Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWEST GULF MARINE INC · GALVESTON, TX, UNITED STATES · built 2003
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Endorsements, as the file codes themcw_un
DocumentationValid · issued 28 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 44 inspections, each with its date, unit and type; 9 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 22 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 44
18 August 2024
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7983662
7 September 2023
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7787905
14 July 2023
Drydock Exam · Cargo Tank Internal · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7744593
11 March 2022
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7405740
7 September 2021
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7306273
30 August 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7479489
22 November 2020
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7105963
15 July 2019
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6750732
30 May 2018
COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6428467
27 June 2017
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6221462
21 June 2017
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6177464
10 February 2016
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5869940
30 June 2015
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5168985
29 June 2015
MTSA Verification · Periodic Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5164267
25 February 2014
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4806231
6 February 2014
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4844378
6 July 2013
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4654107
25 October 2012
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4472058
15 April 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4287901
1 December 2011
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4233624
29 November 2010
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3905126
22 November 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3937968
24 March 2010
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3700790
12 December 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3379051
19 November 2008
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3649941
19 May 2008
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3382114
17 April 2008
Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3181938
4 April 2008
Damage Survey · Permit to Proceed
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3177568
27 March 2008
Damage Survey · Permit to Proceed
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3172420
10 January 2008
Examination of Repairs · Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3127910
20 June 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2973802
1 May 2007
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2919616
26 April 2007
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2951491
12 April 2006
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2657908
3 March 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2595161
2 March 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2594566
18 April 2005
MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2336291
11 April 2005
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2344369
8 October 2004
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2254940
14 April 2004
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2044082
6 April 2004
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2064213
28 January 2004
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2007644
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1986342
15 January 2003
COI Inspection · Construction Oversight
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1770455
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 September 2021
Resolved
When major alterations or major repairs of tank vessels become necessary the work shall be done under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect for new construction insofar as possible. When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible.
Vsl was reported with damage received from Hurricane Ida
Vsl shall provide provide proof of permanent repairs prior to loading cargo.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2022
Electrical › Electrical Distribution System (service) › Cable
Issued 26 June 2017
Resolved
Armor cable below the junction box on the tanktop is worn through to bare wire. Replace cable to satisfaction of USCG Inspector prior to cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 July 2017
Resolved 27 June 2017
Resolution: Verified the replacement of worn through armored cable.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 29 June 2015
Resolved
Prior to conducting cargo operations, existing Pressure/Vacuum Valve of 3.0/2.0 must be replaced as a 3.0/0.5 (Pres/Vac Valve) and meet the requirements for vapor overpressure and vacuum protection in accordance with Marine Safety Center letter Serial: #C2-0305145, dated May 21, 2003.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 July 2015
Resolved 30 June 2015
Resolution: Pressure Vacuum valve of 3.0/2.0 has been removed and replaced with a 3.0/0.5 Pres/Vac Valve to meet requirements in accordance with MSC Letter Serial: #C2-0305145 dated May 21, 2003.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 4 April 2008
Resolved
Starboard stern vapor piping, cargo piping, and containment are bent as a result of an earlier collision.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2008
Resolved 14 April 2008
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 27 March 2008
Resolved
The port vapor and cargo discharge headers were both damage and bent during an allision. Barge is to proceed to TT-237 to conduct an air test to determine whether cargo can be safely discharged from the stbd cargo discharge pipe.
Action required: 705 - Other - as specified
Resolved 28 March 2008
Resolution: Witnessed air test on both vapor and cargo discharge pipes, all sat. Issued PTP for barge to proceed to Nederland, TX to discharge at Chevron facility using stbd discharge headers.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 27 March 2008
Resolved
Make permanent repair to both the port vapor and cargo header that were damage in an allision.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2008
Construction/Loadline › Hull › Side Shell
Issued 10 January 2008
Resolved
Area on the # 2 STBD Deck Gunnel worn.
Condition: Unknown
Due 10 January 2008
Resolved 10 January 2008
Resolution: Witnessed satisfactory air test on the 2'' 8" x 5'' deck gunnel insert on the # 2 STBD wing tank.
Construction/Loadline › Hull › Side Shell
Issued 10 January 2008
Resolved
Area on the stern needed replacing.
Condition: Unknown
Due 10 January 2008
Resolved 10 January 2008
Resolution: Witnessed satisfactory repairs of a 6'''' x 3'''' 9" area on the STBD side of the stern.
Construction/Loadline › Hull › Side Shell
Issued 10 January 2008
Resolved
An area in the Headlog needed replacing.
Condition: Unknown
Due 10 January 2008
Resolved 10 January 2008
Resolution: Witnessed satisfactory repairs of a 3'' x 4'' headlog insert.