Records from 2016 to 2025. Most recent: inspection, 11 December 2025.
Documentation record
Registered dimensions (L × B × D)72.0 ft × 54.7 ft × 7.0 ft
Registered tonnagegross 97 / net 66
ITC dimensions (L × B × D)72.0 ft × 54.7 ft × 7.0 ft
ITC tonnageNot recorded
BuilderCROWN POINT INDUSTRIES · JEAN LAFITTE, LA, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 17 June 2026 · expires 30 June 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
11 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 8281980
15 December 2022
Annual Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7612524
29 September 2021
COI Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7318111
27 July 2021
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7275535
13 April 2021
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7175076
19 November 2020
Deficiency Check
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7100827
17 November 2020
Annual Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7100684
22 October 2020
Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7090434
27 February 2019
Internal Structural Exam · Administrative Inspection · Hull Examination · Deficiency Check · Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6633737
10 October 2018
Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6559861
5 December 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6318255
5 January 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6078326
9 June 2016
Deficiency Check · Hull Examination · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5908672
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 17 November 2020
Resolved
Each self propelled vessel in ocean and coastwise service must have an approved emergency position indicating
radio beacon. EPIRB was installed, but did not have registration sticker affixed to device. 46 CFR 94.60-1(a).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 November 2020
Resolved 19 November 2020
Resolution: Epirb Registration was provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 17 November 2020
Resolved
Where weather decks form boundaries of crew spaCes, suitable protective coverings shall be applied to prevent formation
or accumulation of moisture. 01 Deck staboard side forward accomodation window was broken. 46 CFR 92.20-15(c).
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 November 2020
Resolved 19 November 2020
Resolution: New window glass was installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 April 2019
Resolved
Approved hand portable fire extinguishers shall be installed on all vessels. The hand portable extinguisher located on the starboard forward exterior bulkhead of the pilothouse had a damamged discharge horn. Extinguihser to be repaired or replaced. 46 CFR 95.10-5 Old I
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 April 2019
Resolution: Discharge hose including horn was replaced by 3rd party technician.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 18 April 2019
Resolved
Rescue boat shall be capable of being easily maneuvered and suitable for its intended service. During man overboard drill rescue boat outboard engine would not start and crew could not manually maneuver boat to retrieve rescue dummy. 46 CFR 94.10-5(e) Old I.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 April 2019
Resolution: Rescue boatwas verified operational by attending MI.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 October 2018
Resolved
Starboard remote emergency fuel shutoff valve is not operable and needs to be repaired or replaced per 46 CFR 56.50-60(d)(1).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2018
Resolved 20 October 2018
Resolution: Emergency fuel shutoff reachrod knuckle joint replaced. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 19 October 2018
Resolved
Grouped lifefloats must be divided by spacers, of which are missing and must be inserted per 46 CFR 94.15-10(d)(7).
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2018
Resolved 20 October 2018
Resolution: Lifefloat spacers were inserted between each lifefloat. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 19 October 2018
Resolved
Anchor release mechanism is excessively oxidized, rendering the anchor unusable. This must be repaired or replaced per 46 CFR 96.07-5(a).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2018
Resolved 20 October 2018
Resolution: Anchor release mechanism was replaced with new materials. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 19 October 2018
Resolved
Rescue boat engine is inoperable and needs to be repaired or replaced per 46 CFR 94.10-5(e).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2018
Resolved 20 October 2018
Resolution: Rescue boat engine was replaced and a video was provided showing the rescue boat being operated on the water. All sat.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 December 2017
Resolved
Vessel is a month & a half beyond annual inspection deadline. Conduct annual inspection prior to sail.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 5 December 2017
Resolution: Cleared at end of inspection.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 5 December 2017
Resolved
Deviation card out of date. Obtain new deviation card.
Action required: 705 - Other - as specified
Due 5 January 2018
Resolved 8 December 2017
Resolution: Vessel obtained a new deviation card.
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 5 December 2017
Resolved
Port Engine shaft packing leaking in excess. Fix port shaft packing.
Action required: 705 - Other - as specified
Due 12 December 2017
Resolved 8 December 2017
Resolution: Vessel tightened shaft packing and added more packing.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 5 December 2017
Resolved
Rudder angle indicator inoperable. Provide evidence of properly operating rudder angle indicator.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Witnessed proper operation of rudder angle indicator.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 5 December 2017
Resolved
STBD Generator overspeed inoperable. Provide evidence of proper operation.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Tested proper operation of STBD generator overspeed.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 5 December 2017
Resolved
E-lights out- 1 behind wheelhouse & 1 in STBD engine room. Provide evidence of proper operation.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Witnessed proper operation of both E-Lights.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 5 December 2017
Resolved
MSD capacitor inoperable. Provide evidence of proper operation of MSD.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Witnessed proper operation of MSD via toilets and witnessed locked ovbd valve.
Fire Fighting › Fire Hoses › Condition
Issued 5 December 2017
Resolved
One fire hose blew under pressure. Obtain one new fire hose.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Visually checked all vessel fire hoses included newly installed hose.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 9 June 2016
Resolved
Provide operable emergency lighting for the starboard side engine room escape hatch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 15 July 2016
Resolution: Emergency lighting for the starboard side engine room escape hatch operating sat.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 9 June 2016
Resolved
Provide operable emergency lighting for engine room access passageway.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 15 July 2016
Resolution: Emergency lighting for engine room access passageway operating sat.
Stability › Intact Stability (when using lifting gear) › General
Issued 9 June 2016
Resolved
Provide operable vessel tilt alarm.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 August 2016
Resolved 15 July 2016
Resolution: Vessel tilt alarm operating sat.