAS BEEN REVOKED AND THE VESSEL MUST IMMEDIATELY GAS FREE ALL CARGO TANKS AND UNDERGO AN INSPECTION FOR CERTIFICATION PRIOR TO CARGO OPERATIONS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 March 2019
Resolved 3 April 2019
Resolution: COI inspection complete this day.
Fire Fighting › Structural - A Class Divisions › Cargo Pump Rooms
Issued 6 April 2016 Resolved
Pump engine room forward door opens into the hazardous location indicated on the vessel's Hazardous Zone Plan. This arrangement requires that all electrical equipment within the pump engine room to be designed for hazardous locations. Either upgrade electrical equipment in this space or remove door. Ref. 46CFR111.105-31(m)
Action required: 705 - Other - as specified
Due 6 May 2016
Resolved 20 April 2016
Resolution: Door removed; steel insert welded in door location.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 March 2016 Resolved
Install guards to protect workers from exposed alternator, water pump and drive shaft pulleys on the generator prime mover to the satisfaction of the attending Marine Inspector.
Action required: 705 - Other - as specified
Due 8 March 2016
Resolved 16 March 2016
Resolution: Protective guard was installed.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 10 March 2014 Resolved
JB01 - Remove soot filled lagging on port cargo pump exhaust. Inspect for and repair any exhaust leaks in exhaust prior to replacing lagging to the satisfaction of the attending marine inspector. 04/14/2014: Vessel representative [name withheld] requested an extension of 30 for the 835 due to service constraints.
Due 17 May 2014
Resolved 5 May 2014
Resolution: Sat Test of Repairs
Construction/Loadline › Hull › Double Hull
Issued 4 August 2006 Resolved
Gas free and make available for inspection number 2 stbd and number 2 double bottom voids.
Due 11 August 2006
Resolved 8 August 2006
Resolution: Completed inspection.
Deck/Cargo › Cargo Stowage
Issued 11 August 2003 Resolved
Conduct air testing of suspect areas (cargo residue) in way of inboard blkhds of #1 port/stbd cargo tanks in center passageway, in the presence of a CG marine inspector. Until test is conducted, no cargo shall be loaded into the #1 port/stbd tanks. LEGACY COMPONENT DESC: #1 port & stbd inboard bulkheads
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 August 2003
Resolved 14 August 2003
Resolution: Witnessed satisfactory air testing of suspect areas, noting no leakage. Vsl will monitor the areas for the next two loading cycles and report all results of these inspections to the office.
Documentation › Certificates/Documents
Issued 31 July 2002 Resolved
Provide valid copy of the International Load Line Certificate LEGACY COMPONENT DESC: International Load Line Certificate
Condition: Unknown
Due 1 September 2002
Resolved 2 August 2002
Electrical
Issued 6 August 2001 Resolved
Properly fasten cables/wires leading to the main distribution panel using metal fasteners, IAW 46CFR111.60
Condition: Unknown
Due 24 October 2001
Resolved 24 October 2001
Electrical
Issued 6 August 2001 Resolved
Provide High Voltage warning sign on back of distribution panel IAW 46CFR111.01-1
Condition: Unknown
Due 15 August 2001
Resolved 15 August 2001
Deck/Cargo
Issued 6 August 2001 Resolved
Provide discharge removal equipment on board as requirede by 33CFR155.210
Condition: Unknown
Due 15 August 2001
Resolved 15 August 2001
Documentation
Issued 6 August 2001 Resolved
Provide a valid International Loadline Certificate per 46CFR31.25-1
Condition: Unknown
Due 24 October 2001
Resolved 24 October 2001
Electrical
Issued 6 August 2001 Resolved
Provide a machinery guard on the generator IAW 46CFR58.01-20
Condition: Unknown
Due 15 August 2001
Resolved 15 August 2001
Deck/Cargo
Issued 6 August 2001 Resolved
Provide a 30X30 mesh flame screen on the #4 Stbd P/V valve IAW 46CFR35.30- 10
Condition: Unknown
Due 15 August 2001
Resolved 15 August 2001
Deck/Cargo
Issued 6 August 2001 Resolved
Conspicously mark the location of the emergence cargo shut down located o the exterior aft deck house bulkhead IAW 46CFR32.50-35
Condition: Unknown
Due 15 August 2001
Resolved 15 August 2001
Documentation
Issued 14 August 1998 Resolved
SUBMIT STABILITY BOOK TO MSC FOR APPROVAL AND ISSUE OF REPLACEMENT STABILITY LETTER IAW 46 CFR 170.110.
Condition: Unknown
Due 14 August 1998
Resolved 14 August 1998
Deck/Cargo
Issued 15 August 1996 Resolved
OPEN FOR INSPECTION EACH CARGO TANK PRESSURE/VACUUM (PV) VALVE PRIOR TO THECARRIAGE OF ANY OIL IN BULK AS CARGO OR CARGO RESIDUE AS REQUIRED BY 46 CFR38.25.10.
Condition: Unknown
Due 9 September 1996
Resolved 9 September 1996
Documentation
Issued 15 August 1996 Resolved
PROVIDE A VESSEL RESPONSE PLAN TO THE U.S.C.G. FOR REVIEW AND APPROVAL PRIOR TO THE CARRIAGE OF ANY OIL IN BULK AS CARGO OR CARGO RESIDUE AS REQUIRED BY 33 CFR 155.1015.
Condition: Unknown
Due 15 August 1998
Resolved 9 September 1996
Documentation
Issued 15 August 1996 Resolved
PROVIDE SHIPBOARD OIL POLLUTION PREVENTION PLAN (SOPEP) APPROVAL LETTER FROM U.S. COAST GUARD AS REQUIRED BY MARPOL 73/78 ANNEX I REGULATION 26.
Condition: Unknown
Due 21 August 1996
Resolved 21 August 1996
Deck/Cargo
Issued 15 August 1996 Resolved
PROVIDE DISCHARGE REMOVAL EQUIPMENT PRIOR TO THE CARRIAGE OF ANY OIL IN BULK AS CARGO OR CARGO RESIDUE AS REQUIRED BY 33 CFR 155.210.
Condition: Unknown
Due 9 September 1996
Resolved 9 September 1996
Deck/Cargo
Issued 15 August 1996 Resolved
PROVIDE OIL TRANSFER PROCEDURES FOR REVIEW AND APPROVAL TO THE U.S.C.G. PRIOR TO THE CARRIAGE OF ANY OIL IN BULK AS CARGO OR CARGO RESIDUE AS REQUIRED BY 33 CFR 155.720.
Condition: Unknown
Due 9 September 1996
Resolved 9 September 1996
Deck/Cargo
Issued 15 August 1996 Resolved
HYDROSTATICALLY TEST ALL CARGO PIPING AND CARGO HOSE TO 1 1/2 TIMES THE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) PRIOR TO THE CARRIAGE OF ANY OIL IN BULK AS CARGO OR CARGO RESIDUE AS REQUIRED BY 33 CFR 156.170.
Condition: Unknown
Due 9 September 1996
Resolved 9 September 1996
Deck/Cargo
Issued 5 November 1994 Resolved
PROVIDE EVIDENCE OF RECENT HYDRO TGESTING OF ALL CARGO PIPING PER 33CFR156.170
Condition: Unknown
Due 5 November 1994
Resolved 5 November 1994
Deck/Cargo
Issued 5 November 1994 Resolved
REPLACE FLAME SCREEN #4 PORT P/V VALVE.
Condition: Unknown
Due 5 November 1994
Resolved 5 November 1994
Deck/Cargo
Issued 5 November 1994 Resolved
PROVIDE EVIDENCE OF RECENT HYDRO TESTING OF ALL CARGO HOSES PER 33CFR156.170.
Condition: Unknown
Due 5 November 1994
Resolved 5 November 1994
Documentation
Issued 5 November 1994 Resolved
PROVIDE EVIDENCE OF PARTICIPATION IN BENZENE PROGRAM.
Condition: Unknown
Due 5 November 1994
Resolved 5 November 1994
Construction/Loadline
Issued 5 November 1994 Resolved
REPAIR ALL SIDE RAILS.
Condition: Unknown
Due 5 December 1994
Resolved 8 November 1994
Fire Fighting
Issued 5 November 1992 Resolved
PROVIDE PLACARDS FOR EACH HALON SYSTEM SHOWING INSTRUCTIONS FOR REMOTE AND LOCAL RELEASE OF SYSTEM.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Electrical
Issued 5 November 1992 Resolved
PROVIDE COVER FOR GENERATOR FAN.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 5 November 1992 Resolved
RETEST THE CARGO HOSES TO 1.5 MAWP AS REQUIRED IN 33 CFR. CARGO HOSES ARE NOT TO BE USED UNTIL RETESTED.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Electrical
Issued 5 November 1992 Resolved
PROVE REMOTE SHUTDOWNS FOR THE GENERATOR ARE FUNCTIONAL. GENERATOR NOT TO BE USED UNTIL SHUTDOWNS ARE OPERATIONAL
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Electrical
Issued 17 December 1991 Resolved
REPAIR BROKEN GENERATOR REMOTE SHUTDOWN SWITCH
Condition: Unknown
Due 10 January 1992
Resolved 6 January 1992
Deck/Cargo
Issued 7 November 1990 Resolved
HYDRO TEST CARGO PIPING AND HOSES AS OUTLINED IN 33CFR
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Electrical
Issued 7 November 1990 Resolved
PROVIDE GUARD FOR END OF GENERATOR SET.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Deck/Cargo
Issued 7 November 1990 Resolved
CALIBRATE CARGO PUMP GAUGES AND LOG
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Fire Fighting
Issued 7 November 1990 Resolved
SUBMIT FIRE EXTINGUISHER REPORT
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Construction/Loadline
Issued 13 December 1988 Resolved
MAKE WATERTIGHT - AS DESIGNED- MACHINERY SPACE ESCAPE SCUTTLE PRIOR TO 20DEC88 TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 13 December 1988
Resolved 13 December 1988
Electrical
Issued 13 December 1988 Resolved
SHIELD MAIN ELECTRICAL SWITCH BOARD - MACHINERY SPACE - FROM LEAKAGE FROM ESCAPE SCUTTLE / HATCH PRIOR TO 27DEC88 TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 13 December 1988
Resolved 13 December 1988
Deck/Cargo
Issued 13 December 1988 Resolved
TEST AND LOG CARGO PUMPS CORRECT RELIEF VALVE PRESSURE PRIOR TO CARGO TRANSFER OR 14 JAN89 TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 13 December 1988
Resolved 13 December 1988
Deck/Cargo
Issued 24 December 1986 Resolved
3. PROPERLY TEST CARGO PUMPS TO MAX PRESSURE AT NEXT DISCHARGE OF CARGO TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Electrical
Issued 24 December 1986 Resolved
2. NEW GENERATOR IS NOT TO BE UTILIZED UNTIL DRAWINGS HAVE BEEN SUBMITTED TO [name withheld] AND APPROVED.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986

Casualty record · 3

11 September 2000Major Marine Casualty · role: Involved in a Marine Casualty · activity 147704
7 February 2011Routine · role: Involved in a Marine Casualty · activity 3945310
30 October 2017Routine · role: Involved in a Marine Casualty · activity 6302906
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

INVESTIGATOR (2000–2017). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.