Records from 2008 to 2025. Most recent: inspection, 15 December 2025.
Documentation record
Registered dimensions (L × B × D)293.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,597 / net 1,597
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 7 February 2026 · expires 31 March 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1597 - Simplified, Gross Ton
1597 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 26
15 December 2025
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8284160
18 May 2024
Type not recorded
No type recorded · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7917999
2 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7802131
28 August 2023
Examination of Repairs · MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7773403
13 November 2022
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7593350
22 July 2020
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7013196
5 December 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6865556
18 October 2019
Damage Survey · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6837464
18 October 2019
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6840422
31 August 2018
Cargo Tank Internal · Internal Structural Exam · Drydock Exam · MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6528201
1 November 2017
Examination of Repairs · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6299434
27 October 2016
Damage Survey · Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6030732
13 May 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5888440
2 November 2015
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5755791
6 November 2014
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5017693
12 August 2013
COI Inspection · MTSA Verification · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4682970
16 November 2012
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4485633
9 November 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4481376
5 March 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4257086
7 November 2011
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4179769
4 October 2010
Annual Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3827424
27 April 2010
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3725273
23 September 2009
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3601138
10 August 2009
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3561460
15 October 2008
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3345414
29 August 2008
Cargo Tank Internal · Deadweight Survey · MTSA Verification · Initial Construction-Excluding Oversight · Initial Certification · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3309681
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 November 2022
Resolved
Repairs must be made to each abrge GM 3810 (#1 Port valve) and GM 3812 (#4 Port Valve). Repairs must be tested and witnessed by local OCMI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2022
Resolution: Barge welding new stachion in place and conducted NDT.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2016
Resolved
Crop and renew 4' x 3' section of side shell plate to include deck knuckle on port side mid body.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 4 November 2016
Resolved 28 October 2016
Resolution: completed crop and renew of insert on side shell, conducted soap and water test on all welds, all SAT
Electrical › Electric Supply System (service) › Cable
Issued 6 November 2015
Resolved
Remove dead end wire from battery box on the cargo pump engine or terminate in proper enclosure.
Due 6 December 2015
Resolved 6 November 2015
Resolution: Dead end wiring is now terminated inside enclosed battery box and secured.
Engineering › Fuel Oil Service System › Hose
Issued 7 November 2011
Resolved
Provide documentation that steep braided hose (multiple) meet SAE J1942 requirements. Subject hoses are located on thermal fluid heater, cargo pump and prime mover fuel supply and return lines.
Due 7 January 2012
Resolved 12 December 2011
Resolution: Vessel rep submitted documentation to marine inspector. Cross referenced with SAE and hose manufacturer. Aeroquip 2807 series hoses installed on barge meet SAE J1942 requirements.
Engineering › Fuel Oil Service System › Piping
Issued 29 August 2008
Resolved
Replace all diesel fuel tubing on the generator with approved tubing as discribed in 46 CFR 56.50-75(a)(3).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2008
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 13 August 2008
Resolved
Vessel resubmission is overdue. The TVRP must be amended to verify intended areas of operation/COTP zones, and identify contact information for border states before approval is granted.
Due 13 September 2008
Resolved 3 February 2009
Resolution: Vessel resubmission approved 2/3/09 with revisions received 1/28/2009. New vessel VRP expiration date 2/28/2014.