Documentation record
Registered dimensions (L × B × D)61.5 ft × 22.0 ft × 9.1 ft
Registered tonnagegross 93 / net 63
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPASCAGOULA BOAT & IRON WK · ESCATAWPA, MS, UNITED STATES · built 1967
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNORFOLK, VA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 24 November 2025 · expires 31 December 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Gross Ton
63 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 34
8 January 2026
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 8292181
27 June 2022
Initial Certification · Deficiency Check · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7488444
25 April 2022
TPO Audit
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7449280
22 February 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7144126
23 December 2020
Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7115606
27 November 2020
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7126842
11 June 2020
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6987406
14 March 2020
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6928883
14 December 2018
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6605588
22 March 2018
Industry Initiated Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6395617
18 April 2016
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5862701
30 September 2015
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5732467
18 June 2015
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5157017
26 April 2015
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5111141
29 September 2014
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4995580
21 June 2013
MTSA/ISPS Verification · Industry Initiated Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4627106
29 March 2013
Type not recorded
No type recorded · Station Ponce De Leon Inlet · USCG Southeast District (CGD-SE) · Activity 4558813
10 November 2011
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4186301
16 September 2011
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4147087
14 March 2010
Deficiency Check · Industry Initiated Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3703229
17 December 2009
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3654889
5 February 2009
Type not recorded
No type recorded · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3414998
14 January 2009
MTSA Verification · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3394218
12 December 2008
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3379896
2 October 2007
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3072595
12 September 2007
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3055813
12 September 2007
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3056114
12 October 2006
MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2799191
1 October 2006
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3036226
20 September 2006
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2783479
25 February 2005
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2300607
14 November 2000
Uninspected Towing Vessel
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1055479
20 July 1998
Uninspected Towing Vessel
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 796263
10 January 1997
Type not recorded
No type recorded · District 5 (B) · USCG East District (CGD-E) · Activity 660751
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 6 July 2022
Resolved
Survival craft must be stowed in accordance with the requirements of 199.130 of this chapter. Each liferaft must be arranged for float-free launching.
Liferaft painter, weak link, and hydrostatic release not correctly arranged in order for liferaft to float free in case of emergency.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2022
Resolved 8 July 2022
Resolution: Received email from vessel rep with pictures that show the liferaft set up for a float-free arrangement.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 6 July 2022
Resolved
A vessel that is certificated for limited coastwise, coastwise, or oceans routes whose contract for construction was prior to 8/27/2003 must be equipped with either a fixed fire extinguishing system or an approved 160-B fire-extinguishing system to protect the engine room.
Hose of semi-portable fire extinguisher, as currently stored on aft portion of upper deck, cannot reach inside the engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed the semi-portable extinguisher moved to the upper fiddley of the engine room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 July 2022
Resolved
Piping and machinery components that exceed 428°F, including exhaust manifolds, must be insulated.
Replace loose/missing lagging on starboard generator exhaust.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed lagging secured on starboard generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 July 2022
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. The valve must be installed in the fuel piping directly outside of the fuel oil supply tank. The valve must be operable from a safe place outside the space where the valve is installed.
Fuel shutoff valve outside fuel supply tank not capable of being closed remotely from outside of the space.
*Only fuel shutoff valves near the engines are capable of being closed remotely from outside the space, but not the ones near the tanks.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed and tested new installation of fuel shutoff valves at main tanks supply fuel to main engines and generators.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 July 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and the safety of persons onboard under normal and emergency conditions. Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must be maintained to ensure proper operation.
Both port and starboard shafts were leaking excessively.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed sump area and shafts appeared to be working as designed.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 6 July 2022
Resolved
The vessel’s portable fire pump must be self-priming and power-driven.
During inspection, portable fire pump would not draw suction and was not self-priming.
*Vessel is fitted with fixed fire pump as well, but per company’s current TSMS procedures, each vessel must have a portable fire pump onboard that is to serve as the primary fire pump to be used in case of emergency.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed portable fire pump operating properly.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 6 July 2022
Resolved
Alcohol testing of each individual directly involved in a SMI must be conducted within 2 hours of when the SMI occurs.
Vessel’s coastwise route endorsement means that it is not always within 2 hours of shore for alcohol testing. Alcohol test kits currently available onboard expired as of 6/30/22.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed current alcohol test strips onboard with documentation.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 6 July 2022
Resolved
The owner or managing operator must implement procedures to identify and mitigate health and safety hazards, including by not limited to: confined space entry.
Company’s Health and Safety Plan, as incorporated in their TSMS section 144, requires that “each vessel will be outfitted within a single gas oxygen meter”.
No portable gas meter available onboard at time of inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed change to TSMS that no longer requires a gas meter to be carried onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 July 2022
Resolved
The owner, managing owner, or master of a towing vessel must ensure that the vessel’s lifesaving equipment complies with the applicable requirements of part 141 and is in good working order.
The retroreflective tape on all 3 ring lifebuoys is faded and/or improper and requires replacement. Additionally, the 60 ft lifeline must be removed from one of the ring lifebuoys, as at least one lifebuoy must not have a lifeline attached.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed retroreflective tape applied.
10 - Safety of Navigation › N/A - No Subsystem › GNSS receiver/terrestrial radio navigation system
Issued 6 July 2022
Resolved
Towing vessels certificated for a coastwise route must be equipped with an electronic position-fixing device (i.e. GPS).
Installed Furuno GP-32 GPS has experienced the GPS date rollover problem and reads a date of 2002, instead of 2022. Update firmware in order for unit to reflect correct date, if possible, or replace unit.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed that new GP-39 GPS had been installed onboard.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 6 July 2022
Resolved
Internal management audits must be conducted annually, within 3 months of the anniversary date of the TSMS certificate.
TSMS certificate anniversary date is 01 Jun. Last internal management audit was carried out on 04 November 2020. This means the internal TSMS management audit is significantly overdue.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on on 7/28/22 the TSMS company provided objective evidence that an internal management audit was conducted.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 6 July 2022
Resolved
Survival craft must be stowed in accordance with the requirements of 199.130 of this chapter. A survival craft that weighs 407.8 lbs or less may be lifted not more than 1 foot in order to launch. Each liferaft must be arranged to permit it to drop into the water from the deck on which it is stowed.
Current liferaft stowage/launching arrangements does not meet these requirements. Owner/operator to provide a proposal to the TPO and OCMI for modification and timeframe for rectification.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2022
Resolved 8 September 2022
Resolution: Received 835 Review and Response Letter from TPO, dated 9/8/22. It reports that on 7/15/22 the attending TPO surveyor witnessed new cradle installation at edge of deck where the liferaft is stowed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 6 July 2022
Resolved
If the cognizant OCMI has reasonable cause to believe that the vessel’s survey program is deficient, that OCMI may require an audit or survey of the vessel in the presence of a representative of the cognizant OCMI and/or require that the vessel comply with the external survey program requirements.
Due to the number and nature of technical and operational deficiencies identified during the course of the initial COI inspection, the TPO (Sabine Surveyors) is required to carry out a one-time additional external vessel survey. The scope of the external survey by the TPO shall be at least equivalent to that of an annual vessel survey as delineated in 46 CFR 137.215.
Advance notice shall be provided to the local OCMI at least 72 hours prior to conducting the external survey, in order that a representative from the local OCMI may have the opportunity to attend, if so determined by the local OCMI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2022
Resolved 21 July 2022
Resolution: Received email from the TPO reporting that the additional external survey was carried out in Norfolk, VA on 7/15/22. 18 NCs were noted by the attending TPO surveyor. Update 8/31/22: received updated report from TPO, reporting that all NCs were corrected.