Records from 1985 to 2011. Most recent: inspection, 5 January 2011.
Inspection history · 93
5 January 2011
Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 3921470
18 March 2009
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3658472
1 March 2009
Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3425808
24 February 2009
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3423897
19 February 2009
Damage Survey · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3420469
15 January 2009
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3394558
23 December 2008
Deficiency Check · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3384205
9 October 2008
MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3334739
12 June 2008
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3235439
27 March 2008
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3172807
25 March 2008
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3173591
13 March 2008
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3163790
8 January 2008
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3127337
4 January 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3124893
13 December 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3117535
12 December 2007
Ballast Water Examination · ACP Annual Oversight · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3112729
3 May 2007
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2921311
31 January 2007
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2865289
22 January 2007
Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2859845
16 August 2006
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2775739
17 October 2005
ACP Annual Oversight
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2516295
24 September 2005
Type not recorded
No type recorded · Commandant (CG-INV) · Activity 2960653
11 January 2005
ACP Annual Oversight
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2273413
30 January 2004
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2000203
9 December 2003
ACP COI Oversight
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1964719
8 December 2003
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1961501
5 December 2003
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1959630
25 November 2003
In-Service Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1954408
24 November 2003
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1953894
21 November 2003
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1952062
19 November 2003
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1950703
11 November 2003
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1951706
9 July 2003
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1876430
22 January 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1733912
26 September 2002
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1684551
29 August 2002
In-Service Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1664362
14 May 2002
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1616770
22 January 2002
Administrative Inspection · In-Service Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1480510
9 November 2001
Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1401594
24 October 2001
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1428105
3 July 2001
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 1068163
3 May 2001
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 1064382
10 November 1999
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 811647
14 October 1999
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 787944
21 September 1999
COI Inspection
Physical examination · Activities Europe · Activity 1440194
21 September 1998
Type not recorded
No type recorded · Activities Europe · Activity 421027
21 September 1998
Re-Inspection
Physical examination · Activities Europe · Activity 1368865
27 October 1997
Administrative
Administrative · Activities Europe · Activity 1114993
24 September 1997
Type not recorded
No type recorded · Activities Europe · Activity 409999
24 September 1997
COI Inspection
Physical examination · Activities Europe · Activity 1430457
23 September 1996
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1402328
15 November 1995
Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1396435
3 October 1994
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1175397
14 June 1994
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1018702
27 January 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 852283
15 December 1993
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 849768
6 November 1993
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 848555
2 November 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 362060
6 October 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1150773
24 September 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 830187
23 September 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 827362
16 April 1993
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 832599
16 April 1993
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1143063
16 April 1993
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1148452
3 November 1992
Re-Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1134496
23 March 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 451661
17 December 1991
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 951212
13 September 1991
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1249798
31 May 1991
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1219433
29 May 1991
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1212929
17 October 1990
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1219163
6 October 1990
Deficiency Check · Hull Examination · Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 928273
4 October 1990
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1242822
16 May 1990
MARPOL Annex II Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1238017
26 April 1990
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1236813
24 April 1990
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 913405
16 April 1990
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1212668
18 October 1989
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 886947
20 August 1989
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 893073
23 February 1989
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1045299
18 February 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1352753
10 September 1988
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1348541
26 June 1988
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1205385
23 March 1988
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 522576
4 February 1988
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1016637
7 January 1988
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1317475
18 August 1987
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1002258
15 August 1987
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1005696
13 March 1987
Type not recorded
No type recorded · COTP NEW HAVEN · USCG Northeast District (CGD-NE) · Activity 479176
22 November 1986
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1311188
13 May 1986
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 495478
5 October 1985
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1302422
5 June 1985
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 985941
Deck/Cargo › Inert Gas System › IGS Blower
Issued 18 March 2009
Resolved
The inboard IG blower began over-heating and leaking lube oil. High speed bearing believed to be worn. Vessel to make satisfactory repairs to CG and ABS.
Action required: 705 - Other - as specified
Due 14 April 2009
Resolved 18 March 2009
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 18 March 2009
No resolution recorded
The vessel must submit a plan review/proposal concurrently to ABS Surveyor and CG Sector ST. Petersburg, FL for permanent repairs to the vessel's IGS blowers or replacement of the IGS blowers to ensure failure of the IGS blowers (high speed bearings) will not occur again.
Action required: 705 - Other - as specified
Deck/Cargo › Inert Gas System › IGS Blower
Issued 1 March 2009
Resolved
The inboard IG blower began over-heating and leaking lube oil. High speed bearing believed to be worn. Vessel to make satisfactory repairs to CG and ABS.
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 March 2009
Resolved 6 March 2009
Resolution: Received class report attesting to the proper operation of the IG blower.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 19 February 2009
Resolved
Inbrd IGS blower has been reported as not operational. Make repairs & demonstrate proper operation of the inboard IGS blower to an attending CG [name withheld]/unloading of cargo is permitted as long as the outboard blower unit is functioning. If there are any changes in the status to the outboard IGS blower unit the vessel must cease cargo ops, and make a report to the cognizant [name withheld].
Action required: 705 - Other - as specified
Due 25 February 2009
Resolved 24 February 2009
Resolution: ABS Cleared
Deck/Cargo › Inert Gas System › IGS Blower
Issued 23 December 2008
Resolved
IG blower experiencing over-heating problems. PRIOR TO LOADING CARGO, the vessel is to make satisfactory repairs or replace both IG blowers to the satisfaction of the attending Marine Inspector and ABS Surveyor.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 14 January 2009
Resolution: ABS rep witnessed proper operation of newly installed IG blower.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 12 June 2008
Resolved
Vessel may not conduct cargo operations until the IGS system is repaired and operational test are conducted
Action required: 705 - Other - as specified
Due 20 June 2008
Resolved 12 June 2008
Resolution: IGS system repaired and testes with CG and ABS, SAT.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 12 June 2008
Resolved
While IGS system is inoperable the vessel must monitor the inert gas in the tanks, in addition the vessel may not shift berths without prior approval from the OCMI.
Action required: 705 - Other - as specified
Due 20 June 2008
Resolved 12 June 2008
Resolution: Repairs were completed, SAT.
Construction/Loadline › Hull › Hull Plating
Issued 27 March 2008
Resolved
Vsl sustained damage to the hull when allegedly struck by a tank barge IWO Port Pontoon, steering gear comnpartment. Temporary repairs to be completed to the satisfaction of class prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 March 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 19 January 2007
Resolved
Provide one tug escort from "J" buoy to the Port Angeles Anchorage. Conduct repairs to stbd turbocharger prior to departure.
Action required: 705 - Other - as specified
Resolved 25 January 2007
Resolution: Vsl completed repairs to turbocharger to the satisfaction of ABS.
Personnel › Certificates/Documents/Licenses › License, Chief Engineer
Issued 11 January 2005
Resolved
Licensed C/E on-board does not meet aggregate tonnage requirements. Prior to operating beyond the bondary line, vessel must be manned by a licensed C/E. Provide copy of new C/E's license to local OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 January 2005
Resolution: Vessel received new certified C/E that meets requirements of NVIC 2-81.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 11 January 2005
Resolved
P/V flame screens to #1 & #2 port cargo tanks are corroded. After discharge of current cargo in 1 & 2 port cargo tanks and prior to loading cargo in 1 & 2 cargo tanks renew/replace flame screen and covers on both PV vents.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 January 2005
Resolution: Flame screens and covers replaced.
Lifesaving › Lifeboat
Issued 25 November 2003
Resolved
Make proper repairs to engine on #1 lifeboat, specifically cracked cylinder head. LEGACY COMPONENT DESC: Propulsion Engine
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 December 2003
Resolved 5 December 2003
Resolution: Deficiency cleared by Class (ABS) report.
Deck/Cargo
Issued 9 November 2001
Resolved
Prior to loading cargo, repair leaking cargo tank(s) into the #2 double bottom water ballast tank and #3 port double bottom water ballast tank to the satisfaction of ABS. Provide class report attesting to resolution.
Condition: Unknown
Due 9 November 2001
Resolved 14 May 2002
Deck/Cargo
Issued 9 November 2001
Resolved
Prior to loading cargo, make permanent repairs and prove proper operation of the IGS to the satisfaction of ABS and provide class report attesting toresolution.
Condition: Unknown
Due 9 November 2001
Resolved 14 May 2002
Documentation
Issued 21 September 1999
Resolved
PROVIDE PROOF THAT THE SOPEP HAS BEEN REVIEWED ANNUALY IN ACCORDANCE WITH 33CFR151.28.
Condition: Unknown
Due 4 October 1999
Resolved 4 October 1999
Engineering
Issued 3 October 1994
Resolved
RENEW OR REPLACE HAND RELIEF DEVICE ON SHIP SERVICE AIR RECEIVER #803 STBD SIDE.
Condition: Unknown
Due 3 November 1994
Resolved 3 November 1994
Fire Fighting
Issued 3 October 1994
Resolved
REPAIR/RENEW FIRE DETECTION ZONE 5 IN ENGINE ROOM. VSL TO MAINTAIN MANNED ENGINEERING WATCHES UNTIL THIS REQT IS CLEARED.
Condition: Unknown
Due 3 November 1994
Resolved 3 November 1994
Engineering
Issued 3 October 1994
Resolved
TEST SAFETIES, AUTOMATION PROCEDURES, AND CONDUCT HYDROSTATIC TEST TO 1.25MAWP FOR CARGO BOILER #MOB7901.
Condition: Unknown
Due 3 November 1994
Resolved 3 November 1994
Engineering
Issued 3 October 1994
Resolved
CONDUCT HYDROSTATIC TEST TO 1.5MAWP AND TEST SAFETIES ON CLAYTON HEATING BOILER.
Condition: Unknown
Due 3 November 1994
Resolved 3 November 1994
Engineering
Issued 3 October 1994
Resolved
TEST SAFETY RELIEF DEVICES TO BOTH P/S WASTE HEAT BOILERS.
Condition: Unknown
Due 3 November 1994
Resolved 3 November 1994
Lifesaving
Issued 6 November 1993
Resolved
RENEW FORE AND AFT HATCHES ON BOTH LIFEBOATS AS ORIGINAL.
Condition: Unknown
Due 6 November 1993
Resolved 6 November 1993
Engineering
Issued 6 November 1993
Resolved
TEST AND LOG RESULTS OF STARBOARD WASTE HEAT BOILER SAFETY RELIEF VALVE ANDPROVIDE COPY OF LOG TO [name withheld].
Condition: Unknown
Due 6 November 1993
Resolved 6 November 1993
Electrical
Issued 6 November 1993
Resolved
MAKE OPERABLE PORT AND STARBOARD LIFEBOAT DAVIT MAIN DISCONNECT SWITCHES SAFETY INTERLOCK.
Condition: Unknown
Due 6 November 1993
Resolved 6 November 1993
Engineering
Issued 6 November 1993
Resolved
CLAYTON STEAM BOILER NOT TO BE USED UNTIL NEW SAFETY RELIEF VALVE INSTALLEDAND TESTED IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 6 November 1993
Resolved 6 November 1993
Electrical
Issued 6 November 1993
Resolved
THREE MAIN (480 VOLT) ELECTRICAL BOXES BETWEEN TUG/BARGE ON TUG END TO BE EXAMINED 1 JUNE 94. IF CONTINUED CORROSION AND LEAKING, BOXES TO BE RENEWED.
Condition: Unknown
Due 6 November 1993
Resolved 6 November 1993
Deck/Cargo
Issued 6 October 1993
Resolved
PROVIDE STATEMENT FROM MASTER SHOWING THAT ALL CARGO PUMP EMERGENCY SHUTDOWNS HAVE BEEN TESTED. STATEMENT SHALL INCLUDE TEST RESULTS.
Condition: Unknown
Due 6 October 1993
Resolved 6 October 1993
Engineering
Issued 23 September 1993
Resolved
PROVE PROPER OPERATION OF BOTH WASTE HEAT BOILER SAFETY RELIEF VALVES AT SEA AND LOG RESULTS N ENGINEERS LOG.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Lifesaving
Issued 23 September 1993
Resolved
PROVIDE PROPER FIRE SUITS FOR EMERGENCY GEAR LOCKERS ACCORDING TO 46 CFR 35.30-20.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Fire Fighting
Issued 23 September 1993
Resolved
PROVIDE TEN (10) CUBIC FEET OF SAND FOR BOTH HEATING BOILERS OR ONE B-II PORTABLE FIRE EXTINGUISHER PER BOILER.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Lifesaving
Issued 23 September 1993
Resolved
PROVE PROPER OPERATION OF DAVITS, WINCHES, AND LIMIT SWITCHES.
Condition: Unknown
Due 5 November 1993
Resolved 10 November 1993
Lifesaving
Issued 23 September 1993
Resolved
WEIGHT TEST BOTH LIFEBOATS.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Engineering
Issued 23 September 1993
Resolved
PROVE PROPER OPERATION OF LOW WATER ALARM, INSPECT BOILER MOUNTS AND POP TEST SAFETY RELIEF VALVES ON THE CARGO HEATING BOILER.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Engineering
Issued 23 September 1993
Resolved
REPAIR CRACK AT THE REMOTE LEVEL SENSOR NOZZLE AND CONDUCT HYDROSTATIC TESTWHEN REPAIRS ARE COMPLETE ON THE STBD WASTE HEAT BOILER. REPAIRS TO BE ACCOMPLISHED BY CERTIFIED WELDER IAW MANUFACTURES REPAIR PROCEDURES.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Engineering
Issued 23 September 1993
Resolved
INSTALL INSTALLATION TO BOTH WASTE HEAT BOILERS AS REQUIRED, INCLUDING PIPING AND ACCESS COVERS.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Engineering
Issued 23 September 1993
Resolved
INSTALL CG APPROVED PRESSURE RELIEF VALVE ON THE SHIP SERVICE CONTROL/AIR RECIEVER AND POP TEST THE SAME. VALVE MUST NOT BE SET (STAMPED) MORE THAN MAWP.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Deck/Cargo
Issued 23 September 1993
Resolved
PROVE PROPER OPERATION OF THE CARGO MONITOR AUTOMATIC DISCHARGE VALVE.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Construction/Loadline
Issued 23 September 1993
Resolved
CROP AND RENEW WASTED SPOOL PIECE ON THE STBD WASTE HEAT BOILER BOTTOM BLOWPIPING. CONDUCT NDT WHEN REPAIRS COMPLETED.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Engineering
Issued 23 September 1993
Resolved
REPAIR EXHAUST LEAKS, CONDUCT HYDRO, INSPECT BOILER MOUNTS, POP TEST SAFETYRELIEF VALVE AND TEST AUTOMATION PROCEDURE ON CLAYTON STEAM GENERATOR.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Lifesaving
Issued 23 September 1993
Resolved
REPAIR LIFE BOATS IN WAY OF HAND RAILS IN ACCORDANCE WITH MANUFACTOR INSTRUCTIONS AND PROCEDURES.
Condition: Unknown
Due 5 November 1993
Resolved 10 November 1993
Fire Fighting
Issued 23 September 1993
Resolved
REPAIR OR REPLACE VALVE ON FIRE STATION #10 ON TUG.
Condition: Unknown
Due 5 November 1993
Resolved 10 November 1993
Fire Fighting
Issued 23 September 1993
Resolved
REPLACE OR HYDRO TEST ALL 21 BOTTLES OF FIXED CO2 SYSTEM FOR TUG ENGINE ROOMS.
Condition: Unknown
Due 5 November 1993
Resolved 10 November 1993
Fire Fighting
Issued 23 September 1993
Resolved
REPLACE OR HYDRO TEST ALL "BAGER" PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 5 November 1993
Resolved 10 November 1993
Lifesaving
Issued 23 September 1993
Resolved
PROVE PROPER OPERATION OF ALL BATTERY OPERATED EMERGENCY LIGHTS THROUGHOUT THE VESSEL.
Condition: Unknown
Due 5 November 1993
Resolved 10 November 1993
Construction/Loadline
Issued 23 September 1993
Resolved
CROP AND RENEW WASTED SPOOL PIECE ON THE PORT ENGINE ROOM GENERAL SALT WATER SERVICE OVBD PIPING. CONDUCT NDT WHEN REPAIRS COMPLETED.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Engineering
Issued 23 September 1993
Resolved
PROVE PROPER OPERATION OF THE DIRECT CONTACT HEATER SAFETY RELIEF VALVE.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Documentation
Issued 23 September 1993
Resolved
REDO FIRE CONTROL PLAN FOR BARGE AND TUG SHOWING AS IS CONDITION OF BOTH.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Fire Fighting
Issued 23 September 1993
Resolved
NUMBER ALL PORTABLE FIRE EXTINGUISHERS AND FIRE STATIONS IN ACCORDANCE WITHNEW FIRE CONTROL PLAN.
Condition: Unknown
Due 15 November 1993
Resolved 10 November 1993
Construction/Loadline
Issued 17 October 1990
Resolved
VSL AUTHORIZED TO PROCEED TO MONTREAL CANADA TO DISCHARGE ALL CARGO. VSL THEN TO PROCEED TO REPAIR FACILITY TO CONDUCT REPAIRS BOTTOM DAMAGE IN WAY OF#4 PORT AND #5 PORT DOUBLE BOTTOM WING BALLAST TANKS. AFTER DISCHARGING CARGO IN MONTREAL. VSL IS NOT AUTHORIZED TO CARRY CARGO UNTIL REQ. CLEARED.
Condition: Unknown
Due 17 October 1990
Resolved 17 October 1990
Engineering
Issued 17 October 1990
Resolved
DEMONSTRATE PROPER OPERATION OF LOW LUBE OIL ALARM TO PORT MAIN ENGINE ROCKER ARM LUBE OIL SYSTEM. VSL NOT AUTH TO LEAVE GATX TERMINAL, STATEN ISLAND, NY UNTIL THIS RQMNT IS CLEARED.
Condition: Unknown
Due 17 October 1990
Resolved 17 October 1990
Electrical
Issued 6 October 1990
Resolved
PROVE PROPER OPERATION OF PORT AND STBD DSL GEN AND THE 300 KW BARGE GEN. OVERSPEED TRIPS.
Condition: Unknown
Due 6 October 1990
Resolved 6 October 1990
Engineering
Issued 6 October 1990
Resolved
TEST PORT AND STBD WASTE HEAT BOILER SAFETY VALVES WHEN VESSEL IS UNDERWAYAND LOG TEST RESULTS IN ENGINEERS LOG. SEND COPY TO THE COGNIZANT [name withheld] TO BE COMPLETED NO LATER THAN 06 NOV. 90._x001C_
Condition: Unknown
Due 6 October 1990
Resolved 6 October 1990
Electrical
Issued 6 October 1990
Resolved
INSTALL MISSING FLOURESCENT LIGHT COVERS THROUGHOUT BOTH TUG AND BARGE.
Condition: Unknown
Due 6 October 1990
Resolved 6 October 1990
Engineering
Issued 6 October 1990
Resolved
INSTALL GUARDS TO THE SIGHT GLASSES IN THE FO DAY TANKS AND THE LO SETTLINGTANKS. THE ABOVE REQUIREMENTS ARE TO BE COMPLETED NO LATER THAN 06 NOV 90.
Condition: Unknown
Due 6 October 1990
Resolved 6 October 1990
Engineering
Issued 6 October 1990
Resolved
PROVE PROPER OPERATION OF PORT AND STBD MN DSL OVERSPEED TRIP.
Condition: Unknown
Due 6 October 1990
Resolved 6 October 1990
Construction/Loadline
Issued 26 April 1990
Resolved
GAS FREE AND MAKE CARGO TANK 6P AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 26 April 1990
Resolved 26 April 1990
Engineering
Issued 26 April 1990
Resolved
RETUBE STARBOARD WASTE HEAT BOILER NEXT DRYDOCKING AND IN NO CASE LATER THAN 31AUG90. THE STBD. WASTE HEAT BOILER IS NOT TO BE OPERATED UNTIL IT IS RETUBED AND TESTED.
Condition: Unknown
Due 26 April 1990
Resolved 26 April 1990
Deck/Cargo
Issued 24 April 1990
Resolved
PRIOR TO CARRIAGE OF CARGOES THAT REFERENCE 46 CFR 153.408 AND/OR 153.409 IN 46 CFR 153, TABLE 1 PROVE PROPER OPERATION OF THE HIGH LEVEL ALARM AND INDEPENDENT AUTOMATIC CARGO SHUTDOWN SYSTEM.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Documentation
Issued 24 April 1990
Resolved
PROVIDE ON BOARD A COPY OF NATIONAL UNIVERSAL FOAM INSTRUCTION SHEET 631, APPENDIX A DATED 1 AUGUST 1983.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Deck/Cargo
Issued 24 April 1990
Resolved
PRIOR TO CARRIAGE OF CARGOES THAT REFERENCE 46 CFR 153.527 IN 46 CFR 153, TABLE 1 PROVIDE EACH CREW MEMBER WITH THE PROPER EMERGENCY ESCAPE BREATHING APPARATUS.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Deck/Cargo
Issued 24 April 1990
Resolved
PRIOR TO CARRIAGE OF CARGOES THAT REFERENCE 46 CFR 153.554(A) IN 46 CFR 153, TABLE 1 PREPARE AND/ORPROVIDE WRITTEN OPERATING PROCEDURES FOR CARGO DISCONNECT/CONNECT. THE PROCEDURES MUST DISCUSS BLEEDING OF CARGO PRESSURE, PROPER PERSONAL PROTECTION EQUIPMENT AND EMERGENCY FIRST AID.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Documentation
Issued 24 April 1990
Resolved
PRIOR TO CARRIAGE OF SULFURIC ACID PROVIDE ON BOARD A COPY OF CCGD8(MMT) LETTER, SERIAL H3M3-6142, DATED 14 FEBRUARY 1984.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Documentation
Issued 24 April 1990
Resolved
PROVIDE ON BOARD A COPY OF LOADING MANUAL - ASI DRAWING # C8-777-29-01-062BREVISION 3. A COPY OF THE SAME IS TO BE SUBMITTED TO THE USCG MARINE SAFETY CENTER (G-MSC) FOR APPROVAL.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Deck/Cargo
Issued 24 April 1990
Resolved
PRIOR TO CARRIAGE OF CARGOES THAT REFERENCE 46 CFR 153.236(B) IN 46 CFR 153, TABLE 1 REPLACE BRONZE P/V VALVES WITH FERROUS P/V VALVES.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Deck/Cargo
Issued 24 April 1990
Resolved
PRIOR TO CARRIAGE OF CARGOES THAT REFERENCE 46 CFR 153.526(A) IN 46 CFR 153, TABLE 1 PROVIDE DETECTOR TUBES APPROPRIATE FOR THE CARGOES TO BE CARRIED.
Condition: Unknown
Due 24 April 1990
Resolved 24 April 1990
Engineering
Issued 16 April 1990
Resolved
CONDUCT HYDRSTATIC TESTS ON THE PORT AND STBD WASTE HEAT BOILERS (ON TUG) AT 1 1/4 TIME THE MAWP IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Engineering
Issued 20 August 1989
Resolved
REPAIR AND PROVE PROPER OPERATION OF THE OILY-WATER SEPARATOR, SO VESSEL'S IOPP CERTIFICATE CAN BE ENDORSED.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Engineering
Issued 20 August 1989
Resolved
WHILE AT VESSEL IS AT SEA, TEST BOTH SAFETY VALVES ON PORT AND STBD. WASTE HEAT BOILERS AND LOG SAME. THE LIFTING PRESSURE IS NOT TO EXCEED 100 PSI. RESULTS OF TEST ARE TO BE PRESENTED TO THE [name withheld] AS PROOF OF SATISFACTORY TEST, SO VALVES CAN BE SEALED.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Electrical
Issued 20 August 1989
Resolved
REPAIR/RENEW ALL NON WORKING "E" LIGHTS THROUGHOUT THE VESSEL.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Accommodation/Occupational Safety
Issued 20 August 1989
Resolved
REPAIR THE VENTILATION SHUT DOWN ON THE BRIDGE AND PROVE PROPER OPERATION.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Electrical
Issued 20 August 1989
Resolved
FREE UP AND MARK THE EMERGENCY DIESEL GENERATOR FUEL SHUT OFF VALVE.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Deck/Cargo
Issued 20 August 1989
Resolved
GAS FREE AND MAKE CARGO TANKS 6P AND 6S AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Lifesaving
Issued 20 August 1989
Resolved
MAKE PERMANENT REPAIRS IN LIEU OF TEMPORARY REPAIRS TO STBD. GUNWALE ON THENO. 2 LIFEBOAT.
Condition: Unknown
Due 20 August 1989
Resolved 20 August 1989
Deck/Cargo
Issued 18 February 1989
Resolved
PRIOR TO UTILIZING #2 CARGO PUMP FOR CARGO TRANSFER OPERATIONS, MAKE PUMP AVAILABLE FOR COAST GUARD INSPECTION. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI NOT LATER THAN 18 MARCH 1989.
Condition: Unknown
Due 18 February 1989
Resolved 18 February 1989
Engineering
Issued 26 June 1988
Resolved
PROVE PROPER OPERATION OF BOTH THE PORT AND STBD MAIN DIESEL ENGINE OVERSPEED PROTECTION DEVICES.
Condition: Unknown
Due 26 June 1988
Resolved 26 June 1988
Engineering
Issued 18 August 1987
Resolved
SUBMIT TO THE COAST GUARD FOR APPROVAL AN UPDATED AUTOMATED MACHINERY TEST PROCEDURE TO REPLACE PRESENT BUILDERS APPROVED PROCEDURE. PROCEDURE TO BE IN ACCORDANCE WITH NAVIC 1-69 AND 6-84.
Condition: Unknown
Due 18 August 1987
Resolved 18 August 1987
Deck/Cargo
Issued 15 August 1987
Resolved
PRIOR TO CARRYING NEXT CARGO OF FLAMMABLE OR COMBUSTIBLE LIQUID, DEMONSTRATE THE PROPER OPERATION OF THE INERT GAS GENERATOR SYSTEM'S RECORDER (PROVIDE INK FOR STYLUS) BY 28 AUG 87.
Condition: Unknown
Due 15 August 1987
Resolved 15 August 1987
Fire Fighting
Issued 15 August 1987
Resolved
REVISE AND POST FIRE CONTROL PLAN ON THE TUG "FRANCES HAMMER" REFLECTING ACCURATE LOCATION OF ALL FIRE DAMPERS (CURRENT FIRE CONTROL PLAN INACCURATE FOR UPPER DECK) BY 15 SEP 87.
Condition: Unknown
Due 15 August 1987
Resolved 15 August 1987
Engineering
Issued 15 August 1987
Resolved
EFFECT PERMANENT REPAIRS TO THE VESSEL'S OILY WATER SEPERATOR AND BILGE MONITOR. ALL OILY BILGE WATER TO BE RETAINED ON BOARD UNTIL REPAIRS COMPLETED OR DISCHARGED TO APPROVED RECEPTION FACILITY. REPAIRS TO BE EFFECTED PRIOR TO THE VESSEL SAILING FOREIGN OR NEXT US PORT OF CALL.
Condition: Unknown
Due 15 August 1987
Resolved 15 August 1987
Engineering
Issued 15 August 1987
Resolved
CONDUCT TEST AS PER CG APPROVED AUTOMATION PROCEDURE, OF ITEMS 1.0 THROUGH 4.10 & 8.0 THROUGH 8.26 BY 15 SEP 87.
Condition: Unknown
Due 15 August 1987
Resolved 15 August 1987
Deck/Cargo
Issued 15 August 1987
Resolved
PRIOR TO DISCHARGING NEXT CARGO DEMONSTRATE REMOTE EMERGENCY STOP TO THE VESSEL'S THREE PRIME MOVERS FOR THE CARGO PUMPS BY 28 AUG 87.
Condition: Unknown
Due 15 August 1987
Resolved 15 August 1987