Records from 1985 to 2023. Most recent: inspection, 22 November 2023.
Inspection history · 89
22 November 2023
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7828545
13 October 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6290390
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107343
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107344
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107345
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107351
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107355
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107366
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107374
19 March 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6107380
13 August 2016
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5973302
12 February 2007
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2870762
7 July 2005
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2418107
18 May 2005
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2361236
3 May 2005
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2348267
3 December 2004
Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2252561
29 July 2004
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2149145
28 May 2004
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2080581
19 May 2004
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2072782
19 May 2004
Damage Survey
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2087300
1 October 2002
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1684292
17 September 2002
MARPOL Annex V Examination · Annual Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1676460
3 June 2002
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1626010
17 May 2001
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1444522
1 March 2001
Plan Review "T" Boat
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1058148
18 August 2000
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1365916
10 July 2000
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1417181
9 June 2000
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1050513
25 May 2000
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1446938
3 November 1999
Excursion Permit · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 812737
8 June 1999
Hull Examination · COI Inspection · MARPOL Annex V Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1444176
13 April 1999
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1122424
9 November 1998
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 803272
9 July 1998
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1392945
23 June 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 792719
26 February 1998
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1364597
22 September 1997
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 755132
20 September 1997
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 196659
12 July 1997
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1368311
22 April 1997
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1092353
6 November 1996
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1385826
12 July 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1089785
10 July 1996
COI Inspection · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1466977
1 March 1996
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1412923
28 August 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 880958
31 July 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1183245
29 June 1995
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1191471
24 June 1995
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1190345
27 February 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1162491
9 February 1995
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1363185
24 January 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1133603
15 December 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1149812
2 December 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1179814
2 December 1994
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1447397
22 September 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 861417
22 September 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 870698
31 July 1994
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 110776
31 July 1994
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 222625
17 June 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1409144
18 February 1994
Deficiency Check · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1356518
18 November 1993
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1389722
8 October 1993
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1136613
5 August 1993
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 843419
19 February 1993
COI Inspection · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1373789
18 November 1992
Damage Survey · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1135940
5 September 1992
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 170182
21 August 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1258994
14 August 1992
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1354183
24 October 1991
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1255561
15 October 1991
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 937589
17 January 1991
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1237725
26 October 1990
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 921107
27 September 1990
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1231116
9 January 1990
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 900212
9 January 1990
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 903685
29 December 1989
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1229407
23 October 1989
Hull Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1198699
12 September 1989
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1237821
22 June 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1044759
29 March 1988
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1343391
20 November 1987
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1314302
1 October 1987
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1319639
25 August 1987
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1031168
7 August 1987
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1011525
11 February 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1320382
15 January 1987
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1028959
20 November 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1007617
9 December 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1295922
27 November 1985
Initial Certification
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996021
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 7 July 2005
Resolved
Reweld broken hand railing forward section located on the starboard side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 July 2005
Resolved 14 July 2005
Engineering › Steering Gear System › Ram
Issued 7 July 2005
Resolved
Renew bushings and bolts for starboard rudder post to ram/tiller connection.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 July 2005
Resolved 14 July 2005
Engineering › Sea-water System (primary cooling) › Piping
Issued 7 July 2005
Resolved
Renew 1 1/2 inch flexible hose for exhaust cooling line for port and starboard main engines.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 July 2005
Resolved 14 July 2005
Engineering › Reduction Gearing/Clutches › Gear
Issued 7 July 2005
Resolved
Renew starboard transmission hose from the tank to to lower connection.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 July 2005
Resolved 14 July 2005
Navigation › Piloting/Steering › Compass Deviation Table
Issued 3 December 2004
Resolved
Provide a recently calculated magnetic compass deviation table.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined new deviation table.
Communications › Audible Communications › Bell
Issued 3 December 2004
Resolved
Provide a bell with a minimum diameter of 300 mm.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined satisfactory 300 mm bell.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 December 2004
Resolved
Make 1 1/2 inch hole in fwd engine room bulkhead watertight on the port side of the watertight door.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined satisfactorily plugged hole.
Fire Fighting › Fire Main › Condition
Issued 3 December 2004
Resolved
Make permanent repairs to holed fire main piping in fwd generator room, port, IWO aft bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined renewed section of fire main and witnessed satisfactory operational test.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 3 December 2004
Resolved
Repair crankcase breather tube on port MDE to eliminate excessive vapors escaping into engine room.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Crankcase breather piping determined to be original manufacturer installation and deemed to be satisfactory.
Communications › Audible Communications › SPD (Other)
Issued 3 December 2004
Resolved
Prove proper operation of fixed PA system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Witnessed satisfactory test of PA system.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 December 2004
Resolved
Provide and install a machinery guard for fwd end of port MDE, IWO flywheel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined satisfactory machinery guard.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 3 December 2004
Resolved
Remove spilled fuel from fwd generator room bilge IWO fuel tank (port).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined bilges. All sat.
Engineering › Pressure Vessel › Relief Valve
Issued 3 December 2004
Resolved
Prove proper operation of all safety relief valves and make air receivers available for internal examination.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined new, factory tested safety relief valves and internally examined both UPVs. all sat.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 December 2004
Resolved
Replace glass flourescent lighting fixtures in main cabin with fixtures having suitable guards, or unbreakable globes.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined new fixtures with unbreakable globes and guards.
Construction/Loadline › Hull › Bottom Plating
Issued 3 December 2004
Resolved
Remove water, oil and debris from bilge area in lazarette IWO rudder post for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined hull plating IWO rudder post. All sat.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 3 December 2004
Resolved
Repair oil leaks on exhaust manifold on aft generator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined repaired oil leak. All sat.
Engineering › Fuel Oil Service System › Pump
Issued 3 December 2004
Resolved
Repair fuel leaks on aft generator fuel pump.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined fuel system and witnessed satisfactory test of generator prime mover.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 3 December 2004
Resolved
Properly insulate turbocharger exhaust piping on port MDE.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined satisfactory insulation on turbo exhausts.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 3 December 2004
Resolved
Reroute outboard turbocharger lube oil return line on port MDE.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2005
Resolved 20 December 2004
Resolution: Examined rerouted line. All sat.
Engineering › Bilge Water Management System › Piping
Issued 28 May 2004
Resolved
Renew wasted section of piping and sea valve for fire/bilge pump system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2004
Resolved 2 June 2004
Resolution: Renewed wasted section of piping and sea valve for fire/bilge pump system.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 28 May 2004
Resolved
Drill stop and V-weld small crack in deep web starboard longitudianl frame in void #1.
Action required: 705 - Other - as specified
Due 3 June 2004
Resolved 2 June 2004
Resolution: Repaired. All SAT.
Construction/Loadline › Structures › End Bulkhead
Issued 28 May 2004
Resolved
Repair minor cracks in aft starboard corner of lazarette.
Action required: 705 - Other - as specified
Due 3 June 2004
Resolved 2 June 2004
Resolution: Repaired SAT.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 28 May 2004
Resolved
Remove excess oil from engine room and lazarette.
Action required: 705 - Other - as specified
Due 3 June 2004
Resolved 2 June 2004
Resolution: Removed all SAT.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 28 May 2004
Resolved
Retack Rail mesh on upper deck.
Action required: 705 - Other - as specified
Due 3 June 2004
Resolved 2 June 2004
Resolution: Retacked rail mesh, all SAT.
Construction/Loadline › Structures
Issued 19 May 2004
Resolved
Make repairs to both port side windows and side shell surrounding windows. LEGACY COMPONENT DESC: Superstructure
Due 1 June 2004
Resolved 20 May 2004
Resolution: Per phone conversation, the windows were covered with plexi-glass.
Pollution Prevention/Response › Prevention Equipment
Issued 1 October 2002
Resolved
Properly repair the sewage tank crack on the port side of the tank. LEGACY COMPONENT DESC: Sewage System Tank
Action required: 705 - Other - as specified
Due 8 October 2002
Resolved 29 October 2002
Stability › Unintentional Flooding
Issued 1 October 2002
Resolved
Remove the water/waste from the lazarette space bilges. LEGACY COMPONENT DESC: Sewage water in the bilges
Action required: 705 - Other - as specified
Due 8 October 2002
Resolved 8 October 2002
Resolution: Corrected
Engineering › Bilge Water Management System
Issued 1 October 2002
Resolved
Properly mount the bilge strainer on the line in the #2 void space. LEGACY COMPONENT DESC: Strainer
Action required: 705 - Other - as specified
Due 8 October 2002
Resolved 29 October 2002
Engineering › Fuel Oil Storage/Transfer System
Issued 17 September 2002
Resolved
Replace fuel tank vent screen with 30 X 30 mesh screen. LEGACY COMPONENT DESC: Ventilation
Due 20 September 2002
Resolved 29 October 2002
Electrical › Lighting (service)
Issued 17 September 2002
Resolved
Install light fixture guard on main deck to light fwd port. LEGACY COMPONENT DESC: Lighting Fixture
Due 20 September 2002
Resolved 18 September 2002
Resolution: Guards installed
Accommodation/Occupational Safety › Occupational Safety
Issued 17 September 2002
Resolved
Install rubber floor matting on deck in front of switchboard. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Due 20 September 2002
Resolved 18 September 2002
Resolution: Rubber matting installed
Engineering › Bilge Water Management System
Issued 17 September 2002
Resolved
Ensure bilge pump and bilge piping are operational. Vsl crew required to conduct 10 minute checks of all compartments while operating in commercial service. LEGACY COMPONENT DESC: Piping
Due 20 September 2002
Resolved 1 October 2002
Engineering › Compressed Air System (start air)
Issued 17 September 2002
Resolved
Provide means for a USCG Marine Inspector to visually inspect the internals of both air receiver tank bottles or have bottles hydrostatically tested to 1.25 lbs. Provide servicing report of test of safety relief valve. LEGACY COMPONENT DESC: Receiver/Bottle
Due 20 September 2002
Resolved 1 October 2002
Construction/Loadline › Hull
Issued 17 September 2002
Resolved
Repair cracks (v-weld) stbd side IWO transom bulkhead stiffeners and plug (bead weld) main deck hole penetration. LEGACY COMPONENT DESC: Stiffener
Due 20 September 2002
Resolved 1 October 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 17 September 2002
Resolved
Tighten hydraulic line couplings or replace. LEGACY COMPONENT DESC: Gear/Clutch Starter (hydraulic)
Due 20 September 2002
Resolved 18 September 2002
Resolution: Leak corrected
Engineering
Issued 17 May 2001
Resolved
PROVE PROPER OPERATION OF RELIEF VALVES ON FWD AND AFT AIR COMPRESSORS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 24 May 2001
Resolved 21 May 2001
Navigation
Issued 17 May 2001
Resolved
PROVIDE EMERGENCY BROADCAST PLACARD IN PILOTHOUSE.
Condition: Unknown
Due 17 May 2001
Resolved 18 May 2001
Construction/Loadline
Issued 25 May 2000
Resolved
Crop and insert set-in area of port sideshell plating. Area requires insertapprox. 8 ft. X 4 ft. and is located above the waterline IWO engineroom.
Condition: Unknown
Due 25 May 2000
Resolved 25 May 2000
Documentation
Issued 8 June 1999
Resolved
Provide a valid FCC Radio Safety Certificate.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 8 June 1999
Resolved
Repair 2 waterlights for lifefloats.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Construction/Loadline
Issued 8 June 1999
Resolved
Complete installation of bilge high level alarms.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 9 July 1998
Resolved
PROVIDE LOGBOOK AND PROPERLY LOG REQUIRED EMERGENCY DRILLS AND INSPECTION OF LIFESAVING EQUIPMENT.
Condition: Unknown
Due 9 July 1998
Resolved 9 July 1998
Construction/Loadline
Issued 9 July 1998
Resolved
INSTALL GASKET ON DECK HATCH FOR ENGINEROOM.
Condition: Unknown
Due 9 July 1998
Resolved 9 July 1998
Lifesaving
Issued 9 July 1998
Resolved
PATCH ONE 22 PERSON LIFEFLOAT USING MANUFACTURERS APPROVED PATCH KIT.
Condition: Unknown
Due 9 July 1998
Resolved 9 July 1998
Construction/Loadline
Issued 9 July 1998
Resolved
INSTALL GASKET ON DECK HATCH FOR LAZARETTE.
Condition: Unknown
Due 9 July 1998
Resolved 9 July 1998
Engineering
Issued 26 February 1998
Resolved
RENEW INNER CUTLASS BEARINGS DURING NEXT DRYDOCK.
Condition: Unknown
Due 26 February 1998
Resolved 26 February 1998
Navigation
Issued 12 July 1997
Resolved
REPAIR COMPASS LIGHT PRIOR TO ANY NIGHT OPERATION.
Condition: Unknown
Due 12 July 1997
Resolved 12 July 1997
Documentation
Issued 12 July 1997
Resolved
PROVIDE COPY OF SAFETY RADIO CERTIFICATE.
Condition: Unknown
Due 12 July 1997
Resolved 12 July 1997
Engineering
Issued 12 July 1997
Resolved
REWELD PORT EXHAUST AT LEAK.
Condition: Unknown
Due 12 July 1997
Resolved 12 July 1997
Navigation
Issued 12 July 1997
Resolved
PROVIDE STEAMING AND STERN LIGHT THAT MEET UL 1104.
Condition: Unknown
Due 12 July 1997
Resolved 12 July 1997
Construction/Loadline
Issued 12 July 1997
Resolved
PROPERLY MARK BILGE MANIFOLD.
Condition: Unknown
Due 12 July 1997
Resolved 12 July 1997
Construction/Loadline
Issued 6 November 1996
Resolved
V AND WELD 3 INCH AREA ON FORWARD END S/B SIDE OF INSERT S/B SIDE OF RUDDERPOST.
Condition: Unknown
Due 6 November 1996
Resolved 6 November 1996
Construction/Loadline
Issued 6 November 1996
Resolved
V AND WELD BOTTOM FRAME TO #1 INTERCOASTAL FROM STERN.
Condition: Unknown
Due 6 November 1996
Resolved 6 November 1996
Construction/Loadline
Issued 12 July 1996
Resolved
PROPERLY REPAIR THE 2ND AND 3RD STRINGERS FROM THE PORT SIDE IN THE STEERING COMPARTMENT. SECTION OF THE 2ND STRINGER REQUIRED TO BE CROPPED.
Condition: Unknown
Due 12 July 1996
Resolved 12 July 1996
Lifesaving
Issued 10 July 1996
Resolved
NO LATER THAN 11 MARCH 1997, INSTALL ON BOARD IN A FLOAT FREE ARRANGEMENT, A FCC ACCEPTED, CATEGORY 1, 406 MHz EPIRB.
Condition: Unknown
Due 10 July 1996
Resolved 10 July 1996
Engineering
Issued 10 July 1996
Resolved
PROPERLY REPAIR REMOTE BRIDGE CABLE SHUTDOWN TO BOTH MDE AND PROVE OPERATION TO THE COAST GUARD. VSL NOT TO CARRY PASSENGERS UNTIL CABLE REPAIRED.
Condition: Unknown
Due 15 July 1996
Resolved 15 July 1996
Navigation
Issued 1 March 1996
Resolved
Replace 1 cotter pin on steering linkage where missing.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Electrical
Issued 1 March 1996
Resolved
SURVEY GENERATOR FOR LEAKS AND MAKE REPAIRS.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Lifesaving
Issued 1 March 1996
Resolved
Plug overboard above waterline in way of aft, starboard, engine room.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Lifesaving
Issued 1 March 1996
Resolved
PROPERLY PLUG UNUSED OVERBOARD DISCHARGE ON THE STERN.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
PROVIDE A REPAIR PROPOSAL FOR THE REPAIR OF THE INSET SHELL PLATING AND DAMAGED FRAMES ON THE PORT SIDE IN THE AIR COMPRESSOR COMPARTMENT.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
REPAIR BROKEN WELD IN THE FORE PEAK, IN WAY OF THE FWD WEB, LOWER STBD SIDE.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Electrical
Issued 1 March 1996
Resolved
CONDUCT AN ELECTRICAL SURVEY OF THE VESSEL AND MAKE APPROPRIATE REPAIRS.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
PROVIDE A REPAIR PROPOSAL FOR THE IMPROPER REPAIRS, BROKEN WELDS, BROKEN FRAMES, SHARP INSETS AND BUCKLED FRAMES, IN WAY OF THE PORT AND STBD STERN CORNERS.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Engineering
Issued 1 March 1996
Resolved
RENEW PORT PROPELLER, PRIOR TO OPERATING WITH PASSENGERS.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
REPLACE VALVE HANDLE ON ENGINE ROOM BILGE LINE OVERBOARD VALVE.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Engineering
Issued 1 March 1996
Resolved
RENEW ALL ENGINE ROOM SEA STRAINERS.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
PROPERLY REPAIR THE 2ND AND 3RD STRINGERS FROM THE PORT SIDE IN THE STEERING COMPARTMENT. SECTION OF THE 2ND STRINGER REQUIRED TO BE CROPPED.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Fire Fighting
Issued 1 March 1996
Resolved
Replace leaking 2' section of piping in forward section of engine room in way of the manifold before operating with passengers. Notify Coast Guard for inspection when prepared prior to operation with passengers.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Accommodation/Occupational Safety
Issued 1 March 1996
Resolved
Close, and maintain in a closed position, all marine sanitation device valves while within 3 miles of a U.S. shoreline.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Lifesaving
Issued 1 March 1996
Resolved
Post emergency procedures in a position conspicuous to all passengers. As found in 46 CFR 185.25-5.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Engineering
Issued 1 March 1996
Resolved
Repair and prove operation of port engine tachometer.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
PROVIDE A REPAIR PROPOSAL FOR THE INSET SIDE SHELL PLATING, CRUSHED AND DEFORMED FRAMES, IN WAY OF THE PORT SIDE ENGINE ROOM.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
PROVIDE A REPAIR PROPOSAL FOR THE DAMAGED BULKHEAD AND FRAMES IN THE 2ND COMPARTMENT, TO INCLUDE DAMAGED SID SHELL PLATING.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Lifesaving
Issued 29 June 1995
Resolved
REMOVE ALL PASSENGER SEATING ON UPPER DECK THAT IS IN EXCESS OF 45 PASSENGERS. SEATING IS MEASURED AT 18 INCHES PER PERSON.
Condition: Unknown
Due 29 June 1995
Resolved 29 June 1995
Lifesaving
Issued 24 June 1995
Resolved
Remove mattresses from the life floats and return life floats to a float free arrangement.
Condition: Unknown
Due 24 June 1995
Resolved 26 June 1995
Lifesaving
Issued 9 February 1995
Resolved
Provide 6 orange smoke and 3 additional red distress flares.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Accommodation/Occupational Safety
Issued 9 February 1995
Resolved
Properly label passenger loading characteristics in accordance with the stability letter.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 9 February 1995
Resolved
Replace flame screens on port and starboard fuel vents.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Documentation
Issued 9 February 1995
Resolved
Provide pollution prevention placards at bridge and engine room stations.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Lifesaving
Issued 9 February 1995
Resolved
Repair small cracks in lifefloats and rips in netting.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Lifesaving
Issued 9 February 1995
Resolved
Provide 6 waterlights for life floats so that each life float has a separate water light attached.
Condition: Unknown
Due 9 February 1995
Resolved 10 February 1995
Documentation
Issued 9 February 1995
Resolved
Provide a copy of the FCC operators permit.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Electrical
Issued 9 February 1995
Resolved
Label electrical panel in the engine room.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Electrical
Issued 9 February 1995
Resolved
Provide a battery box for two (2) batteries in wheelhouse. Ensure proper wiring.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Lifesaving
Issued 9 February 1995
Resolved
Secure step over the shaft on the port engine.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Lifesaving
Issued 9 February 1995
Resolved
Secure the ladder to the engine room.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Navigation
Issued 9 February 1995
Resolved
Provide one (1) ships horn/whistle.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Deck/Cargo
Issued 9 February 1995
Resolved
Replace mooring lines as needed.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 9 February 1995
Resolved
Repair lagging to port engine.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Lifesaving
Issued 9 February 1995
Resolved
Remove unused battery from the engine room.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Electrical
Issued 9 February 1995
Resolved
Remove dead end wires from port engine, generator, and hot water heater.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 9 February 1995
Resolved
Move or protect fuel lines to port engine and generator on walkway in engine room.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Navigation
Issued 2 December 1994
Resolved
Repair leaks to steering lines in compartment #2 and properly remove all hydraulic fluid from the bilges.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Repair all cracked welds in forepeak in way of frame #1.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Engineering
Issued 2 December 1994
Resolved
Repair all exhaust leaks on both main diesel engines.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Repair 4 twisted longitudinals on port side in forward area of engine room.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Replace missing longitudinals in way of old exhaust system on both sides inthe engine room.
Condition: Unknown
Due 1 February 1995
Resolved 1 February 1995
Electrical
Issued 2 December 1994
Resolved
Remove improper wiring connections to battery and provide caps to same battery.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Repair cracks to rub rail on port side and stern and all others found during drydocking.
Condition: Unknown
Due 1 February 1995
Resolved 1 February 1995
Lifesaving
Issued 2 December 1994
Resolved
Provide double clamps to all overboard lines in engine room and lazarette.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Engineering
Issued 2 December 1994
Resolved
Replace port propeller due to excessive pitting.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Engineering
Issued 2 December 1994
Resolved
Replace port cutlass bearing due to excessive wear.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Repair crack on starboard side in compartment #3 just forward of the aft bulkhead.
Condition: Unknown
Due 15 December 1994
Resolved 15 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Plug trim tab hydraulic lines on starboard side and remove all inoperable gear associated with trim tabs.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Properly remove excessive oil from bilges.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Engineering
Issued 2 December 1994
Resolved
Repair and replace lagging on all exhaust lines.
Condition: Unknown
Due 1 February 1995
Resolved 1 February 1995
Navigation
Issued 2 December 1994
Resolved
Replace starboard rudder bearing due to excessive play and wear.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Repair all cracked welds as marked, and all others found, in lazarette in way of stern corners.
Condition: Unknown
Due 1 February 1995
Resolved 1 February 1995
Construction/Loadline
Issued 2 December 1994
Resolved
Replace twisted framing as marked in lazarette in way of stern corners.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Construction/Loadline
Issued 2 December 1994
Resolved
Make all sea valves available for inspection.
Condition: Unknown
Due 2 December 1994
Resolved 2 December 1994
Navigation
Issued 17 June 1994
Resolved
REINSTALL MISSING RUDDER POST CAPTIVE CHAINS.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Construction/Loadline
Issued 18 February 1994
Resolved
PERMANENTLY CLOSE OR SEAL OFF WATERTIGHT DOOR BETWEEN ENGINE ROOM AND PUMP ROOM.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Construction/Loadline
Issued 18 February 1994
Resolved
REPLACE PVC VALVES FOR MSD OVERBOARD DISCHARGE WITH VALVES OF METALLIC OR EQUIVALENT FIRE-RESISTANT MATERIAL.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Construction/Loadline
Issued 18 November 1993
Resolved
WELD BROKEN STANCION, STBD SIDE FORWARD AT DECK.
Condition: Unknown
Due 18 November 1993
Resolved 18 November 1993
Fire Fighting
Issued 19 February 1993
Resolved
Conduct a satisfactory fire and man overboard drill in the presence of a Coast Guard marine inspector.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Documentation
Issued 19 February 1993
Resolved
Provide valid Certificate of Documentation with Registry endorsement.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Engineering
Issued 19 February 1993
Resolved
Tighten aft inboard engine mount on port engine.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Electrical
Issued 19 February 1993
Resolved
Provide overcurrent protection and properly installed and mounted switch for diesel fuel pump located in engine room.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Lifesaving
Issued 19 February 1993
Resolved
Replace missing pendants on life floats with polypropylene line.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Lifesaving
Issued 19 February 1993
Resolved
Provide a 60 foot polypropylene lifeline on at least one of the liferings.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Fire Fighting
Issued 19 February 1993
Resolved
Provide elbow on aft fire station so hose does not kink when deployed.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Lifesaving
Issued 19 February 1993
Resolved
Provide a total of twelve 25mm flares and a total of six smoke flares.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Construction/Loadline
Issued 19 February 1993
Resolved
Reweld cracked welds on port side shell in compressor room just forward of aft bulkhead where marked.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Engineering
Issued 19 February 1993
Resolved
Repair air leak on starboard compressor located in compressor room.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Engineering
Issued 19 February 1993
Resolved
Repair ventilation duct closure on lazarette starboard vent.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Fire Fighting
Issued 19 February 1993
Resolved
Provide operating pressure gauge on fire pump.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Construction/Loadline
Issued 19 February 1993
Resolved
Provide a captive chain on forepeak hatch.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Lifesaving
Issued 19 February 1993
Resolved
Provide eight additional adult PFD's for a total of 125. Vessel restrictedto carrying 117 passengers until completed.
Condition: Unknown
Due 15 December 1993
Resolved 19 February 1993
Navigation
Issued 19 February 1993
Resolved
Tighten bolts on port rudder post head and replace nuts where necessary. Bolt holes should be properly aligned prior to installation.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Construction/Loadline
Issued 19 February 1993
Resolved
Remove excessive oil from bilges.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Construction/Loadline
Issued 19 February 1993
Resolved
In engine room, reweld cracked underdeck longitudinal frame on port side where the exhaust support bracket is attached.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Engineering
Issued 19 February 1993
Resolved
Provide cap for lube oil tank, port side, engine room.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Engineering
Issued 19 February 1993
Resolved
Secure the protective bracket over the port propeller shaft.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Electrical
Issued 19 February 1993
Resolved
Provide cap on battery located aft of port engine, underneath ventilation ducting.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Electrical
Issued 18 November 1992
Resolved
Replace all burned electrical wiring in engine room.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Engineering
Issued 18 November 1992
Resolved
Double clamp all main cooling water lines on port and starboard main dieselengines.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Replace or clean oil from plywood floor in compressor/ air conditioning compartment.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Unknown
Issued 18 November 1992
Resolved
Remove all debris from vessel including fire damaged insulation, sheating and wiring. Remove all oil and oily debris from bilges and make entire vessel available for inspection.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Reweld all cracked welds in aft starboard corner of lazarette.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Engineering
Issued 18 November 1992
Resolved
Replace cracked mounting bolt on port main engine, forward outboard corner.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Engineering
Issued 18 November 1992
Resolved
Replace all exhaust pipe lagging on all machinery in the engine room. All lagging has been damaged by fire.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Secure framing around hatch leading into compressor/air conditioning compartment.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Replace sheathing over insulation on deck hatch over port engine.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Submit repair proposal for battered and buckled frames and side shell in way of forward port corner of engine room. PROPOSAL MUST BE SUBMITTED AND APPROVED BY USCG MSD ST THOMAS PRIOR TO COMMENCEMENT OF THE REPAIRS.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Accommodation/Occupational Safety
Issued 18 November 1992
Resolved
Replace skin valve for head intake.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Make wire penetrations in engine room/lazarette bulkhead watertight.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 18 November 1992
Resolved
Reweld pinhole in frame bay #2 counting forward from transom at the deck joint in the lazarette.
Condition: Unknown
Due 18 November 1992
Resolved 18 November 1992
Electrical
Issued 21 August 1992
Resolved
Secure main A/C electric switchboard front panel located on aft bulkhead, starboard side in engine room. Provide cover plates for exposed breaker openings. Provide dielectric mat in front of panel.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Engineering
Issued 21 August 1992
Resolved
Renew lagging on main engine exhausts where necessary.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Construction/Loadline
Issued 21 August 1992
Resolved
Make overhead in compressor room weathertight.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Construction/Loadline
Issued 21 August 1992
Resolved
Provide dog for watertight hatch leading into engine room.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Engineering
Issued 21 August 1992
Resolved
Renew transmission cable for starboard engine. Cable is presently frayed in several locations due to chafing against moving machinery.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Engineering
Issued 21 August 1992
Resolved
Provide skin valve for transmission cooling water exhaust on both engines. Remove plastic hosing from this system and replace with rubber or other material suitable for this service.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Electrical
Issued 21 August 1992
Resolved
Remove improper speaker wire from audio amplifier circuit and replace with approved wire. Remove all unused wire from under the pilot console, and inthe vicinity of the engines, battery boxes and generator.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Lifesaving
Issued 24 October 1991
Resolved
BUOYANT APPS BLEACHED FROM EXPOSURE TO WEATHER AND NO LONGER INTERNATIONAL_x001C_ORANGE.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
LIGHT ON FORWARD RING BUOY INOPERABLE.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
RING BOUY BLEACHED FROM EXPOSURE TO THE ELEMENTS AND NO LONGER_x001C_ INTERNATIONAL ORANGE.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
FLOAT FREE LIGHT NO LONGER WATER TIGHT DUE TO MISSING RETAINING PIN. _x001C_ _x001C_
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
OUTER SKIN ON SEVERAL BUOYANT APPS. TORN.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
PADDLES IN BUOYANT APPS. MISSING.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
PENDANTS ON BUOYANT APPS ARE NOT 12 FT. AND DIVIDED INTO TO TWO SIX _x001C_ FOOT SECTIONS.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Lifesaving
Issued 24 October 1991
Resolved
RETROREFLECTIVE TAPE INADEQUATE OR MISSING ON BUOYANT APPS.
Condition: Unknown
Due 1 November 1991
Resolved 4 December 1991
Engineering
Issued 15 October 1991
Resolved
REPLACE BOTH PORT AND STARBOARD PROPELLERS DUE TO EROSION OF THE METAL AT THE BASE OF THE BLADES ON THE HUB.
Condition: Unknown
Due 15 October 1991
Resolved 15 October 1991
Engineering
Issued 26 October 1990
Resolved
PLACE DOUBLE CLAMPS ON ALL FLEXIBLE COOLING HOSES ON BOTH ENGINES THAT LEAD OVERBOARD.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Electrical
Issued 26 October 1990
Resolved
REPLACE THE COVER IN THE AIR CONDITIONER ELECTRICAL CONTROL BOX IN THE COMPRESSOR ROOM TO PREVENT EXPOSURE OF PERSONS TO ELECTRICAL HAZARDS.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Engineering
Issued 26 October 1990
Resolved
REPAIR LEAKS IN FUEL LINE AT PORT FUEL FILTERS.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Electrical
Issued 26 October 1990
Resolved
INSTALL LIGHTING FIXTURE COVERS ON ALL ENGINE ROOM LIGHTS AND BOTH MEN AND WOMEN'S HEADS.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Fire Fighting
Issued 26 October 1990
Resolved
PROVIDE AN APPROVED BRACKET FOR THE B-II FIRE EXTINGUISHER IN THE ENGINE ROOM.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Engineering
Issued 26 October 1990
Resolved
REPAIR AND MAKE AVAILABLE FOR TESTING AND INSPECTION, THE STARBOARD AIR COMPRESSOR.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Engineering
Issued 26 October 1990
Resolved
REPLACE THE BROCKEN PRESSURE GUAGE ON THE PORT COMPRESSOR.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Electrical
Issued 26 October 1990
Resolved
REPLACE THE CORRODED FRESH WATER PUMP MOTOR CONTROLLER IN THE STERN COMPARTMENT.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Engineering
Issued 23 October 1989
Resolved
INSTALL GUARDS ON DAY TANK FUEL TANK TO PROTECT SIGHT GLASS FROM DAMAGE.
Condition: Unknown
Due 23 October 1989
Resolved 23 October 1989
Engineering
Issued 23 October 1989
Resolved
MAKE REPAIRS TO CLUTCH DRIVEN BILGE PUMP ON STARBOARD MAIN ENGINE
Condition: Unknown
Due 23 October 1989
Resolved 23 October 1989
Construction/Loadline
Issued 23 October 1989
Resolved
REPLACE VERTICAL STANCHIONS IN ENGINE ROOM (2) TO SUPPORT MAIN LONGITUDINALDECK GIRDERS.
Condition: Unknown
Due 23 October 1989
Resolved 23 October 1989
Documentation
Issued 23 October 1989
Resolved
PROVIDE COPY OF FCC SOLAS EXEMPTION CERTIFICATE
Condition: Unknown
Due 23 October 1989
Resolved 23 October 1989
Fire Fighting
Issued 20 November 1987
Resolved
PROVIDE AN APPROVED NOZZLE FOR FIRE STATION #1.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Lifesaving
Issued 20 November 1987
Resolved
RENEW LINE AND GRABLINE ON RINGBUOY LOCATED ON STERN OF VESSEL.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Accommodation/Occupational Safety
Issued 15 January 1987
Resolved
PERFORM A SANITARY CLEAN UP OF BOTH HEADS.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Lifesaving
Issued 15 January 1987
Resolved
PROVIDE A SAFETY ORIENTATION LECTURE AT THE BEGINNING OF EACH VOYAGE OR POST LIFE PRESERVER DONNING INSTRUCTIONS ON EACH PASSENGER DECK.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Lifesaving
Issued 15 January 1987
Resolved
PLACE THE EPIRB INTO OPERATING CONDITION.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Lifesaving
Issued 15 January 1987
Resolved
LABEL THE CHILD'S PFD LOCKER ON THE UPPER DECK.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Electrical
Issued 15 January 1987
Resolved
REPAIR THE FIRE DAMAGED LIGHT IN THE WOMEN'S HEAD.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Accommodation/Occupational Safety
Issued 15 January 1987
Resolved
REPLACE THE BROKEN GLASS IN THE MAIN DECK ACCOMMODATION AREA ON THE STARBOARD SIDE.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Deck/Cargo
Issued 15 January 1987
Resolved
PLACE ANCHORING EQUIPMENT ON THE BOW VICE THE ENGINE ROOM. MAKE THE ANCHOR READY FOR INSTANT USE.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Engineering
Issued 15 January 1987
Resolved
REPLACE THE PLASTIC DAY TANK SIGHT GLASS WITH AN APPROPRIATE TYPE.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Construction/Loadline
Issued 15 January 1987
Resolved
MARK THE WATERTIGHT DOOR AT FRAME 12 "TO BE KEPT CLOSED AT ALL TIMES EX- CEPT WHEN USED FOR TRANSIT".
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Construction/Loadline
Issued 15 January 1987
Resolved
REMOVE ALL EXCESS OIL FEROM THE ENGINE ROOM BILGE.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Electrical
Issued 15 January 1987
Resolved
REPAIR THE LEAK IN THE GENERATOR EXHAUST LINE.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Construction/Loadline
Issued 15 January 1987
Resolved
REMOVE ALL FUEL FROM THE BOW COMPARTMENT.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Deck/Cargo
Issued 15 January 1987
Resolved
PROVIDE ANCHOR LINE FOR THE BOW ANCHOR, ATTACH IT TO THE ANCHOR AND KEEP IT READY FOR USE IN THE VICINITY OF THE BOW.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Accommodation/Occupational Safety
Issued 15 January 1987
Resolved
IN ADDITION TO THE STBD MAIN CABIN WINDOW, REPAIR OR REPLACE ALL FRACTURED WINDOWS.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Construction/Loadline
Issued 15 January 1987
Resolved
REPAIR THE LEAK IN THE SEA WATER INTAKE LINE IN THE STEERING COMPARTMENT.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Engineering
Issued 15 January 1987
Resolved
REPAIR THE LEAK IN THE STBD ENGINE TRANSMISSION COOLING LINE.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Engineering
Issued 15 January 1987
Resolved
PROVIDE CHAFFING PROTECTION FOR THE COPPER FUEL LINES WHERE THEY CROSS OVER"KNIFE EDGES".
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Lifesaving
Issued 15 January 1987
Resolved
CONNECT ALL INFLATABLE WEAK LINKS TO THE VESSEL.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987
Engineering
Issued 15 January 1987
Resolved
PROVIDE ADDITIONAL CATHODIC PROTECTION FOR THE PROPELLERS.
Condition: Unknown
Due 15 January 1987
Resolved 15 January 1987