Records from 2011 to 2023. Most recent: inspection, 5 December 2023.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC PLANT 296 · ASHLAND CITY, TN, UNITED STATES · built 2011
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portGIBSON, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 August 2026 · expires 30 September 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Net Ton
1619 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
5 December 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7834029
6 December 2021
Examination of Repairs · COI Inspection · Cargo Tank Internal · Internal Structural Exam · MTSA Verification · Drydock Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7360119
27 March 2018
Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6379902
27 March 2018
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6381043
3 November 2017
Administrative Inspection · SIP Initial Entry
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6300300
19 September 2017
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6267473
3 August 2017
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6233609
11 July 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6205422
22 December 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6080272
9 November 2016
COI Inspection · Internal Structural Exam · MTSA Verification · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6035195
17 October 2015
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5756643
2 March 2015
Examination of Repairs · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5076893
6 February 2015
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5066260
6 February 2015
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5099123
15 October 2014
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5023088
5 August 2014
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4944520
12 July 2014
Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4924859
11 July 2014
Type not recorded
No type recorded · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 4923480
9 September 2013
MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4710019
11 October 2012
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4457765
5 June 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4334775
28 October 2011
Deficiency Check
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4180276
15 September 2011
Hull Examination · Cargo Tank Internal · Initial Certification · Administrative Inspection · MTSA Verification · Initial Construction-Excluding Oversight · Internal Structural Exam
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4119637
Deck/Cargo › Holds/Tanks › Hatch
Issued 27 March 2018
Resolved
Broken dogging hardware on two hatches located on the port side of the barge. The broken hardware on the hatches was caused from an allision with a dredge pipe.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 27 March 2018
Resolved 27 March 2018
Resolution: Replaced dogging hardware to satisfaction of Coast Guard Marine Inspector.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 17 October 2015
Resolved
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 November 2015
Resolved 17 October 2015
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 17 October 2015
Resolved
Valve position indicator needed to be replaced
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 October 2015
Resolved 17 October 2015
Resolution: Valve position indicator pin replaced
Deck/Cargo › Holds/Tanks › Hatch
Issued 6 February 2015
Resolved
Make repairs to port #5 aft hatch cover and coaming to the satisfaction of attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2015
Resolution: Conducted satisfactory air tests at 1.5 psi of the repaired area and inspected the weld repair in the wing void.
Construction/Loadline › Hull › Double Hull
Issued 6 February 2015
Resolved
In way of port #5 wingtank commencing 4'6" foward of the aft bulhead and extending foward 15', the upper 3'8" of side plating was set in from 0-7" with the adjacent deck and gunwale plating distorted to conform.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2015
Resolution: Conducted satisfactory air tests at 1.5 psi of the repaired area and inspected the weld repair in the wing void.
Construction/Loadline › Hull › Double Hull
Issued 6 February 2015
Resolved
In way of the port #5 wing tank, commencing at the aft bulkhead and extending forward 3', the outboard 18" of deck and gunwale was distorted from 0-3".
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2015
Resolution: Conducted satisfactory air tests at 1.5 psi of the repaired area and inspected the weld repair in the wing void.
Construction/Loadline › Hull › Double Hull
Issued 6 February 2015
Resolved
In way of the stbd #5 wingtank, commencing 3' forward of the aft bulkhead and extending forward approximately 10', the upper 2' 6" of side plating was set in from 0-6" with the adjacent deck and gunwale distorted from 0-4".
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2015
Resolution: Conducted satisfactory air tests at 1.5 psi of the repaired area and inspected the weld repair in the wing void.
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2011
Resolved
#1 Void, Stbd at Frame 38, 2-transition knuckles bent at full size then cut down to 2' 6"
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 October 2011
Resolved
#1 Void, Stbd at Frame 38, 1-floor frame, full height X 6' 4" long
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2011
Resolved
#1 void Stbd at Frame 38, 1-floor plate, 3' 2-1/2" X 3' 6"
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2011
Resolved
# 2 Void Stbd at Frame 32, 1-knuckle, full size X 3' 2" long
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 October 2011
Resolved
# 2 Void Stbd at Frame 32, 1-floor frame, full height X 4' 2" long
Action required: 705 - Other - as specified
Due 28 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2011
Resolved
# 2 Void Stbd at Frame 32, 1-floor plate, 2' 6" X 4' 2"
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 October 2011
Resolved
#2 Void Stbd at Frame 32, 1-floor angle, 5" X 3" X 5/16" X 3' 10"
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Transverse Frame
Issued 14 October 2011
Resolved
#2 Void Stbd at Frame 32, 1-6" channel X 3' 9" long
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2011
Resolved
#2 Void Stbd at Frame 32, 1-plate, 4" X 1/2" X 4"
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2011
Resolved
#7 Void Stbd at Frame 2; 1- Knuckle, full size X 3' long.
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 28 October 2011