Records from 2000 to 2020. Most recent: inspection, 10 June 2020.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS · ASHLAND CITY, TN, UNITED STATES · built 2000
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 June 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Net Ton
1619 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 27
10 June 2020
Bulk Liquid Transfer Monitor
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6973351
18 March 2020
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6928592
26 February 2020
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6915870
13 February 2020
Administrative Inspection · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6909472
10 March 2019
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6640470
28 November 2018
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6586673
28 September 2017
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6276298
6 June 2016
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5899370
1 July 2015
MTSA Verification · Examination of Repairs · Drydock Exam · Internal Structural Exam · Cargo Tank Internal · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5175371
29 April 2014
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4851094
7 May 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4304404
3 March 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4259239
9 April 2010
COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3712976
15 February 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4059746
22 June 2009
Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3511194
23 May 2008
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3214617
17 July 2007
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2998222
8 August 2006
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2740259
7 July 2005
Internal Structural Exam · Hull Examination · Examination of Repairs · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2418288
6 June 2005
COI Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2378101
24 August 2004
MTSA Verification · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2169046
17 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1966254
18 September 2003
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1907621
22 May 2002
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1620416
7 August 2001
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1370350
17 July 2000
Examination of Repairs
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1051453
10 July 2000
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1464958
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 February 2020
Resolved
No extensive repairs to the hull or machinery which affect the safety of a vessel shall made without the knowledge of the Officer in Charge, Marine Inspection.
The tank barge MMI 3023(O.N. 1095688) is allowed a
one-time transit, with cargo, from Corpus Christi, TX, to Kinder Morgan Pasadena; The vessel is to discharge cargo at said facility and conduct permanent repairs at Southwest Shipyard. Damage consists of three fractures to the STBD bow void side shell just aft of the headlog and above the loaded waterline 4" x 1/2", 2" x 1", and 12" x 1 1/2" to be repaired to the satisfaction of the local [name withheld] shots are to be taken in the vicinity around the damaged side shell to determine extend of material wastage. The vessel is loaded with Raffinate.
The master is required to notify the cognizant OCMI upon arrival and/or in the event that conditions aboard the vessel change during its transit.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 March 2020
Resolved 23 March 2020
Resolution: Deficiency cleared via satisfactory witness of repairs by Marine Inspectors.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 8 August 2006
Resolved
Proved proper operation pressure/vacuum settings on the PV valve. Provide test report to CG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 August 2006
Resolution: PV Valve test by Louisiana Valve & Machine Works
Construction/Loadline
Issued 10 July 2000
Resolved
Proceed to dry-dock in Paducah, Kentucky and make repairs to the bilge knuckle in #1 starboard wing void/double bottom to the satisfaction of the attending Coast Guard Marine Inspector. No cargo operations are authorized until repairs are completed.
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000