ST MARYS CONQUEST

Built
1937
Last inspected
6 March 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 6 March 2026
…with no type recorded8
Operational controls None recorded without a removal date
Years with a record 33 calendar years (1987–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

5015012
Flag
UNITED STATES
Tonnage
5653 - Simplified, Gross Ton 5653 - Simplified, Net Ton
Maury page id
psix-41965
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 5

Inspection history · 93

6 March 2026 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8320919
21 April 2025 Administrative Inspection · Deficiency Check · Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8150863
7 January 2025 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8059550
13 May 2024 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7911603
13 May 2024 Drydock Extension
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7912890
10 May 2024 Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 7909846
13 March 2024 Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7895715
6 February 2024 Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7861982
17 October 2023 Deficiency Check · Damage Survey
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7810045
3 May 2023 Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7681125
27 March 2023 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7656107
15 March 2023 Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7651459
4 May 2022 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7444134
19 April 2022 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7433767
15 February 2022 Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7396578
31 January 2022 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7388145
21 January 2021 COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7122949
12 August 2020 Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7031357
12 August 2020 Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7059967
22 May 2019 Drydock Exam · Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6697061
27 March 2019 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6650779
20 August 2018 Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6528655
13 March 2018 Examination of Repairs · Deficiency Check · Drydock Extension
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6371370
22 February 2018 MTSA Verification · Annual Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6359909
1 February 2018 Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 6376486
2 May 2017 Plan Review (Other than "T")
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6137013
27 February 2017 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6098236
3 February 2017 COI Inspection · MARPOL Annex VI Survey · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6083798
2 June 2016 Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5898734
9 February 2016 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5811870
28 January 2016 Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5807900
9 December 2015 Damage Survey
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5779156
22 July 2015 Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5193690
25 June 2015 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5163079
12 June 2015 Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5154048
21 April 2015 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5107761
31 March 2015 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5094329
23 March 2015 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5089424
3 March 2015 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5077507
16 July 2014 Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4926379
3 April 2014 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4828387
7 March 2014 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4812414
23 October 2013 Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4739993
7 June 2013 Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4613604
5 June 2013 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4612070
6 June 2012 Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4358456
29 February 2012 Deficiency Check · COI Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4253967
23 June 2011 Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4054218
26 February 2010 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3686690
19 February 2009 Plan Review (Other than "T") · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3420633
12 September 2008 Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3326669
28 July 2008 Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3283982
16 May 2008 Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3207102
27 March 2008 Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3286072
31 January 2008 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3141368
12 January 2008 Type not recorded
No type recorded · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 3129281
10 January 2008 Type not recorded
No type recorded · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 3128919
20 December 2007 Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3118832
20 December 2007 Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3119334
20 June 2007 Drydock Extension
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3141609
5 April 2007 Deadweight Survey · Deficiency Check · Plan Review (Other than "T")
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2903018
31 January 2007 COI Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2852885
20 April 2006 Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2629814
18 April 2006 Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2646707
3 April 2006 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2617911
2 June 2005 MTSA Verification
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2377359
26 April 2005 Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2343134
16 May 2004 Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2069153
8 March 2004 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2015667
22 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978908
13 March 2003 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1753449
21 June 2002 Hull Examination
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1634612
29 April 2002 Drydock Extension · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1610455
30 January 2002 COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1482743
18 October 2001 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1074189
12 September 2001 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1072699
4 May 2001 Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1068221
12 March 2001 Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1065839
21 February 2001 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1058837
25 March 2000 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 816425
18 February 2000 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1378949
17 February 1999 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1473459
25 February 1998 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1408101
15 May 1997 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1106678
9 April 1997 Hull Examination · Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1102108
27 March 1996 Damage Survey
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1083527
24 March 1996 Damage Survey
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1078753
22 March 1996 Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 89750
14 March 1996 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1367665
16 August 1995 Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1447474
31 July 1995 Damage Survey
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1360211
30 July 1995 Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 42745
20 January 1987 Administrative
Administrative · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1008643

Deficiency record · 140

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 June 2025 Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port required. One lifebuoy was missing the required markings and was missing retroreflective tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2025
Resolved 30 June 2025
Resolution: Ring buoy was cleaned, restenciled, and new retro applied.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 June 2025 Resolved
Where fitted, it shall be the duty of the master to see that the emergency lighting and power systems are operated and inspected at least once in each week. 04 emergency lights were found inoperable. Conduct necessary repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2025
Resolved 30 June 2025
Resolution: All four lights are now operational.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 21 April 2025 Resolved
Each life raft must be arranged for float-free launching. The arrangement must ensure that the life raft or life rafts, when released and inflated, are not dragged under by the sinking vessel. Hydrostatic Release Unit was installed incorrectly which had the painter line secured to the cradle. Training was provided to the crew and the HRU was installed correctly during the inspection.
Action required: 10 - Deficiency Rectified
Resolved 4 June 2025
Resolution: Training was provided to the crew and the HRU was installed correctly during the inspection.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 April 2025 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment is provided, maintained, and replaced as indicated. CO2 system for the bow thruster room was recently serviced; however, 01 hoses was found split in numerous places. Conduct necessary servicing of the CO2 system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 30 June 2025
Resolution: The hose was renewed. All Sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 13 May 2024 Resolved
Vessel that operates in fresh water at least six months in every 12 month period since the last drydock must be examined in accordance with intervals set inside the table. Vessels COI shows ISE next exam date 20APR2023. Vessel is authorized to off load at St. Marys Cement dock and is free to transit. No further cargo operations are authorized intil ISE is completed or an ISE extension request is approved.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 July 2024
Resolved 15 May 2024
Resolution: Conducted drydock extension/ISE extension exam and OCMI granted one year extension of ISE.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 13 March 2024 Resolved
Approved portable fire extinguishers must be installed in accordance with Table 95.50-10(a) of this section. Several extingushers were not on board due to them currently being serviced.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2024
Resolution: Received report showing servicing and placement of all fire extinguishers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 March 2024 Resolved
All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the "maximum allowable working pressure" of the pressure vessel or piping system. The SRV for the pressure vessel in the bow thruster space relieved at 10 psi lower than set point and the SRV for the main deck tank relieved at 10 psi higher than set point.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 March 2024
Resolved 21 March 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 March 2023 Resolved
CO2 portable extinguisher in Green Bay Deck Gen enclosure needs annual service.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: A serviced portable CO2 for 2023 has been provided.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 27 March 2023 Resolved
Mount liferaft on forecastle deck for automatic release.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: Liferaft has been mounted for automatic release on focsle.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 27 March 2023 Resolved
Gen Deck House port and stbd WTD entry need adjustments.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2023
Resolved 5 April 2023
Resolution: WTDs have been adjusted.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2023 Resolved
Dust collector M/C amp metter needs to be replaced.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: Amp meter on M/C for dust collector has been replaced.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 27 March 2023 Resolved
In stbd fwd cement tunnel area outside of control room, repair or replace EM light fixture.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: EM light fixture is operating properly.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 27 March 2023 Resolved
Green Bay Deck Gen enclosure ventilation hatch is missing hardware on studs to secure properly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: Missing securing hardware has been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2023 Resolved
In cement control room, remove stowed items behind the SWBD.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: Items found stowed behind SWBD in control room have been removed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 March 2023 Resolved
Provide 1 Type I lifejacket to meet COI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 5 April 2023
Resolution: TYPE I lifejacket with vessel name, light, and whistle has been provided to meet COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 April 2022 Resolved
Cummins 6.7 service Genset is currently being overhauled. Complete servicing with CAT/Cummins. Provide evidence of L/O psi, High temp, Overspeed, reverse power relay testing or test for local OCMI prior to putting Genset back in normal service.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 May 2022
Resolution: Received vendor report and attesting email that alarm testing and reverse power relay completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 April 2022 Resolved
Green Bay unloading Genset cat 3512 is currently being serviced with CAT. Provide evidence of L/O psi, High Temp, Over speed, and reverse power relay testing or test for local OCMI prior to putting Genset back in normal service.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2022
Resolution: Received CAT vendor tech reports for top end over haul conducted and layup inspection / alarm setpoint testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 April 2022 Resolved
Remote valves for High and Low suction of main fuel oil tank are not operational. Repair both valves and test remote operation or both to satisfaction of local OCMI.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2022
Resolution: Valves and remote reach rods have been repaired and operate properly.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 19 April 2022 Resolved
Multiple Battle lantern/emergency lights not working. Make repairs and provide MI’s with total count of DC lights onboard.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2022
Resolution: 04 defective units were discovered during vessel sweep, new units ordered and are being switched out with operational ones.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 April 2022 Resolved
Life ring up forward on STBD side needs retro tape and water light is not operational.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 May 2022
Resolution: New retro tape installed, waterlight restored to proper operation.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 April 2022 Resolved
PORT side running light has issue with lamp changing device. Make repairs and verify STBD side is operating as intended prior to vessel movement.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2022
Resolution: Nav lights have been replaced and are operating properly.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 August 2020 Resolved
On 11AUG20 the vessel grounded just outside the navigation channel IVO the Port of Green Bay. The vessel's bow section grounded and the vessel became stuck and unable to free itself. As a result of the grounding the vessel is to have a damage survey conducted by it's Recognized Classification Society. Results of this survey and any resulting conditions of class are to be reported immediately to MSD Sturgeon Bay. If the survey reveals that there is no damage and there are no conditions of class the vessel may have this 835 cleared and signed off on by the attending Class Surveyor. Please contact the below Inspector with the damage survey findings.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 August 2020
Resolution: ABS Sturgeon Bay conducted a damage survey and no damage was found. No conditions of class were issued. The vessel is fit for route and service.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 March 2019 Resolved
Bilges in machinery spaces must be free of oil accumulation which might create a fire hazard. Bowthruster space bilge has 3" of oil present. Remove oil from bilge to the satisfaction of attending Marine Inspector prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 April 2019
Resolved 3 April 2019
Resolution: Bowthruster bilge space has been pumped free of oil and cleaned to the satisfaction of attending Marine Inspectors.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 March 2019 Resolved
Load line markings and reference line shall be painted white or yellow on a dark background or in black on a light background. Load line as reference line are same color as hull. Paint markings a contrasting color to hull to the satisfaction of attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2019
Resolved 9 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 March 2019 Resolved
If a vessels COI is renewed less often than annually, the Marine Inspector must check the settings of the safety or relief valves on all pressure vessels twice every 5 years, no more than 3 years elapse. Relief valve on pressure vessel located on tool deck would not operate properly. Prove operation of relief valve or work with ABS Classification to remove pressure vessel to the satisfaction of attending Marine Inspectors.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2019
Resolved 21 January 2021
Resolution: All safety releif valves were tested along with details of the MAWP for each unit.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 27 March 2019 Resolved
Each light fixture must have a globe, lens, or diffuser of high strength guard or be made of high strength material. Forward store room by anchor on the port side of vessel is missing diffuser. Repair/replace diffuser/fixture to satisfaction of attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2019
Resolved 9 July 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 27 March 2019 Resolved
Emergency lighting and power systems shall be in proper operating condition. Emergency lighting in tool deck space, at aft of cargo tunnel, and forward of cargo tunnel found inoperable. Repair/replace to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2019
Resolved 1 August 2019
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 27 March 2019 Resolved
As noted in CVC Policy Letter 16-04, vessel required to carry logbook. Logbook not found on vessel. Provide documentation to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2019
Resolved 18 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 27 March 2019 Resolved
All lifesaving equipment must be arranged IAW sub chapter W. Life raft not arranged to float free with current hydrostatic release installment. Repair/replace to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2019
Resolved 9 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2019 Resolved
Machine Aux Controller Group has 2 motor controllers cabinets not labeled and one is missing cover for run light indicator.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: Motor controller cabinets were labeled and cover was installed for missing run indicator light to the satisfaction of attending Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2019 Resolved
Electrical cord for mounted drill press was chaffed and exposing cable conductors.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: Drill press power cord was repaired to the satisfaction of attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 March 2019 Resolved
Hydraulic oil head tank for Bowthruster has loose pipe fittings and is leaking down assembly and onto the deck.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: Hydraulic head tank for Bowthruster had assembly fittings tightend up and oil removed from deck to the satisfaction of attending Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2019 Resolved
Machine Space [name withheld] P101 had breaker #15 completed missing from panel exposing buss work.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: Machine Space [name withheld] P101 breaker slot #15 has been blanked off to the satisfaction of attending Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2019 Resolved
Found dead ended cable hanging in workspace/shop area.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: Dead ended cable was terminated inside of a junction box to the satisfaction of attending Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2019 Resolved
A motor controller cabinet located at MCC #3 is not labeld.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: MCC #3 motor controller cabinet was labeled to the satisfaction of attending Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 27 March 2019 Resolved
On deck generator shed light fixture in overhead is missing its globe, cage, diffuser, cover.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2019
Resolved 27 March 2019
Resolution: On deck generator shed light fixture in overhead has its cover installed to the satisfaction of attending Marine Inspector.
Construction/Loadline › Hull › Weld
Issued 13 March 2018 Resolved
Reattach pipe hanger for sounding tubes in #3 Stbd, #4 P & S, #5 P & S ballast tanks.
Due 30 March 2019
Resolved 10 July 2019
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 22 February 2018 Resolved
Several emergency lights (automatic battery operated lanterns) not illuminating: Control room, center landing between ballast pumps, cargo tunnel slide locations 16, 18, 37, & 47. Prove proper operation of all emergency lighting.
Due 31 March 2018
Resolved 13 March 2018
Resolution: Renewed lanterns with LED type.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 22 February 2018 Resolved
Emergency light missing at emergency escape trunk aft port side of cargo tunnel. Install and prove proper operation of emergency lamp at escape trunk.
Condition: Improper/Lack of Maintenance
Due 31 March 2018
Resolved 13 March 2018
Resolution: Installed automatic battery operated lantern.
Fire Fighting › Remote Fuel Shutoff › General
Issued 22 February 2018 Resolved
Properly label remote operated fuel shutoff valve for on deck cargo unloading generator.
Due 31 March 2018
Resolved 13 March 2018
Engineering › Fuel Oil Storage/Transfer System › Flange
Issued 22 February 2018 Resolved
Suitable shields are to be fitted in way of the flanged joints in the fuel fill piping in vicinity of valve above "at sea" generator.
Due 31 March 2018
Resolved 13 March 2018
Resolution: Installed ABS Class approved flange "tape".
Communications › Alarms/Indicators › High Water Alarm
Issued 22 February 2018 Resolved
Prove proper operation of forward bilge high level alarm.
Due 31 March 2018
Resolved 13 March 2018
Resolution: Demonstrated satisfactory visual and audible operation
Electrical › Lighting (service) › Switch
Issued 3 February 2017 Resolved
Renew Light switch for forward floodlight, starboard forecastle. 46 CFR 111.01-1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Stability › Watertight Integrity › General
Issued 3 February 2017 Resolved
Reinstall howse pipe covers for both anchor chains.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 3 February 2017 Resolved
Renew lifebouy light bracket starboard side main deck forward.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Engineering › Compressed Air System (control) › Hose
Issued 3 February 2017 Resolved
Renew aft hose, Diesel driven air compressor at the cooler.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 3 February 2017 Resolved
Properly service portable fire extinguisher located in the on deck generator space.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Electrical › Electrical Distribution System (service) › Cable
Issued 3 February 2017 Resolved
Remove or properly terminate dead end wire in the ladderway main deck forward machinery space.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Electrical › Lighting (service) › Conductor
Issued 3 February 2017 Resolved
Properly wire (Remove extension cord) light fixture located in the aft tunnel at end of conveyor or remove.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 April 2017
Resolved 27 February 2017
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 3 February 2017 Resolved
Remove, or make available for internal inspection, and testing of relief valve bubbler system air compressor.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 February 2017 Resolved
Install (Bolt down) Guards for both ballast pumps. Guards found on station not bolted down.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 February 2017 Resolved
Prove proper operation of navigation light port side.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 3 February 2017
Resolution: Corrected prior to departure.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 3 February 2017 Resolved
Prove proper operation of all e lighting.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Electrical › Lighting (service) › Lighting Fixture
Issued 3 February 2017 Resolved
Properly mount light fixture main deck port side near Water Tight door. Light fixture is busted away from bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2017
Resolved 27 February 2017
Construction/Loadline › Hull › Hull Plating
Issued 9 December 2015 Resolved
Make temporary repairs to 18-inch fracture located at stbd transom in vicinity of draft mark 12-13 to the satisfaction of attending ABS surveyor prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2015
Resolved 9 December 2015
Resolution: ABS witnessed satisfactory temp repairs.
Construction/Loadline › Hull › Hull Plating
Issued 9 December 2015 Resolved
Make permanent repairs to temp repairs made to 18-inch fracture located at stbd transom in vicinity of draft mark 12-13 to satisfaction of ABS.
Action required: 705 - Other - as specified
Due 31 January 2016
Resolved 1 April 2016
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1-Routine Visual Inspections
Issued 12 June 2015 Resolved
The weekly and quarterly inspection checklists were improperly filled out. They were copies of a previously filled out checklist; there were no original signatures. Properly fill out each checklist and sign with original signature.
Action required: 705 - Other - as specified
Due 12 July 2015
Resolved 25 June 2015
Lifesaving › Inflatable Liferafts › Float Free
Issued 12 June 2015 Resolved
Renew hydrostatic release attached to the liferaft located on the bow. Release expired on Jan2015.
Action required: 705 - Other - as specified
Due 12 July 2015
Resolved 25 June 2015
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 23 March 2015 Resolved
03 Lifebuoys do not have proper retro-reflective tape, name of the vessel and homeport as required. 46 CFR 199.70
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 31 May 2015
Resolved 12 June 2015
Lifesaving › Inflatable Liferafts › Container Construction
Issued 23 March 2015 Resolved
Survival craft casing is damaged and not fit for use. 46CFR 199.261
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 31 May 2015
Resolved 12 June 2015
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 23 March 2015 Resolved
Lifejacket lights located in Port & Starboard storage location have non-functional lights. 46 CFR 199.70
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 31 May 2015
Resolved 12 June 2015
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1.1-Documentation Routine Vessel Inspection
Issued 23 March 2015 Resolved
Complete all required Vessel General Permit requirements as per EPA. EPA VGP 4.1.3
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 31 May 2015
Resolved 12 June 2015
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 March 2014 Resolved
Navigation Lights not operable due to depleted batteries. 33 CFR 83.20
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2014
Resolution: Battery charger was determined to be functional but not turned on during the winter. Deficiency was cleared prior to departure from vessel.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 7 March 2014 Resolved
Non-Tank Vessel Response plan was not onboard as required by 33 CFR 155.5015.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2014
Resolution: Plan was being updated and located at company headquarters.
Engineering › Pressure Vessel › Relief Valve
Issued 7 March 2014 Resolved
Repair/replac relief valve on the main service air compressor oil/air tank. 46 CFR 54.15-10(c)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2014
Resolved 3 April 2014
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 29 February 2012 Resolved
Exposed drive belts for dust collector in the forward tool deck require guards.
Due 1 April 2012
Resolved 4 April 2012
Resolution: Received email and photos from Ed Hogan (V.P. of Operations) showing proper installation of guards; accepted same.
Lifesaving › Lifebuoys › Serviceable
Issued 29 February 2012 Resolved
Reflective tape was obscured from build-up of cement dust (cargo product)
Due 8 March 2012
Resolved 8 March 2012
Resolution: Scrubbed and cleaned or renewed reflective tape.
Lifesaving › Immersion Suits › General
Issued 29 February 2012 Resolved
Lights attached to immersion suits were inoperable due to failure to insert batteries (all suits affected).
Due 8 March 2012
Resolved 8 March 2012
Resolution: New batteries installed where missing.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 29 February 2012 Resolved
Brow/gangway to vessel was inadequate. Wooden ladder was not properly secured nor was a net provided for falls.
Due 9 March 2012
Resolved 9 March 2012
Resolution: Vessel received instruction and email regarding OSHA regulatory cite
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 29 February 2012 Resolved
Deck plates in the forward tool room were not properly secured.
Due 9 March 2012
Resolved 9 March 2012
Resolution: Secured with proper clamps.
Engineering › Compressed Air System (control) › Valve
Issued 24 February 2009 Resolved
Renew Bubbler pressure vessels air relief valve.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 6 April 2009
Electrical › Lighting (emergency) › Lighting Fixture
Issued 24 February 2009 Resolved
Make all emergency lights in tunnel operational.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 6 April 2009
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 24 February 2009 Resolved
As required make repairs to the bent hand rails on the main deck.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 6 April 2009
Engineering › Diesel Engine (auxiliary) › Valve
Issued 24 February 2009 Resolved
Install a remote fuel oil valve outside main deck generator fuel oil tank which serves the temp main deck engine/air compressor IAW 46 CFR 50-60.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 6 April 2009
Engineering › Generator (propulsion/auxiliary-electric) › Equipment Grounding Circuitry
Issued 24 February 2009 Resolved
Submit Equipment Specifications for the engine/air compressor removed from within the forward portside cabin.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 June 2009
Resolved 2 March 2010
Electrical › Lighting (service) › Lighting Fixture
Issued 24 February 2009 Resolved
Install glass globes and light fixtures cages on the lighting fixtures within and above the main deck generator (box).
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 6 April 2009
Engineering › Compressed Air System (control) › Compressor
Issued 24 February 2009 Resolved
Submit proposal which addresses installing a new engine/air compressor unit that serves mooring, deck and anchor winches.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 June 2009
Resolved 2 March 2010
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 June 2008 Resolved
Install a shaft guard for the bow thruster propulsion shaft in the bow thruster space where crew is required to step over the propulsion shaft. 46 CFR 58.01-20 and 46 CFR 92.25-15.
Condition: Improper Installation
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 June 2008 Resolved
Provide a protective guard over the engine flywheel of the stbd side generator. Currently this engine has no protective guard. 46 CFR 58.01-20 and 46 CFR 92.25-15.
Condition: Improper Installation
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 4 June 2008 Resolved
Install a hand rail where the hand rail was removed at the stbd ladder in the unloading tunnel just forward of the cargo control room. 46 CFR 92.25-15
Condition: Improper/Lack of Maintenance
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 4 June 2008 Resolved
Service the Portable B-II fire extinguisher in the Generator Conex Box installed on deck. The current Fire Extinguisher was serviced in February 2007. NFPA 10, 46 CFR 95.25-20 and 46 CFR97.15-60.
Condition: Improper/Lack of Maintenance
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Engineering › Fuel Oil Service System › Hose
Issued 4 June 2008 Resolved
Replace the fuel hoses to and from the racor filters in the deck generator box (house). Current hoses do not meet SAE J-1942 standards. As an alternative, approve fire sleeves can be installed over the current hose to meet SAE fire standards. Fire sleeves are to be installed in accordance with the manufactures instructions. 46 CFR 56.60-25 (b).
Condition: Placed in Improper Service
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Engineering › Fuel Oil Service System › Hose
Issued 4 June 2008 Resolved
Replace all fuel and oil hoses on the bow thruster that do not meet SAE J-1942 stanards. Current hoses do not meet the SAE J-1942 standard. As an alternative, approve fire sleeves can be installed over the current hoses to meet SAE fire standards. Fire sleeves are to be installed in accordance with the manufactures instructions. 46 CFR 56.60-25 (b).
Condition: Placed in Improper Service
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Engineering › Fuel Oil Service System › Hose
Issued 4 June 2008 Resolved
Replace all fuel and oil hoses on all generators and machinery located in the forward machinery space. Current hoses on the generators and hydro pump do not meet SAE J-1942 standards. As an alternative, approve fire sleeves can be installed over the current hoses to meet the fire standard. Fire sleeves are to be installed in accordance with the manufactures instructions. 46 CFR 56.60-25 (b).
Condition: Placed in Improper Service
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 4 June 2008 Resolved
Stow all Oxygen, Acetylene, Propane bottles in approved upright racks in an approved stowage locker. 46 CFR 147.60(b). Currently these cylinders are stored in machinery spaces and in the cargo unloading tunnel.
Condition: Improper/Lack of Maintenance
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Electrical › Electric Supply System (service) › Transformer
Issued 4 June 2008 Resolved
Install non-conductive mating behind the forward main electrical switchboard/panel. 46 CFR 111.30-11
Condition: Improper Installation
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Engineering › Fuel Oil Service System › Valve
Issued 4 June 2008 Resolved
Repair or replace the leaking fuel valve on the bow thruster fuel day tank. 46 CFR 56.50-75 and 46 CFR 56.50-60.
Condition: Improper/Lack of Maintenance
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Lifesaving › Immersion Suits › Serviceable
Issued 30 May 2008 Resolved
Provide proof of satisfactory air & floatation testing of the five (5) immersion suits that are older than 1996. 46 CFR 199.273 and NVIC 01-08
Condition: Improper/Lack of Maintenance
Due 15 July 2008
Resolved 28 July 2008
Resolution: Attended vessel and Verified the requirement was corrected.
Lifesaving › Embarkation Appliances/Stations › Handholds
Issued 30 May 2008 Resolved
Provide embarkation ladders for the forward 6 man liferaft. 46 CFR 199.30 and 46 CFR 199.110
Condition: Improper Installation
Due 28 August 2008
Resolved 12 September 2008
Resolution: Received a Telephone call from the Master of the vessel certifying the required embarkation ladder was installed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 May 2008 Resolved
Provide hand rail or chain for the portside forward deck just aft of the bulwarks. 1966 Load Lines and 46 CFR 92.25-5.
Condition: Improper/Lack of Maintenance
Due 15 July 2008
Resolved 30 May 2008
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 30 May 2008 Resolved
Remove all flammable liquids in excess of 5 gallons (e.g. Kerosene, propane, oxygen and acetylene) from the forward machinery space and the cargo unloading tunnel. Remove all combustible liquids in excess of 55 gallons from the forward machinery space. Flammables and combustibles to be removed prior to any vessel operations. 46 CFR 147.45
Condition: Unknown
Due 30 May 2008
Resolved 30 May 2008
Documentation › Certificates/Documents › Certificate of Inspection
Issued 31 January 2008 Resolved
Make barge available for Credit Drydock and Internal Structural exam. O/O failed to comply with the provisions of the Drydock extension letter issued by the Ninth Coast Guard District dated March 7, 2007. As such vessel was operated out of compliance with its certificate of inspection as of July 1, 2007. See MISLE activity 2903018 and scaned documents for further details.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 February 2008
Resolution: DDX extension survey was conducted on 6/21/07
Construction/Loadline › Hull › Side Shell
Issued 20 December 2007 Resolved
Prior to departure, affect repair to damage on stbd forward bow to the satisfaction of attending marine inspector
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 28 December 2007
Resolved 21 December 2007
Resolution: Fracture was repaired by drill-stop and welding. Performed Air-Lance test to the weld repair, all sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 19 April 2007 Resolved
Prior to use of fwd cement cargo pump, IAW MSC ltr E1-0701069, provide vendor tech data for CORTEN pipe penetration demonstrating system MAWP does not exceed 25% of component MAWP.
Action required: 705 - Other - as specified
Resolved 10 May 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 19 April 2007 Resolved
Prior to use of fwd cement pump, iaw MSC ltr E1-0701069, provide vendor tech data for flex connections in 6-in discharge for cement pump demonstrating system MAWP does not exceed 25% of component MAWP.
Action required: 705 - Other - as specified
Resolved 10 May 2007
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 19 April 2007 Resolved
Prior to use of unloading generator, provide construction details for independent fuel tank demonstrating compliance with 46 CFR 58.50-10.
Action required: 705 - Other - as specified
Resolved 10 May 2007
Stability › Severe Wind/Roll › General
Issued 19 April 2007 Resolved
IAW MSC ltr C1-0701168, submit intact stability calculations demonstrating compliance with Marine Safety Manual IV, Chap 6, Sect E.7.
Due 18 May 2007
Resolved 10 May 2007
Resolution: Stability calculations submitted to MSC on 4/20/07
Engineering › Fuel Oil Service System › Filter
Issued 19 April 2007 Resolved
Prior to use of unloading generator, provide drip pan beneath fuel filters iaw 46 CFR 56.50-60(k)
Action required: 705 - Other - as specified
Resolved 10 May 2007
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 19 April 2007 Resolved
Prior to use of unloading generator, provide non-conductive mat in front and rear of switchboard iaw 46 CFR 111.30-11
Action required: 705 - Other - as specified
Resolved 10 May 2007
Electrical › Electric Supply System (service) › Battery Installation
Issued 19 April 2007 Resolved
Prior to use of unloading generator, demonstrate batteries meet installation requirements in 46 CFR 111.15-5.
Action required: 705 - Other - as specified
Resolved 10 May 2007
Engineering › Fuel Oil Service System › Valve
Issued 19 April 2007 Resolved
Prior to operation of unloading generator, provide remote means to operate fuel shutoff valve to independent fuel tank iaw 46 CFR 56.50-60(d)
Action required: 705 - Other - as specified
Resolved 10 May 2007
Electrical › Electric Generation Source (service) › Power Requirement
Issued 31 January 2007 Resolved
Prior to operation submit approved plans and all associated components for new unloading generator.
Action required: 705 - Other - as specified
Resolved 10 May 2007
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 31 January 2007 Resolved
Have Starboard anchor comply IAW 46CFR32.15-15
Action required: 705 - Other - as specified
Due 3 March 2007
Resolved 10 May 2007
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 3 April 2006 Resolved
Replace lifelines and retro on all lifebuoys onboard.
Action required: 705 - Other - as specified
Due 3 May 2006
Resolved 20 April 2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 April 2006 Resolved
Place all original documentation on the vessel.
Action required: 705 - Other - as specified
Due 3 May 2006
Resolved 20 April 2006
Construction/Loadline › Structures
Issued 16 May 2004 Resolved
Cut, Crop and Renew 3/8 inch plate, (6ft by 6ft section) and the third and forth longitudinal frames (6 ft) from the overhead in the bulkhead which seprates the #5 Stbd Cargo Hold and the #4 Stbd Ballast Tank. Repairs required as a result of a 14 inch crack present. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Action required: 705 - Other - as specified
Due 18 May 2004
Resolved 18 May 2004
Resolution: Completed repairs.
Construction/Loadline › Hull › Hull Plating
Issued 18 June 2002 Resolved
Repair forward transverse blkd in way of #1 and reweld bracketts.
Condition: Unknown
Due 27 June 2002
Resolved 27 June 2002
Resolution: Repair completed.
Construction/Loadline › Markings
Issued 30 January 2002 Resolved
Deck reference mark requires renewal in contrasting color LEGACY COMPONENT DESC: Load Line Mark
Action required: 705 - Other - as specified
Due 1 March 2002
Resolved 31 January 2002
Resolution: Vessel to depart Milwaukee for Bay Ship in Sturgeon Bay for required DDX in approx two weeka. Ref marks to be freshed after hull is repainted.
Documentation › Certificates/Documents
Issued 30 January 2002 Resolved
Provide copy of vessels most recent issue stability letter for CG examination and post original in the wheelhouse of pusher tug. LEGACY COMPONENT DESC: Stability Letter
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2002
Resolved 21 June 2002
Resolution: Verified stablility statement on L/L certificate
Lifesaving › Inflatable Liferafts
Issued 30 January 2002 Resolved
Provide (1) 6-person liferaft as required and accompanying annual servicing certificate LEGACY COMPONENT DESC: Carriage Requirement
Action required: 17 - Rectify deficiencies prior to departure
Due 31 January 2002
Resolved 31 January 2002
Lifesaving › Lifebuoys
Issued 30 January 2002 Resolved
Maintain waterlights (cement dust) and replace batteries/provide current date LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2002
Resolved 31 January 2002
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 30 January 2002 Resolved
Provide annual service report and required number LEGACY COMPONENT DESC: Number
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2002
Resolved 30 January 2002
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 30 January 2002 Resolved
Ensure all portable extinguishers are on station with complimentary mounting bracket LEGACY COMPONENT DESC: Mounting Bracket
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2002
Resolved 30 January 2002
Stability › Watertight Integrity
Issued 30 January 2002 Resolved
Maintain and demonstrate proper operation of port/aft wtd indicator light in tunnel
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2002
Resolved 31 January 2002
Resolution: Adjustment to limmit witch made by vessels Chief Engineer, system now found sat.
Stability › Watertight Integrity
Issued 30 January 2002 Resolved
Adjust emerg escape trunk scuttle quick acting hand wheel so as easily opened/secured
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2002
Resolved 31 January 2002
Documentation › Certificates/Documents
Issued 30 January 2002 Resolved
Provide vessel most recent stability letter for CG inspection and post in wheelhouse of pusher tug under glass. LEGACY COMPONENT DESC: Stability Letter
Condition: Unknown
Due 28 February 2002
Resolved 10 May 2002
Resolution: Vessel was never issued stability letter, stability book approved by CHIMS on 11Jun1992 will take place of this document. Requirement resinded.
Engineering › Diesel Engine (auxiliary)
Issued 30 January 2002 Resolved
Replace defective jacket water temp gauge on the at sea 200kw generator.
Action required: 705 - Other - as specified
Due 30 May 2002
Resolved 21 June 2002
Deck/Cargo › Mooring/Anchoring
Issued 30 January 2002 Resolved
Inspect weeping air supply pipe line @ flange on warping winch N0.4. LEGACY COMPONENT DESC: Winch
Condition: Improper/Lack of Maintenance
Due 30 May 2002
Resolved 27 June 2002
Resolution: Leak repaired.
Construction/Loadline › Hull
Issued 30 January 2002 Resolved
Closely examine internals of the port and stbd fwd ballast tanks in way of the shell inset with ringed welded rivets for possible damage. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Due 30 May 2002
Resolved 21 June 2002
Resolution: Corrected during DD.
Unknown
Issued 4 May 2001 Resolved
Provide certified service/test results for automatic shutdown mechanisms oncargo system prime mover.
Condition: Unknown
Due 4 May 2001
Resolved 4 May 2001
Unknown
Issued 18 February 2000 Resolved
Prove proper operation of relief valve for main compressor air receiver
Condition: Unknown
Due 18 February 2000
Resolved 18 February 2000
Lifesaving
Issued 18 February 2000 Resolved
Renew line on forwardmost life ring.
Condition: Unknown
Due 2 March 2000
Resolved 6 March 2000
Lifesaving
Issued 18 February 2000 Resolved
Provide proper markings, retroreflective tape, and non-expired batteries for all immersion suits, life jackets, and work vests.
Condition: Unknown
Due 2 March 2000
Resolved 6 March 2000
Electrical
Issued 18 February 2000 Resolved
Remove dead-end wires and unused electrical boxes throughout vessel.
Condition: Unknown
Due 16 March 2000
Resolved 6 March 2000
Lifesaving
Issued 18 February 2000 Resolved
Procure liferaft hydrostatic release unit with marked expiration date.
Condition: Unknown
Due 2 March 2000
Resolved 6 March 2000
Construction/Loadline
Issued 18 February 2000 Resolved
Provide proper gangway including hand rails and cargo net.
Condition: Unknown
Due 18 February 2000
Resolved 18 February 2000
Construction/Loadline
Issued 18 February 2000 Resolved
Properly mark emergency escape hatches and routes.
Condition: Unknown
Due 18 February 2000
Resolved 18 February 2000
Engineering
Issued 25 February 1998 Resolved
Present 04 air receivers for CG inspection prior to 31MAR98.
Condition: Unknown
Due 30 March 1998
Resolved 1 May 1998
Electrical
Issued 9 April 1997 Resolved
Renew batteries and prove proper operation of E-lights at #3 port and #2-#4stbd (in the tunnel), prior to 10MAY97
Condition: Unknown
Due 9 April 1997
Resolved 9 April 1997
Engineering
Issued 9 April 1997 Resolved
Prove proper operation of low lube oil (pressure) trip on unloading generator prior to 10MAY97._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 April 1997
Resolved 9 April 1997
Engineering
Issued 9 April 1997 Resolved
Prove proper operation of fuel valve reach rod to generator fuel supply_x001C_ prior to 10MAY97.
Condition: Unknown
Due 9 April 1997
Resolved 9 April 1997
Construction/Loadline
Issued 24 March 1996 Resolved
Crop and renew damaged port side shell plating and internal structural members in way of 1st frame space forward of aft bulkhead in bow thruster compartment. Hose test rivets on side shell in this compartment, and make repairs as necessary. Load no further cargo until repairs completed.
Condition: Unknown
Due 24 March 1996
Resolved 24 March 1996
Electrical
Issued 14 March 1996 Resolved
Make electrical system repairs as indicated by inspector: (a) remove wire nuts, (b) replace missing junction box covers and light globes and guards, (c) remove all dead run wires, (d) Install "on-off" sw for diesel air compressor in an enclosure.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Deck/Cargo
Issued 14 March 1996 Resolved
Renew all fuel and oil line hoses with approved hose of no more than 30" inlength.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Deck/Cargo
Issued 14 March 1996 Resolved
Renew fractured air compressor lube oil temperature regulator housing on diesel air compressor.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Deck/Cargo
Issued 14 March 1996 Resolved
Re-route fuel and lube oil lines in vicinity of exhaust system on both bow thruster engine and air compressor diesel engines.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Lifesaving
Issued 14 March 1996 Resolved
Prior to sailing, and until a fire protected flammable storage locker is installed, remove all paint, thinner, and flammable liquids from the vessel.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Documentation
Issued 14 March 1996 Resolved
Provide evidence of ABS approval of required vessel plans as discussed withOCMI Chicago, IL.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Deck/Cargo
Issued 14 March 1996 Resolved
Prove proper operation of remote automated release of STBD anchor.
Condition: Unknown
Due 7 June 1996
Resolved 7 June 1996
Construction/Loadline
Issued 31 July 1995 Resolved
MAKE REPAIRS TO #2 BULKHEAD, PORT SIDE, WHERE CRACKED (CORNER BRACKET AND BULKHEAD BELOW 5TH LONGITUDINAL FROM MAIN DECK). REPAIRS TO BE MADE IAW PROPOSAL APPROVED BY ABS, AND TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.