Records from 2015 to 2025. Most recent: inspection, 8 September 2025.
Inspection history · 8
8 September 2025
In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8229538
25 June 2024
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7941800
21 May 2024
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7911633
11 September 2022
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7556858
19 May 2021
PSC B · Ballast Water Examination · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7200840
1 June 2018
ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6422367
12 October 2016
Ballast Water Examination · ISPS III Exam · NPV Safety Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6019794
13 October 2015
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5735931
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 September 2025
Resolved
The rules concerning lights (83.20 through 83.31) shall be complied with from sunrise to sunset and in all weather. PSCO verified that the navigational lights were destroyed from the crane during aforementioned in-service exam. 33CFR83.20(a)(b)
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 September 2025
Resolution: Received, reviewed and accepted ABS Class report rectifying deficiency.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 21 May 2024
Resolved
The arrangements for the storage, distribution and utilization of oil used in pressure lubrication systems shall be such as to ensure the safety of the ship and persons on board. PSCO observed minor lube oil leak from No 1 and 2 steering gear blocks.
74SOLAS(09) II-2/4.2.3.1 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2024
Resolution: o-rings on plugs located on hydraulic oil distribution box replaced
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 21 May 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed PVC pipes installed on the smoke extraction detection system in place of steel piping per the manufactures design specifications.
74SOLAS(20)I/11(a) 40ac
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2024
Resolution: PVC pipes removed and replaced with steel pipe
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed J/W leaking from the M/E J/W cooling valve.
74SOLAS(20)I/11(a) 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2024
Resolution: auto control valve on M/E jacket cooling water temp regulating system, o-ring replaced and valve actuator tested with no leaks.