MMI 3056 is a 2006 tank barge. The Coast Guard has recorded 27 inspections since 2006, most recently in January 2026, along with 14 deficiencies and 4 casualty investigations between 2012 and 2026.
Records from 2006 to 2026. Most recent: inspection, 22 January 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2006
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton 1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
There is a pinhole leak in the cargo vapor line. Temp repairs completed using rubber patch with epoxy underneath.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 August 2018
Resolved 14 August 2018
Resolution: cropped and renewed approximately 200 feet of logitudal vapor line with one tranverse flange to vapor drop only using shipyard furnished material. Crop and renew two 18" x 8" inserts on the tranverse header in kind. Conducted a visual exam of all repairs
Electrical › Electric Supply System (service) › Transformer
Issued 21 December 2012Resolved
Transformer to the left of the switchboard shall be replaced prior to use of generator. Transformer's top was heavily corroded.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 July 2015
Deck/Cargo › Cargo Heating › General
Issued 21 December 2012Resolved
Thermal fluid heater must be tested prior to use in the presence of a Coast Guard marine inspector.
Action required: 705 - Other - as specified
Resolved 23 July 2015
Resolution: Added endorsement to COI
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 20 September 2006Resolved
Provide original or certified copy of COFR to attending marine inspector. 33 CFR 138.65
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Proof of COFR found in MISLE, copy to be placed in Activity # 2815396.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 20 September 2006Resolved
Provide proof of Cargo Transfer Procedures onboard to the attending marine inspector. 33 CFR 155.720
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Cargo Transfer Procedures onboard.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 20 September 2006Resolved
Provide proof of Vessel Responce Plan onboard vessel as per 33 CFR 155.1030
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Approved Vessel Response Plan onboard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: High level indicating devices (rising sticks) installed on barge.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 September 2006Resolved
Paint or mark Benzene regulated areas as per 46 CFR 197.535
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Painted and marked Benzene regulated area on barge.
Provide proof of Benzene Monitoring Program as per 46 CFR 197 subpart C and NAVIC 6-92
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Benzene Monitoring Program information will verified with fax scanned to Activity # 2815396.
Install exhaust blanket on generator exhaust piping. 46 CFR 58.10-5
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Exhaust blanket installed on generator exhaust piping.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 20 September 2006Resolved
Install non-conductive deck covering in front of the switchboard in the Thermal Fluid Heater house. 46 CFR 111.30-11
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Non-Conductive deck covering installed in from of thermal fluid heater switchboard.
Deck/Cargo › Cargo Heating › General
Issued 20 September 2006Resolved
Install insulated incombustable material on cargo header pipe and all other heated pipes exposed to personnel as required in 46 CFR 36.05-10
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2006
Resolution: Installed insulated incombustable material on cargo header pipe.
13 January 2012Routine · role: Involved in a Marine Casualty · activity 4224130
14 May 2012Routine · role: Involved in a Marine Casualty · activity 4312067
14 May 2025Routine · role: Involved in a Marine Casualty · activity 8225291
22 January 2026Routine · role: Involved in a Marine Casualty · activity 8300939
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.