Records from 2016 to 2026. Most recent: inspection, 7 January 2026.
Documentation record
Registered dimensions (L × B × D)50.0 ft × 19.0 ft × 7.0 ft
Registered tonnagegross 44 / net 35
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderINTRACOASTAL IRON WORKS · BOURG LA, UNITED STATES · built 1993
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it44 - Simplified, Gross Ton
35 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 11
7 January 2026
Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8269918
24 March 2025
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8088953
27 November 2024
Drydock Exam · Examination of Repairs · Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8040627
18 January 2024
Deficiency Check · Annual Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7840241
20 October 2022
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7553721
28 December 2021
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7365870
10 November 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7093173
20 November 2019
Drydock Exam · Annual Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6844540
4 January 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6605649
26 October 2017
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6294764
12 October 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6017473
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 January 2024
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practicable conditions. Bilge system was found completely clogged and unable to dewater any of the applicable watertight spaces. Check valve in lazarette also found to be improperly functioning with water backflowing into the space. Conduct necessary repairs to ensure proper operation of the system.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 30 January 2024
Resolved 30 January 2024
Resolution: Vessel conducted necessary repairs/cleaning of system. system tested satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 January 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] repairs were identified in numerous voids of the vessel, some below the water line. Create inspection schedule to monitor repairs and submit a repair proposal for next drydock.
Action required: 705 - Other - as specified
Resolved 14 February 2025
Resolution: Vessel completed repairs at DD period. AN: 8040627
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 18 January 2024
Resolved
The master shall conduct sufficient fire and man overboard drills to make sure that each crew member is familiar with his or her duties in case of emergency. Required crew was not present at time of inspection to conduct drills. Ensure crew is present to conduct satisfactory fire and man overboard drills.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 January 2024
Resolved 30 January 2024
Resolution: Crew demonstrated competency in conducting both fire and man overboard drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 January 2024
Resolved
Exhaust gas must not leak from the piping or any connections. Numerous leaks in the exhaust piping were found in the ER and lazarette. Conduct necessary repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 February 2024
Resolved 30 January 2024
Resolution: Necessary repairs conducted, no leaks were detected upon system testing.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 18 January 2024
Resolved
Nozzles, flanges, or other fittings for fuel tank pipe connections to a metal tank must be welded and reinforced. Aft fuel fill pipe is cracked where pipe meets the deck plate. Conduct necessary repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 February 2024
Resolved 30 January 2024
Resolution: Fuel fill pipe was repaired to satisfaction of MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 January 2024
Resolved
Flexible hoses may be used provided it is fitted with suitable connection fittings and has high resistance to salt water, petroleum oil, and vibrations. Diesel fuel hose in lazarette was found leaking. Conduct necessary repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 February 2024
Resolved 30 January 2024
Resolution: Repairs conducted to satisfaction of MI.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 18 January 2024
Resolved
All vessels shall be provided with suitable steering apparatus. Significant chafing was observed on hydraulic lines of steering apparatus. Renew hydraulic lines and prevent future chafing.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 February 2024
Resolved 30 January 2024
Resolution: Repairs conducted to the satisfactory of MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 January 2024
Resolved
Rigid nonmetallic materials are acceptable for use in non-vital piping systems. Flexible hose for water expansion tank connected to port engine was deteriorated. Renew hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 February 2024
Resolved 30 January 2024
Resolution: Vessel renewed hose from engine cooling system to expansion tank on deck. System test satisfactory to attending MI.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 18 January 2024
Resolved
The owner or operator shall be prepared to conduct tests and have the vessel ready for inspections of all watertight closures in the hull, decks, and bulkheads. Incomplete repair welds were observed on numerous water tight hatches. Conduct necessary repairs on next dry dock availability. 46 CFR 176.802(a)(2)
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 29 May 2024
Resolution: Vessel completed welding of hatches
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 January 2024
Resolved
Each life jacket must be marked with type I retroreflective material. The retroreflective tape of 23 lifejackets were found wasted. Vessel replaced the lifejackets with new lifejackets during the inspection. New life jackets were found satisfactory. 46 CFR 185.604(h)
Action required: 10 - Deficiency Rectified
Due 18 January 2024
Resolved 18 January 2024