MAURY USCG vessel records
← All vessels

NMS 3106

Built
1980
Last inspected
18 June 2010
Controls
None recorded without a removal date
Also recorded as
N.M.S. NO. 3106 (2005), CHEM 1705 (2009)

This record may be incomplete: the most recent inspection recorded for this vessel was 16 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 18 June 2010
…with no type recorded48
…past their stated due date1
Operational controls None recorded without a removal date
Years with a record 29 calendar years (1982–2010)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Tonnage
2239 - Regulatory (Subpart C or D), Gross Ton 2239 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-51389
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 21

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. Only barges and towing vessels are in this archive, so any other vessel type in the same activity does not appear here: these lists are a floor, not a complete manifest.

CAPT STREIF Towing Vessel · MISLE 188939 · 18 May 2009 · activity 3479356M/V JASEN AUGUST Towing Vessel · MISLE 199446 · 18 May 2009 · activity 3479356CHEM 3702 Tank Barge · MISLE 878041 · 18 May 2009 · activity 3479356IB1700 Tank Barge · MISLE 947635 · 18 May 2009 · activity 3479356MARTIN J. PELLEGRIN Towing Vessel · MISLE 188515 · 17 February 2005 · activity 23075394632 Freight Barge · MISLE 48126 · 20 October 2003 · activity 1942754STC 102 Tank Barge · MISLE 51995 · 20 October 2003 · activity 1942754M/V MISS PAM Towing Vessel · MISLE 122722 · 20 October 2003 · activity 1942754MARTIN J. PELLEGRIN Towing Vessel · MISLE 188515 · 3 April 2003 · activity 1773714MARTIN J. PELLEGRIN Towing Vessel · MISLE 188515 · 23 December 2002 · activity 1730910G. WALKER Towing Vessel · MISLE 132277 · 14 April 2001 · activity 27017BURNS JOHNSON JR. Towing Vessel · MISLE 186778 · 25 April 1997 · activity 50484CHEM 974 Tank Barge · MISLE 49762 · 4 January 1997 · activity 33238MARTIN J. PELLEGRIN Towing Vessel · MISLE 188515 · 4 January 1997 · activity 33238AXL 252 Tank Barge · MISLE 45971 · 1 December 1996 · activity 55903BURNS JOHNSON JR. Towing Vessel · MISLE 186778 · 1 December 1996 · activity 55903BURNS JOHNSON JR. Towing Vessel · MISLE 186778 · 29 February 1996 · activity 64491LT 103 Tank Barge · MISLE 47416 · 26 February 1996 · activity 70039GMS-450 Industrial Vessel · MISLE 49147 · 26 February 1996 · activity 70039N.M.S. NO. 1449 Tank Barge · MISLE 51415 · 26 February 1996 · activity 70039N.M.S. NO. 1476 Tank Barge · MISLE 54159 · 26 February 1996 · activity 70039NITA E Towing Vessel · MISLE 87953 · 26 February 1996 · activity 70039MICHAEL L Towing Vessel · MISLE 105953 · 26 February 1996 · activity 70039DM 4930 Freight Barge · MISLE 46717 · 15 September 1995 · activity 21141TROJAN WARRIOR Towing Vessel · MISLE 139613 · 15 September 1995 · activity 211414603 Tank Barge · MISLE 48125 · 21 September 1993 · activity 458562

Inspection history · 103

18 June 2010 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3769784
16 July 2009 Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3542517
20 May 2009 Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3480069
19 May 2009 Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3478755
18 May 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3479356
31 January 2009 Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3403410
10 November 2008 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3360624
1 August 2008 Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3305905
29 July 2008 Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3283061
23 April 2008 Administrative Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3189680
27 February 2008 Permit to Proceed · Damage Survey · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3154846
26 November 2007 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3104599
11 July 2007 Hull Examination · MTSA Verification · Internal Structural Exam · Administrative Inspection · Examination of Repairs · Cargo Tank Internal · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2991446
2 October 2006 Annual Inspection · Cargo Tank Internal · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2791938
1 October 2005 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2512553
28 September 2005 Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2507543
15 July 2005 Hull Examination · Deficiency Check · Periodic Inspection · Internal Structural Exam
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2427474
27 June 2005 MTSA Verification
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2405190
17 February 2005 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2307539
5 August 2004 Damage Survey
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2156779
15 June 2004 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2101925
23 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1985152
22 October 2003 Administrative Inspection
Administrative · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1933955
20 October 2003 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1942754
28 August 2003 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1887321
3 April 2003 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1773714
23 December 2002 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1730910
13 September 2002 Hull Examination · COI Inspection · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1623726
15 May 2002 Permit to Proceed
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1617478
27 March 2002 Examination of Repairs
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1598739
8 March 2002 Administrative Inspection
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1493693
18 January 2002 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1481903
21 May 2001 Damage Survey · Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1064850
14 April 2001 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 27017
5 January 2001 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1410458
7 December 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 285146
1 February 2000 Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 809165
23 April 1999 Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 792157
17 February 1999 Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 800290
18 February 1998 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1111252
9 January 1998 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1115163
25 April 1997 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 50484
18 February 1997 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1100135
4 January 1997 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 33238
1 December 1996 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 55903
1 December 1996 Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1093338
29 February 1996 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 64491
26 February 1996 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 70039
9 February 1996 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1081455
15 September 1995 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 21141
17 April 1995 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 852232
21 February 1995 Examination of Repairs · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1450944
21 April 1994 COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1396131
25 February 1994 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1356523
18 January 1994 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 457076
21 September 1993 Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 458562
26 May 1993 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 520866
6 April 1993 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1362756
29 December 1992 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1141306
15 December 1992 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1140556
14 December 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 493464
4 November 1992 Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 468191
14 April 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 443844
28 February 1992 COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 962584
24 January 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 534547
27 September 1991 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 471656
23 February 1991 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 512377
1 February 1991 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 931137
11 October 1990 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 509476
10 May 1990 Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 440018
9 March 1990 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1220993
19 February 1990 Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 925906
4 October 1989 Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 528105
5 May 1989 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1346057
11 April 1989 Re-Inspection · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1346053
8 November 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 891096
13 April 1988 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1338728
21 March 1988 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 508060
3 March 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 458527
27 October 1987 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 461181
27 May 1987 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 472140
19 February 1987 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1322716
21 January 1987 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 519593
24 September 1986 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 505273
10 July 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 466487
23 April 1986 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297070
15 February 1986 Permit to Proceed
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1295565
12 February 1986 Examination of Repairs
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 991210
12 February 1986 Permit to Proceed
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001494
18 August 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 511990
25 June 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1290676
4 March 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1287575
23 February 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1289756
15 February 1985 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 979315
18 January 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 496155
11 June 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 975931
29 May 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 973115
24 June 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971370
9 June 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965709
16 March 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272431
21 October 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973802
14 September 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280058
12 February 1982 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1277113

Deficiency record · 79

Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Provide ultrasonic testing report of #3 port and starboard double bottom frames paying paying particular attention to the bottom 6 inches. Prove the thickness is within the allowable range and renew all wasted areas to “good metal” as required by the UT results to the satisfaction of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Resolution: Attending Marine inspector received satisfactory UT report.
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Starting aft and working forward in #3 double bottom frames 1-15 as labeled. On frame #1 crop and renew existing insert to the full height of the double bottom (approximately 18')
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
On #2 frame, crop and renew insert to tank bottom located in No.3 Wing Tank.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between #2 and #3 frames, crop and renew centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and Renew the last 2 feet of frames #2 and #3 nearest the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
On frames #3 and #4 crop and renew the first 18” as marked.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #3 and #4 crop and renew centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and Renew the last two feet of frame #4 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #4 and #5 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #5 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and Renew the most outboard 18 inches of frame #5.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and Renew the last two feet of frame #6 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the most outboard 18 inches of frame #6.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #6 and #7 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and Renew the last two feet of frame #6 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #7 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the most outboard 18 inches of frame #7.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #8 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the most outboard 18 inches of frame #8.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #8 and #9 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #9 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #10 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #9 and #10 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #10 and #11 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #11 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #11 and #12 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #12 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #12 and #13 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Crop and renew the last two feet of frame #13 adjacent to the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #13 and #14 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
Between frames #14 and #15 crop and renew the centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 27 February 2008
Construction/Loadline › Hull › Double Hull
Issued 27 February 2008 Resolved
It appears that No. 3 port void and double bottom are of the same condition as noted in No. 3 Starboard. A condition assessment survey report of #3 port double bottom shall be provided to the attending marine inspector by the compliance date noted below.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2008
Resolved 23 April 2008
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 26 November 2007 No resolution recorded
Tank Barge Chem 1705 O.N. 617689 must be in full compliance with 46CFR 111.105-5 and 111.105-31(1) no later than 01Aug08. Or must be down graded in cargo authorization such that the Class I/Division I location requirements no longer apply. For electronically controlled cargo pump engines.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 January 2009 — due date passed with no resolution recorded
Engineering › Steam System (auxiliary) › Piping
Issued 2 October 2006 Resolved
Prove or remove steam piping above the deck along vessel centerline and repair or replace support brackets within 30 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 18 October 2006
Resolution: Removed steam piping from deck and capped at the valve flange.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 2 October 2006 Resolved
Repair and renew hatch cover dogs on bow void as required by 46 CFR 42.15 within 30 days
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 18 October 2006
Resolution: Replaced hatch cover dogs on bow void.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 2 October 2006 Resolved
Prove draft marks clearly visible on vessel as required by 46 CFR 170.120 within 30 days.
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 6 October 2006
Resolution: Painted the draft marks on vessel.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 2 October 2006 Resolved
Prove properly sealed rising stick indicators as required by 46 CFR 38.10-20 within 30 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 6 October 2006
Resolution: Sealed the rising stick indicators.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 2 October 2006 Resolved
Prove name and hailing port clearly visible on stern of barge as required by 46 CFR 67.123 within 30 days.
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 6 October 2006
Resolution: Made name and hailing port visible on vessel.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 2 October 2006 Resolved
Prove operation of high level and overfill alarms as required by 46 CFR 39-20.9 within 30 days.
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 6 October 2006
Resolution: Prove operation of high level and overfill alarms.
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 2 October 2006 Resolved
Make #4 port and starboard cargo tanks and #4 port and starboard wing voids gas free and ready for inspection.
Action required: 705 - Other - as specified
Due 2 November 2006
Resolved 6 October 2006
Resolution: Gas freed the #4 port and starboard cargo tanks.
Construction/Loadline › Hull › Hull Plating
Issued 28 September 2005 Resolved
Make permanent repairs to cracked side shell plating located on starboard side in way of stern void to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 October 2005
Resolved 4 October 2005
Construction/Loadline › Hull › Weld
Issued 5 August 2004 Resolved
Approx 6" fractured weld discovered in No. 1 starboard void space at the turn of the bilge. Fracture ground out and re-welded.
Condition: Damaged By Earlier Event
Due 5 August 2004
Resolved 5 August 2004
Resolution: re-welded
Construction/Loadline › Structures › Manhole
Issued 15 June 2004 Resolved
Renew deck hatches, two in stern void, and one for # 5 port void.
Action required: 705 - Other - as specified
Due 15 July 2004
Resolved 18 June 2004
Resolution: Replaced two deck hatches in way of the stern viod and one in way of the #5 aft port void.
Construction/Loadline › Structures › Manhole
Issued 15 June 2004 Resolved
Renew all deck hatches in way of #1 p/s, #2 p/s, #3 p/s, #4 p/s, and #5 p/s voids by the next Internal Structural Exam.
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 September 2005
Resolved 21 July 2005
Resolution: Replaced all hatch covers for #1-4 port and #1-5 stbd wing voids.
Deck/Cargo › Cargo Heating › General
Issued 15 June 2004 Resolved
Repair or replace all steam condensate valves.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2004
Resolved 18 June 2004
Resolution: Repaired one and replaced the remaining steam condensate valves on the vessel.
Deck/Cargo › Towing › Chocks
Issued 15 June 2004 Resolved
Repair or replace three damaged buttons on stern.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 July 2004
Resolved 18 June 2004
Resolution: Replaced the three damaged buttons on the stern.
Deck/Cargo
Issued 31 May 2002 Resolved
Repairs are required for a faulty fillet weld- overhead cargo tank 2S
Due 16 August 2002
Resolved 11 August 2002
Deck/Cargo
Issued 31 May 2002 Resolved
Weld fill-ins required in cargo tank 3S
Due 16 August 2002
Resolved 11 August 2002
Deck/Cargo
Issued 31 May 2002 Resolved
Bent reach rod located in cargo tank 5S
Due 16 August 2002
Resolved 11 August 2002
Deck/Cargo
Issued 31 May 2002 Resolved
Pick-ups in cargo tank 4S aft bulkhead
Due 16 August 2002
Resolved 11 August 2002
Deck/Cargo
Issued 31 May 2002 Resolved
Faulty fillet weld in cargo tank 5S
Due 16 August 2002
Resolved 11 August 2002
Deck/Cargo
Issued 31 May 2002 Resolved
Repairs are necessary to specified "K" brace in bow void
Due 16 August 2002
Resolved 11 August 2002
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 18 January 2002 Resolved
Found 12 V blue light attached to the top of the mast. Light removed prior to completion of inspection due to possibility of confusing it with a navigational light.
Due 18 February 2002
Resolved 18 January 2002
Resolution: Light removed.
Construction/Loadline
Issued 21 May 2001 Resolved
Pinhole leak in #5 port cargo tank at portside aft corner of raised trunk.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 21 April 1994 Resolved
REPLACE THE TOWING CABLE BUTTONS ON VESSEL'S STERN VOID DECK. THE MUSHROOMSHAPE CABLE LOCKING LIPS ARE BROKEN OFF. ONLY THE AFT BUTTONS, PORT & STBDSIDES, REQUIRE REPLACING.
Condition: Unknown
Due 21 May 1994
Resolved 7 July 1994
Construction/Loadline
Issued 25 February 1994 Resolved
DISCHARGE CARGO AND MAKE PERMANENT REPAIRS TO #1 STBD WING VOID AND PORT SIDE OF STERN VOID. VESSEL IS TO REMAIN IN NEW ORLEANS ZONE AND NOT TO LOAD CARGO UNTIL SATISFACTORY REPAIRS WITNESSED BY MARINE INSPECTOR.
Condition: Unknown
Due 25 February 1994
Resolved 25 February 1994
Deck/Cargo
Issued 25 February 1994 Resolved
PLACE GUARDS AROUND PUMP ENGINE EXHAUST LINES OR INSULATE TO PROTECT FROM INJURY.
Condition: Unknown
Due 25 February 1994
Resolved 25 February 1994
Construction/Loadline
Issued 25 February 1994 Resolved
GAS FREE AND MAKE AVAILABLE FOR INSPECTION THE PORT AND STARBOARD SIDE OF #5 WING VOID. (BOTTOM TRANSVERSE FRAMES APPEAR FRACTURED)
Condition: Unknown
Due 25 February 1994
Resolved 25 February 1994
Construction/Loadline
Issued 19 February 1990 Resolved
GAS-FREE AND MAKE AVAILABLE FOR COAST GUARD INSPECTION: #2 STBD CARGO TANK AND #2 STBD WING VOID. (POSSILE CARGO LEAK INTO #2 STBD WING VOID)
Condition: Unknown
Due 19 February 1990
Resolved 19 February 1990
Deck/Cargo
Issued 13 April 1988 Resolved
GAS FREE AND PRESENT VESSEL TO THE COAST GUARD FOR A STRUCTURAL INTERNAL EXAM OF NUMBER 3 PORT AND STARBOARD WING VOIDS IN ACCORDANCE WITH 46CFR31.10-21(A) TABLE.
Condition: Unknown
Due 13 April 1988
Resolved 13 April 1988
Construction/Loadline
Issued 15 February 1986 Resolved
MAKE BOW RAKE GAS FREE AND REPAIR THE HOLE IN THE BOW LOCATED AT THE STARBOARD FORWARD CORNER, ON THE SIDE SHELL, ABOUT ONE FOOT BELOW THE MAIN DECK.
Condition: Unknown
Due 15 February 1986
Resolved 15 February 1986
Unknown
Issued 23 February 1985 Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL NMS 3106 DN617689
Condition: Unknown
Due 23 February 1985
Resolved 23 February 1985
Construction/Loadline
Issued 23 February 1985 Resolved
MAKE PERMANENT REPAIRS TO DAMAGED AREA ON PORT SIDE APPROXIMATELY 3'X2" GASH STBD SIDE 12"X2" GASH IN WAY OF BOW RAKE ON BOTTOM PLATE. THE ABOVE REPAIR TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR PRIOR TO 04MAR85. WHILE SUBJECT BARGE IS IN TRANSIT, THE
Condition: Unknown
Due 23 February 1985
Resolved 23 February 1985
Unknown
Issued 15 February 1985 Resolved
GOUGE AND REPAIR WELD FROM BOTH SIDES 3'FOOT CRACK IN SHALL PLATE AT STB UPPER AFT RAKE CORNER AND 1'FOOT CRACK AT PORT UPPER AFTER RAKE CORNER.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Deck/Cargo
Issued 15 February 1985 Resolved
CLEAN AND GAS FREE ALL CARGO TANKS FOR INTERNAL EXAM BY CG-INSPECTOR PRIOR TO LOADING GRADE C OR HIGHER CARGO. NOTIFY COGNIZANT OCMI WHEN TANKS ARE READY FOR EXAM.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Unknown
Issued 15 February 1985 Resolved
REPAIR BROKEN STBD RUNNING LIGHT STAND AND ENERGENCY CARGO PUMP SHUTDOWN SIGN
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Unknown
Issued 15 February 1985 Resolved
MAKE PROPER REPAIR TO INTERNAL STIFFENERS AND SIDE BRACKETS IN WAY OF LOWER SHELL PLATING IN FORWARD RAKE.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Unknown
Issued 29 May 1984 Resolved
RESTENCIL NAME AND HAILING PORT ON STERN.
Condition: Unknown
Due 29 May 1984
Resolved 29 May 1984
Unknown
Issued 29 May 1984 Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE N.M.S. NO. 3106, DN617689.
Condition: Unknown
Due 29 May 1984
Resolved 29 May 1984
Unknown
Issued 29 May 1984 Resolved
LABEL EMERGENCY SHUT DOWN STATION TO BE VISIBLE FROM THE FORE AND AFT POSITIONS OF THE BARGE.
Condition: Unknown
Due 29 May 1984
Resolved 29 May 1984
Unknown
Issued 29 May 1984 Resolved
PLACE ON BOARD OIL TRANSFER PROCEDURES REQUIRED BY 33 CFR 155.750.
Condition: Unknown
Due 29 May 1984
Resolved 29 May 1984
Unknown
Issued 29 May 1984 Resolved
MAKE PERMANENT REPAIRS TO THE DECK KNUCKLE FRACTURE ON THE PORT SIDE OF THESTERN VOID.
Condition: Unknown
Due 29 May 1984
Resolved 29 May 1984
Unknown
Issued 29 May 1984 Resolved
MAKE PERMANENT REPAIRS TO PORT NAVIGATION LIGHT STAND.
Condition: Unknown
Due 29 May 1984
Resolved 29 May 1984
Unknown
Issued 9 June 1983 Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO VESEL N.M.S. NO. 3106, DN617689
Condition: Unknown
Due 9 June 1983
Resolved 9 June 1983
Construction/Loadline
Issued 9 June 1983 Resolved
PROCEED TO TEXICO CONVENT, OFF LOAD ALL PRODUCT AND PROCEED EMPTY TO NAT- IONAL MARINE SERVICE LOUISIANA SHIPYARD FOR PERMANENT REPAIRS TO
Condition: Unknown
Due 9 June 1983
Resolved 9 June 1983
Construction/Loadline
Issued 9 June 1983 Resolved
(REQUIREMENT 1 CONTINUED) SATISFACTION OF OCMI.
Condition: Unknown
Due 9 June 1983
Resolved 9 June 1983
Construction/Loadline
Issued 14 September 1982 Resolved
MAKE TEMP. REPAIRS TO HATCH COVER IN WAY OF #3&4 PORT WING TANK PRIOR TO DEPARTURE CORPUS CHRISTI. MAKE PERM. REPAIRS NEXT DRYDOCK.
Condition: Unknown
Due 14 September 1982
Resolved 14 September 1982
Navigation
Issued 14 September 1982 Resolved
MAKE TEMP. REPAIRS TO PORT RUNNING LIGHT AND SCREEN PRIOR TO DEPARTURE FROMCORPUS CHRISTI, TX. PERM. REPAIRS NEXT DRYDOCK.
Condition: Unknown
Due 14 September 1982
Resolved 14 September 1982
Deck/Cargo
Issued 14 September 1982 Resolved
MAKE PERM. REPAIRS TO ALL DAMAGED STEAM CONDENSATE LINES PRIOR TO 1 NOV 82 ZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZ
Condition: Unknown
Due 14 September 1982
Resolved 14 September 1982

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.