Inspection history · 33
1 July 2025
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8172039
27 August 2024
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7980142
22 March 2024
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 7883502
16 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7880169
1 February 2024
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7885273
21 June 2023
Annual Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7719782
15 April 2023
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7670519
15 April 2023
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7674759
1 August 2022
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7522129
16 February 2022
Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7397415
23 August 2021
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7326211
16 June 2020
Deficiency Check · Initial Certification · DAPI Audit
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7024252
6 May 2019
Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6683359
26 March 2019
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6651964
24 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6547651
12 July 2018
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6513341
3 October 2016
Administration
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6028004
11 August 2016
Administration
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5987351
29 January 2016
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5807165
1 November 2013
Industry Initiated Exam
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4745319
30 October 2012
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4475038
6 September 2012
DAPI Audit · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4434236
5 September 2012
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4432090
3 August 2012
Spot Check (Safety)
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4432027
12 December 2011
Administration
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4207314
8 October 2009
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3611555
29 September 2009
Administration · Spot Check (Safety)
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3606163
19 May 2005
Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 2376553
11 March 2005
Uninspected Other
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2308135
27 July 2004
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2146443
23 October 1998
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 86046
29 June 1998
Uninspected Towing Vessel
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1128066
18 June 1993
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1153287
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 August 2024
Resolved
All seals and gaskets shall be properly maintained to prevent leaks of flammable or combustible liquid into the machinery space. Multiple leaks on fuel piping and were observed in the engine room.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 August 2024
Resolved 29 August 2024
Resolution: Attended vessel and witnessd that all valves were tightened and there were no leaks.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 August 2024
Resolved
Each lifebuoy must be approved under approval series 160.050/160.150. Grab lines shall have a minimum breaking strength of 1350 lbs. Grab lines on multiple lifebuoys were dry rotted and require replacement.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 August 2024
Resolved 6 September 2024
Resolution: Vessel rep provided pictures that grab lines were replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 27 August 2024
Resolved
Each exhaust pipe from an internal combustion engine which is within reach of personnel must be insulated or otherwise guarded to prevent burns. Generator exhaust was missing lagging.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2024
Resolved 29 August 2024
Resolution: Attended vessel and saw that lagging was replaced.
01 - Certificates & Documentation › 013 - Documents › Survey report file
Issued 23 August 2021
Resolved
Fixed CO2 system last serviced July 2020. Local Fire servicing company not available to service until early September. After serving O/O to provide company of the fixed CO2 system serving report as required by 46 CFR 142.240. CG MI to re-attend and verify installation before 07SEPT2021
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2021
Resolved 15 September 2021
Resolution: Company rep provided service Fire Fighting Equipment serving reports, reviewed all sat. Requirement cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 23 August 2021
Resolved
Flammable stowage locker in engine room not properly secured. Secure the flammable locker as required by 46 CFR 142.225. CG MI to re-attend and verify installation before 07SEPT2021
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2021
Resolved 20 September 2021
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 23 August 2021
Resolved
Observed flat black paint worn on the port and stbd running/navigation lights. Repaint the backing on the Port & Stbd running lights as required by 33 CFR, Part 87. To be corrected on or before 07SEPT2021
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 September 2021
Resolved 20 September 2021
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 June 2020
Resolved
Company failed to fully fill out forms as required by companies Towing Vessel Record (TVR) Subchapter Compliance Management System (Maritime Compliance International, LLC Publication), new managing owner stated she would review, obtain all pubs and fill out all required TVR forms.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 13 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 June 2020
Resolved
Main engine room switchboard and one main panel; several breakers had excessive openings. Required protected shielding be fabricated to shield mariners from potential electrical shock.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 4 August 2020
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 25 June 2020
Resolved
Missing three red and three orange flares, Vessel operates on Great lakes route required 6 day and 6 night flares.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 13 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 25 June 2020
Resolved
Pressure vessels, relief valves set 10 psi higher than PV ratings. Required new relief valves, rated at of less than the PV’s MAWP to be installed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 13 July 2020
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 June 2020
Resolved
Noted while all crewmembers had recovered safety orientation training, checklist or records were not completed for several crewmembers. Company to document in the TVR or place in the official log book.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 13 July 2020
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 25 June 2020
Resolved
Chemical testing Audit reflected; EAP requirements not displayed on the vessel, supervisor has not received 1 hour of EAP training, and report for FY 2019 not submitted nor was a latest MIS form available.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 13 July 2020
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 24 September 2018
Resolved
The vessel is currently broadcasting (1) Length and Beam measurements for antenna placement are not correct.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 October 2018
Resolved 19 November 2018
Resolution: Vsl out-of-service
Personnel › Certificates/Documents/Licenses › MMD, Ordinary Seaman
Issued 8 October 2009
Resolved
5 of 9 crewmembers did not have valid MMDs.
Due 8 October 2009
Resolved 8 October 2009
Resolution: Crewmembers were replaced with properly documented mariners.
Communications › Alarms/Indicators › General Alarm
Issued 11 March 2005
Resolved
As per 46CFR27.201, add engineroom general alarm bells with a flashing red lights
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Communications › Alarms/Indicators › General Alarm
Issued 11 March 2005
Resolved
Properly label all general alarm bells (46CFR27.201(3)).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Operations/Management › Drills/Instruction › Activating General Alarm
Issued 11 March 2005
Resolved
Document weekly testing of the general alarm bells (46CFR27.201(4)).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2009
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 11 March 2005
Resolved
Install an engineroom fire detection system as per 46CFR27.203.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Communications › Internal Communications System › Sound-powered Telephone
Issued 11 March 2005
Resolved
Install internal communications as per 46CFR27.205.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 11 March 2005
Resolved
Install fuel shut off valves as per 46CFR27.207
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Operations/Management › Drills/Instruction › Fire
Issued 11 March 2005
Resolved
Ensure crew is properly trained in firefighting procedures as per 46CFR27.209
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2009
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 11 March 2005
Resolved
Ensure new crew safety orientation is conducted as per 46CFR27.209(d).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2009
Fire Fighting › Fire Pumps › Pressure
Issued 11 March 2005
Resolved
Prior to 29APR05, ensure the vessel's power driven fire pump, produces 50 psi with both fire stations open and flowing water as per 46CFR27.301(1).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Fire Fighting › Fire Pumps › Power Source
Issued 11 March 2005
Resolved
Prior to 29APR05, ensure fire pump can be remotely energized as per 46CFR27.301(2).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 11 March 2005
Resolved
Properly service the installed engineroom CO2 suppression system and provide this unit with the service report
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 11 March 2005
Resolved
As per 33CFR159.7, ensure the vessels MSD is certified and properly labeled
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 11 March 2005
Resolved
As per 33CFR159.59, ensure MSD operating instructions are properly posted and that an operation manual is onboard
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 11 March 2005
Resolved
Ensure vessel has a waste management (garbage) plan as per 33CFR151. 57
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 11 March 2005
Resolved
Ensure waste management (garbage) is documented as per 33CFR151.55
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2009
Deck/Cargo › Towing › Towline
Issued 11 March 2005
Resolved
Ensure towline is documented and adequate for service as per 33CFR 164.74
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Deck/Cargo › Towing › Towline
Issued 11 March 2005
Resolved
Ensure towline eye is properly spliced as per as per 33CFR164.74(a)(2).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Deck/Cargo › Towing › Towline
Issued 11 March 2005
Resolved
Ensure a visual inspection of the towline is performed and documented as per 33CFR164.80(a)(5).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2009
Operations/Management › Casualty Reporting/Post-Casualty Actions › Notice of Marine Casualty
Issued 11 March 2005
Resolved
Ensure Masters, Chiefs, and Owners are aware of the reporting requirements for marine causalities as per 46CFR04.05-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Pump
Issued 11 March 2005
Resolved
Ensure vessel has an oily waste discharge pump installed as per 33CFR155.410(a)(1).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Resolution: Waived. Vessel only uses mobile facilities to discharge waste oil via suction. Meets intent of regulations-no means of pumping waste oil over board.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 11 March 2005
Resolved
Ensure vessel has a fixed internal oily waste bilge slop piping system as per 33CFR155.410(a).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2009
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 11 March 2005
Resolved
Ensure oily waste discharge piping has an on deck outlet as per 33CFR155.410(a)(2).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2005
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 11 March 2005
Resolved
Ensure oily waste discharge on deck outlet or portable shore connection, meets the requirements of per 33CFR155.410(a)(3).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2009
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 11 March 2005
Resolved
Ensure the oily waste discharge piping outlet has a stop valve installed as per 33CFR155.410(a)(4).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Resolution: 10 5-gallon buckets on board
Pollution Prevention/Response › Prevention Equipment › Portable Containment
Issued 11 March 2005
Resolved
Ensure vessel has portable oil transfer containment as per 33CFR155.320(b)(1)(2).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Resolution: 10 5-gallon buckets on board
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 11 March 2005
Resolved
Ensure vessel has Oil Transfer Procedures as per 33CFR155.820. Ensure these procedures cover all the applicable items as listed in 33CFR155.750
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Personnel › Certificates/Documents/Licenses › PIC
Issued 11 March 2005
Resolved
Ensure Person-in-charge of oil transfers are properly documented as per 33CFR155.710 and 715.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2005
Documentation › Logs/Records › Declaration of Inspection
Issued 11 March 2005
Resolved
Ensure vessel maintains copies of oil transfer Declarations of Inspections as per 33CFR156.150.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2005
Operations/Management › Navigation Safety › Arrival/Departure Tests
Issued 11 March 2005
Resolved
Ensure all navigational tests and inspections are conducted and logged as per 33CFR164.80
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 March 2005
Resolved
Ensure all dead end electrical wires are removed or terminated in weather-tight junction boxes
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 March 2005
Resolved
Ensure all wire nut twisted wires are taped and installed in weather-tight junction boxes or are replaced with a positive crimp connector
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 March 2005
Resolved
Ensure all wires are supported with metal clamps or are installed in wire runs
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Engineering › Freshwater System (injector cooling) › Piping
Issued 11 March 2005
Resolved
Ensure all piping systems are properly supported with metal hangers
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 March 2005
Resolved
Ensure all exposed rotating machinery belts, pulleys, or couplings are properly guarded
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Engineering › Freshwater System (injector cooling) › Hose
Issued 11 March 2005
Resolved
Replace "masking taped" MDE raw water hose
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2005
Electrical › Electric Generation Source (service) › Panelboard
Issued 11 March 2005
Resolved
Ensure all open electrical boxes and controllers are covered or blanked off
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Stability › Watertight Integrity › Weathertight Enclosure
Issued 11 March 2005
Resolved
Replace all missing bolts on watertight portholes
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 11 March 2005
Resolved
Ensure oil transfer hoses meet the requirements of 33CFR155.800 and 33CFR154.500
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2005