Records from 2007 to 2026. Most recent: inspection, 27 May 2026.
Inspection history · 23
27 May 2026
Administrative Inspection · Vessel Attendance · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8396067
26 February 2026
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8316930
26 February 2026
Internal Structural Exam · Drydock Exam · Deficiency Check · Administrative Inspection · Vessel Attendance
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8317223
17 June 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8160229
1 May 2024
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7904961
19 April 2024
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7898087
18 August 2023
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7771162
14 June 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7715022
27 April 2022
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7438723
24 February 2022
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7401209
1 November 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7343092
17 March 2021
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7158135
8 March 2021
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7152374
24 May 2020
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6961794
17 March 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6927911
22 May 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6690478
7 September 2018
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6534673
25 July 2018
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6491581
17 June 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6451342
21 February 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6358715
26 April 2017
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6133325
14 April 2017
Administrative Inspection · Uninspected Other
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6127704
19 December 2016
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6060157
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 17 March 2026
Resolved
Each vessel must have - a propulsion-control system operable from the pilothouse. Port MDE RPM gauge not working at local and pilothouse while engine was in operation. Tech was onboard and identified issue during J/W high temp testing and was in process of fixing upon departure. Have system brought back to operation.
46 CFR 130.120
Action required: 10 - Deficiency Rectified
Resolved 18 March 2026
Resolution: Vessel rep provided photos of local tachometer and bridge operation station of Port MDE RPM's.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 17 March 2026
Resolved
All emergency lights shall be marked with a letter “E” at least 1/2 inch high. Vessel installed new e-lighting but had not yet labeled them. Vessel crew labeled all emergency lighting before MI departure as per requirement.
46 CFR 97.37-25
46 CFR 131.840
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 17 March 2026
Resolution: Corrected before MI departure
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 17 June 2025
Resolved
Vessels must have on emergency load, lights for survival craft, in area of water where it isto be launched, lighting in passageways, and WTDs. Egress lighting not functional at embarcation, passageways, or water.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 19 July 2025
Resolution: Repaired lights
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 June 2025
Resolved
For standby endorsement a fire monitor with min flow rate of 500 gpm is required. Fire monitor is not functional. No standby work until repaired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 18 March 2026
Resolution: Vessel rep requested "stand-by service" endorsement be removed and cancellation of fire monitor. Vessel shall not conduct stand-by service until re-instatement of fire monitor.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 17 June 2025
Resolved
ABS rules relating to anchoring equipment are mandatory. Vessel does not have an ABS approved anchoring system. Vessel must have abs approved anchoring system for sub chapter "I" requirements by next dry dock.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 27 March 2026
Resolution: Video of operation provided to MSU Houma by vessel rep on 23 Mar 2026, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 19 April 2024
Resolved
Each launching appliance must be arranged so that during preparation and launching, the survival craft, its launching appliance, and the area of water into which it is to be launched is illuminated by lighting supplied from the emergency source of electrical power. Required lighting is not installed at the port and starboard life raft launching locations. 46 CFR 133.150(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2024
Resolved 24 April 2024
Resolution: Emergency lights installed at life raft launching locations.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 June 2023
Resolved
Every vessel over 65 ft must have FCC Bridge to Bridge safety certificate. Bridge to brige certificate was expired.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 June 2023
Resolved 14 June 2023
Resolution: Provided new FCC Certificate.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 14 June 2023
Resolved
EPIRB hydrostatic release was expired.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 June 2023
Resolved 14 June 2023
Resolution: New hydrostatic release was installed
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 14 June 2023
Resolved
The master shall ensure firefighting equipment is inspected annually. Fire fighting equipment inspection dates were outside of 1 year.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 June 2023
Resolved 14 June 2023
Resolution: Provided report from certififed 3rd party attesting to the inspection of FF equipment.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 14 June 2023
Resolved
Each item of life saving equipment must be ready for immediate use.
Rescue platform chains were too short and the platform could not reach the water.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 June 2023
Resolved 14 June 2023
Resolution: Vessel crew installed new chains.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2023
Resolved
If there is non-follow up steering at an alternative steering station, a rudder angle indicator must be provided.
STBD runnder angle indicator at the emergency steering station was inoperable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 July 2023
Resolved 14 June 2023
Resolution: Crew repaired rudder angle indicator.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 June 2023
Resolved
Wiring must be properly supported to avoid damage. Wiring at the switchboard was supported with plastic ties and not properly supported to avoid sharp bend.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 June 2023
Resolved 14 June 2023
Resolution: Crew installed metal wire supports and removed sharp bend.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 April 2022
Resolved
Vessel shall be in a safe and seaworthy condition. Fuel was observed leaking from the Bow Thruster fuel filter.
Cleared by MI on 27APR2022.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 27 April 2022
Resolution: Replaced Filter. Leak corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 27 April 2022
Resolved
Vessel shall maintain integrity of the structure and watertight integrity of bulkhead or deck penetrations. The watertight penetration of the ER forward bulkhead was unable to seal due to missing rock blocks. Cleared by MI on 27APR2022.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 April 2022
Resolution: Third Party placed ROX block into the opening and properly secured.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 27 April 2022
Resolved
Vessel shall have adequate emergency lighting fitted along the line of escape. Vessel had four (04) emergency lights that were inoperatable or were not able to adequately light the line of escape.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 April 2022
Resolution: Changed the LED bulb polarity direction, lights now work correctly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 April 2022
Resolved
Rudder angle indicator shall be installed and working properly. During the steering test of aft controls on follow-up, the port rudder indicator showed 40 deg, starboard showed 20 deg when the rudder stick was placed at the 30 degree mark.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 13 May 2022
Resolution: Vessel provided tech report stating that aft RAI was properly calibrated and funtional.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 April 2022
Resolved
Vessel shall be able to show the proper dayshapes necessary. Vessel was missing one of the proper dayshapes.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 13 May 2022
Resolution: Vessel purchased the missing dayshapes.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 27 April 2022
Resolved
Each OSV must have a line-throwing appliance approved under 160.031 or 160.040. Vessel did not have the full 25 cartridges.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 13 May 2022
Resolution: Vessel purchased additional cartridges for vessel.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 27 April 2022
Resolved
Each lifesaving appliance must be inspected monthly and the EPIRB tested monthly. Vessel was not able to produce logs of testing prior to MAR2021 and Master was unsure of how to test EPRIB.
Action required: 10 - Deficiency Rectified
Resolved 27 April 2022
Resolution: MI educated Master and Vessel Rep on EPRIB testing and logging required tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 April 2022
Resolved
The pressure indicating gage shall be a minimum 1.2 times to 2 times the reliefing device. The relief was set for 185psi. The port had a maximum of 200psi gauge and the stbd had 160psi gauge.
Action required: 10 - Deficiency Rectified
Resolved 27 April 2022
Resolution: Vessel [name withheld] indicating gages.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 March 2021
Resolved
Safety and relief valves on pressure vessels msut have their settings checked twice in a 5 year period not to exceed 3 yeears. Vessel has 2 pressure vessels with 4 installed relief devices tat were last tested in JULY 2018. Vessel shall provide servicing information for relief valves within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2021
Resolved 19 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 March 2021
Resolved
The inspection for cerification by the MI shall determine safety conditiosn for pressure vessels. MI observed leak on starboard pressure vessel relief device (100 psi rated ) and the compressor activated constantly during inspection due to pressure loss. Relief device shall be replaced with adequate size and pressure rating for pressure vessel prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 March 2021
Resolved
Electrical equipment and installations must be designed and installed to provide normal and emergency services. Shore power connection light shows not available and incorrect rotation. Electrical required to address issue and clear with report attesting to system within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2021
Resolved 19 April 2021
Resolution: Cleared to satisfaction of MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 March 2021
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal operating governor and adjusted so that the speed cannot exceed the maximum rated speed by more than 15 percent. Overspeed shutdown for the #2 generator was inoperable. Repair prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2021
Resolution: Issue was corrected.
Communications › Radio Communications › EPIRB
Issued 27 April 2017
Resolved
Provide proof of updated all sign (WDJ4762) on the EPIRB registration.
Action required: 705 - Other - as specified
Due 4 May 2017
Resolved 2 May 2017
Operations/Management › EPA Vessel General Permit (VGP) › 1.5.1-VGP Notice of Intent (NOI)
Issued 27 April 2017
Resolved
Provide proof of NOI for VGP has been submitted.
Action required: 705 - Other - as specified
Due 4 May 2017
Resolved 2 May 2017
Electrical › Electrical Distribution System (service) › Junction Box
Issued 27 April 2017
Resolved
Replace dryer plug receptacle.
Action required: 705 - Other - as specified
Due 4 May 2017
Resolved 2 May 2017