Records from 2006 to 2025. Most recent: inspection, 16 December 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2006
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Gross Ton
1754 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 26
16 December 2025
Administrative Inspection · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8284280
16 December 2025
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8284304
18 August 2025
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8212923
14 February 2025
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8081418
11 October 2022
COI Inspection · Drydock Exam · Internal Structural Exam · Cargo Tank Internal · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7575103
9 September 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7308714
11 August 2020
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7030163
8 January 2020
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6886420
9 October 2019
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6831159
28 June 2018
Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6459691
2 October 2017
MTSA/ISPS Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6279753
12 July 2016
Drydock Exam · Internal Structural Exam · Examination of Repairs · COI Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5938237
15 May 2015
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5176023
15 July 2014
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4917201
9 October 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4459905
18 August 2012
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4416795
10 August 2011
Deficiency Check · MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4073921
6 August 2010
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3816376
16 September 2009
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3596605
15 September 2009
Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3594926
24 June 2008
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3246252
19 June 2008
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3241247
15 February 2008
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3150114
10 September 2007
Annual Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3054090
28 June 2006
Internal Structural Exam · Initial Certification · MTSA Verification · Cargo Tank Internal · Hull Examination
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2694135
9 March 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2599319
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 16 December 2025
Resolved
All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. The hull and deckhouses shall be of steel or iron construction except that the pilothouse and decks over quarters may be constructed of wood. Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. Vessel has a 6 inch inset at the port stern box corner wrap, 107 inches below the deck. Vessel is make permanent repairs to the satisfaction of the USCG MI prior to conducting cargo operations. Vessel is allowed a one-time transit to Bludworth Shipyard for repairs.
46 CFR 32.60-1(a)
Action required: 705 - Other - as specified
Resolved 20 December 2025
Resolution: Attended vessel to witness satisfactory NDT of the weld insert.
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2008
Resolved
The #2 port wing void has a broad 6" inset from the deck gunnel to 7" down the side shell.
Action required: 705 - Other - as specified
Due 15 July 2008
Resolved 24 June 2008
Resolution: Vessel cropped and renewed 9'' X 20'' X 1/2" OF #2 port wing tank air tested all satisfactory.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 28 June 2006
Resolved
Vessel Owner shall prove that cargo pump engine units are in complete compliance with 46 CFR 111.105-31(l).
Action required: 705 - Other - as specified
Due 1 August 2008
Resolved 10 August 2011