Inspection history · 45
6 November 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8264999
20 December 2024
COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8046629
25 October 2024
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8024623
18 October 2024
Damage Survey · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8020918
14 July 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7957798
14 February 2024
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7862847
17 May 2023
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7690877
21 February 2023
Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7639616
31 January 2023
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7631262
15 November 2022
Internal Structural Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7594970
2 May 2022
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7446554
17 February 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7397893
20 July 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7261750
5 March 2021
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7150939
9 January 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6886375
9 December 2019
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6869848
7 November 2019
Drydock Exam · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6851148
16 November 2018
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6583571
15 November 2017
Internal Structural Exam · Periodic Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6307097
27 February 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6097644
20 December 2016
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6060220
3 December 2015
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5774421
5 June 2015
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5144933
3 December 2014
Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5034672
17 October 2014
MTSA Verification · COI Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5006207
15 January 2014
COI Inspection · MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4778703
29 November 2012
Annual Inspection · SIP Inspection/Audit · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4492493
16 October 2012
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4465505
27 October 2011
MTSA Verification · Annual Inspection · SIP Inspection/Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4177173
12 December 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3909239
3 November 2010
MTSA Verification · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3882610
19 July 2009
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3541269
18 November 2008
Annual Inspection · MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3365236
15 February 2008
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3152435
6 December 2007
SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3176070
6 November 2007
Internal Structural Exam · MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3093932
27 July 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3008986
8 May 2007
SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3176008
5 December 2006
MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2865846
12 July 2006
SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3175944
22 November 2005
SIP Initial Entry · MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2539278
24 March 2005
MTSA Verification
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2322820
25 February 2005
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2301181
4 November 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2235033
28 October 2004
Hull Examination · Internal Structural Exam · Cargo Tank Internal · Initial Certification · MTSA Verification
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2229833
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 6 November 2025
Resolved
The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine (such as by cutting off the intake air). STBD cargo pump prime mover unable to effectively stop using remote shutdown. Repair to satisfaction of attending marine inspector prior to discharging or transferring cargo with the STBD Cargo Pump.
46 CFR 32.50-35 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 November 2025
Resolution: Received satisfactory video evidence.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 6 November 2025
Resolved
If installed after July 23, 1990, the high-level alarm and tank overfill alarm required by paragraph (a) of this section must - (2) activate an alarm in the event of loss of power to the alarm system. When tested, alarms were not present on the cargo deck.
46 CFR 39.2007 (b) (2)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2026
Resolved 12 January 2026
Resolution: Report attached to docs tab outlining alarm servicing/testing. All sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 20 December 2024
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. MI observed a VCS flange without a permanent stud.
46 CFR 39.2001(j)
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 20 December 2024
Resolved 2 January 2025
Resolution: O/O installed vapor line alignment stud.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 20 December 2024
Resolved
No person shall conduct an oil or hazardous material transfer operation unless the discharge containment required by §§ 154.530, 155.310, and 155.320 of this chapter, as applicable, is in place and periodically drained to provide the required capacity. MI observed current condition of discharge containment is not suitable for transfer operations.
33 CFR 156.120(n)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 December 2024
Resolved 2 January 2025
Resolution: O/O removed equipment from containment drainage.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 December 2024
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. MI observed 02 life rings missing retro-reflective tape.
46 CFR 199.70(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 January 2025
Resolved 2 January 2025
Resolution: O/O replaced retro-reflective tape.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 October 2024
Resolved
The Coast Guard may re-inspect at any time any vessel subject to inspection under 46 USC. During re-inspection if any defects or imperfections are discovered or when repairs become necessary the Coast Guard will notify the master and state what is required. The Duty Marine inspector received report from Vessel Traffic Service the Barge was soft aground IVO Buoy 2 at PNCT. Barge required to remain at lay berth until Marine Inspectors conducts damage survey to determine seaworthiness. 46 CFR 2.01-10(b) - 701 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 October 2024
Resolution: MI observed no obivious damage to wing voids. No water ingress on Port and STBD sides.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 February 2024
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons and the vessel from electrical hazards. Generators not intended to be operated in parallel, shall be electrically or mechanically interlocked to prevent accidental out of phase paralleling. Install mechanical interlock on switchboard to prevent accidental paralleling in accordance with the manufacture instructions.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 March 2024
Resolved 28 February 2024
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 May 2023
Resolved
While moored, vessel's hull was punctured by the dock in the forward rake stbd side 12' above the waterline. Vessel is to transit directly to Court St for permanent repairs.
Action required: 705 - Other - as specified
Due 17 May 2023
Resolved 22 May 2023
Resolution: Passed final weld and NDT for 24" x 24" insert. All sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 February 2023
Resolved
All tank vessels, except unmanned tank barges, contracted for on or after July 1, 1969, shall have efficient guard rails or bulwarks on decks and bridges. The height of rails or bulwarks shall be at least 39-1/2 inches from the deck except that where this height would interfere with the normal operation of the vessel, a lesser height may be approved by the Commandant. At exposed peripheries of the freeboard and superstructure decks the rails shall be in at least three courses including the top. The opening below the lowest course shall not be more than 9 inches. The courses shall not be more than 15 inches apart. 03 courses of chain are missing from the STBD aft quarter. 46 CFR 32.02-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2023
Resolved 24 February 2023
Resolution: Operator installed chains.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 February 2023
Resolved
Operational tests and checks of all safety and limit controls, combustion controls, programming controls, and safety relief valves must be conducted by the owner, chief engineer, or person in charge at the inspection for certification, periodic inspection, and when directed by the Officer in Charge, Marine Inspection, to determine that the control components and safety devices are functioning properly and are in satisfactory operating condition. The system must be locked-out in order to prevent operation in lieu of required tests. Marine inspector discovered system was not properly tagged out. 46 CFR 61.30-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2023
Resolved 24 February 2023
Resolution: Operator disconnected fuel lines and tagged-out the system.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 November 2022
Resolved
Replace FWD most rail stanchion on STBD side
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2022
Resolved 7 December 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 March 2021
Resolved
33CFR156.120(r): The emergency means of shutdown required by §§154.550 and 155.780 of this chapter, as applicable, is in position and operable. Aft pull station for Port transfer pump inoperable. Repair aft pump emergency shut down.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 March 2021
Resolved 5 March 2021
Resolution: MI received evidence of aft emergency pull station was working properly.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 5 March 2021
Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements, a system meeting the requirements of 46 CFR 39.2007. Loss of power alarm to liquid overfill protection panel inoperable. Replace battery. 46CFR39.2009:
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 March 2021
Resolved 5 March 2021
Resolution: MI received evidence of panel operating during loss of power.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2019
Resolved
Operational tests and checks of all safety and limit controls, combustions controls, programming controls, and safety relief valves must be conducted at the inspection for certification, periodic inspection, and when directed by the [name withheld] could not provide objective evidence that the thermal fluid heater safety relief valve had been tested since installation.
Action required: 10 - Deficiency Rectified
Resolved 10 December 2019
Resolution: Operator bench tested valve and provided certificate.
Construction/Loadline › Structures › Rake
Issued 15 November 2017
Resolved
See emailed and scanned worklist for items to be corrected prior to next credit dry dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2019
Resolved 18 November 2019
Resolution: Completed all repairs
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 15 November 2017
Resolved
The bellows on both cargo pumps are not vapor tight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 16 November 2017
Resolution: Recieved pictures verifying replacement.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 30 January 2014
Resolved
Both port and starboard cargo pump shaft penetration through the bulkhead are not gas tight.
IAW 46 cfr 32.50-1 where cargo pump shafts pierce gas tight bulkheads, stuffing boxes with readily accessible gas tight glands shall be provided.
Due 2 March 2014
Resolved 4 April 2014
Resolution: Verified proper gas tight penetration of shaft.
Electrical › Lighting (service) › Lighting Fixture
Issued 30 January 2014
Resolved
Both port and starboard flood lights above the cargo pump room are currently located within the hazardous location and do not meet the Class 1 Div 1 requirements.
IAW 46 cfr 111.05-31(L)1 Lighting in hazardous areas are required to be intrinsically safe or explosion proof.
Due 2 March 2014
Resolved 4 April 2014
Resolution: Verified proper placement of lights, 10ft from cargo opening.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 15 January 2014
Resolved
High level alarm and tank overfill alarm must activate an alarm in the event of loss of power to the alarm system. 46 CFR 39.2007
Action required: 705 - Other - as specified
Due 29 January 2014
Resolved 29 January 2014
Resolution: Received email video of vessel representative conducting a satisfactory test of the High level/Tank overfill power failure alarm.
Deck/Cargo › Cargo Stowage › General
Issued 3 November 2010
Resolved
Wasted and loose mounting brackets pertaining to storage container on deck top.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2011
Resolved 13 December 2010
Resolution: Witnessed the proper installation of mounting brackets for paint locker.