Inspection history · 115
18 May 2026
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8380784
17 March 2026
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8327359
17 February 2026
Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8313077
16 February 2026
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8341106
11 February 2026
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8309347
4 January 2026
Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8290751
4 January 2026
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8327037
3 November 2025
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8262580
3 November 2025
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8264131
6 September 2025
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8242730
18 July 2025
Administrative Inspection · Damage Survey · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8188774
29 April 2025
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8129723
10 April 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8109516
3 March 2025
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8087363
14 February 2025
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8079655
14 February 2025
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 8079768
18 December 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8075145
6 August 2024
In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7975375
2 August 2024
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7987532
25 June 2024
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7960488
29 May 2024
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7922730
19 April 2024
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7898487
18 March 2024
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7908678
13 February 2024
Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7863315
31 January 2024
Deficiency Check · Construction Oversight
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7858912
2 January 2024
Administrative Inspection · Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7844352
26 December 2023
Damage Survey
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7842561
25 December 2023
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7842342
21 November 2023
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7829044
13 October 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7810476
8 September 2023
Periodic Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7787870
27 July 2023
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7770372
26 July 2023
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7753270
24 July 2023
Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7751267
17 July 2023
Damage Survey
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7744997
10 March 2023
Construction Oversight · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7649053
30 January 2023
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7629324
15 December 2022
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7629620
2 December 2022
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7626282
22 November 2022
Explosive Handling Operation-Commercial · Explosive Handling Operation-Administrative
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596831
9 November 2022
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7620252
8 November 2022
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7592184
7 November 2022
Explosive Handling Operation-Commercial · Explosive Handling Operation-Administrative
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596823
25 October 2022
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7595505
21 October 2022
Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7583438
7 October 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7573346
7 October 2022
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7573549
3 October 2022
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7606514
29 September 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596909
26 September 2022
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7566570
26 September 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596905
19 September 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596903
10 September 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596896
4 September 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596893
27 August 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596931
20 August 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596929
10 August 2022
Deficiency Check · Administrative Inspection · In-Service Inspection · Construction Oversight
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7530819
4 August 2022
Explosive Handling Operation-Administrative
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7596927
28 July 2022
Explosive Handling Operation-Commercial
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7646305
20 July 2022
Administrative Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7512118
6 May 2022
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7537982
11 April 2022
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7433237
8 April 2022
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7538019
21 March 2022
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7415400
10 February 2022
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7396598
6 January 2022
Construction Oversight
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7378548
23 December 2021
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7371953
15 December 2021
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7369068
19 November 2021
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7354131
27 October 2021
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7363343
18 October 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7335253
15 October 2021
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7339970
13 October 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7331847
21 September 2021
Administrative Inspection · Deficiency Check · Annual Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7317316
11 June 2021
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7222560
1 May 2021
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7189167
7 April 2021
In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7170631
1 April 2021
Construction Oversight · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7167070
16 March 2021
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7156952
16 March 2021
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7160862
9 March 2021
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7152616
27 February 2021
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7152692
27 January 2021
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7135128
7 January 2021
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7120996
23 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7115485
6 November 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7090865
15 October 2020
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7077598
27 July 2020
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7017271
9 July 2020
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6974560
11 May 2020
In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6951427
15 April 2020
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6961974
28 October 2019
Drydock Exam · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6843582
19 July 2019
Deficiency Check · MARPOL Annex VI Survey · MARPOL Annex I Examination · Periodic Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6754294
16 April 2019
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6663534
14 January 2019
Explosive Handling Operation-Commercial
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6620596
12 December 2018
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6596824
5 December 2018
Explosive Handling Operation-Commercial
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6592697
28 July 2018
Examination of Repairs · Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6495454
28 July 2018
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6495675
15 April 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6392360
12 December 2017
Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6323209
25 October 2017
Damage Survey · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6295136
12 October 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6332837
31 August 2017
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6256494
28 August 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6274852
14 April 2017
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6124667
17 January 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6123193
4 January 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6065759
25 October 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6029611
3 October 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6014739
23 September 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6007914
16 August 2016
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5975475
3 August 2016
Deadweight Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5960869
18 July 2016
Internal Structural Exam · Underwater Inspection in lieu of Drydock
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5925939
19 January 2016
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5807314
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 17 March 2026
Resolved
Where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part. Vessel rep contacted MI stating their FM200 fixed fire fighting agent was accidentally released in one of their spaces. Recharge bottle or replace bottle with in-kind agent (FM200). Provide service report to local OCMI office.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 April 2026
Resolved 7 April 2026
Resolution: Company provided report from third party. All SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 February 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
MI received notification that subject vessel discovered a raw water leak from the suction manifold of the ballast system. Make approved repairs and/or replace with in-kind approved equipment. Make repairs available for inspection to MI's.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2026
Resolved 9 March 2026
Resolution: Company replaced wasted section of pipe. Tested system, all SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 11 February 2026
Resolved
Where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part. Vessel rep contacted MI stating their FM200 fixed fire fighting agent was accidentally released in one of their spaces. Recharge bottle or replace bottle with in-kind agent (FM200). Provide service report to local OCMI office.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2026
Resolved 19 February 2026
Resolution: Company provided service report and invoice. All SAT
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 January 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
During further investigation, vessel crew discovered both water deluge pumps were effected by the flooding in the compartment. This resulted in the forward water deluge system inoperable. Make permanent repairs to both pumps and make available for inspection to MI's
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2026
Resolved 27 January 2026
Resolution: MI witnessed proper operation of the deluge system. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 January 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
During further investigation, vessel crew discovered one of the two forward seawater cooling pumps inoperable after flooding in the compartment. Make permanent repairs to the effected pumps and make equipment available for inspection to MI's.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2026
Resolved 23 January 2026
Resolution: MI witnessed operation of system. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 January 2026
Resolved
MI received notification that subject vessel discovered a raw water leak from the suction manifold of the forward seawater cooling system which resulted in flooding of the 2C compartment and isolation of various vital systems. Identify cause/extent of failure, provide repair proposal, and make permanent repairs to effected systems.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 8 January 2026
Resolved 23 January 2026
Resolution: MI witnessed proper operation of equipment. All SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 November 2025
Resolved
Where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part. Vessel rep contacted MI stating their FM200 fixed fire fighting agent was accidentally released in one of their spaces. Recharge bottle or replace bottle with in-kind agent (FM200). Provide service report to local OCMI office.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 December 2025
Resolved 4 December 2025
Resolution: vessel had FM200 bottle recharged. Provided service report, see documents.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 April 2025
No resolution recorded
At least two lifebuoys on the vessel must be fitted with a self-activating smoke signal approved under approval series 160.157. Lifebuoys fitted with smoke signals must also be fitted with lights. Both smoke signals found expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 April 2025
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port required to be marked on the stern of the vessel. Noted name and port rubbed off of ring life buoys and SOLAS retro-reflective tape damaged.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 22 May 2025
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 December 2023
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. Cargo on board caused damage to the vessel. Vessel must undergo a damage assessment by the cognizant Coast Guard OCMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2023
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 December 2023
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Prior to repairs.
Action required: 705 - Other - as specified
Resolved 28 December 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 October 2023
Resolved
Vessels greater than 100 gross tons shall comply with 56.50–60, 56.50–85, and 56.50–90. There are multiple fuel leaks within the fwd and aft f/o transfer piping system. The DG4 automated f/o transfer shut-off is also not operating as designed. Vessel will repair and demonstrate proper operation, including DG4 daytank sensors. Until cleared, automated fuel transfers from the main f/o storage tanks are prohibited and all internal fuel transfers to diesel generator daytanks while vessel is underway must be under continuous remote monitoring by a LCC and/or SSV crewmember.
***This deficiency supersedes deficiency #1, issued 09/27/2023 by Activity 7787870***
Code 705: Deficiency is due by next DD or before 01Feb2024
Action required: 705 - Other - as specified
Due 1 February 2024
Resolved 14 February 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 September 2023
Resolved
Vessels greater than 100 gross tons shall comply with 56.50-60, 56.50-85 and 56.50-90. There are multiple f/o leaks on the fwd and aft f/o transfer manifolds. The DG4 automatic f/o transfer shut off is also not operating as designed. Vessel will repair and demonstrate proper operation including DG4 day tank sensors. Until this is cleared automated transfers from the main f/o tanks to the day tanks are prohibited and valves shall remain closed. All f/o transfers must be completed with a qualified PIC onboard the vessel to monitor transfer.
46 CFR 56.50-75
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2023
Resolved 8 November 2023
Resolution: Deficiency cleared to be re-issued with verbiage change prohibitting automated fuel transfers but allowing transfers uunderway if continuously monitored by LCC and/or SSV crewmember.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 September 2023
Resolved
Life jackets must be stowed as follows: Readily accessible, the life jacket stowage positions must be marked with the words "Life Jackets" or appropriate symbol from IMO resolution. Where due to the particular arrangements of the vessel the life jackets required may become inaccessible alternate provisions must be made to the satisfaction of the OCMI include an increase in the number carried. Current stowage arrangement for life jackets on the vessel is required to be corrected to prevent damage of life jackets and accessories. Correct the satisfaction of the attending MI.
46 CFR 199.70 (b) (2)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 13 October 2023
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 27 September 2023
Resolved
Nothing in the subpart shall be construed as limiting the inspector from making such tests and inspections as he deems necessary to be assured to the the seaworthiness of the vessel. IAW 47 CFR 80.103 when using DSC (digital selective calling) techniques, coast stations and ship stations must use maritime mobile service identities (MMSI) assigned by the commission. The vessels VHF radio is not currently connected to GPS and the MMSI is input into the radio but with no location. Correct installation to allow for the DSC button to properly notify when pressed during an emergency.
46 CRR 91.27-15
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 13 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 September 2023
Resolved
The material, design, construction, workmanship and arrangement of the main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such must be at least equivalent to the standards established by ABS rules. The freshwater cooling for the cooling pump listed as 2 in Thruster room 1 is leaking. Repair to the satisfaction of the attending MI.
46 CFR 58.05-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 13 October 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 27 September 2023
Resolved
Each type I or II hull must have a weather tight weather deck. The flush scuttles that allow access to the f/o transfer spaces below deck have water leaking into the space. Replace gaskets to ensure spaces below the deck line are weather tight.
46 CFR 172.100 (a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 13 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 September 2023
Resolved
The inspection for certification shall include an inspection of machinery and equipment. Vessel crew is not familiar with how to properly test the bilge alarms in the ballast pump room. Prepare written instructions for proper testing in accordance with the vessels SMS. Test to the satisfaction of the attending MI.
46 CFR 91.25-10
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 13 October 2023
Resolution: Incorporated in the PSTP (not approved)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 September 2023
Resolved
Electric installations on vessels must ensure: maintenance of system integrity through compliance with the applicable system requirements IEEE, NEC, IEC. Vessel has dead end wires located above the A/C unit in the thruster drive room 2. Repair to the satisfaction of the attending MI.
46 CFR 111.01-1 (a)(3)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 November 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2023
Resolved
Electric installations on vessels must ensure: maintenance of system integrity through compliance with the applicable system requirements IEEE, NEC, IEC. Vessel has an electrical junction box hanging free in the thruster 2 space under the ladder. Repair to the satisfaction of the attending MI.
46 CFR 111.01-1 (a)(3)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 13 October 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 September 2023
Resolved
Each life buoy must be marked in block capital letters with the name of the vessel and the name of the port required to be marked on the stern of the vessel. Repair marking and retroreflective tape on each life buoy to the satisfaction of the attending MI.
46 CFR 199.70 (a)(2)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 September 2023
Resolved
Each life jacket must have a life jacket light approved under series 161.112 securely attached to the front shoulder area of the jacket. Expired lights on multiple PFDS. Repaired.
46 CFR 199.70 (b)(4)(i)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Corrected
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 11 September 2023
Resolved
AIS carriage- AIS class A device must be on aboard and properly installed on a self propelled vessel of 65' or more in length, engaged in commercial service. The vessels AIS was not properly functioning. Corrected.
33 CFR 164.46 (b)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2023
Resolved
The main steering and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed. The #2 azimuth steering motor for the #2 thruster was not operating as designed. Repair/replace to the satisfaction of the attending MI.
46 CFR 58.25-10 (b)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Replaced in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2023
Resolved
The material, design, construction, workmanship and arrangement of the main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such must be at least equivalent to the standards established by ABS rules. The freshwater cooling for the cooling pump listed as 1 in Thruster room 4 is leaking. Repair to the satisfaction of the attending MI.
46 CFR 58.05-1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 September 2023
Resolved
Each of the following in or around the bilge area must be arranged or constructed so that it cannot be damaged by bilge water: Generators, Motors, Electric Couplings and Electric Cable. There is standing water in thruster rooms 2 and 4 as well as the stern f/o transfer space. Corrected.
46 CFR 111.01-5
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Removed prior to vessel movement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 September 2023
Resolved
Exhaust pipe installations must conform to the requirements of part 1 section 23 of NFPA 302 incorporated by reference. Exhaust piping on the DG6 and DG2 were missing lagging, replaced in kind. Corrected.
46 CFR 58.10-5 (d)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 11 September 2023
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 July 2023
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Of the vessel's 4 azimuth thruster propulsion units two currently have only 1 of 2 motors. Thruster # 1 and 4 must be repaired to the satisfaction of the attending MI.
46 CFR 58.10-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 July 2023
Resolution: Blower ducting found to be cause of overheat shutdown of motors. Ducting repaired and Motors tested all sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 24 July 2023
Resolved
When more than 12 nautical miles from the nearest land, any discharge of oil or oily mixtures into the sea from a ship other than an oil tanker or from machinery space bilges of an oil tanker is prohibited... One of four spaces containing diesel generators on board the vessel has standing fuel oil in the space. The #4 generator space experienced a leak of f/o, which penetrated the bulkhead cable penetration to the deck, washing into the sea. Approximately 25 gallons. The vessel owner will submit a transit plan before entering 12 nautical miles to cover mitigation of any further discharge into the sea. Once permitted to enter port the generator room #4 will be cleaned and surveyed by the attending MI before departure.
33 CFR 151.10 (a)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 July 2023
Resolution: Plan submitted and space cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 July 2023
Resolved
Electric installations on vessels must ensure: Maintenance of system integrity through compliance with the applicable system requirements to which plan review has been approved. The number 4 generator's prime mover has an unknown fuel oil leak causing f/o to fill the compartment. Day tank has been secured and prime mover is not longer leaking additional f/o. Survey and repair to the satisfaction of the attending MI.
46 CFR 111.01-1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 August 2023
Resolved 27 September 2023
Resolution: Issued with another CG 835V item covering the entire f/o transfer system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 July 2023
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. (46 CFR 58.10-10 Diesel Eng sends to Gas Eng). Of the vessel's 4 azimuth thruster propulsion unit #2 is not operable. The two motors required to operate the unit are not operating as designed. Repair to the satisfaction of the attending MI.
46 CFR 58.10-5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2023
Resolution: Motors 1 and 2 in Thruster 2 were replaced in kind and operationaly tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 October 2022
Resolved
Each electric propulsion installation must meet section 4-8-5/5.5 of ABS Steel Vessel Rules. Arrangements for electric propulsion generators are to be such that propulsion can be maintained in case of failure of a power supply. In accordance with the Droneship Operations Manual, the following operations are conducted remotely and do not require personnel onboard the droneship: Activation of propulsion equipment. Prove operation of remotely activating propulsion equipment from the Launch Control Center.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 26 September 2022
Resolved
Deck edges are protected by wire rope guard rails in two courses. Install second course around the periphery of the deck.
DBA # 47
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Electric installations on vessels must ensure: protection of passengers, crew, other persons, and the vessel from electrical hazards. Remove all dead-end wires throughout and remove excess wiring in thruster pod spaces.
DBA # 64
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Electric installations on vessels must ensure: protection of passengers, crew, other persons, and the vessel from electrical hazards. Ensure all cabling /wiring is properly supported.
DBA # 64
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Electric installations on vessels must ensure: protection of passengers, crew, other persons, and the vessel from electrical hazards. Install back plates on IT racks in forward command seavan. Remove extension cord for dehumidifier in Aft 4160. Bolt down conduit near aft SCR skid.
DBA # 64
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Each outlet or junction box must have a cover unless a fixture canopy, switch cover, receptacle cover, or other cover is used. Install cover on open junction box in forward command seavan.
DBA # 84
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 September 2022
Resolved
Nontank vessels subject to this subpart may not operate upon the navigable waters of the United States unless in compliance with a vessel response plan (VRP) approved under § 155.5065. Obtain a Non-Tank Vessel Response Plan.
DBA # 14
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 17 February 2023
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 26 September 2022
Resolved
Vessel will maintain digital records and work orders to cover the requirements for an unofficial logbook. Formalize documentation process for emergency drills and training for both dockside and offshore operations.
DBA # 62
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 27 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 September 2022
No resolution recorded
All automatically or remotely controlled or monitored vital systems addressed by part 62 of this subchapter must be subjected to tests and inspections to evaluate the operation and reliability of controls, alarms, safety features, and interlocks. Test procedures must be submitted to the Coast Guard for approval. Submit updated PSTPs and demonstrate compliance with DBA item #35.
DBA # 35
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022 — due date passed with no resolution recorded
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 September 2022
Resolved
No marine employer shall engage or employ any individual to serve as a crewmember unless the individual passes a chemical test for dangerous drugs for that employer. Establish DAPI Program and complete satisfactory audit.
DBA # 20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 13 December 2022
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 26 September 2022
Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards. Install missing machinery guards for accessory drives on generators 1-6. Repair cracked fuel pump guard on GEN2/3.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 29 November 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 September 2022
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302. Repair exhaust leak on GEN1 and GEN5. Replace cracked exhaust bellow on GEN5. Provide missing exhaust flange bolt/nut on GEN5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 27 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 September 2022
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Ensure all jacket water hoses have double hose clamps. Replace chaffed fuel supply line on GEN2. Jacket water leaks found at the j/w pumps on GEN4/5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 26 September 2022
Resolved
Droneship will display navigation lights according to COLREGS 72 rules. Ensure compliance with DBA item #1 and fix loose wire on starboard running light.
DBA # 1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 September 2022
Resolved
The respective piping systems installed on ships and barges shall have the necessary valves and relief valves for safe and efficient operation of the vessel. Repair air release valve in aft fuel oil pump room. Repair local position indications on FVAA300 and FVAB300 in fwd. fuel oil pump room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 26 September 2022
Resolved
The machinery space is equipped with leak detection and hydrocarbon sensors, which indicate if any significant fuel oil leaks or high fuel vapor concentrations occur in the space to prevent any potential flame or asphyxiation risk when the tank is opened. Calibrate hydrocarbon sensor in aft fuel oil pump room.
DBA # 24
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 26 September 2022
Resolved
As outlined in the SpaceX Recovery SMS, section 07.13, upkeep/cleaning procedures for maintaining bilges are to be conducted only by offloading bilge water and oily waste in port to a shore side facility. Remove hydraulic oil from under the deck plates in T1.
DBA # 25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 27 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Each panelboard must have a noncombustible enclosure that meets §§ 111.01-7 and 111.01-9. 208 panel missing blank in GEN1 space.
DBA # 76
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 26 September 2022
Resolved
All other openings to a protected space must be capable of being closed. Louvers not closing all the way on GEN5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Electric installations on vessels must ensure maintenance of services necessary for safety under normal and emergency conditions. Battery charger LED light is out in GEN6 space.
DBA # 64
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 24 October 2022
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 26 September 2022
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Renew all spray-foam penetrations throughout with approved material.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 7 February 2023
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 26 September 2022
Resolved
Demonstrate Navigation Safety Compliance as outlined in DBA # 15.
DBA # 15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 27 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 September 2022
Resolved
Demonstrate Vital System Automation to include the OPS Genie Alert System as outlined in DBA # 37.
DBA # 37
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 25 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 September 2022
Resolved
Demonstrate suitability of Diesel Engine Installations as outlined in DBA # 27.
DBA # 27
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 27 September 2023
Resolution: Item rectified.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 September 2022
Resolved
The operators of each vessel and facility engaged in the transfer operation shall retain a signed copy of the declaration of inspection on board the vessel or at the facility for at least 1 month from the date of signature. Ensure all Declarations of Inspections are filled out/filed for all transfers for the required time period.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 25 October 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 September 2022
Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and framed, stiffened and fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and weathertight when closed. The means for securing these doors weathertight shall consist of gaskets and clamping devices or other equivalent means and shall be permanently attached to the bulkhead or to the doors themselves, and the doors shall be so arranged that they can be operated from both sides of the bulkhead. Water tight doors and hatches on the 4160v generator and thruster spaces did not seal properly and were unable to be opened. Adjust WTD and hatches to facilitate proper sealing and operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 19 April 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 September 2022
No resolution recorded
Reference B of the Equivalency Determination Letter, P-2021-1914, dated 02 April 2022 references “Marmac Droneship DBA Matrix – Final 10-20-21”, dtd 10/20/2021”. Due to the revisions that have been made, a new equivalency determination approval letter is required with the updated references.
Equivalency Determination Letter, P-2021-1914
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022 — due date passed with no resolution recorded
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 September 2022
Resolved
The COFR Operator of a vessel must establish and maintain (or cause to be established and maintained) evidence of financial responsibility. The current COFR is for “all non-tank barges up to 6000 gross tons.” Vessel’s classification has changed from barge to industrial vessel. Update COFR as appropriate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 October 2022
Resolved 7 December 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 10 August 2022
Resolved
All vessels shall have efficient guard rails or bulwarks on decks...The height of rails or bulwarks shall be at least 39 1/2 inches from the deck...At exposed peripheries of the freeboard and superstructure decks, the rails shall be in at least three courses, including the top. Vessel railing has been removed.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 August 2022
Resolved 31 August 2022
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 August 2022
Resolved
Approved fire extinguishing systems may be used or required in locations delineated in this section on the following vessels. (1) On all self-propelled vessels other than yachts and fishing vessels. The case-by-case approval (CORR: 2020-0269, dated June 15, 2020) is no longer valid due to modifications to the spaces for which the systems were designed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 August 2022
Resolved 24 January 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 August 2022
Resolved
Systems protecting a single space not exceeding 6,000 cubic feet in gross volume may be installed without a stop valve if a suitable horizontal means of escape from the space exists. The enclosures for two separate generators have been combined, enlarging the gross volume of the space to 10,232.9 cu.ft.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 August 2022
Resolved 24 January 2023
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 16 December 2021
Resolved
In general, compliance with the structural standards established by the ABS will be considered satisfactory evidence of structural efficiency. Provide repair plan for making permanent repairs to the deck fracture on the main deck amidships.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2021
Resolved 14 January 2022
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 September 2021
Resolved
On vessels of 1,000 gross tons and greater, a fixed carbon dioxide or clean agent system as described in 46 CFR subpart 95.16 must be installed in any space that contains internal combustion or gas turbine main propulsion machinery, or auxiliary machinery with an aggregate power of 1,000 b.h.p. or greater, or the fuel oil units of such machinery, including purifiers, valves, and manifolds. The FM200 fire protection system for the SSDG# 1 is currently not operational.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 18 October 2021
Resolved 25 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 September 2021
Resolved
All fuel pipes, pipe connections, and accessories shall be readily accessible. The piping shall run in sight wherever practicable, protected against mechanical injury, and effectively secured against excessive movement and vibration by the use of soft nonferrous metal liners or straps without sharp edges. Fuel lines going to Gen-sets on deck are not properly secured or protected from mechanical damage.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 12 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 September 2021
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. SSDG # 3 had wasted/corroded fuel lines.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 September 2021
Resolved
Shutoff valves of a suitable type shall be installed in the fuel supply lines, one as close to each tank as practicable, and one as close to each carburetor as practicable. Where fuel tanks are installed below the weather deck, arrangements shall be provided for operating all shutoff valves at the tanks from outside the compartments in which they are located, preferably from an accessible position on the weather deck. Fuel shut-off valve to/from fuel tank for low-voltage generator set is missing valve handle.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 September 2021
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302. There was missing lagging on various areas of SSDG#1-6 and around turbo on 208V generator set.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 10 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 September 2021
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. The 480V generator set had plastic bowl on secondary fuel filter.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 21 September 2021
Resolved
On vessels of 1,000 gross tons and greater, a fixed carbon dioxide or clean agent system as described in 46 CFR subpart 95.16 must be installed in any space that contains internal combustion or gas turbine main propulsion machinery, or auxiliary machinery with an aggregate power of 1,000 b.h.p. or greater, or the fuel oil units of such machinery, including purifiers, valves, and manifolds. Temperature sensors in generator enclosures are not properly affixed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 21 September 2021
Resolved
All other openings to a protected space must be capable of being closed. Doors, shutters, or dampers must be installed for openings in the lower portion of the space. Openings in the upper portion of the space must be capable of being closed off either by permanently
installed means or by the use of canvas or other material normally carried on the vessel. Crop and renew wasted door framing on SSDG#2 and SSDG#3
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 10 February 2022
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 September 2021
Resolved
Fixed agent cylinders must be stored outside the space being protected. Numerous FM-200 container pipe penetrations are too large for the pipe and do not adequately protect the cylinders.
Piping, fittings and nozzles must be installed in accordance with the manufacturers operation manual. The FM 200 nozzle in the aft Command and Control module was obstructed by ventilation.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 September 2021
Resolved
Piping, fittings and nozzles must be installed in accordance with the manufacturers operation manual. The FM 200 nozzle in the aft Command and Control module was obstructed by ventilation.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 September 2021
Resolved
Lifejackets must be stowed to be readily accessible and must be marked with the word LIFEJACKETS. The aft lifejacket locker is not properly secured.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 September 2021
Resolved
Flanges and other fuel level gauges shall be welded or brazed to the tank. The tubular sight glass for the RP-1 tank is broken.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 September 2021
Resolved
Efficient guard rails shall be installed along the exposed peripheries. Properly secure forward starboard upper wire rail course.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 1 December 2021
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 21 September 2021
Resolved
Portable and semi-portable fire extinguishers must be inspected, maintained, and tested in accordance with the inspection, maintenance procedures, and hydrostatic pressure tests required by Chapters 7 and 8 of NFPA 10, Standard for Portable Fire with the frequency specified by NFPA 10. Establish scheduled maintenance program for all firefighting equipment.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2021
Resolved 27 September 2023
Resolution: Maintenance being conducted.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 21 September 2021
Resolved
On vessels of 1,000 gross tons and greater, a fixed carbon dioxide or clean agent system as described in 46 CFR subpart 95.16 must be installed in any space that contains internal combustion or gas turbine main propulsion machinery, or auxiliary machinery with an oil units of such machinery, including purifiers, valves, and manifolds. No fire suppression is installed in either 7P or 7C Fuel Oil Pump Rooms.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 January 2022
Resolved 12 October 2022
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 21 September 2021
Resolved
The shipboard oil pollution emergency plan must be onboard and identify the principal characteristics of the vessel. Fuel tanks have been added below deck and the SOPEP does not capture this arrangement.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 10 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 September 2021
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. There was a lube oil leak on SSDG#3 in way of the fuel pump assembly.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 18 October 2021
Resolved 18 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 September 2021
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. There was coolant leak on SSDG#6.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 27 October 2021
Resolved 18 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 June 2021
Resolved
Electrical installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. Proposed removal of the motor generator and replacement with electrical transformer must be approved, installed to the satisfaction of, and demonstrated operation acceptable to attending USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 18 June 2021
Resolved 8 July 2021
Resolution: PMG1 Replaced w/ Transformer
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 April 2021
Resolved
No repairs or alterations affecting the safety of the vessel with regards to the hull, machinery, or equipment shall be made without the knowledge of the Officer in Charge, Marine Inspections. Fuel oil system coming from tanks 7P and 2S is currently not approved by CVC or MSC. Vessel is not authorized to use this fuel oil system until such approvals are received and workmanship tested and verified by local OCMI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2021
Resolved 22 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 1 April 2021
Resolved
Electrical installations on vessels must ensure: protection of passengers, crew, other persons, and the vessel from electrical hazards. Vessel's current electrical arrangement condition does not meet previously approved electrical plans. Vessel is to address all comments on MSC letter E2-2100642, which identified numerous potential electrical safety hazards to the vessel and personnel.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2021
Resolved 3 May 2021
Resolution: Vessel provided required information and submission of load analysis. Deficiency changed to rectify w/in 14 days.
Vessel has resubmitted electrical plans to MSC for review and provided appropriate response to MSC plan review letter.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2021
Resolved
No repairs or alterations affecting the safety of the vessel with regards to the hull, machinery, or equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. Evaluate structural damage identified in 1C, 6P, and 8C and provide a repair plan proposal to the OCMI.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2021
Resolved 20 April 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 18 March 2021
Resolved
The means of securing and maintaining weathertightness shall be to the satisfaction of the Administration. Replace worn and deteriorated hatch cover gaskets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2021
Resolved 18 October 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 March 2021
Resolved
Vessels that operate in salt water must be examined in accordance with the intervals set forth in Table 91.40-3(a). Make vessel available for internal structural examination not later than 09 Apr 2021.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2021
Resolved 18 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 October 2020
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery or equipment shall be made without the knowledge of the Officer in Charge, Marine Inspections. Vessel is to tag out, lock-out temporary low voltage generator while underway or under tow.
Action required: 705 - Other - as specified
Due 19 October 2020
Resolved 29 October 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 14 August 2020
Resolved
Vessel shall have efficient guardrails or bulwarks on deck. The section of the vessel does not have any guard rails for fall prevention.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
Resolution: Guard Rails installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 August 2020
Resolved
Each lifebuoy must be marked with name of the port required to be marked on the stern of the vessel. Lifebuoys on-board did not have the name of the homeport.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 14 August 2020
Resolved
General arrangement plans showing for each deck the fire control stations, the various sections enclosed by fire-resisting bulkheads, together with particulars of the fire alarms, detecting systems, the sprinkler installation (if any), the fire extinguishing appliances, means of access to different compartments, decks, etc., and the ventilating systems including particulars of the master fan controls, the positions of dampers, the location of the remote means of stopping fans, and identification numbers of the ventilating fans serving each section. Vessel did not have a fire control plan.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 September 2020
Resolved 24 September 2020
Resolution: To the satisfaction of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Initial inspection shall be such as to ensure that the electrical installation fully comply with the applicable regulations and are in accordance with approved plan. The vessel's on-board electrical installation does not match what was approved by MSC.
Action required: 705 - Other - as specified
Due 14 September 2020
Resolved 13 October 2020
Resolution: Updated electrical plans have been submitted to the MSC.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
The initial inspection is to determine that the arrangement material and their installation meet this chapter and the approved plans. Unable to verify proper operation of electrical distribution system on-board.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 5 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Initial inspection shall be such as to ensure that the machinery installation fully comply with the applicable regulations and are in accordance with approved plan. Unable to verify installation and test the operation of thrusters and their associated components.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2020
Resolved 8 September 2020
Resolution: Systems operationally tested
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Electrical equipment must be arranged to prevent damage to the equipment. Two Seavan in the aft section of the vessel were actively leaking water from the overhead, thus creating an electrical hazard.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2020
Resolved 8 September 2020
Resolution: Conducted hose test w/ no leaks present
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
There must be ground detection for each electrical propulsion system and ship's service power system. Operator not able to prove proper operation of a ground detection system on-board.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 14 August 2020
Resolved 8 September 2020
Resolution: Tested all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Electrical equipment must be arranged to prevent damage to the equipment. Distribution panels inside medium voltage generator boxes are exposed to wet environment and are showing signs of corrosion.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
Resolution: New panels installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
All electrical installations in hazardous locations must comply with the requirements of IEEE. Vessel was unable to prove electrical installations in the rocket processing space meet IEEE standards.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 September 2020
Resolved 24 September 2020
Resolution: To the satisfaction of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
All pressure vessels shall satisfactorily pass the hydrostatic test prescribed by regulations. No documentations was provided to verify the N2 expansion pressure vessel in the N2 Seavan was hydrostatically tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
Resolution: Documentation provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Each panel board must have a circuit directory card holder with designation of each circuit. Two breaker panels in the aft "command and control" Seavan did not have circuit directories.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Electric installations on vessels must ensure protection from electrical hazards. Cables and wires in the aft "command and control" Seavan were not properly secured in accordance with acceptable standards.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
The material design and arrangement of main propulsion machinery shall meet these standards in ABS Rules. Aft port thruster has active hydraulic leak when in operation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 14 September 2020
Resolved 6 November 2020
Resolution: To the satisfaction of the MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2020
Resolved
Initial inspection shall be such as to ensure that the electrical installation fully comply with the applicable regulations and are in accordance with approved plan. The vessel has a portable generator and fuel tank on deck that may be used to provide power to the 480 volt system and has not been reviewed or approved by MSC.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 8 September 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Prove proper installation of electrical distribution systems as per the plans that were submitted to MSC.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 18.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Prove proper operation of electrical distribution system after installation is completed.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 19.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Prove proper operation of thrusters to include safety devices, remote control, and general operations.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 20.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Prove Proper operation of all medium voltage generators under load.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued and consolidated, see item deficiency # 18.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 August 2020
Resolved
Determine cause of water leaks in the SEAVAN and electrical rooms and make appropriate repairs.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 21
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Ensure all electrical equipment (switchboards, panel boards, distribution panels, controllers, etc) meets the appropriate degree of protection; distribution panels inside medium voltage generator boxes, electric equipment in spaces with actively leaking overhead.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 23
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Install Ground Indication/Detection.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 22.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 August 2020
Resolved
Install Non-Conductive Deck covering along each switchboard OR prove current covering is sufficient.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 10 August 2020
09 - Working and Living Conditions › 092 - Working Conditions › Adequate lighting - mooring arrangements
Issued 7 August 2020
Resolved
Install emergency lighting in each Thruster room.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2020
Resolved 10 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 August 2020
Resolved
Install required Racor fuel filter Metal bowl on each Medium V Generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2020
Resolved 10 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Demonstrate installation pressure tests for all pressurized systems, including “Rocket Processing” equipment. Tests must be conducted it 1.5 times the maximum allowable working pressure, in the presence of a USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 August 2020
Resolved 10 August 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 August 2020
Resolved
Demonstrate hydrostatic testing of new section of piping installed in aft fire main.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 10 August 2020
09 - Working and Living Conditions › 092 - Working Conditions › Emergency cleaning devices
Issued 7 August 2020
Resolved
Remove/relocate equipment blocking aft eyewash station and make easily accessible.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2020
Resolved 10 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Ensure all panelboards and switching unit is provided with a circuit directory and that all blanks are installed in all panel openings.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 26.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Re-route air conditioning condensation drain lines so that they are not passing over electrical equipment.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Install means to prevent cables from chaffing and ensure all cables are secure and/or supported in accordance with IEEE Std 45.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 27
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2020
Resolved
Identify source of oil observed within aft, port thruster and, if a leak is found, affect repairs.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 28
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 August 2020
Resolved
Ensure all electrical appliances in the Hazardous Location Space are installed iaw IEEE.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 14 August 2020
Resolution: Not resolved. Cancelled and reissued see item deficiency # 24
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 April 2020
Resolved
Based on current operational restrictions due to COVID-19 and IAW ALCOAST 100-20, the required Annual Inspection for Certification is deferred until not later than 15 June 2020; at which time the Annual Inspection will commence. The COI issued 15 January 2016 will remain valid, but a satisfactory USCG Inspection must be completed prior operation after 15June2020.
Action required: 705 - Other - as specified
Due 15 June 2020
Resolved 15 June 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Engine International Air Pollution Prevention Certificate (EIAPP)
Issued 19 July 2019
Resolved
Vessel shall not operate diesel engines during international voyage. Vessel shall obtain an Engine International Air Pollution Prevention Certificate (EIAPP) from the EPA, and submit to OCMI for documentation and approval of International Air Pollution Certificate.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 1 December 2021
Resolution: International voyages prohibited on COI
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 April 2019
Resolved
Perform periodic inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2019
Resolution: Completed periodic inspection
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 28 July 2018
Resolved
Make permanent repairs to original scantling on deck (6) 10'x40' plates and wing support structure - prior to rocket operations.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 July 2018
Resolved 7 November 2018
Resolution: Repairs completed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 15 April 2018
Resolved
Conduct annual COI inspection, prior to condcuting recovery operations.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 June 2018
Resolved 9 July 2018
Resolution: Annual inspection completed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 2 November 2017
Resolved
Conduct post landing barge internal structural exam prior to next barge rocket recovery operation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 15 November 2017
Resolution: Conducted ISE of #3 & #4 voids.
Engineering › Thrusters › Seal
Issued 14 April 2017
Resolved
Conduct operation test of all propulsion thrusters.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 June 2017
Resolved 22 June 2017
Resolution: Witnessed operational testing of all propulsion thrusters.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 14 April 2017
Resolved
Conduct test procedures for propulsion system.
Condition: Placed in Improper Service
Due 15 June 2017
Resolved 22 June 2017
Resolution: Witnessed approved propulsion automation testing and procedures.
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 14 April 2017
Resolved
Test emergency stops for all machinery.
Condition: Invalid
Due 15 June 2017
Resolved 22 June 2017
Resolution: Witnessed emergency shutdowns on all propulsion thruster HPUs.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 21 July 2016
Resolved
Provide Load Line Certificate prior to operating outside the boundry line.
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 October 2016
Resolved 3 October 2016
Resolution: ILLC issued by ABS to expire on 10JUN2018.
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 16 February 2016
Resolved
Repair combing rail and stanchions on port side.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 4 April 2016
Resolved 19 April 2016
Resolution: Combing and stanchions were cropped and renewed.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 16 February 2016
Resolved
Replace discharged portable fire extinguishers.
Condition: Damaged By Earlier Event
Due 4 April 2016
Resolved 19 April 2016
Resolution: All discharged fire extinguishers were replaced with new.
Electrical › Electric Supply System (service) › Cable
Issued 16 February 2016
Resolved
Repair port side power & cable supply lines & conduit and prove proper operation of all equipment/machinery IAW approved test procedures.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2016
Resolved 25 October 2016
Resolution: Conduit and power supply lines were all repaired. Witnessed testing of thrusters IAW test procedures.
Engineering › Thrusters › Hose
Issued 16 February 2016
Resolved
Replace damaged hydraulic hose on the stbd bow thruster with SAE J 1942 with hose end fittings that comply with SAE J 1475.
Condition: Damaged By Earlier Event
Due 1 August 2016
Resolved 21 July 2016
Resolution: Hydraulic hose was replaced.