MAURY USCG vessel records
← All vessels

RIVER GIRL

Built
1979
Last inspected
14 October 2025
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 14 October 2025
…with no type recorded16
Operational controls None recorded without a removal date
Years with a record 19 calendar years (1993–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDN4465
175943
Flag
UNITED STATES
Maury page id
psix-175943

Documentation record

Registered dimensions (L × B × D)56.0 ft × 24.1 ft × 8.6 ft
Registered tonnagegross 123 / net 83
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPHILLIP DITTA · MADISONVILLE, LA, UNITED STATES · built 1979
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portEDENTON, NC
Endorsements, as the file codes themcw_un
DocumentationValid · issued 23 July 2026 · expires 30 June 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it123 - Regulatory (Subpart C or D), Gross Ton
83 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 36 inspections, each with its date, unit and type; 23 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 15 other vessels inspected with it; 2 other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 15

Inspection history · 36

14 October 2025 Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8251823
30 September 2025 COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8229500
18 March 2025 Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8095640
9 October 2024 Annual Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8016218
3 October 2023 Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7803761
6 July 2023 Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7738228
14 December 2022 Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7619201
29 September 2022 Annual Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7567701
19 November 2021 Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7355633
26 October 2021 Annual Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7339746
22 September 2021 Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7318399
4 March 2021 Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7150261
13 July 2020 Administrative Inspection · Initial Certification · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7005378
27 March 2020 Deficiency Check · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6943340
3 February 2020 Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6902184
20 June 2019 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6760576
4 June 2015 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5144374
8 November 2014 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5023896
20 March 2014 Deficiency Check · Industry Initiated Exam · MTSA Verification · DAPI Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4819542
3 May 2011 DAPI Audit · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4006939
18 April 2011 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3989004
10 February 2011 Industry Initiated Exam · MTSA Verification · DAPI Audit · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3943405
16 November 2007 Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 3110569
15 September 2006 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2779158
25 August 2006 MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2759737
30 November 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2270563
24 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978975
22 December 2003 Type not recorded
No type recorded · Station Grand Isle · USCG Heartland District (CGD-H) · Activity 1968702
8 January 2003 Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 1740316
3 May 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 666503
27 March 2001 Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 1522395
19 January 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 57979
29 October 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 224192
21 June 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 40324
29 September 1994 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 19975
5 September 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 151331

Deficiency record · 23

07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 October 2023 Resolved
Means must be provided for stopping each fan...and closing, in case of fire, each doorway, ventilator, and annualar space around funnels and other openings. Port E/R vent cover had a broken hinge at the time of inspection.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 21 November 2023
Resolution: Corrected immediately after inspection, rep provided picture of repair prior to COB.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 October 2023 Resolved
All fire hoses which are defective and incapable of repair must be destroyed. Port fire hose leaked under working pressure of the pump.
Action required: 10 - Deficiency Rectified
Resolved 21 November 2023
Resolution: Corrected prior to completion of inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 October 2023 Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid, as those terms are defined in 46 CFR subpart 30.10, into the machinery space. The port generator had a lube oil leak into the bilge while operating.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
Resolution: Photo and video evidence provided of the generator operating with a new seal and no leaks into the containment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 October 2021 Resolved
Port Gen Set front plate has temporary repairs. Complete repairs to the satisfaction of the attending Marine Inspector iaw 46 CFR 143.205(a).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2021
Resolved 3 January 2022
Resolution: New plate installed on Port Gen Set, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 October 2021 Resolved
Port fire main valve is leaking. Repair iaw 46 CFR 142.325(a)(1).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2021
Resolved 19 November 2021
Resolution: Valve repaired, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 26 October 2021 Resolved
Both MDE RPM gauges and starboard Jacket Water Temp gauge are inoperable/unreadable in the engine room, repair/replace iaw 46 CFR 143.230(c)(1) and (c)(2).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2021
Resolved 19 November 2021
Resolution: Gauges repaired, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 March 2021 Resolved
The Fleming rudder on port inboard had a fracture and was damaged as well as the starboard outboard. The inboard Fleming rudder starboard was intact, however was excessively loose. The starboard main rudder was misaligned by 2-4 degrees, with the rudders placed at amidships (centered).
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 4 March 2021
Resolved 11 March 2021
Resolution: Completed repairs and sea trails to the satisfaction of the Coast Guard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 October 2020 Resolved
Electrical equipment must be marked with its respective current and voltage ratings. Port Generator is not marked with respective current ratings, data placard is missing. Ensure breaker is properly sized to generator output.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 29 October 2020
Resolution: Received phots showing tags attached to Port and Stbd generator derated.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 October 2020 Resolved
Electrical connections must be suitably installed to prevent them from coming loose through vibration or accidental contact. Electrical components that pose an electrical hazard must be in an enclosure. The following electrical equipment under bridge must be made safe: Battery's remove wing nuts, properly terminate electrical wiring, Remove all wire nuts, place covers on junction box, provide proper support for wires in overhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 13 October 2020
Resolution: Electrical equipment was made safe as required.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 October 2020 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Second phase on amp meter is not operating as designed. Prove proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 13 October 2020
Resolution: Amp meter is operational.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 5 October 2020 Resolved
Machinery and fuel tank spaces must be separated from accommodation spaces by bulkheads. Doors may be installed provided they are the self-closing type. Door separating engine room from galley is not operational and self closing device is missing. Prove proper operation of door.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 13 October 2020
Resolution: Door was self closing and operational.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 October 2020 Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Door on fwd bow hatch has broken dog and window a/c unit has gap that will allow water to enter galley. Ensure weather tight penetrations are maintained.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 13 October 2020
Resolution: Hatch and a/c unit was tested for weather tightness, all sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 August 2020 Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the 50% of the vessels that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 90 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (Rectify deficiencies prior to movement) and the vessel may no longer be permitted to operate.
Action required: 705 - Other - as specified
Due 17 November 2020
Resolved 5 October 2020
Resolution: Conducted exam for initial certification as required.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 27 March 2020 Resolved
Schedule and complete a COI inspection NLT 30 days from the issuance of this CG-835V or Provide proof that Stevens Towing vessel fleet is in compliance with the 25% inspection phase in period in lieu of completing COI inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 November 2020
Resolution: COI validated
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2020 Resolved
Port Rudder damaged; missing lower 1/3 and missing shoe/rudder bearing support. Repair/Replace in kind.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2020
Resolution: Vessel replaced and or made corrective repairs (see report in vessel documents)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2020 Resolved
STBD rudder bearing support/shoe cracked. Grind for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2020
Resolution: Vessel replaced and or made corrective repairs (see report in vessel documents)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2020 Resolved
Port cutlass bearing damaged/missing. Remove shaft for further inspection of shaft and bearing housing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2020
Resolution: Vessel replaced and or made corrective repairs (see report in vessel documents)
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 25 March 2020 Resolved
Forward bow compartment and void #2 missing hull bottom plating and all hull framing. (CVK not removed)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2020
Resolution: Vessel replaced and or made corrective repairs (see report in vessel documents)
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 25 March 2020 Resolved
During damage survey MIs noted pitting throughout the vsl which exceeds the allowable 25% wastage throughout. New hull plating bow to stern and port/STBD side shell repalcement is required prior to being placed back into service. No internal inspection ahs been completed at this time due to, invalid marine chemist cert. Thus not allowing inspectors to verify conditions of internal framing. All hull plating and framing must be repalced in kind.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2020
Resolution: Vessel replaced and or made corrective repairs (see report in vessel documents)
Documentation › Logs/Records › Garbage Recordkeeping
Issued 25 August 2006 Resolved
Provide proof of proper garbage disposal.
Action required: 705 - Other - as specified
Due 31 August 2006
Resolved 15 September 2006
Resolution: Provide copy of garbage disposal log.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 25 August 2006 Resolved
Properly register Certificate of Documentation.
Action required: 705 - Other - as specified
Due 31 August 2006
Resolved 15 September 2006
Resolution: Provided copy of properly registered COD.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 25 August 2006 Resolved
Provide proof of inspection of all fire extinguishers.
Action required: 705 - Other - as specified
Due 31 August 2006
Resolved 15 September 2006
Resolution: Received verfication of fire extinguisher inspections.
Communications › Alarms/Indicators › General Alarm
Issued 25 August 2006 Resolved
Properly repair general alarm lights.
Action required: 705 - Other - as specified
Due 31 August 2006
Resolved 15 September 2006
Resolution: Provided proof of repairs.

Recorded names · 2

REGINA H (2004–2011), ISLAND GIRL (2019–2022). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.