Records from 2015 to 2026. Most recent: inspection, 9 September 2026.
Documentation record
Registered dimensions (L × B × D)160.0 ft × 40.0 ft × 8.7 ft
Registered tonnagegross 467 / net 467
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJAMES BUILT LLC · CALVERT CITY, KY, UNITED STATES · built 2014
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portMEMPHIS, TN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 June 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it467 - Simplified, Net Ton
467 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 14
9 September 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8486237
7 January 2025
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8059491
17 April 2024
Drydock Exam · COI Inspection · Administrative Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7896821
10 January 2024
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7851831
22 September 2023
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7796711
11 August 2022
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7530258
10 August 2021
Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7272755
16 July 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7007952
30 July 2019
Internal Structural Exam · MTSA Verification · COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6767348
23 August 2018
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6517725
22 August 2017
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6243900
7 March 2017
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6101440
25 July 2016
Administrative Inspection · Periodic Inspection · MTSA/ISPS Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5940535
26 June 2015
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5164247
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 January 2025
Resolved
The following plans, if applicable to the particular vessel, must be submitted for Coast Guard review in accordance with § 110.25-3:
(a)Elementary one-line wiring diagram...
Plan submitted to fulfill this requirement: Marine Solutions Dwg. No. 051301EL-1(Rev0): Electrical Arrangement (1Sht)
The plan has not been approved and as of this date the status of the plan remains the same as stated in letter dated 11/20/2013, Serial E2-1303955, "Returned for Revision". The outstanding requirement as noted in letter, "Ground detection system is not shown on the drawing per 46 CFR 111.05-21."
Re-submit referenced plan with required revision for MSC approval.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Required plan submitted for MSC approval this date.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 April 2024
Resolved
Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. Set seal was found broken on cargo pump relief valve, and setting appeared to have been altered. Prove the relief valve is set to the correct pressure relief setting and reseal.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2024
Resolved 1 July 2024
Resolution: Received report attesting to the cargo pump relief valve being satisfactorily tested at it set pressure of 125psi at the last annual testing.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 11 August 2022
Resolved
Barge cargo hose #10 was cracked and showing signs of bulging due to the braided wire rusting. Remove hose from service and replace with new.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2022
Resolved 11 August 2022
Resolution: The deficiency was cleared to the satisfaction of an USCG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 August 2019
Resolved
Install shut off valve in cargo pump engine fuel supply line.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2019
Resolved 20 August 2019
Resolution: Valve installed as required.
Electrical › Electric Supply System (service) › Cable
Issued 22 August 2017
Resolved
Unapproved use of temporary flexible cord (extension cord) used in lieu of fixed wiring for permanent circuit and receptacle. NFPA NEC 400.8(1), incorporated by 46 CFR 111.60-13(b)(1), prohibits flexible cord as a substitute for fixed wiring. Extension cord installed from ship service generator through overhead race to provide a receptacle at crew work station.
Action required: 705 - Other - as specified
Due 22 August 2017
Resolved 22 August 2017
Resolution: Temporary flexible cord removed from vessel.