Records from 2004 to 2026. Most recent: inspection, 24 July 2026.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC & C MARINE & REPAIR INC · BELLE CHASSE, LA, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 18 November 2025 · expires 31 December 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Net Ton
735 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 38
24 July 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8445741
10 July 2025
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8182398
29 October 2024
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8026446
15 August 2024
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7981769
24 July 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7751173
29 September 2022
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7568595
1 June 2022
COI Inspection · Administrative Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7465327
29 June 2021
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7239209
16 June 2020
Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6978122
18 July 2019
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6754470
25 July 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6488126
12 April 2017
Hull Examination · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6123180
29 September 2016
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6013259
30 September 2015
Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5732874
28 October 2014
Cargo Tank Internal
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5014104
4 August 2014
Internal Structural Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4943440
6 June 2014
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4995068
17 April 2014
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4840358
23 August 2013
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4694354
10 July 2012
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4374503
3 July 2012
Administrative Inspection · COI Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4365820
12 October 2010
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3873112
29 May 2010
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3755562
16 July 2009
Drydock Exam · Internal Structural Exam · Examination of Repairs · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3564317
19 May 2009
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3478613
9 March 2009
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3430452
15 February 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3148052
3 January 2007
Annual Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2849942
18 August 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2752192
18 January 2006
Annual Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2569968
16 November 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2535694
12 April 2005
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2332016
8 April 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2329567
25 February 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2299260
6 January 2005
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2270096
5 January 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2269340
30 November 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2250268
14 July 2004
MTSA Verification · COI Inspection · Cargo Tank Internal · Hull Examination · Initial Certification · Construction Oversight · Internal Structural Exam
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2132701
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 10 July 2025
Resolved
Safety and relief valves for steam shall be provided with a substantial lifting device so that the disk can be lifted from its seat when the pressure in the vessel is 75 percent of that at which the valve is set to blow.
The valve seat was seized. Repair or replace valve and test.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2025
Resolution: Relief valve renewed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 July 2025
Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors must be fitted with a single screen of corrosion resistant wire of at 30x30 mesh or two sections of at least 20x20 mesh. Flame screen on the cargo tank vent riser was not secured and had a 2' gap in the screen mesh.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2025
Resolution: Flame screen repaired.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 30 September 2015
Resolved
PV valve on VCS line and cargo pump relief valve outside of allowable testing windows. Remove valves & have serviced & tested at approved facility.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 October 2015
Resolved 1 October 2015
Resolution: Valves removed and tested, inspected satisfactory.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 July 2012
Resolved
Provide CG approved plan for modified vapor control piping (now cargo piping) & obtain new COI CAA from MSC -OR- return all piping & associated P/V valve to original configuration, remove individual cargo tank P/V valves, restore all components required for closed gauging to include high level alarm system (make available for CG inspection) & benzene control program (46 CFR 197 Subpart C).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2012
Resolution: Barge returned to original configuration
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 5 July 2012
Resolved
Remove/update incorrect test date from cargo piping.
Action required: 705 - Other - as specified
Due 3 August 2012
Resolved 12 July 2012
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 3 July 2012
Resolved
OTP failed to account for modifying vapor recovery system into overhead loading, cargo piping.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2012