Records from 2011 to 2026. Most recent: inspection, 9 July 2026.
Inspection history · 13
9 July 2026
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8433736
3 June 2026
Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8390065
14 January 2026
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8296793
30 September 2025
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8244158
9 June 2025
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8155550
21 May 2025
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8140945
6 November 2024
Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8035303
7 May 2024
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7909524
13 February 2024
Deficiency Check · Initial Certification · Administrative Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7864863
27 July 2023
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7759028
17 April 2013
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4572212
18 January 2013
Industry Initiated Exam · MARPOL
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4520975
20 March 2011
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3973377
08 - Alarms › N/A - No Subsystem › General alarm
Issued 3 June 2026
No resolution recorded
Each vessel must be fitted with a general alarm that has installed in the engine room or other area where the general alarm is hard to hear a supplemental flashing red light. The lower engine room is not fitted with a red light and the light provided in the forward work space is blue.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2026 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 10 June 2025
Resolved
The master must ensure that all lifesaving equipment is properly maintained and ready for use at all times. A waterlight for a ring buoy was not operating properly. Repair or replace waterlight, restore to operation.
Action required: 10 - Deficiency Rectified
Resolved 10 June 2025
Resolution: Waterlight battery was replaced and restored to proper operation.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 10 June 2025
Resolved
A towing vessel must carry adequate and up-to-date charts, maps, and nautical publications for the intended voyage, including: Coast Guard light list. Vessel did not have most current light list edition. Install most current edition on vessel.
Action required: 10 - Deficiency Rectified
Resolved 10 June 2025
Resolution: Most current light list was downloaded to vessel from USCG NAVCEN.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 June 2025
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Aft on the Texas deck, a goose neck closure does not close properly. Ensure goose neck closure closes as designed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 30 September 2025
Resolution: Aft Texas Deck goose neck closure closes as designed.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 10 June 2025
Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into such spaces. Port louver is broken, repair to original.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 30 September 2025
Resolution: Port louver has been repaired/replaced.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 10 June 2025
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Waste receptacles around vessel are plastic material, replace with noncombustible type.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 30 September 2025
Resolution: Waste receptacles have been changed to metal material.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 June 2025
Resolved
Each watertight door and watertight hatch must be marked on both sides in clearly legible letters at least 25 millimeters (1 inch) high: “WATERTIGHT DOOR—KEEP CLOSED” or “WATERTIGHT HATCH—KEEP CLOSED”. Both engine room hallway watertight doors are not labeled on each side. Label the sides of the doors that are missing labels.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 30 September 2025
Resolution: WTDs are properly labeled.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 9 June 2025
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford protection against hazards to life, property, and the environment. Port aft stairway leading to pilot house has a step not bolted down to the structure. Replace mounting hardware for the 3rd step from the bottom.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 30 September 2025
Resolution: Mounting hardware for step has been replaced and is secure.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2025
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must: (1) Be maintained to ensure proper operation.
Vessel suffered a loss of the port engine due to overheating. Complete repairs to port engine and conduct operational test to satisfaction of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2025
Resolution: Vessel overheat was due to wrapped rope/cable around port prop/shaft. Tested with USCG on 10JUN2025, company Memo submitted for event.