Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
143 - Simplified, Gross Ton
114 - Simplified, Net Ton
Maury page id
psix-8826
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 5 August 2021Resolved
Fuel shutoff remote valves must be marked at least one inch high indicating the purpose and way to operate them. Properly mark remote valve instructions and ensure valves are installed correctly and leak free.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2021
Resolved 10 August 2021
Resolution: Valves marked and repaired.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 August 2021Resolved
Means must be provided closiing ventilators in machinery spaces. Provide a means to close all vents in the machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2021
Resolved 10 August 2021
Resolution: Ventilation secured.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 August 2021Resolved
Flammable storage lockers must be secured to the vessel. Secure flammable storage locker.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2021
Resolved 10 August 2021
Resolution: Locker secured.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 5 August 2021Resolved
Vessel must have an installed pump to discharge oily mixtures through fixed piping accessible from the weather deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2021
Resolved 10 August 2021
Resolution: Pump and piping installed.
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 19 March 2001Resolved
COAST GUARD LOCAL NOTICE TO MARINERS MISSING.
Condition: Unknown
Due 1 April 2001
Resolved 9 August 2012
Resolution: Replaced by current deficiency