Records from 2008 to 2026. Most recent: inspection, 11 February 2026.
Documentation record
Registered dimensions (L × B × D)226.8 ft × 44.6 ft × 24.0 ft
Registered tonnagegross 1,691 / net 685
ITC dimensions (L × B × D)226.8 ft × 44.6 ft × 24.0 ft
ITC tonnagegross 1,691 / net 685
BuilderCHING FU SHIPBUILDING CO LTD · KAOHSUNG, TAIWAN · built 2008
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLAS VEGAS, NV
Trade endorsementsRegistry
DocumentationValid · issued 28 January 2026 · expires 31 January 2027
Service, as the file records itCommercial Fishing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1691 - Convention (Subpart B), Gross Ton
685 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
11 February 2026
MARPOL Annex I Examination · MARPOL Annex IV Survey · Reflagging & Initial Certification · Administrative Inspection · MARPOL Annex VI Survey
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8309132
6 May 2020
MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 6950012
14 February 2019
MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 6626223
30 January 2018
MARPOL Annex I Examination
Physical examination · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 6345910
9 March 2017
Deficiency Check · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 6100619
2 February 2017
Type not recorded
No type recorded · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 6083248
10 February 2016
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5816441
17 December 2015
MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5773520
10 March 2009
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3430690
17 February 2009
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3424763
4 January 2009
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3388489
23 December 2008
Uninspected Other · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3383945
18 December 2008
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3381594
17 December 2008
Type not recorded
No type recorded · Station Apra Harbor · USCG Oceania District (CGD-O) · Activity 3381691
17 December 2008
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3382204
11 November 2008
MARPOL Annex I Examination · Uninspected Other
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 3362042
Documentation › Logs/Records › Oil Record Book
Issued 30 January 2018
Resolved
Found recording discrepancies in ORB. Several dates of bunkering did not match the date in ORB, but the amounts were correct. No internal transfers from previous Chief Engineer identified and noted. Recommended finding MEPC.1/Circ.736 in language of CE to assist with correct logging information.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 January 2018
Resolved 31 January 2018
Resolution: Conducted training.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 9 March 2017
Resolved
Provide a NTVRP on board the vessel.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 10 March 2017
Resolution: Vessel provoded NTVRP.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 9 March 2017
Resolved
Provide a current calibration of the Oil Content Meter.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 10 March 2017
Resolution: Vesssel provided OCM calibration.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 23 December 2008
Resolved
Replace all copper tubing with stainless steel tubing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 December 2008
Fire Fighting › Grease Extraction Hood › General
Issued 23 December 2008
Resolved
Install Galley hood and fire protection equipment
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2008
Resolution: Vsl purchased and installed ANSUL R-102 Hood Fire Suppression System in Galley.
Lifesaving › Inflatable Liferafts › Capacity
Issued 23 December 2008
Resolved
Provide additional life raft to accommodate the total number of individuals on board.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2008
Resolution: Vsl purchased and installed a CG approved, 8 person life raft. S/N: CI-8-17828-KOS-A-O, DOM: NOV 2008.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 23 December 2008
Resolved
Provide a means to enable the Master to verbally communicate with the crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2008
Resolution: Vessel hired additional crew member fluent in English language and the language of the crew.
Fire Fighting › Fire Main › Material
Issued 23 December 2008
Resolved
Replace all PVC to appropriate schedule of metal piping. Vsl provided proposal to Sector Guam on 28DEC08.
Action required: 705 - Other - as specified
Due 28 January 2009
Resolved 5 May 2009
Resolution: Recieved email from [name withheld] detailing upgrade on F/M piping.
Electrical › Electric Generation Source (emergency) › Generator
Issued 23 December 2008
Resolved
Provide a proposal for installation of emergency power for vital system. Vsl provided proposal to Sector Guam on 28DEC08.
Action required: 705 - Other - as specified
Due 28 January 2009
Resolved 5 May 2009
Resolution: Received email from [name withheld] detailing including photos of installed new emergency electrical generator.
Stability › Intact Stability (when using lifting gear) › General
Issued 23 December 2008
Resolved
Provide an intact stability booklet marked "examined" and documentation from Classification society Det [name withheld] stating the vessel is fit for service intended after departing from Guam.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 December 2008
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 23 December 2008
Resolved
Provided proposal for bilge piping manifold system to have check valve install on suction line.
Action required: 705 - Other - as specified
Due 28 January 2009
Resolved 5 May 2009
Resolution: Recieved email from [name withheld] including photos of the bilge piping modifications.