Records from 2005 to 2026. Most recent: inspection, 16 March 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,291 / net 1,291
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2005
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1291 - Simplified, Gross Ton
1291 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 26
16 March 2026
Internal Structural Exam · Examination of Repairs · Drydock Exam · MTSA Verification · COI Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8320839
2 December 2024
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8041949
21 November 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8038127
29 May 2024
Periodic Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7921764
17 February 2021
Internal Structural Exam · Examination of Repairs · MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7141759
4 February 2020
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6902793
23 October 2018
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6566546
27 December 2017
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6329460
2 February 2017
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6080891
3 November 2015
Examination of Repairs · COI Inspection · Drydock Exam · MTSA Verification · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5755376
28 January 2015
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5059164
11 March 2014
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4814597
6 January 2014
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4779710
3 November 2013
Administrative Inspection · Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4746537
3 November 2013
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4793515
21 August 2012
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4419652
23 February 2012
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4249697
14 December 2010
MTSA Verification · Drydock Exam · Deficiency Check · Cargo Tank Internal · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3907719
24 September 2009
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3609283
5 February 2009
MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3415448
19 October 2007
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3083041
10 May 2007
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2996808
7 November 2006
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2816349
14 July 2006
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2739924
6 December 2005
Initial Certification · Internal Structural Exam · Hull Examination · MTSA Verification · Cargo Tank Internal · Examination of Repairs
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2546690
25 October 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2521732
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 4 February 2020
Resolved
Permanent stud broken on vapor control flange. Repair or replace prior to conducting operations requesting vapor control system.
Action required: 705 - Other - as specified
Resolved 3 March 2020
Resolution: Vessel welded new stud in place and sent pictures to SECMOB. Cleared.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 5 February 2009
Resolved
Make operable high level/overfill alarm system. Item must be corrected prior to loading cargo.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 6 February 2009
Fire Fighting › Remote Fuel Shutoff › General
Issued 5 February 2009
Resolved
Replace prime mover manual shutdown cable (cable is frayed at pull station). Item must be corrected prior to off-loading cargo.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 6 February 2009
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 6 December 2005
Resolved
Vessel owners are prove that the cargo pump engine unit is in complete compliance with 46 CFR 111.105-31(l).
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 6 December 2010
Resolved 16 December 2010
Resolution: The vessel retrofitted a USCG approved John Deere Power Tech Tier II engine to comply with Class I, Div I requirements. The barge rep successfully demonstrated proper operation of the new engine to the MI.