Documentation record
Registered dimensions (L × B × D)119.9 ft × 34.3 ft × 16.1 ft
Registered tonnagegross 199 / net 136
ITC dimensions (L × B × D)119.9 ft × 34.3 ft × 16.1 ft
ITC tonnagegross 445 / net 133
BuilderMCDERMOTT SHIPYARD A DIVISION OF J RAY MCDERMOTT & CO INC · AMELIA, LA, UNITED STATES · built 1975
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portST CROIX, VI
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 22 October 2025 · expires 31 October 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it199 - Regulatory (Subpart C or D), Gross Ton
445 - Convention (Subpart B), Gross Ton
136 - Regulatory (Subpart C or D), Net Ton
133 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 28 inspections, each with its date, unit and type; 15 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 8 other vessels inspected with it; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 28
17 April 2025
Deficiency Check · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8108848
14 March 2025
Administrative Inspection
Administrative · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8093739
12 August 2024
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7980179
25 July 2024
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7969954
18 December 2023
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7840187
13 June 2022
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7476746
8 November 2017
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6303983
15 September 2017
Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6267378
14 September 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6000334
13 September 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6002574
2 June 2016
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5936966
16 April 2014
Industry Initiated Exam · DAPI Audit · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4837569
9 September 2012
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4532842
13 May 2011
Industry Initiated Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4012893
13 January 2011
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3930034
21 December 2006
MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2844411
3 August 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2449701
25 August 2004
Type not recorded
No type recorded · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2189636
12 May 2003
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1792471
21 January 2000
Uninspected Towing Vessel
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1399305
2 October 1999
Uninspected Towing Vessel · Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1436270
30 September 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 650061
2 August 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 7764
2 August 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 98102
26 June 1996
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 200834
26 June 1996
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 765703
10 January 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 184562
4 August 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 221253
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 17 April 2025
Resolved
Sufficient lighting suitable for the marine environment must be provided within crew working and living areas.
(b) Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space and must be either:
(1) Automatic, battery-operated with a duration of no less than 2 hours; or
(2) Non-electric, phosphorescent adhesive lighting strips that are installed along escape routes and sufficiently visible to enable egress with no power. The following emergency lighting failed to operate upon actuation: 06 crew berthing accommodation emergency lights and 01 at the access ladder to the engine room. 46 CFR 143.410 (a)&(b).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 April 2025
Resolution: All batteries were replaced, tested and found operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 April 2025
Resolved
There must be an alternate means to control the propulsion and steering system which must:
(1) Be independent of the primary control required by § 143.225; (c) There must be a means to stop each propulsion engine and steering motor from each operating station. Emergency shut-off controls for both diesel engines failed to operate upon actuation. 46 CFR 143.585 (a) & (b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 April 2025
Resolution: Corrected on the spot, tested both controls and found operating, caused by a lose cable.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Risk evaluation, training and instruction to seafarers
Issued 17 April 2025
Resolved
All crewmembers must be provided with health and safety information and training that includes:(1) Content and procedures of the owner or managing operator's health and safety plan;(2) Procedures for reporting unsafe conditions;(3) Proper selection and use of PPE appropriate to the vessel operation;(4) Safe use of equipment including deck machinery, rigging, welding and cutting, hand tools, ladders, and abrasive wheel machinery found onboard the vessel;(5) Hazard communication and cargo knowledge;(6) Safe use and storage of hazardous materials and chemicals;(7) Confined space entry;(8) Respiratory protection; and(9) Lockout/Tagout procedures. There is no evidence that the health and safety plan was distributed to the crew members. 46 CFR 140.510
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: A distribution list was rpovided where crew signed for the health and safety plan.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 17 April 2025
Resolved
Towing vessels must be equipped with the following equipment, as applicable to the area of operation: Search light, controllable from the vessel's operating station and capable of illuminating objects at a distance of at least two times the length of the tow. Port search light was found inoperable. 46 CFR 140.725 (b).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Searchlight was found back in service.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The mechanical reach-rod connecting the closing stem valve for the tank # S4 was found broken and inoperable. 46 CFR 143.205
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Reach-rod was repaired and placed back in service.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The cables for overspeed prevented device for each main diesel engine was found broken due to corrosion during testing. 46 CFR 143.205
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: New cables (rope-wires) have been installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 April 2025
Resolved
Flammable and combustible products must not be stored in machinery spaces, unless they are stored in a suitable container that meets the requirements of § 142.225 of this subchapter. Engine room was found to have multiple plastic 5 gallons buckets that needs to be removed from the engine room. 46 CFR 142.220
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: All plastic buckets have been removed from the engine room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2025
Resolved
Machinery must be maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Steering room is watertight, and was found with water. Remove water and correct rudder bearing seals water intrusion.46 CFR 143.205
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2025
Resolved 29 April 2025
Resolution: Water was removed and bearing seals adjusted.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 February 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessels switchboard does not have a lock out tab to prevent generators to be placed under load at the same time, install a braker lock out device. 46CFR143.205 (a)
Action required: 17 - Rectify deficiencies prior to departure
Due 8 March 2024
Resolved 9 February 2024
Resolution: Received evidence of lock out tab being installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 February 2024
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Repair energized exposed wires from switch and outlet on the aft bulkhead of the engine room fiddley. 46CFR143.400(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 8 March 2024
Resolved 9 February 2024
Resolution: Received evidence of light switch and outlet repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 February 2024
Resolved
Pressure vessels over 5 cubic feet in volume and over 15 pounds per square inch maximum allowable working pressure (MAWP) must be equipped with an indicating pressure gauge (in a readily visible location) and with one or more spring-loaded relief valves. Provide gauges that read past the relief valve setting of 250 PSIG so test can be conducted safely. 46CFR143.300 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 27 March 2024
Resolution: Testes SAT, 02 air receivers relieved at 160 psi
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 February 2024
Resolved
All installed bilge piping must have a check/foot valve in each bilge suction that prevents unintended backflooding through bilge piping. Install / verify check valves on Port and STBD engine room bilge suctions. Install strainer and check valve on AFT steering bilge suction. 46CFR143.275
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 21 February 2024
Resolution: Received photo evidence of the clearance of the installation of a foot/check valve on the steering gear room.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 February 2024
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Repair or remove dead end wires under the steering counsel on flying bridge. 46CFR143.400(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 27 March 2024
Resolution: Wires removed, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 February 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Install a down pipe on the electric water heater relief valve. 46CFR143.205 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 21 February 2024
Resolution: This office also received photo evidence of the installation of a down pipe for the hot water relief valve in the engine room.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 8 February 2024
Resolved
Shipboard lighting. Emergency lighting must be provided for all internal crew working and living areas. Install emergency lighting in the engine room that provides lighting to the emergency exit. 46CFR143.410 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 27 March 2024
Resolution: Light previously installed, MI testes e-light all sat.