Inspection history · 39
2 March 2017
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6095428
1 July 2016
Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5930736
28 April 2016
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5865004
28 April 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5934047
29 June 2015
Periodic Inspection · MTSA Verification · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5167906
28 July 2014
Annual Inspection · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4931599
30 July 2012
Annual Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4389402
16 February 2012
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4245623
1 February 2012
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4236249
8 August 2011
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4112599
21 July 2011
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4095854
17 June 2011
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4046329
13 July 2009
Hull Examination · Cargo Tank Internal · Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3533515
16 April 2009
Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3452317
18 September 2008
Internal Structural Exam · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3330348
6 June 2008
Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3229167
7 September 2007
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3052056
31 August 2007
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3044176
6 August 2007
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3019747
11 August 2006
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2743903
18 April 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2628052
16 May 2005
COI Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2359090
8 April 2005
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2334822
17 August 2004
Annual Inspection · MTSA Verification
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2168564
29 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978924
16 December 2003
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2029559
8 October 2003
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1923863
15 September 2003
Administrative Inspection
Administrative · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1905535
11 September 2003
Internal Structural Exam · Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1903657
26 December 2002
Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1723391
13 December 2002
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1718565
11 April 2002
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1603945
9 April 2002
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1603211
4 April 2002
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1601365
25 October 2001
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 26650
23 August 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1071152
24 May 2000
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1462100
12 January 2000
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 473250
29 June 1999
COI Inspection · Initial Construction-Excluding Oversight · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1445518
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 30 July 2012
Resolved
Provide documentation for fresh water service.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Unable to provide documentation for fresh water service, COI to be amended to reflect vessel operates in salt water and dry dock dates to concur at next annual inspection.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 30 July 2012
Resolved
Provide documentation for Benzene monitoring program.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Provided documention to verify benzene monitoring program.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 30 July 2012
Resolved
Replace or repair cover for prime mover.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Replaced cover for prime mover.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 30 July 2012
Resolved
Install RPM and oil gauge on prime mover.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Installed RPM and oil gauge on prime movers.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 30 July 2012
Resolved
Service exhaust leak on prime mover.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Repaired exhaust leak on prime mover.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 30 July 2012
Resolved
Service safety release valves.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Safety relief valves properly serviced.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 30 July 2012
Resolved
Install stem indicator for valve in open or closed position
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Stem installed for valve indictaor.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 30 July 2012
Resolved
Service pressure gauge on transfer line.
Action required: 705 - Other - as specified
Due 24 October 2012
Resolved 4 October 2012
Resolution: Pressure gauge properly serviced.
Construction/Loadline › Hull › Bottom Plating
Issued 8 August 2011
Resolved
Fractured weld located on port side corner wrapper bottom. Vessel to make permanent repairs prior to carrying cargo.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 August 2011
Resolved 24 August 2011
Resolution: Welded repairs were made to the port, bow rake at the bilge wrapper; pressure test was satisfactory.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 13 July 2009
Resolved
Maximum liquid level must be conspicuous and permanent.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2009
Resolution: Markings were painted but not made permanent at this time.
Deck/Cargo › Vapor Control Systems › Manual Isolation Valve
Issued 13 July 2009
Resolved
Valve nearest riser could not be fully opened or fully closed. Repair or replace.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2009
Resolution: Valve was replaced.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 13 July 2009
Resolved
#1P sight glass gasket was not seated properly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2009
Resolution: Gasket replaced.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 13 July 2009
Resolved
P/V gauge displayed 1 psi when there was no pressure in line.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2009
Resolution: gauge was replaced.
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 13 July 2009
Resolved
Barge had several buckets of pollutant materials on main deck. Required open buckets to be removed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2009
Resolution: buckets were removed from deck of barge.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 13 July 2009
Resolved
Closed gauging system (all sight glass had vapor bypass) not vapor tight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 July 2009
Resolution: All sightglass were made vapor tight.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
BOW RAKE: Renew #1 and #2 stbd deep web knuckle bracket; stbd outboard vertical cord in way of #1 truss; weld on #1 truss in way of #1 deck longitudinal; approx 1 foot tear in side shell stbd in way of #1 stbd web knuckle; renew #3, #4, and #5 diagonal in #3 bay; approx 24 inches #1 side longitudinal at aft port bulkhead; #1, #2 and #3 port aft tripping brackets.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
BOW RAKE: Pick up welds as marked on #3 side longitudinal and renew approx 2 feet outboard vertical cord in way of port #1 side long.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Picked up welds.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#1 PORT VOID: Renew tripped deep web floor frame in way of side shell bilge knuckle at #2 truss; crushed portion of forward bulkhead.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#2 PORT VOID: Pick up welds as marked on #1 side longitudinal.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Picked up welds.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#3 PORT VOID: Renew deep web floor frame in way of #7 truss and #1 aft tripping bracket.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Replaced/welded bracket, deep web floor frame.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#4 PORT VOID: Renew deep web floor frame at #4 truss and pick up welds as marked on #1 side longitudinal at trusses.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Picked up welds. Renewed floor frame.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#6 PORT VOID: Renew top #2 truss in way of #1 side longitudinal; #2 deep web floor frame; #1 side longitudinal in way of #3 truss; #5 truss cord in way of #1 side longitudinal and #1 and #2 tripping bracket on aft bulkhead.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Renewed/welded trusses along #1 side longitudinal. Welded new tripping brackets.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#1 STBD VOID: Renew crushed forward bulkhead upper section as marked; bottom aft corner bracket and tripped deep web floor frames in way of #2, #3, #4, and #5 trusses;
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Insert on fwd bkhd upper section. Renewed/welded corner brackets and deep web floor frames.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#2 STBD VOID: Renew #7 tripping bracket on aft bulkhead and torn weld at aft bulkhead in way of #1 side longitudinal.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Renewed/welded tripping bracket. Rewelded torn weld at aft bkhd along #1 side longitudinal.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#3 STBD VOID: Renew buckled section of transverse frame on #5 truss at #1 side long and brackets as marked at aft bulkhead.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Renewed buckled section and rewelded brackets.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#4 STBD VOID: Renew tripped transverse deep web floor frame on #4 and #5 truss in way of side shell bilge knuckle; all welds as marked; #1 side longitudinal in way of #4 truss; outside vertical cord on #4 truss and #1 side longitudinal in way of #3 truss.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Renewed tripped transverse deep web floor frame. Welded where marked.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#5 STBD VOID: Renew as marked approx 10 feet of #1 side longitudinal; top corner bracket on forward bulkhead; all tripped deep web transverse frames in way of side shell knuckle and crushed sections of vertical cord as marked.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Renewed as marked. Corner bracket welded. Tripped deep web transverse frames rewelded.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
#6 STBD VOID: Renew top tripping bracket on aft bulkhead; weld #1 side longitudinal as marked in way of #1, #2, #3, #4 and #5 trusses; buckled section at bottom of #1 truss and #1 and #2 tripping brackets on aft bulkhead.
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Renewed tripping brackets. Picked up welds.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
AFT PEAK: Renew four stbd corner brackets; six port corner brackets; #1 top transverse frame on aft bulkhead stbd from corner bracket to #2 vertical frame; make repairs to tear at #2 vertical frame aft bulkhead and to aft stbd cup where plate tore from deck.
Action required: 705 - Other - as specified
Resolved 23 April 2009
Construction/Loadline › Hull › Hull Plating
Issued 30 May 2008
Resolved
Crop and renew damaged shell plating in port corner wrap of headlog with approximately 18" x 18" insert.
Action required: 705 - Other - as specified
Due 15 September 2008
Resolved 23 April 2009
Construction/Loadline › Hull › Bottom Plating
Issued 30 May 2008
Resolved
Crop & renew insets in way of rake and headlog that exceed the maximum plate deflection as required by the attending mariine inspector after close-up visual inspection during upcoming internal structural examination.
Action required: 705 - Other - as specified
Due 29 June 2009
Resolved 29 April 2009
Resolution: Cropped and renewed chords and stiffeners at headlog.
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 31 August 2007
Resolved
Capstan wheel was wasted to the point of unserviceability.
Action required: 705 - Other - as specified
Due 30 September 2007
Resolved 7 September 2007
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 31 August 2007
Resolved
Vapor header manifold missing dowl rod (stud) on stbd side, port side extremely wasted.
Action required: 703 - Prior to bunkering operations
Due 30 September 2007
Resolved 7 September 2007
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 31 August 2007
Resolved
Cargo manifold marking extremely faded
Action required: 703 - Prior to bunkering operations
Due 30 September 2007
Resolved 7 September 2007
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 31 August 2007
Resolved
Ullage hatch gaskets were not vapor tight and were leaking vapors.
Action required: 703 - Prior to bunkering operations
Due 30 September 2007
Resolved 7 September 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 31 August 2007
Resolved
Emergency shutdown cable parted.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2007
Resolved 7 September 2007
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 31 August 2007
Resolved
Nav. light boxes inner matte black coating was extremely faded.
Action required: 705 - Other - as specified
Due 30 September 2007
Resolved 7 September 2007
Documentation › Certificates/Documents › Certificate of Inspection
Issued 31 August 2007
Resolved
Vessel allowed the COI to go past the 90 grace period for annual inspection.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 31 August 2007
Resolved 31 August 2007
Resolution: Barge inspected and deemed fit to continue in accordance with COI.
Documentation › Certificates/Documents
Issued 11 September 2003
Resolved
Place original or certified copy of Certificate of Inspection on vessel. LEGACY COMPONENT DESC: Certificate of Inspection
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 October 2003
Resolved 24 September 2003
Stability › Watertight Integrity
Issued 13 December 2002
Resolved
Make repairs to the #2 port wing void manhole cover hinge.
Condition: Unknown
Due 13 January 2003
Resolved 26 December 2002
Deck/Cargo › Vapor Control Systems
Issued 9 April 2002
Resolved
Prior to loading cargo, replace the stud on the vapor control system's header valve flange face.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 April 2002
Resolution: Received letter from vessel operator stating header valve ashore for stud repair/replacement and will be back on board the vessel on 4/13/2002.
Documentation
Issued 23 August 2001
Resolved
Provide shipboard oil prevention emergency plan or a exemption letter._x001C_
Condition: Unknown
Due 24 November 2001
Resolved 7 March 2002