Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)74.0 ft × 32.5 ft × 10.5 ft
Registered tonnagegross 212 / net 169
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHORIZON SHIPBUILDING INC · BAYOU LA BATRE, AL, UNITED STATES · built 2012
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 15 September 2025 · expires 30 September 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it169 - Simplified, Net Ton 212 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 27 inspections, each with its date, unit and type; 3 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 18 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 September 2025Resolved
Propulsion machinery, including main engines must be maintained to ensure proper operation. Vessel experienced a red gear failure on STBD engine. Vessel shall make repairs to the satisfaction of attending third party (TVIB). Vessel shall submit TPO corrective action report once repairs are made.
46 CFR 143.205(b)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2025
Resolved 8 September 2025
Resolution: Vessel replaced throttle pressure switch. Test SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 December 2021Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Prior to getting underway provide proof of satisfactory operation of the PORT main engine to the CG marine inspector, TPO or TPO approved internal surveyor.
46 CFR 143.205
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2021
Resolution: Technician attended the vessel and identified water in the port fuel tank. fuel line and filters were drained for the port main engine. The port main engine was lined up with the stbd fuel tank and ran with no further issues.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 July 2019Resolved
46CFR143.205(c)(1) Propulsion machinery, including main engines, reuction gears, shaft bearings, and electrical equipment and systems, must: be maintained to ensure proper operation.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 11 August 2019
Resolved 10 July 2019
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.