Inspection history · 190
6 October 2025
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8247480
14 March 2025
Explosive Handling Operation-Administrative
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8130640
1 December 2022
Load Line/Change of Employment
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7603429
11 May 2022
Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7453053
17 November 2021
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7353273
30 September 2021
In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7324339
21 October 2020
Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7077232
26 February 2020
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6917962
19 February 2020
Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6911729
30 October 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6840754
17 October 2018
MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6562784
4 May 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6406469
4 May 2018
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6408157
4 May 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6408646
16 November 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6316411
8 November 2017
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6302546
8 September 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6262779
7 September 2017
Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6266883
27 June 2017
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6122884
7 June 2017
Plan Review (Other than "T") · Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6224072
26 October 2016
Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6029725
30 June 2016
Administrative Inspection · Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5925477
30 June 2016
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5930891
15 November 2015
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5773903
30 October 2015
Administrative Inspection · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5754425
8 October 2015
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5848141
14 May 2015
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5795581
8 April 2015
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5099910
19 March 2015
Administrative Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5087010
19 December 2014
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5042243
17 December 2014
Administrative Inspection · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5036400
13 April 2014
Damage Survey · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4836095
13 April 2014
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4836190
6 November 2013
MARPOL Annex I Examination · Periodic Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4732096
5 November 2013
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4748106
1 July 2013
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4646996
19 September 2012
Annual Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4444350
31 May 2012
Internal Structural Exam · Hull Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4263626
28 September 2011
Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4156431
6 October 2010
MTSA/ISPS Verification · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3851312
6 September 2010
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3847004
15 April 2010
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3717386
30 March 2010
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4341307
12 March 2010
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3694988
2 March 2010
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3688898
8 February 2010
Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3678404
8 July 2009
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3528558
10 December 2008
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3377917
5 November 2008
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3357415
29 September 2008
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3335154
9 January 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3128024
5 June 2007
Hull Examination · Examination of Repairs · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2925150
2 April 2007
Drydock Extension
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2900079
27 November 2006
Annual Inspection · MTSA Verification · Administrative Inspection · MARPOL Annex I Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2826416
17 October 2005
COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2516230
30 March 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2322881
28 February 2005
Deficiency Check · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2347744
14 October 2004
Annual Inspection · MTSA Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2221212
28 June 2004
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2162167
28 January 2004
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1969047
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1971703
23 December 2002
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1722440
9 December 2002
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1716731
25 November 2002
MARPOL Annex I Examination · Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1704568
26 March 2002
Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1599095
12 February 2002
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1484672
28 October 2001
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1373684
26 February 2001
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1370020
8 November 2000
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1054780
25 October 2000
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1361779
23 December 1999
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 134710
15 November 1999
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1462035
4 January 1999
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 196211
4 January 1999
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 758079
16 December 1998
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1388669
25 November 1998
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1368937
18 November 1998
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1461930
30 October 1998
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 25546
28 October 1998
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1395046
26 November 1997
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 774876
19 November 1997
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1386129
29 October 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1364424
6 July 1997
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 55075
20 March 1997
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1106847
11 February 1997
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363927
18 December 1996
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1094488
30 October 1996
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363826
15 November 1995
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1431577
18 December 1994
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1450937
10 December 1994
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1387656
9 December 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 20826
9 December 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 153783
7 November 1994
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1425518
20 November 1993
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1409047
9 November 1992
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 958205
20 May 1992
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1258891
20 April 1992
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 958935
1 April 1992
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 957432
26 March 1992
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 948186
22 January 1992
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 950241
8 January 1992
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1260696
13 December 1991
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1255595
14 March 1991
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 912438
21 November 1990
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1225265
29 January 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1224377
4 December 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 905350
29 November 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1239321
22 November 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1227850
1 November 1989
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 916858
12 April 1989
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1206296
12 January 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 888808
21 December 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1346001
23 November 1988
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1207162
20 April 1988
Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1195225
21 March 1988
Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1198540
10 March 1988
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1297602
10 February 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1337587
13 January 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1324195
2 December 1987
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1002531
25 September 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1011315
14 May 1987
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1024474
10 January 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 479767
22 December 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1335663
11 December 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 497465
11 December 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 510058
26 November 1986
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1329639
1 November 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 491941
23 October 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 452186
16 October 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 437767
15 October 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 478764
8 October 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 532170
29 September 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1006215
18 September 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 444684
18 September 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 526099
7 September 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 452730
7 September 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 480927
28 August 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 501674
28 August 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 534145
10 July 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 520817
3 July 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 486148
2 July 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 540005
26 June 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 490152
26 June 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 500870
19 June 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 478440
3 June 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 483717
3 June 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 499643
1 June 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 469892
31 May 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 512669
30 May 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 482250
29 May 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 503723
15 May 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 449815
15 May 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 509235
15 May 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 535498
22 April 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 485107
2 April 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 466779
23 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 496841
19 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 503492
19 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 513604
11 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 500556
11 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 509017
9 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 510991
6 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 489306
5 March 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 515637
19 February 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 446925
15 December 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 494737
6 December 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 462104
27 November 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 439188
25 November 1985
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 996424
20 November 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 480081
14 November 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 458750
13 November 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 477894
17 October 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 477198
16 October 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 534289
3 October 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 483459
2 October 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 466004
19 September 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 522816
18 September 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 474605
22 August 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 458549
22 August 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 476186
17 July 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 522624
11 July 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 477862
4 July 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 477103
19 June 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 486242
12 June 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 527479
10 June 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 981950
29 May 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 504456
15 May 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 984273
29 April 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 468309
5 February 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1284266
28 November 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 978098
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 November 2021
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal operating governor and adjusted so that the speed cannot exceed the maximum rated speed by more than 15 percent. Overspeed shutdown not functioning in accordance with manufacturer's instructions. Demonstrate proper overspeed shutdown of #2 generator set in presence of Marine Inspector.
46 CFR 111.12-1(b)
Action required: 705 - Other - as specified
Resolved 18 November 2021
Resolution: satisfactory overspeed test completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 November 2021
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal operating governor and adjusted so that the speed cannot exceed the maximum rated speed by more than 15 percent. Overspeed shutdown not functioning in accordance with manufacturer's instructions. Grounding wire on #1 generator air shutoff solenoid replaced.
46 CFR 111.12-1(b)
Action required: 10 - Deficiency Rectified
Resolved 17 November 2021
Resolution: wire replaced. Test completed. All Sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 October 2020
Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Found a dead end wire in the forward compartment above the rack in the top of the port aft section and in the top of the starboard which is in a connection box.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2020
Resolved 25 November 2020
Resolution: Dead end wires in the forecastle have been removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 October 2020
Resolved
For vessels assigned a load line, see subchapter E (load lines) of this chapter, for special requirements as to strength, closure of openings, etc. The port 1 and 5 gooseneck vents are missing their physical closures.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2020
Resolved 25 November 2020
Resolution: Port 1 and 5 gooseneck vents covers have been replaced in-kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 October 2020
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of this chapter. High jackwater temperature shutdown testing must be completed on all installed engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2020
Resolved 25 November 2020
Resolution: High jackwater temperature shutdown test was completed satisfactorily.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 February 2020
Resolved
No Repairs or alterations affecting the safety the vessel with regard to the hull, machinery, or equipment shall be made with out the knowledge of the Officer in Charge, Marine Inspection. The aft 3" bilge suction pipe in the port no.5 void is corroded and holed. Renew the pipe to the satisfaction of the attending USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2020
Resolved 28 February 2020
Resolution: New 3" bilge suction pipe installed in the #5 port void. All sat.
Engineering › Lubricating Oil Service System › Piping
Issued 4 May 2018
Resolved
06199-A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its life-saving appliances, fire-fighting or other equipment. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in Subchapter I. Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he deems necessary to be assured of the safety and seaworthiness of the vessel. A discharge of oil allegedly originated from the machinery equipment on board the barge HALEAKALA, discharging into the navigable waterway and upon equipment and/or cargo on board the vessel. The vessel and its cargo pose a harmful risk to the environment while underway due to the oil contaminated vessel hull and cargo. Provide proof to the marine inspector that the vessel, its equipment and its cargo no longer pose a risk to the marine environment prior to sailing.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 5 May 2018
Resolution: Crane engine oil supply line o-ring renewed. Oil removed from deck, containers and engine room.
Deck/Cargo › Cargo Condition › Contamination
Issued 4 May 2018
Resolved
A discharge of oil allegedly originated from the machinery equipment on board the barge HALEAKALA, discharging into the navigable waterway and upon equipment and/or cargo on board the vessel. The vessel and its cargo pose a harmful risk to the environment while underway due to the oil contaminated vessel hull and cargo. Provide proof to the marine inspector that the vessel, its equipment and its cargo no longer pose a risk to the marine environment prior to sailing.
Action required: 60 - Rectify deficiencies prior to movement
Due 4 May 2018
Resolved 5 May 2018
Resolution: [name withheld] ([name withheld]) reported that he and [name withheld] inspected the crane engine for repairs. The cleanliness and condition of the vessel and crane were to the satisfaction of the Marine Inspector.
Construction/Loadline › Markings › Load Line Mark
Issued 8 November 2017
Resolved
Deck mark on starboard side is not painted in a contrasting color to the hull.
Action required: 705 - Other - as specified
Due 28 November 2017
Resolved 13 November 2017
Resolution: Loadline deck mark verified to be painted a contrasting color to the hull.
Fire Fighting › Means of Escape › Blocked
Issued 8 November 2017
Resolved
Crew was unable to open the starboard engine room emergency escape hatch. Escape hatch shall be operational for personnel to escape engine room.
Action required: 705 - Other - as specified
Due 28 November 2017
Resolved 9 November 2017
Resolution: Escape hatches operationally tested; all sat.
Electrical › Electric Generation Source (service) › Generator
Issued 8 November 2017
Resolved
Port engineer could not satisfactorily test the port generator high temperature alarm and crane generator high temperature alarm. Prove high temperature sensor alarms are operational for each.
Action required: 705 - Other - as specified
Due 28 November 2017
Resolved 9 November 2017
Resolution: High temp alarms operationally tested; all sat.
Engineering › Freshwater System (intermediary cooling) › Piping
Issued 8 November 2017
Resolved
Thruster engine flexible non metallic expansion joints on the fresh water piping found materially wasted. Replace in kind.
Action required: 705 - Other - as specified
Due 28 November 2017
Resolved 13 November 2017
Resolution: Thruster engine flexible non metallic expansion joints on the fresh water piping replaced in kind.
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 November 2017
Resolved
Provide records for non metallic expansion joints placed into service on salt water piping for thruster cooling, or replace expansion joints if installed more than 10 years.
Action required: 705 - Other - as specified
Due 28 November 2017
Resolved 13 November 2017
Resolution: Thruster engine flexible non metallic expansion joints on the salt water piping replaced in kind.
Engineering › Lubricating Oil Service System › Piping
Issued 7 September 2017
Resolved
Found a severed O-ring at the lube oil delivery pipe flange connection located after the pump on the upper deck crane engine.
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 7 September 2017
Resolution: O-ring replaced in kind, witnessed satisfactory operational test of the crane engine which was placed back into service.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 27 June 2017
Resolved
Provide datasheet for industrial 3-way valve, and provide updated plans, copies of USCG Type approval certs., & copies of the DIOM manuals for both installed fire fighting systems.
Action required: 705 - Other - as specified
Due 27 July 2017
Resolved 28 June 2017
Resolution: Received required datasheets and type approval certs from Global Fire, all sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 27 June 2017
Resolved
Properly install six 250 degree quartzoid bulbs (spec #42276) on Ansul CO2 system, which protects the machinery space for the industrial crane.
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 31 August 2017
Resolution: Verified installation of the quartzoid buld actuators and the CV-98 valves for the CO2 storage cylinders for the ANSUL fixed CO2 system in the upper machinery space. All sat.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 2 January 2017
Resolved
provide a different means to secure the auto actuation of the Halon system for the lower machinery space, as the arrangement they have now creates a hazard for personnel working on the vessel as noted in
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 31 August 2017
Resolution: Verified modifications of new arrangement with approved plan details. Witness operational testing of system. All sat.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 30 October 2015
Resolved
Prove Proper operation of oily water separator for completion of IOPP Cert.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2015
Resolved 30 October 2015
Resolution: Vessel proved proper operation of Oily water Separator
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 30 October 2015
Resolved
Complete fixed fire extinguishing system function test in the presence of a CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2015
Resolved 31 October 2015
Resolution: Witnessed proper operation of fire extinguishing system functions.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 March 2015
Resolved
Provide date at which the pneumatic detection/actuation of the fixed gas fire extinguishing systems can be tested/maintained IAW their USCG approved design, installation, operation, & maintenance manuals.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 April 2015
Resolved 14 May 2015
Resolution: Witnessed testing of pneumatic acuation system IAW USCG DIOM manual for Kidde fixed systems.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 17 December 2014
Resolved
The testing for prime mover of generator in the crane house has not been tested. Company allowed to prepare for tests and contact USCG to witness.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 January 2015
Resolved 14 January 2015
Resolution: Witnessed overspeed, low lube oil shut down, high jacket water temp satisfactorily.
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 17 December 2014
Resolved
The last hydrotest was done in 1997, NFPA and CGA allows for 5 year external visual inspection. Sought to have company provide results of last inspection IAW CGA 6.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 January 2015
Resolved 22 December 2014
Resolution: Company provided email documentation, attached to documentation in MISLE.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 17 December 2014
Resolved
USCG issued wrong IOPP or missed verifying that the Oil Content meter was a 60 vs what was on the IOPP as 393. Having company provide 1 year of receipts of proper disposal of oil waste.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 December 2014
Resolved 14 January 2015
Resolution: Routed proper IOPP
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 17 December 2014
Resolved
The detectors in the crane space appeared to be damaged from open flame, vsl rep stated earlier fire servicing company had done tests and left scorch marks. Issued 835 to have current fire servicing company to provide statement of evaluation of detectors.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 January 2015
Resolved 22 December 2014
Resolution: Company provided recent test and damage was done yearas prior by another servicing company they no longer use.
Construction/Loadline › Hull › Hull Plating
Issued 13 April 2014
Resolved
A 12"-16" Inset was found on the Port FWD bow rake, resulting from collision with tug while taking into alongside tow. Inset was observed to approx 4"-6" in depth. Inset did not appear to penetrate hull plating. A 1/2" fracture was found on internal side of inset. Perm repair to be made at next available port to satisfaction of ABS class surveyor.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 22 April 2014
Resolved 2 May 2014
Resolution: Completed perm repair to damged hull plating on Port bow rake. Damaged area was cropped out & renewed with 32" X 40" insert. All repairs were made to the satisfaction of attending ABS class surveyor.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 19 September 2012
Resolved
During periodic exam testing of reverse power relay on #1 generator, reverse power relay failed to operate.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 September 2012
Resolved 20 September 2012
Resolution: Witnessed installation and successful test of reverse power relay on #1 Generator.
Construction/Loadline › Structures › Rake
Issued 8 February 2010
Resolved
Submit permanent repair plan for temporary drill stop/weld repair located portside on #6 blkhd in #1 rake to OCMI. Repair plan to be approved by OCMI prior to start of repairs. Include NDT method for weld repair.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 July 2010
Resolved 12 March 2010
Construction/Loadline › Hull › Stiffener
Issued 5 November 2008
Resolved
Submit plans and make repairs to deck inset and overhead fractures on forward aft crane support.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 November 2008
Resolved
Repair/renew lower deck railing on port quarter of vessel.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: Cropped and renewed railing
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 5 November 2008
Resolved
Renew port fuel tank flame screen as original.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: renewed as required
Documentation › Markings/Placards › Warning Signs
Issued 5 November 2008
Resolved
Renew fuel shutoff valve labels and posted transfer procedures. Also, renew fixed firefighting system labels on deck.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: labels are renewed
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 November 2008
Resolved
Properly dead end wiring beneath tank level indicators in generator space.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: removed dead end wires
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 5 November 2008
Resolved
Repair/renew cover on port generator exhaust and provide lagging on exposed exhaust piping for both generators.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: exhaust cover and lagging renewed
Electrical › Lighting (emergency) › Lighting Fixture
Issued 5 November 2008
Resolved
Make all emergency lighting in the generator space operational.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: emergency lighting in generator space is operating correctly
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 5 November 2008
Resolved
Renew cracked flex coupling on stern thruster.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 17 December 2008
Resolution: replaced in kind
Operations/Management › Pollution › Control of Discharge of Oil
Issued 5 November 2008
Resolved
Provide complete copy of SOPEP on board vessel.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: SOPEP is complete
Electrical › Lighting (emergency) › Ground Indicator
Issued 5 November 2008
Resolved
Repair ground indicator light in forward storage area.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 10 December 2008
Resolution: ground indicator is operating
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 February 2005
Resolved
C + R FIRST SIDE LONG IN #5 STARBOARD VOID FROM FR 62 - FR 66
Due 31 March 2007
Resolved 5 June 2007
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 February 2005
Resolved
C + R SECOND SIDE LONG IN #5 STARBOARD VOID FROM FR 59 - FR 69
Due 31 March 2007
Resolved 5 June 2007
Construction/Loadline › Structures › Manhole
Issued 28 February 2005
Resolved
REPLACE LADDER IN #5 PORT VOID
Due 31 March 2007
Resolved 5 June 2007
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 February 2005
Resolved
C + R FIRST AND SECOND SIDE LONG IN #5 PORT VOID FROM FR 64 - FR 68
Due 31 March 2007
Resolved 5 June 2007
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 February 2005
Resolved
C + R THIRD SIDELONG IN #5 PORT VOID FROM FR 64 - FR 71
Due 31 March 2007
Resolved 5 June 2007
Construction/Loadline › Structures › Rake
Issued 28 February 2005
Resolved
C + R FRAME 4 STARBOARD SIDE UPPER 8 FEET
Due 31 March 2007
Resolved 5 June 2007
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 February 2005
Resolved
Crop and Renew forward bulkhead in # 6 port ballast tank.
SEE INSPECTION NOTES
Due 31 March 2007
Resolved 5 June 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 28 January 2004
Resolved
Label/stencil operating instructions for discharge of fixed CO2 bottles used to protect E/R space (near exit).
Condition: Improper/Lack of Maintenance
Due 28 February 2004
Resolved 18 February 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 28 January 2004
Resolved
Relocate operating instructions for discharge of CO2 bottles used to protect engine room space located in stern thruster room.
Condition: Improper Installation
Due 28 February 2004
Resolved 18 February 2004
Engineering › Fuel Oil Service System › Valve, Control
Issued 28 January 2004
Resolved
Stencil emergency fuel shutoff valves located outside engine room entrance on aft main deck.
Condition: Improper/Lack of Maintenance
Due 28 February 2004
Resolved 18 February 2004
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 28 January 2004
Resolved
Complete hydrostatic test of all portable CO2 bottles (last test completed in '97).
Condition: Improper/Lack of Maintenance
Due 28 February 2004
Resolved 18 February 2004
Fire Fighting › Ventilation Systems
Issued 25 November 2002
Resolved
Prove proper operation of fire damper doors for engine room. LEGACY COMPONENT DESC: Fire Dampers
Condition: Improper/Lack of Maintenance
Due 9 December 2002
Resolved 9 December 2002
Resolution: Witnessed satisfactory operation of fire damper doors.
Fire Fighting › Ventilation Systems
Issued 25 November 2002
Resolved
Prove proper operation of fire damper louvers and close other openings in crane machinery room floor. LEGACY COMPONENT DESC: Fire Dampers
Condition: Improper/Lack of Maintenance
Due 9 December 2002
Resolved 9 December 2002
Resolution: Witnessed satisfactory operation of fire damper louvers. All openings in crane machinery room floor inspected satisfactory.
Accommodation/Occupational Safety › Occupational Safety
Issued 25 November 2002
Resolved
Install safety chains in side rail openings on main deck at port molasses cargo station and starboard aft ladders. LEGACY COMPONENT DESC: Lifeline
Condition: Improper/Lack of Maintenance
Due 26 December 2002
Resolved 9 December 2002
Resolution: Witnessed satisfactory installation of safety chains.
Construction/Loadline › Structures
Issued 25 November 2002
Resolved
Install watertight closures on gooseneck vents for #2 & #5 starboard voids, #6 starboard ballast tank, #5 port void and #6 port ballast tank. LEGACY COMPONENT DESC: Ventilators
Condition: Improper/Lack of Maintenance
Due 26 December 2002
Resolved 23 December 2002
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 25 November 2002
Resolved
Clean or replace fixed firefighting CO2 system operating instructions at crane machinery room. LEGACY COMPONENT DESC: Operating Controls
Condition: Improper/Lack of Maintenance
Due 26 December 2002
Resolved 23 December 2002
Fire Fighting › Structural - Horizontal Zones
Issued 25 November 2002
Resolved
Replace missing stuffings in open pipes passing through the aft bulkhead on the foc'sle, port and starboard. LEGACY COMPONENT DESC: Stuffing Tubes
Due 26 December 2002
Resolved 23 December 2002
Construction/Loadline › Hull
Issued 12 February 2002
Resolved
Engine space sludge holding tanks (aft-port/stbd); bottom plate wasted. Crop/renew. LEGACY COMPONENT DESC: Bottom Plating
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 February 2002
Resolved 8 March 2002
Resolution: Inspected satisfactory repairs to bottom plate in engine space holding tanks.
Construction/Loadline › Hull
Issued 12 February 2002
Resolved
Engine Space forward bhd IWO port side-shell/#7 void aft bhd; fractured/distorted side longs/side shell plate, crop/renew. LEGACY COMPONENT DESC: Hull Plating
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 February 2002
Resolved 8 March 2002
Resolution: Inspected satifactory repairs completed in void #7 and engine space. Longitudinals cropped and renewed as needed. Shell plate wedged back into shape via strongbacks.
Construction/Loadline › Structures
Issued 12 February 2002
Resolved
Forward Rake (stbd); fractured frame member at #3 1/2 frame IWO TOB, crop/renew. LEGACY COMPONENT DESC: Rake
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 February 2002
Resolved 8 March 2002
Resolution: Inspected satisfactory repairs completed in forward rake. Gusset cropped and renewed with 12'' X 18" X 1/2" insert.
Construction/Loadline › Structures
Issued 12 February 2002
Resolved
#7 void; wasted deep bottom frame (btwn frames 93-95), at TOB (stbd), crop/renew. LEGACY COMPONENT DESC: Superstructure
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 February 2002
Resolved 8 March 2002
Resolution: Inspected satisfactory repairs. Deep bottom longitudinal cropped and renewed from frame 93-99.
Construction/Loadline › Penetrations
Issued 12 February 2002
Resolved
#7 Void Sea Chest: (2) wasted sections of 35'x8" schedule 80 pipe. Location: From PORT/STBD sea chests (PORT/STBD deep longs) extending through WTB #108 into engine space (via welded flange) to rising stem flange. Repair to original condition. LEGACY COMPONENT DESC: Pipe Flange
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 February 2002
Resolved 8 March 2002
Resolution: Inspected satisfactory repairs to port and starboard piping in #7 void.
Unknown
Issued 25 October 2000
Resolved
Install cable rails to original condition. Location: above crane engine space (aft). IAW: 46 CFR 92.25-5 (a).
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Electrical
Issued 25 October 2000
Resolved
Repair dead-end electrical wires throughout barge (stbd side/under upper engine space near nav light, forward crane station, #1 generator in lower engine space). IAW: 46 CFR 111.60-11.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Unknown
Issued 25 October 2000
Resolved
Repair to original condition, cracked weld on ladder rail (above feed tank,aft of crane engine space). IAW: 46 CFR 92.25 (a).
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Unknown
Issued 15 November 1999
Resolved
Install a bolted cover on flanged connection of the standard discharge connetion.
Condition: Unknown
Due 15 November 1999
Resolved 29 November 1999
Construction/Loadline
Issued 15 November 1999
Resolved
Repaint the forward and midship draft marks on the port side.
Condition: Unknown
Due 15 November 1999
Resolved 29 November 1999
Construction/Loadline
Issued 18 November 1998
Resolved
#7 Void; Bay 2 outboard (starboard side) bottom long in way of turn of the bilge, crop and renew to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Construction/Loadline
Issued 18 November 1998
Resolved
#7 Void; Bay 1 outboard (starboard side) deep long web frame, crop and renew to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Construction/Loadline
Issued 18 November 1998
Resolved
# 5 Void; Bay 1 renew as original #6 & #7 tripping brackets in way of the #6 & #7 starboard side longs to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Construction/Loadline
Issued 18 November 1998
Resolved
Forepeak; Bay 6 aft bulkhead outboard vertical stiffener (port side) "V" and reweld crack to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Engineering
Issued 28 October 1998
Resolved
Provide permanent fuel oil containment for the crane diesel generator fuel tank fill hose and tank vent in accordance with 33 CFR 155.320 (a).
Condition: Unknown
Due 25 November 1998
Resolved 25 November 1998
Electrical
Issued 28 October 1998
Resolved
Replace inoperable emergency light in main machinary space by storage locker.
Condition: Unknown
Due 25 November 1998
Resolved 25 November 1998
Accommodation/Occupational Safety
Issued 28 October 1998
Resolved
Provide a pressure gauge with markings in increments of "psi" for the cranediesel generator air receiver and prove proper operation of the pressure relief valve.
Condition: Unknown
Due 25 November 1998
Resolved 25 November 1998
Electrical
Issued 28 October 1998
Resolved
Provide permanent splice to wiring in way of battery charger, port side main machinary space.
Condition: Unknown
Due 25 November 1998
Resolved 25 November 1998
Accommodation/Occupational Safety
Issued 28 October 1998
Resolved
Prove proper operation of the #1 S/S diesel generator start air receiver pressure relief valve.
Condition: Unknown
Due 25 November 1998
Resolved 25 November 1998
Engineering
Issued 28 October 1998
Resolved
Effect permanent repairs to the exhaust leak located inside the main machinery space in the overhead approx 3 feet inboard of the horizontal turn of the exhaust piping of the #2 S/S diesel generator.
Condition: Unknown
Due 25 November 1998
Resolved 25 November 1998
Unknown
Issued 28 October 1998
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 28 October 1998
Resolved 5 November 1998
Navigation
Issued 28 October 1998
Resolved
Effect repairs to starboard running light and prove operation prior to night time operations.
Condition: Unknown
Due 29 October 1998
Resolved 5 November 1998
Construction/Loadline
Issued 19 November 1997
Resolved
Provide a Standard Discharge Connection as required by MARPOL 73/78 Regulation 19, and by 33 CFR 155.430.
Condition: Unknown
Due 30 November 1997
Resolved 26 November 1997
Documentation
Issued 19 November 1997
Resolved
Provide an Oil Record Book as required by MARPOL 73/78 Regulation 20, and by 33 CFR 151.25.
Condition: Unknown
Due 30 November 1997
Resolved 26 November 1997
Fire Fighting
Issued 29 October 1997
Resolved
Repair or lubricate the ventilation louvers in the deck of the crane machinery room to allow full closure.
Condition: Unknown
Due 29 October 1997
Resolved 29 October 1997
Documentation
Issued 29 October 1997
Resolved
Renew the International Oil Pollution Prevention Certificate (IOPP)(expired09NOV96), or limit vessel's route to "not on an international voyage" on the Certificate of Inspection (COI).
Condition: Unknown
Due 29 October 1997
Resolved 29 October 1997
Fire Fighting
Issued 30 October 1996
Resolved
Hydro test all CO2 bottles and their flex loops for the fixed extinguishingsystem serving the crane generator space by next drydock but not later than06JAN97.
Condition: Unknown
Due 30 October 1996
Resolved 30 October 1996
Fire Fighting
Issued 15 November 1995
Resolved
REINSTALL MISSING 2'x 2' SECTION OF A-60 INSULATION AND SHEATHING AS ORIGINAL ON THE PORT FORWARD BULKHEAD IN THE HALON ROOM.
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Documentation
Issued 15 November 1995
Resolved
PRIOR TO CARRYING FREIGHT FOR HIRE PROVIDE EVIDENCE THAT THE VESSEL'S ONBOARD SOPEP HAS BEEN APPROVED BY THE U.S. COAST GUARD.
Condition: Unknown
Due 20 November 1995
Resolved 17 November 1995
Unknown
Issued 15 November 1995
Resolved
REPAINT AND PERMANENTLY MARK LOADLINE MARKS.
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 15 November 1995
Resolved
PRIOR TO CARRYING FREIGHT FOR HIRE PROVIDE COPY OF SERVICING REPORT INDICATING FIXED AND SEMI PORTABLE SYSTEMS ARE IN SATISFACTORY OPERATING CONDITION.
Condition: Unknown
Due 20 November 1995
Resolved 17 November 1995
Engineering
Issued 10 December 1994
Resolved
STARBOARD FUEL TANK TO REMAIN EMPTY UNTIL PERMANENT REPAIR TO DAMAGE IS COMPLETED TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 10 December 1994
Resolved 10 December 1994
Fire Fighting
Issued 7 November 1994
Resolved
HYDROSTATICALLY TEST ALL HALON CYLINDERS AND PROVIDE SERVICE REPORTS TO MSOHONOLULU AFTER COMPLETION.
Condition: Unknown
Due 7 November 1994
Resolved 7 November 1994
Construction/Loadline
Issued 20 November 1993
Resolved
REPLACE THE WASTED DRAIN PIPE FOR THE FORWARD AREA. THE PIPE IS LOCATED ON THE PORT SIDE IN #2 PORT VOID AT THE FWD END.
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Documentation
Issued 20 November 1993
Resolved
PROVIDE OIL TRANSFER PROCEDURES FOR REVIEW AND MAINTAIN A COPY ONBOARD THE VESSEL AT ALL TIMES. THIS ITEM TO BE COMPLETED PRIOR TO TRANSFERING OIL PRODUCTS._x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Construction/Loadline
Issued 20 November 1993
Resolved
FREE UP AND PROVE OPERABLE FROM THE MAIN DECK - THE REACH ROD ASSEMBLIES IN#2P VOID FOR THE BILGE SUCTION VALVE TO #1 VOID, AND THE SEAWATER WASDOWN DISCHARGE VALVE._x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Construction/Loadline
Issued 20 November 1993
Resolved
GAS FREE AS NEEDED TO COMPLETE INTERNAL STRUCTURAL EXAM: TANKS/VOIDS 5'S, 6'S, AND 7'S._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Deck/Cargo
Issued 20 November 1993
Resolved
REMOVE SCALE FROM SCREENS TO THE 6" BALL CHECK VENT VALVES FOR 6P (2 VALVES), AND 6S (1 VALVE)_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Deck/Cargo
Issued 20 November 1993
Resolved
FREE THE BALL CHECK IN THE 6" VENT VALVE LOCATED ON THE AFT END OF 4P._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Deck/Cargo
Issued 20 November 1993
Resolved
REPLACE THE MISSING CLOSING DEVICE FOR THE 3" VENT FOR THE 2S VOID_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Engineering
Issued 20 November 1993
Resolved
RPLACE THE FLAME SCREEN FOR THE VENT FOR THE BILGE HOLDING TANK_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 November 1993
Resolved 20 November 1993
Accommodation/Occupational Safety
Issued 9 November 1992
Resolved
PROVIDE A MEANS OF SECURING THE CHAINS BETWEEN THE MAIN DECK RAILS LOCATED ON THE PORT SIDE AFT.
Condition: Unknown
Due 9 December 1992
Resolved 24 November 1992
Accommodation/Occupational Safety
Issued 9 November 1992
Resolved
RENEW THE SHACKLES ON THE CHAINS LOCATED BETWEEN THE MAIN DECK RAILS ON THESTARBOARD SIDE AFT.
Condition: Unknown
Due 9 December 1992
Resolved 24 November 1992
Electrical
Issued 8 January 1992
Resolved
PROPERLY DEAD END ALL EXPOSED WIRING IN THE FOLLOWING AREAS: FORECASTLE_x001C_ NEAR THE CAPSTAN DISTRIBUTION PANEL, IN THE MACHINERY SPACES BEHIND THE ENGINEERING CONSOLE, IN WAY OF BOTH GENERATORS, AND NEAR THE RADIO CONTROL_x001C_PANEL.
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Construction/Loadline
Issued 8 January 1992
Resolved
LABEL THE EMERGENCY ESCAPE SCUTTLE IN THE MACHINERY SPACE ON THE PORT SIDE.
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Engineering
Issued 21 November 1990
Resolved
PERFORM HYDROTESTS ON SHIPS SERVICE AIR RECEIVERS 1 AND 2.
Condition: Unknown
Due 21 November 1990
Resolved 21 November 1990
Engineering
Issued 21 November 1990
Resolved
DEMONSTRATE PROPER OILY WATER SEPARATOR AND MONITOR OPERATION.
Condition: Unknown
Due 21 November 1990
Resolved 21 November 1990
Fire Fighting
Issued 22 November 1989
Resolved
ENGINE ROOM SEMIPORTABLE CARBON DIOXIDE FIRE EXTINGUISHER BOTTLES ARE TO BE HYDROSTATICALLY TESTED AND REFILLED BY AN AUTHORIZED FACILITY.
Condition: Unknown
Due 22 November 1989
Resolved 22 November 1989
Electrical
Issued 1 November 1989
Resolved
PROVIDE BLANK IN OPEN CIRCUIT BREAKER SPACE IN THE DISTRIBUTION PANEL TOP OF MACHINERY SPACE LADDERWAY (PANEL P-12).
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989
Resolved
PROVE PROPER OPERATION OF ALL GENERATOR HIGH COOLING WATER TEMPERATURE ALARMS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Documentation
Issued 1 November 1989
Resolved
PROVIDE A VALID LOADLINE CERTIFICATE.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Fire Fighting
Issued 1 November 1989
Resolved
PROVIDE SERVICING REPORT FOR ALL FIREFIGHTING GEAR.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Engineering
Issued 21 December 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE EXISTING RADIO CONTROL SYSTEM FOR THE STERN THRUSTER. THE STERN THRUSTER IS NOT TO BE OPERATED BY RADIO CONTROL UNTIL THIS REQUIREMENT IS SATISFIED. PRIOR TO INSTALLATION OF ANY NEW STERNTHRUSTER RADIO CONTROL SYSTEM, SUBMIT NECESSARY PLANS TO MSC FOR APPROVAL.
Condition: Unknown
Due 21 December 1988
Resolved 21 December 1988
Engineering
Issued 23 November 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE RADIO CONTROL SYSTEM FOR THE STERN THRUSTER. THE STERN THRUSTER IS NOT TO BE OPERATED UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Engineering
Issued 23 November 1988
Resolved
PROVIDE A GUARD FOR THE STERN THRUSTER DRIVE SHAFT AND FLYWHEEL.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Electrical
Issued 23 November 1988
Resolved
REMOVE ALL DEAD END WIRES ON BOTH GENERATORS LOCATED IN THE MACHINERY ROOM.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Construction/Loadline
Issued 23 November 1988
Resolved
RENEW NUMBER 4 PORT AFTER BALLAST TANK VENT.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Construction/Loadline
Issued 23 November 1988
Resolved
RENEW NUMBER 4 STBD AFTER BALLAST TANK VENT.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Construction/Loadline
Issued 23 November 1988
Resolved
RENEW NUMBER 6 STBD FORWARD BALLAST TANK VENT.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Construction/Loadline
Issued 23 November 1988
Resolved
PROVIDE A SUITABLE GUARD FOR THE MAIN BILGE/BALLAST PUMP DRIVE SHAFT.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Engineering
Issued 23 November 1988
Resolved
PRIOR TO INSTALLATION OF ANY NEW STERN THRUSTER RADIO CONTROL SYSTEM, SUBMIT NECESSARY PLANS TO THE COAST GUARD MARINE SAFETY CENTER FOR APPROVAL.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Fire Fighting
Issued 23 November 1988
Resolved
PROVIDE SERVICE REPORTS FOR THE PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Fire Fighting
Issued 23 November 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE CRANE FIXED FIRE DETECTION SYSTEM.CRANEMACHINERY SPACE IS TO BE MANNED WHILE CRANE MACHINERY IS IN OPERATION.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Electrical
Issued 23 November 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE GENERATOR OVERSPEED TRIPS ON BOTH GENERATOR DRIVES LOCATED IN THE MACHINERY ROOM.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Electrical
Issued 23 November 1988
Resolved
RENEW ALL FLEXIBLE HOSES ON BOTH GENERATOR DRIVES LOCATED IN THE MACHINERY ROOM.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Engineering
Issued 23 November 1988
Resolved
PROVIDE THREADED PLUGS FOR ALL FUEL AND CARGO CONTAINMENT PRIOR TO TRANSFEROF FUEL OR CARGO.
Condition: Unknown
Due 23 November 1988
Resolved 23 November 1988
Construction/Loadline
Issued 21 March 1988
Resolved
MAKE PERMANENT REPAIRS TO PORT BALLAST TANK, FRAME 45 AT NO. 3 SIDE LONG- ITUDINAL, IN LIEU OF TEMPORARY REPAIRS.
Condition: Unknown
Due 21 March 1988
Resolved 21 March 1988
Electrical
Issued 2 December 1987
Resolved
INSTALL METAL LIGHT GUARDS ON CRANE LIGHTS.
Condition: Unknown
Due 2 December 1987
Resolved 2 December 1987
Electrical
Issued 2 December 1987
Resolved
INSTALL RUBBER MAT AT FORECASTLE ELECTRICAL CONTROL PANEL.
Condition: Unknown
Due 2 December 1987
Resolved 2 December 1987
Deck/Cargo
Issued 2 December 1987
Resolved
RENEW VENT AND FLAME SCREENS AT MAIN DECK.
Condition: Unknown
Due 2 December 1987
Resolved 2 December 1987
Electrical
Issued 2 December 1987
Resolved
INSTALL PLUGS AT JUNCTION BOXES AT BOARDING LIGHTS PORT AND STARBOARD FORWARD.
Condition: Unknown
Due 2 December 1987
Resolved 2 December 1987
Electrical
Issued 2 December 1987
Resolved
RENEW STUFFING TUBE CONNECTION AT BARGE CRANE TIE.
Condition: Unknown
Due 2 December 1987
Resolved 2 December 1987
Construction/Loadline
Issued 2 December 1987
Resolved
REINSTALL PORT LIGHT ASSEMBLIES AT FORECASTLE WHERE MISSING.
Condition: Unknown
Due 2 December 1987
Resolved 2 December 1987
Construction/Loadline
Issued 25 September 1987
Resolved
EFFECT PERMANENT REPAIRS TO MAIN DECK STARBOARD SIDE BETWEEN FRAMES 54-55 #4 STARBOARD BALLAST TANK.
Condition: Unknown
Due 25 September 1987
Resolved 25 September 1987
Unknown
Issued 26 November 1986
Resolved
OPEN AND MAKE READY FOR INTERNAL INSPECTION DURING NEXT DRYDOCK THE CARGO HOLD. PARTICULAR ATTENTION TO BE PAID TO DENTED SECTION OF MAIN DECK APPROXIMATELY 7'X8' LOCATED 15' FORWAQRD OF VOID SPACE, AFTER PORT HATCH AND 14' FROM SIDESHELL PORT.
Condition: Unknown
Due 26 November 1986
Resolved 26 November 1986
Unknown
Issued 26 November 1986
Resolved
PROVE PROPER OPERATION OF VENTILATION AND MACHINERY SHUTDOWNS OF CRANE ENGINEROOM WHEN CO2 FIXED SYSTEM IS ACTIVATED. CO2 PORTION OF SHUTDOWN SYSTEM PROVEN, ELECTRICAL PORTION INOPERATIVE.
Condition: Unknown
Due 26 November 1986
Resolved 26 November 1986
Fire Fighting
Issued 25 November 1985
Resolved
PROVIDE ANNUAL PROOF OF SERVICING FOR ALL FIRE EXTINGUISHERS.
Condition: Unknown
Due 25 November 1985
Resolved 25 November 1985
Lifesaving
Issued 25 November 1985
Resolved
REPAIR TO OPERABLE CONDITION THE RING BUOY WATERLIGHT ON THE STARBOARD STERN RING BUOY.
Condition: Unknown
Due 25 November 1985
Resolved 25 November 1985