Records from 1999 to 2026. Most recent: inspection, 21 June 2026.
Inspection history · 155
21 June 2026
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8409741
30 March 2026
COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8334115
29 January 2026
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8303432
22 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8286612
20 November 2025
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8303468
10 November 2025
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8266861
3 October 2025
Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8245807
10 July 2025
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8303482
3 April 2025
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8097151
30 January 2025
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8072316
6 December 2024
Administrative Inspection · Internal Structural Exam · Examination of Repairs · In-Service Inspection · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8044146
11 October 2024
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8017753
1 August 2024
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7972264
27 June 2024
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7948117
15 June 2024
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7935478
14 May 2024
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7912562
30 April 2024
In-Service Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7906026
15 March 2024
Deficiency Check · In-Service Inspection · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7879598
16 January 2024
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7850217
4 January 2024
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7845266
13 December 2023
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7838645
7 November 2023
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7821749
19 October 2023
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7816520
3 April 2023
COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7661755
11 March 2023
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7649207
6 March 2023
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7646601
22 February 2023
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7640560
8 February 2023
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7633868
8 February 2023
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7634629
7 February 2023
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7633356
24 January 2023
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7626535
14 January 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7621443
20 December 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7611532
19 December 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7611090
19 December 2022
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7612441
15 December 2022
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7609743
28 October 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7618825
21 September 2022
Drydock Exam · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7566578
18 August 2022
MTSA Verification · Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7534464
25 April 2022
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7438271
3 February 2022
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7390351
16 December 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7369275
28 October 2021
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7341313
18 August 2021
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7290729
5 August 2021
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7283446
29 April 2021
In-Service Inspection · Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7180860
4 March 2021
Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7150311
19 February 2021
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7148774
31 January 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7135405
21 January 2021
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7128354
21 January 2021
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7128918
13 January 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7124014
8 January 2021
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7121684
13 November 2020
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7095954
10 August 2020
In-Service Inspection · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7028938
16 July 2020
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7007851
4 May 2020
Damage Survey · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6947782
29 April 2020
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6945658
28 April 2020
Administrative Inspection · In-Service Inspection · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6945602
30 January 2020
MTSA Verification · Re-Inspection · DAPI Audit
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6899676
7 November 2019
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6851533
25 July 2019
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6762130
31 May 2019
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6699501
7 May 2019
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6677896
28 February 2019
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6635833
13 November 2018
Internal Structural Exam · Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6579808
23 August 2018
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6517806
15 May 2018
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6415169
22 March 2018
MTSA Verification · Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6376921
7 March 2018
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6367814
28 February 2018
Administrative Inspection · Construction Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6363349
21 January 2018
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6341039
14 December 2017
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6326402
30 September 2017
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6279913
14 September 2017
MTSA Verification · Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6266700
23 May 2017
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6153445
27 April 2017
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6133915
12 February 2017
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6092211
3 February 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6082517
8 December 2016
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6055296
16 September 2016
Drydock Exam · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6004845
31 May 2016
MTSA Verification · In-Service Inspection · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5893055
6 April 2016
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5852856
24 March 2016
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5844714
17 December 2015
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5784615
21 October 2015
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5748179
24 September 2015
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5728103
7 August 2015
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5209099
16 July 2015
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5186251
2 October 2014
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5000526
26 August 2014
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4966220
9 June 2014
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4884401
13 March 2014
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4815958
20 June 2012
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4350055
4 June 2012
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4334076
19 February 2012
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4341676
30 December 2011
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4222125
29 December 2011
Re-Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4215645
29 July 2011
In-Service Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4102775
25 February 2011
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3952684
25 February 2011
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3952964
28 October 2010
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3880072
28 October 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3947857
16 September 2010
Periodic Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3857925
25 February 2010
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3687811
10 July 2009
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3535704
9 April 2009
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3449428
7 April 2009
Spot Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3449938
31 March 2009
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3444817
27 February 2009
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3424952
25 November 2008
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3369505
19 September 2008
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3328760
8 August 2008
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3292642
21 March 2008
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3168778
14 March 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3168794
1 February 2008
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3140142
14 January 2008
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3130065
5 October 2007
Internal Structural Exam · Hull Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3073487
31 January 2007
Special · Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3034741
25 January 2007
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2861475
6 October 2006
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2802517
31 January 2006
MTSA Verification · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2576585
3 August 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2450342
4 May 2005
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2349059
27 April 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2344468
7 April 2005
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2331094
7 April 2005
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2345934
1 February 2005
COI Inspection · MTSA Verification
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2284723
13 September 2004
Construction Oversight · Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2194361
22 March 2004
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2029323
31 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2001656
2 January 2004
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1973332
1 January 2004
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1983407
8 October 2003
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1923669
9 January 2003
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1727938
9 July 2002
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1643584
11 April 2002
Quarterly Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1603576
10 January 2002
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1477742
30 October 2001
Quarterly Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1435295
11 October 2001
Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1451766
31 July 2001
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1462250
11 April 2001
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1468204
9 March 2001
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1060301
11 January 2001
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1418815
19 July 2000
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1417107
14 April 2000
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1473576
22 February 2000
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 816352
13 January 2000
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1468549
15 December 1999
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 812785
29 October 1999
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 813232
27 October 1999
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1384291
27 July 1999
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1423229
29 April 1999
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1386495
22 March 1999
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 781566
20 January 1999
Initial Certification · Deadweight Survey · Construction Oversight · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1378543
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 7 April 2025
Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and framed, stiffened and fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and weathertight when closed. MI observed a crack at bottom clear opening lip on the "B" end watertight door leading to the engine room. Effect permanent repairs to RO. Submit RO report to USCG.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 April 2025
Resolution: ABS report provided by vessel rep.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 January 2025
Resolved
The respective piping systems installed on ships and barges must have the necessary valves for safe and efficient operation of the vessel. MI observed the bilge overboard discharge check valve installed backwards. Re-install valve correctly to the satisfaction of USCG MI.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 February 2025
Resolved 30 January 2025
Resolution: Vessel rep provided pictures of the check valve properly installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 January 2025
Resolved
A nonmetallic expansion joint must be replaced 10 years after it has been placed into service if it is located in a system which penetrates the side of the vessel and both the penetration and the nonmetallic expansion joint are located below the deepest load waterline. The Officer in Charge, Marine Inspection may grant an extension of the ten-year replacement to coincide with the vessel's next drydocking. MI observed a deterorated expansion joint on the A-end main engine jacket water expansion joint. Replace expansion joint to the satisfaction of USCG MI with joints meeting 46 CFR 56.60-1(b). MI could not determine age of all other expansion joints. Vessel rep is required to provide documentation of the age of all remaining expansion joints or propose plan to replace following visual inspection of all joints.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 February 2025
Resolved 30 January 2025
Resolution: Vessel rep provided pictures of new expansion joint installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 March 2024
Resolved
Retro-reflective material. The lifebuoys shall be fitted with retro-reflective material (tape) with a minimum of 5 cm (2 inches) width around the lifebuoy at four locations spaced equally around the circumference of the lifebuoy. Retro-reflective material shall be Type II material that is approved under 46 CFR 164.018.
Marine Inspector observed red retro-reflective tape not approved under 46 CFR 164.018 on multiple life rings on deck. Further, the existing reflective material contained DOT-2 markings on it signifying Motor Vehicle Department of Transportation approved.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 April 2024
Resolved 1 April 2024
Resolution: Vessel sent photos of corrected liferings
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 March 2023
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this sub chapter. Vessel experienced reduction in propulsion due to over-speed sensor activation on B end Voith Unit.
Affect permanent repairs and provide final classification Society attestation of completed repairs to USCG.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 March 2023
Resolved 16 March 2023
Resolution: Recieved ABS (attached) report attesting to repairs of #2 Main Diesel Engine that exipierenced a reduction in propulsion on 10MAR2023.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2023
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this subchapter.
Vessel experienced loss of propulsion due to over-speed sensor activation.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 March 2023
Resolution: Received satisfactory ABS report attesting to proper repairs and operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 December 2022
Resolved
The bilge pumping system shall be capable of operation under all practicable conditions after a casualty. MI's observed the bilge manifold valve serving the "A" end compartment #2 difficult to operate by hand. The chief engineer had to utilize a pipe wrench to operate the valve. Vessel is to service all bilge valves to ensure valves operate freely by hand.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 December 2022
Resolution: Provided repair report. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 15 December 2022
Resolved
Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that the liferaft or liferafts, when released and inflated, are not dragged under by the sinking vessel. All seven (7) inflatable buoyant apparatuses' (IBA) painter and weak-links were shackled to the IBA bands and not connected to the IBA cradle or the vessel.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 15 December 2022
Resolution: All painter/weak-links connections were shackled to the permanently installed IBA cradles. Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 August 2022
Resolved
Each section of firehose must be a lined commercial firehose that conforms to UL 19. Identified 01 fire hose ruptured after testing of fire main. Replace hose.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 August 2022
Resolved 18 August 2022
Resolution: corrected on the spot
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 August 2022
Resolved
Each vessel must carry lifejackets approved under approval series 160.155, 160.176 or 160.177. Each vessel must carry a lifejacket for each person on board, and in addition - (i) A number of lifejackets suitable for children equal to at least 10 percent of the total number of passengers on board must be provided, or such greater number as may be required to provide a lifejacket of suitable size for each person smaller than the lower size limit of the adult-size lifejacket. Identified 06 adult and 05 child life jackets in unsatisfactory condition. Replace lifejackets of an approved type and quantity.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 August 2022
Resolved 18 August 2022
Resolution: correcte on the spot
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 August 2021
Resolved
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician. If the ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony Certificate. Attending USCG Marine Inspectors found the vessel's Safety Radiotelephony Certificate had expired on 08/10/2021.
Action required: 705 - Other - as specified
Due 25 August 2021
Resolved 23 August 2021
Resolution: TXDOT provided copy of current issued certificate.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 August 2021
Resolved
Each vessel must carry a certificate with a valid endorsement while subject to the Bridge-to-Bridge Act. Attending USCG Marine Inspectors found the vessel's Bridge-to-Bridge certificate had expired on 08/10/2021.
Action required: 705 - Other - as specified
Due 25 August 2021
Resolved 23 August 2021
Resolution: TXDOT provided copy of current issued certificate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 April 2021
Resolved
All vessels except unmanned barges shall be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment. Vessel was not able to demonstrate satisfactory operation of the installed bilge pumping system. Demonstrate to the attending Marine Inspectors satisfactory operation of the bilge pumping system as designed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2021
Resolved 6 May 2021
Resolution: Witnessed sat. operation of the bilge pumping sytem.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 April 2021
Resolved
All vessels except barges shall carry at least the minimum number of fire axes as set forth in Table 76.60-5(a). The vessel did not have two operational fire axes as required, due to the top of the handle separating from the heads of the axes. Add 02 operational fire axes to the vessel to the satisfaction of the attending Marine Inspectors.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2021
Resolved 6 May 2021
Resolution: Identified 02 new fire axes installed on the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2021
Resolved
Shutoff valves of a suitable type shall be installed in the fuel supply lines, one as close to each tank as practicable. Where fuel tanks are installed below the weather deck, arrangements shall be provided for the operating of all shutoff valves at the tanks from outside the compartments in where they are located,preferably from an accessible position on the weather deck. The t-handles used to secure the shutoff valves on the weather deck were not able to secure the valves. The surrounding rails/guards/bulwarks/bulkheads prevented the full movement of the t-handles from closing the valves. Furthermore, the t-handles were not labeled for specific valves, and were not universal in size. Provide a corrective action plan to provide appropriate sized t-handles for all weather deck shutoff valves, and have the t-handles suitably marked so crew can easily determine which t-handle can secure which specific emergency shutoff valve.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2021
Resolved 6 May 2021
Resolution: T-Handles marked/labeled for specific valves now. Witnessed sat test of each valve.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 April 2021
Resolved
Doors in stairway enclosures and Main Vertical Zone bulkheads shall meet the following requirements: hold back hooks, or other means of permanently holding the door open, not subject to control station release, will not be permitted. Marine Inspectors observed installed metal hold backs (requiring manual release) on two A-60 doors at the entrance/exit to the salon on the A/B end of the vessel. Remove the metal hold backs so that the doors shall continue to operate as A-60 boundary self-closing doors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2021
Resolved 6 May 2021
Resolution: Hold back were removed from the fire boundary doors.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2021
Resolved
Electric installations on vessels must ensure protection
of passengers, crew, other persons, and the vessel from electrical hazards. Marine Inspectors observed the cables running into the anchor windlass junction box had damaged metal sheathing exposing the rubberized outer layer of the cables, as well as the conducting wires. Effect permanent repairs to the effected system to the satisfaction of the attending Marine Inspectors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2021
Resolved 6 May 2021
Resolution: Cable renewed with new 16 foot segment and completed circuit through installation of a new junction box in the A-End Voith Compartment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 April 2021
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. Marine Inspectors observed a jacket water leak off of the main diesel engine on the A-end of the vessel. Effect permanent repairs to the satisfaction of the attending Marine Inspectors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2021
Resolved 6 May 2021
Resolution: Copper line for jacket water was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 March 2021
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalant to the standards established by ABS. MI's arrived to conducted quarterly inspection. As part of the inspection, MI's requrested to get underway to observe operation of machinery and conduct drills. Due to malfunctions within the Voith system, the vessel could not get underway to demonstrate operations and conduct drills. Prior to carriage of passengers, vessel must prove proper system operation and conduct drills to the satisfaction of the attending MI.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2021
Resolution: Maintenance supervisor stated that the vessel had a broken actuator when USCG was in attendance for quarterly inspection. Renewed actuator and actiator diode. USCG Marine Inspectors attended U/W operational test SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 March 2021
Resolved
Due to numerous recent failures of the Voith sytem rendering the vessel inoperable, provide repair proposal including timeline to rectify Voith steering actuator issue.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 12 March 2021
Resolved 11 March 2021
Resolution: Maintenance supervisor stated that all steering actuators have been upgraded with a different diode to reduce the voltage delivered to the control unit during maneuvering. Service conducted under manufacturer supervision with SAT u/w op tests.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 4 March 2021
Resolved
All piping shall be securely supported. MI's observed a broken pipe support on the firemain overboard piping allowing the piping to vibrate significantly at idle. Repair firemain pipe hanger to satisfaction of attending MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 March 2021
Resolved 11 March 2021
Resolution: Pipe hangers were rewelded and witnessed by USCG MI during u/w seatrial. SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 8 January 2021
Resolved
The installation of all lifesaving appliances and arrangements must be in accordance with the requirements of subchapter W of this chapter. Each rescue boat must be capable of being launched with the vessel making headway of 5 knots in calm water.
Vessel experienced damage to the rescue boat davit, launching equipment, guard rails, and other critical equipment rendering the equipment non operational. All repairs are to be made to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 77.06-01
46 CFR 199.160(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 January 2021
Resolution: Satisfactory repairs made to the Davit and launching equipment. Rescue boat replaced with spare. Completed operational test of the davit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2020
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules.
Vessel reported an oil leak in the A end voith main seal. Vessel is to proceed to dry dock for repairs. Repairs are to be made to the satisfaction of a USCG Marine Inspector.
46 CFR 58-05.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 May 2020
Resolution: ABS survey report.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 November 2019
Resolved
Noted two life rings did not have adequate solas retro reflective tape. Remove damaged existing tape and replace with solas tape.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 November 2019
Resolved 30 January 2020
Resolution: Verified to be rectified
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 7 November 2019
Resolved
One e-light(battle lantern type) was installed in the second deck passenger lounge did not work and required a new battery. Replace battery and test to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 November 2019
Resolved 30 January 2020
Resolution: Verified to be rectified
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 22 March 2018
Resolved
Marking / Labeling of fixed fire fighting system instructions missing, the inspection shall as to insure that the vessel, as regards to fire detecting and extingishing equipment is in satisfactory condition.
46 CFR 71.25-10
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 March 2018
Resolved 22 March 2018
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 21 January 2018
Resolved
"B" end Voith system hydraulic leak. Possible cause a failed system seal. Make final repairs and provide tech report attesting to properly repaired and functioning voith system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2018
Resolved 7 March 2018
Resolution: Received report from ABS and Tech attesting to the proper repair and operation of the VOITH system.
Communications › Public Address System › Loudspeaker
Issued 1 December 2016
Resolved
Modifications were made to existing PA system without plan approval. Submit plans for approval, and upon receipt of approved plans, make vessel available for inspection to the satisfaction of the attending Marine Inspector. [46 CFR 110.25-1(c)(9)]
Action required: 705 - Other - as specified
Due 1 October 2018
Resolved 4 March 2019
Engineering › Lubricating Oil Service System › Piping
Issued 1 December 2016
Resolved
Modifications were made to existing lube oil piping system (addition of preheaters for both MDEs) without plan approval. Submit plans for approval, and upon receipt of approved plans, make vessel available for inspection to the satisfaction of the attending MI. [46 CFR 56.01-10(c)(1)(xvi)]
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 4 March 2019
Accommodation/Occupational Safety › Washroom/Toilet › Location
Issued 1 December 2016
Resolved
Modifications were made to existing bathroom arrangement in salon area by removing existing male and female bathrooms and installing multiple individual bathrooms without plan approval. Plans have been submitted to MSC (hull branch) but have not been approved at this time. Obtain approved plans, and upon receipt of approved plans, make vessel available for inspection to the satisfaction of MI.
Action required: 705 - Other - as specified
Due 1 June 2017
Resolved 3 February 2017
Resolution: Received copy of MSC approval letter H2-1604290 in which structural plans for the salon modification were approved. Based on prevous material inspection of structural arrangement during dry dock period and no comments requiring OCMI verification, cleared.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 1 December 2016
Resolved
Two existing pilothuse AC units were replaced with larger units and an additional AC unit was installed for the crew lounge without plan approval. Submit plans for approval (to include at a minimum updated load analysis and 1 line diagrams). Upon receipt of approved plans, make vessel vailable for inspection to satisfaction of attending MI. [46 CFR 110.25-1]
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 23 August 2017
Resolution: Received documents submitted with the 10-82 request, the deficiency for the AC unit should be cleared. There is a power load analysis as well as updated one line diagram included.
Fire Fighting › Structural - A Class Divisions › Evacuation Stations
Issued 1 December 2016
Resolved
In course of yard period inspection, attending MIs noted that existing insulation in overhead of both A & B end VSP rooms did not meet A-60 reqts as indicated on FCP. As part of agreement b/t USCG, ABS, & TXDOT, center section of insulation was replaced w/ A-60 insulation this shipyard period, & the remaining insulation will be replaced @ next scheduled dry dock & NLT 01OCT18.[46 CFR 72.05-10(g)]
Action required: 705 - Other - as specified
Due 1 October 2018
Resolved 4 March 2019
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 31 May 2016
Resolved
76.15-10
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 2 June 2016
Resolution: 30 second time delay bottle was replaced by firetrol. MI witnessed a satisfactory CO2 system test of the EDG room system.
Electrical › Electric Generation Source (service) › Generator
Issued 6 April 2016
Resolved
Vessel reported issued with ship service generator #2 and has been taken out of service pending troubleshooting and repairs. Vessel is not authorized to carry passengers until repairs are made to the satisfaction of the attending CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 April 2016
Resolved 12 April 2016
Resolution: MI witnessed satisfactory test of #2 SSDG under load following repairs. Please see narrative for amplifying information.
Engineering › Freshwater System (jacketwater cooling) › Pump
Issued 24 September 2015
Resolved
#2MDE outboard jacketwater cooling pump seal dripping
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 October 2015
Resolved 21 October 2015
Resolution: Corrected to the satisfaction of attending Marine Inspector
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 7 August 2015
Resolved
Pneumatic head failed manometer pressure test.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 31 August 2015
Resolution: Heat activation device and fixed CO2 control head tested in accordance with manufacturers'' instructions to the satisfaction of attending MI.
Stability › Weathertight Integrity › General
Issued 9 June 2014
Resolved
All watertight doors on main deck out of adjustment and or frozen and cannot be closed properly.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2014
Resolved 2 October 2014
Resolution: All watertight doors on the main deck have been correctly adjusted.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 4 June 2012
Resolved
Need to update fire control plan to include voith unit ventilation shut down.
Action required: 705 - Other - as specified
Due 30 July 2012
Resolved 21 June 2012
Resolution: Corrected
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 29 July 2011
Resolved
Renew/overhaul installed Voith propeller systems as a condition for credit dry-dock. To be applied during scheduled September 2011 dry-dock.
Action required: 705 - Other - as specified
Resolved 20 December 2011
Lifesaving › Rescue Boat › Propulsion Engine
Issued 30 March 2010
Resolved
During a boat drill, steering locked and engine failed on Bolivar rescue boat. Repair steering and engine.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2010
Lifesaving › Launching Appliances › Davit
Issued 30 March 2010
Resolved
Hydraulic accumulator on Galveston rescue boat davit leaked not allowing boat to swing until pump pressure increased. Replace or repair accumulator and test davit.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2010
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 25 February 2010
Resolved
Paint navigation light brackets, behind lights, flat black.
Action required: 705 - Other - as specified
Due 5 March 2010
Resolved 30 March 2010
Communications › Radio Communications › VHF Radiotelephone
Issued 25 February 2010
Resolved
Replace or repair VHF radio on Galveston (B) end.
Action required: 705 - Other - as specified
Due 5 March 2010
Resolved 30 March 2010
Stability › Watertight Integrity › Weathertight Enclosure
Issued 25 February 2010
Resolved
Replace gasket on escape scuttle on main deck by rescue boat on Galveston (B) end.
Action required: 705 - Other - as specified
Due 5 March 2010
Resolved 30 March 2010
Operations/Management › Drills/Instruction › Fire
Issued 25 February 2010
Resolved
Demonstrate a proper fire and boat drill.
Action required: 705 - Other - as specified
Due 5 March 2010
Resolved 30 March 2010
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 9 April 2009
Resolved
Make permanent repairs to hydraulic system for car barriers at both ends of ferry.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2009
Resolved 29 April 2009
Construction/Loadline › Hull › Collision Chock
Issued 9 April 2009
Resolved
Empty and make rub rail safe for hot work. Once completed make permanent repairs to 1'x1/4" fracture.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2009
Resolved 22 May 2009
Navigation › Collision/Grounding Avoidance › Radar
Issued 7 April 2009
Resolved
Replace "B" end stbd radar screen (installed when proper screen failed) with proper screen.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 22 May 2009
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 7 April 2009
Resolved
Repair or renew deteriorated parts of main deck portable fire extinguishers with proper replacement parts.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 May 2009
Resolved 22 May 2009
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 7 April 2009
Resolved
Repair or renew all deteriorated and ineffective bridge window wipers.
Condition: Improper/Lack of Maintenance
Due 17 April 2009
Resolved 22 May 2009
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 27 February 2009
Resolved
Repair or replace anchor light on "A" end.
Action required: 705 - Other - as specified
Due 6 March 2009
Resolved 13 March 2009
Resolution: Anchor light was properly replace and performed satisfactory operational test.
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 27 February 2009
Resolved
Properly secure electrical shore tie box to vessel.
Action required: 705 - Other - as specified
Due 27 March 2009
Resolved 13 March 2009
Resolution: Secured electrical shore tie box to vessel.
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 27 February 2009
Resolved
Repair electrical winch on "A" end for the rescue boat.
Action required: 705 - Other - as specified
Due 6 March 2009
Resolved 13 March 2009
Resolution: Electrical which to the rescue boat was satisfactorily repaired and performed operational test with satisfactory results.
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 21 March 2008
Resolved
Prior to carrying passengers, complete repairs to bent propulsion blade. Complete repairs to the satisfaction of the attending CG inspector
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2009
Resolution: Vessel was placed in drydock and VOITH blade was repaired.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 14 January 2008
Resolved
Prove proper operation of saloon fire doors at both ends of the vessel. Door latch "catch" missing on both door frames.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 17 March 2008
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 14 January 2008
Resolved
Repair and prove proper operation of urinal in men's restroom
Condition: Unknown
Due 31 January 2008
Resolved 15 February 2008
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 14 January 2008
Resolved
Make available for examination and complete repairs to the leak in hull plating in way of deterioration in sewage tank space, starboard side, forward from aft bhd, four transvers frames and from chine outboard approx 6ft. Make engine room bilge plating available for inspection in way of keel coolers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 February 2008
Resolution: Permanent repairs made to hull plating.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 14 January 2008
Resolved
Repair bent ventillation duct covers in way of main deck, starboard side, forward and aft engine room vent.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 15 February 2008
Electrical › Electrical Distribution System (service) › Junction Box
Issued 25 January 2007
Resolved
Provide evidence that electrical fittings located in bunker box are class I Div I or relocate to exterior of box.
Action required: 705 - Other - as specified
Due 14 February 2007
Resolved 2 March 2007
Electrical › Electrical Distribution System (emergency) › Junction Box
Issued 31 January 2006
Resolved
Repair/replace junction box cover on #1 MDE.
Due 3 February 2006
Resolved 2 February 2006
Electrical › Electric Supply System (service) › Battery Installation
Issued 31 January 2006
Resolved
Properly secure or remove battery and battery box.
Due 3 February 2006
Resolved 2 February 2006
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 31 January 2006
Resolved
Dry out and weather strip emergency battery box on bridge deck.
Due 3 February 2006
Resolved 31 January 2006
Accommodation/Occupational Safety › Washroom/Toilet › Washbasin
Issued 31 January 2006
Resolved
Replace graywater discharge pump in ER and permanently wire.
Due 3 February 2006
Resolved 2 February 2006
Electrical › Electric Generation Source (service) › Panelboard
Issued 31 January 2006
Resolved
Replace gauge covers on #2 MDE panelboard.
Due 3 February 2006
Resolved 2 February 2006
Fire Fighting › Fire Main › Condition
Issued 31 January 2006
Resolved
Crop and renew in kind fire main piping patches with permanent repairs iwo #2 fire pump.
Due 3 February 2006
Resolved 2 February 2006
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 1 February 2005
Resolved
Inspectors found one extinguisher empty and five that had expired inspections.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2005
Resolution: Vessel rectified the extinguishers to the satisfaction of an attending U.S. Coast Guard inspector on 02FEB05.
Lifesaving › Lifejacket/PFD (Type I)
Issued 2 February 2004
Resolved
Modify way life preservers are stored in drop boxes on upper deck or modify storage boxes (4) to ensure all life jackets fall free from box when released. LEGACY COMPONENT DESC: Storage
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 February 2004
Documentation › Manifests/Lists
Issued 2 February 2004
Resolved
Provide index inside emergency lighting panel EL1 located in Bolivar side pilot house. LEGACY COMPONENT DESC: Lighting Panel Index
Due 16 February 2004
Resolved 3 February 2004
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 2 February 2004
Resolved
Update safety plans in pilots houses to reflect actual location, number and types of life jackets stored as well as ring buoys. LEGACY COMPONENT DESC: Safety Plan
Due 16 February 2004
Resolved 2 February 2005
Engineering › Compressed Air System (control)
Issued 2 February 2004
Resolved
Demonstrate proper operation of both air horn receiver relief valves. LEGACY COMPONENT DESC: Valve
Due 16 February 2004
Resolved 3 February 2004
Electrical › Electrical Distribution System (service) › Panelboard
Issued 2 February 2004
Resolved
Demonstrate proper operation of pyrometers for bolivar engine cylinders 2, 5, 11 & Galveston engine cylinders 4, & 11.
Due 16 February 2004
Resolved 2 February 2005
Engineering › Diesel Engine (propulsion-direct drive)
Issued 2 February 2004
Resolved
Demonstrate proper operation of Bolivar engine local RPM gauge.
Due 16 February 2004
Resolved 3 February 2004
Fire Fighting › Combustible Materials
Issued 2 February 2004
Resolved
Make engine room bilges free of oil and oily rags. LEGACY COMPONENT DESC: Oil & Oily Rags
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 February 2004
Electrical › Electric Generation Source (service)
Issued 9 January 2003
Resolved
Demonstrate to attending C.G. inspector the proper operation of the low lube oil shut down on #2 SSDG.
Due 16 January 2003
Resolved 21 January 2003
Electrical › Electric Generation Source (service)
Issued 9 January 2003
Resolved
Demonstrate to attending C.G. inspector the proper operation of overspeed shutdown on #2 SSDG.
Due 16 January 2003
Resolved 21 January 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 9 January 2003
Resolved
Replace #2 MDE pyro wire whiched is chaffed thru.
Due 7 February 2003
Resolved 24 February 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 9 January 2003
Resolved
Demonstrate to attending C.G, inspector the proper operation of the low fuel oil pressure gauge for #2 MDE.
Due 3 March 2003
Resolved 2 February 2004
Engineering
Issued 9 January 2003
Resolved
Replace air regulator valve to air horn on the Galveston end.
Due 16 January 2003
Resolved 21 January 2003
Engineering
Issued 9 January 2003
Resolved
Remove all water and oil from all bilges.
Due 10 January 2003
Resolved 21 January 2003
Electrical
Issued 31 July 2001
Resolved
Determine source and eliminate cause of No.1 SSG continuously blowing fusesin overspeed condition and rendering shutdown safety ineffective.
Condition: Unknown
Due 31 August 2001
Resolved 10 January 2002
Resolution: Completed. Test sat.
Lifesaving
Issued 31 July 2001
Resolved
Install individual release mechanisms for each overhead PFD stowage container.
Condition: Unknown
Due 31 August 2001
Resolved 10 January 2002
Resolution: Completed. Test sat.
Electrical
Issued 11 April 2001
Resolved
Prove proper generator "A" overspeed shutdown.
Condition: Unknown
Due 18 April 2001
Resolved 30 October 2001
Navigation
Issued 11 January 2001
Resolved
Demonstrate proper operation of "B" end fog horn with timer device.
Condition: Unknown
Due 11 January 2001
Resolved 11 January 2001
Engineering
Issued 11 January 2001
Resolved
Demonstrate proper operation of low lube oil pressure alarm on "B" end mainengine.
Condition: Unknown
Due 11 January 2001
Resolved 11 January 2001
Engineering
Issued 11 January 2001
Resolved
Repair and demonstrate proper operation of remote cutoff valve for lube oilstorage tank.
Condition: Unknown
Due 11 January 2001
Resolved 11 January 2001
Navigation
Issued 11 January 2001
Resolved
Demonstrate proper operation of sound powered telephones.
Condition: Unknown
Due 11 January 2001
Resolved 11 January 2001
Lifesaving
Issued 13 January 2000
Resolved
Conduct fire and man overboard drills to the satisfaction of attending Coast Guard inspector no later than 20JAN00 with crew Number Ten.
Condition: Unknown
Due 13 January 2000
Resolved 13 January 2000
Electrical
Issued 13 January 2000
Resolved
Repair aft emergency light in Pilothouse, emergency lights on exterior house, and "A" end light emergency light without "E" marking._x001C_ _x001C_
Condition: Unknown
Due 13 January 2000
Resolved 13 January 2000
Engineering
Issued 13 January 2000
Resolved
No later than 13FEB00, provide main engine low lube oil shutdowns on both main diesel engines in accordance with 46 CFR 58.05-10.
Condition: Unknown
Due 13 January 2000
Resolved 13 January 2000
Fire Fighting
Issued 27 October 1999
Resolved
INSTALL RELIEF VALVE ON MAIN FIRE PUMP.
Condition: Unknown
Due 27 October 1999
Resolved 27 October 1999
Lifesaving
Issued 27 October 1999
Resolved
REMOVE SPILLED HYDRAULIC FLUID FROM VOID SPACE LOCATED UNDER EMERGENCY GENERATOR COMPARTMENT.
Condition: Unknown
Due 27 October 1999
Resolved 4 November 1999
Electrical
Issued 27 October 1999
Resolved
LABEL CIRCUIT BREAKER DIRECTORY FOR ELECTRICAL PANEL IN CREW'S LOUNGE.
Condition: Unknown
Due 27 October 1999
Resolved 4 November 1999
Lifesaving
Issued 27 October 1999
Resolved
FREE UP AND DEMONSTRATE PROPER OPERATION OF MAIN DECK PFD STOWAGE BOX RELEASES MECHANISMS PRIOR TO CARRYING PASSENGERS..
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Fire Fighting
Issued 27 October 1999
Resolved
INSTALL FIRE DAMPER ON 'A' END STARBOARD SIDE OVERHEAD VENT DUCT, FREE UP ACCESS DOOR.
Condition: Unknown
Due 27 October 1999
Resolved 4 November 1999
Lifesaving
Issued 27 October 1999
Resolved
PROVIDE MEANS FOR REMOVING BARRIER FENCES WHILE LAUNCHING RESCUE BOATS.
Condition: Unknown
Due 27 October 1999
Resolved 5 November 1999
Electrical
Issued 27 October 1999
Resolved
REMOVE OR PROPERLY DEAD END ENERGIZED ELECTRICAL WIRING UNDER CONTROL CONSOLES IN BOTH PILOT HOUSES.
Condition: Unknown
Due 27 October 1999
Resolved 4 November 1999
Lifesaving
Issued 27 October 1999
Resolved
STOW CHILD AND ADULT PFDs IN SEPARATE LOCKERS.
Condition: Unknown
Due 27 October 1999
Resolved 27 October 1999
Engineering
Issued 27 October 1999
Resolved
INSTALL METHOD OF TESTING LOW LUBRICATION OIL SHUTDOWN ON EMERGENCY GENERATORS, SHIP SERVICE GENERATORS AND MAIN ENGINES.
Condition: Unknown
Due 27 October 1999
Resolved 27 October 1999
Navigation
Issued 27 October 1999
Resolved
ELIMINATE HYDRAULIC FLUID LEAKS FROM STEERING GEAR CONTROL SYSTEMS INSIDE BOTH PILOT HOUSE CONTROL CONSOLES.
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Engineering
Issued 27 October 1999
Resolved
ELIMINATE LEAKAGE FROM EDG FUEL TANK FUEL SUPPLY LINE AT UNION PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Documentation
Issued 20 January 1999
Resolved
PROVIDE FOR COAST GUARD REVIEW ALL CREW LICENSES PRIOR TO THE OPERATION OF THE VESSEL.
Condition: Unknown
Due 20 January 1999
Resolved 20 January 1999
Lifesaving
Issued 20 January 1999
Resolved
CONDUCT TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR FIRE, ABANDON SHIP, AND MAN OVERBOARD DRILL PRIOR TO THE OPERATION OF THE VESSEL.
Condition: Unknown
Due 20 January 1999
Resolved 20 January 1999