Inspection history · 110
17 April 2026
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8353317
24 March 2026
COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8331093
6 February 2026
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8309878
28 January 2026
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8302771
9 June 2025
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8155401
11 September 2024
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8001595
24 May 2024
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8284789
16 September 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7792759
22 August 2023
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7774097
9 June 2023
Damage Survey · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7716701
8 June 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7714239
18 May 2023
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7691541
5 April 2022
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7424751
19 January 2021
COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7126867
13 January 2021
Drydock Extension
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7123839
24 March 2020
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6930980
28 May 2019
MTSA Verification · MARPOL Annex I Examination · MARPOL Annex VI Survey · Periodic Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6696479
30 August 2018
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6527243
21 August 2018
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6518054
17 April 2018
Annual Inspection · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6392761
6 March 2017
MTSA Verification · Deficiency Check · MARPOL Annex VI Survey · Administrative Inspection · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6099357
12 April 2016
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5852729
1 February 2016
Drydock Exam · Administrative Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5807242
19 June 2015
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5190197
16 April 2015
Annual Inspection · MARPOL Annex VI Survey · Deficiency Check · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5104882
26 March 2015
Damage Survey · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5091210
18 March 2015
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5086174
15 March 2015
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5086974
24 June 2014
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4898795
1 May 2014
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4848194
23 March 2014
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4822625
5 September 2013
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4684958
20 October 2012
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4469830
5 April 2012
MARPOL Annex I Examination · MTSA Verification · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4279561
19 August 2011
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4120268
11 August 2011
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4113285
28 July 2011
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4103249
30 November 2010
MARPOL Annex I Examination · COI Inspection · Internal Structural Exam · Drydock Exam · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3901316
1 September 2010
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3840378
13 May 2010
Deficiency Check · Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3715144
18 January 2010
Administrative Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3667172
1 January 2010
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3657731
7 April 2009
MARPOL Annex I Examination · Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3448054
5 January 2009
Deficiency Check · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3390288
11 June 2008
MARPOL Annex I Examination · MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3234037
12 October 2007
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3078326
6 September 2007
Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3037250
24 November 2006
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2827648
7 September 2006
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2772943
10 August 2006
Plan Review (Other than "T")
Administrative · Marine Safety Center (MSC) · Activity 2742738
5 June 2006
Hull Examination · Administrative Inspection · COI Inspection · Internal Structural Exam · Deficiency Check · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2670791
1 June 2006
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2668282
6 April 2006
Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2618463
21 March 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2606628
12 January 2006
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2566029
19 May 2005
Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2366712
14 January 2005
Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2274927
13 February 2004
Annual Inspection · Internal Structural Exam
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2006446
28 January 2004
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1995147
15 January 2003
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1730950
14 March 2002
Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1493728
11 April 2001
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1451684
3 March 2001
COI Inspection · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1445747
30 January 2001
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1056557
4 January 2001
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1466185
18 April 2000
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1048692
23 March 2000
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1384394
13 November 1999
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 126309
12 November 1999
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 805942
15 September 1999
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 72936
18 June 1999
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 679887
17 June 1999
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1452521
28 January 1999
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1397071
6 May 1998
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 790372
23 April 1998
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 792241
3 June 1997
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 773659
13 January 1997
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1102457
31 December 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1097112
4 June 1996
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 874814
9 May 1996
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1083118
3 May 1996
Deficiency Check · Permit to Proceed · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1419597
26 February 1996
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 884907
24 January 1996
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 878994
7 February 1995
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1148363
12 January 1995
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1173014
29 December 1994
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1160801
22 December 1994
Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1457225
21 December 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 36094
26 July 1994
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 868018
3 May 1994
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1169271
13 April 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 65643
9 April 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 127895
9 February 1994
Re-Inspection · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 853301
4 September 1993
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 178678
11 February 1993
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 834597
7 May 1992
Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1472837
26 February 1992
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1425258
19 February 1992
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 944344
12 February 1992
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 956271
19 February 1991
Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 930370
3 July 1990
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 909374
7 September 1989
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 887601
29 June 1989
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1207544
24 December 1986
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1309001
9 May 1986
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1303804
11 April 1986
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 459031
10 April 1986
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1307593
12 December 1985
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 525038
30 July 1985
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 455710
27 June 1985
Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 992195
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2023
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Vessel was impacted in the aft port corner by towing vessel. Substantial damage has been identify.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2023
Resolution: CLASS Report used as objective evidence, def cleared.
Engineering › Fuel Oil Service System › Valve, Control
Issued 6 March 2017
Resolved
Repair the STBD GenSet remote fuel shut off valve reach rod. 46CFR56.50-75
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 May 2017
Resolved 9 May 2017
Resolution: A new stainless steel reach rod was installed on the STBD genset.
Electrical › Electric Generation Source (service) › Generator
Issued 7 March 2016
Resolved
rep could not demonstrate proper operation of P/S gen-set shut downs
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 May 2016
Resolved 27 April 2016
Resolution: replaced units
Engineering › Compressed Air System (start air) › Valve
Issued 7 March 2016
Resolved
rep could not demonstrate proper operation of port side relief valve due to time constraints.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 April 2016
Resolved 12 April 2016
Electrical › Electric Generation Source (service) › Generator
Issued 7 March 2016
Resolved
stbd gen-set had a dead end wire that was previouly used as a sensor. one end was still connected to the gen-set. remove dead end wire.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 April 2016
Resolved 12 April 2016
Electrical › Lighting (service) › Outlet Box
Issued 7 March 2016
Resolved
found several junctions boxes through out bottom deck that had wires seperating from their junction box. Directed rep to survey area and make permanent attachements to junction boxes as they are found.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 April 2016
Resolved 12 April 2016
Construction/Loadline › Markings › Load Line Mark
Issued 16 April 2015
Resolved
The ring, lines and letters shall be painted white or yellow on a dark ground.
Action required: 705 - Other - as specified
Due 16 May 2015
Resolved 22 April 2015
Resolution: O/o painted port/starboard plimsol and deck lines
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 16 April 2015
Resolved
All 3 ballast control main disconnect and interlock (knive) switch are missing. #1 ballast controller supply power is by-passed, single phase conductor is spliced.
Action required: 705 - Other - as specified
Due 16 May 2015
Resolved 22 April 2015
Resolution: O/o installed approved disconnect/interlock switch in the aforementioned controllers.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 16 April 2015
Resolved
Ground detection system on main switchboard reflects an active ground on "c" phase. troubleshoot and isolate ground
Action required: 705 - Other - as specified
Due 23 April 2015
Resolved 17 April 2015
Resolution: O/o identified and isolated ground on lighting circuit.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 16 April 2015
Resolved
Provide procedures to temporarily operate ballast pumps without the disconnect switch, such instructions shall be posted at the operating station, outside generator space and designated power panel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2015
Resolution: O/o submitted operating plan to MI outlining safety measures and procedures to operate ballast pump controllers.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2015
Resolved
Remove excess twist-on connectors on ballast pump controllers.
Action required: 705 - Other - as specified
Due 23 April 2015
Resolved 22 April 2015
Resolution: O/o removed excess twist-on connectors on ballast pump controllers.
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2015
Resolved
Make temporary repairs IAW approved repair proposal to the satisfaction of the attending marine inspector
Action required: 705 - Other - as specified
Due 20 March 2015
Resolved 20 March 2015
Resolution: Witness fit up stbd side she''ll plate aprox 30x30 iwo fr 35 39. Main deck insert approx 5 x10 replace two frames approx 8 ft long. Replace tripping bracket and transverse long fr 36 37. Workmanship outstanding ABS surveyed repairs along wi
Construction/Loadline › Hull › Bracket
Issued 5 September 2013
Resolved
C/R #3 tripping bracket from bottom IWO Frame #10 outboard in Void 1S.
Due 1 February 2016
Resolved 12 April 2016
Construction/Loadline › Hull › Bracket
Issued 5 September 2013
Resolved
C/R #3 and #6 tripping bracket from bottom IWO Frame #10 outboard in void 2S.
Due 1 February 2016
Resolved 12 April 2016
Construction/Loadline › Hull › Bracket
Issued 5 September 2013
Resolved
C/R #4 and #6 tripping bracket from bottom IWO Frame #14 outboard in void 3S.
Due 1 February 2016
Resolved 12 April 2016
Construction/Loadline › Hull › Transverse Frame
Issued 5 September 2013
Resolved
Properly repair fractured weld on fwd #1 bottom tranverse floor frame where it connects to Stbd Bulkhead (Frame 7) in void 1C.
Due 1 February 2016
Resolved 12 April 2016
Construction/Loadline › Hull › Transverse Frame
Issued 5 September 2013
Resolved
Properly repair fracture on center-line bottom transverse floor frame where diagonal connects to frame; aft bulkhead (Frame 25/22) in void #5-5C.
Due 1 February 2016
Resolved 12 April 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 April 2012
Resolved
Main deck: Properly mount electrical box, between frame 21-22, lane 10
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited J Box replacement
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 April 2012
Resolved
Main deck: Properly reinstall wiring on light, frame 7. between lane 1-2
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited installed wires
Electrical › Lighting (emergency) › Lighting Fixture
Issued 5 April 2012
Resolved
Main deck: Properly replace light in exit sign in stbd eng room.
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited new signs
Construction/Loadline › Structures › Superstructure
Issued 5 April 2012
Resolved
Main deck: C/R stanchion, frame 8, between lane 3-5
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited insert on stanchion
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 April 2012
Resolved
Main deck: Main deck: Properly mount electrical box, between frame 21-22, outboard
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited J box replacement
Construction/Loadline › Structures › Superstructure
Issued 5 April 2012
Resolved
Main deck: C/R stanchion, frame 20, between lane 5-7
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited insert in stanchion
Construction/Loadline › Structures › Superstructure
Issued 5 April 2012
Resolved
Main deck: C/R stanchion, frame 16, between lane 5-7
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited insert in stanchion
Electrical › Lighting (service) › Lighting Fixture
Issued 5 April 2012
Resolved
Main deck: Properly mount light, frame 25, outboard
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited light monted properly
Electrical › Lighting (service) › Lighting Fixture
Issued 5 April 2012
Resolved
Main deck: Properly mount light, frame 32, between lane 5-7
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited monted light
Electrical › Lighting (service) › Lighting Fixture
Issued 5 April 2012
Resolved
Main deck: Properly mount light, frame 48, stbd
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited light
Construction/Loadline › Structures › Superstructure
Issued 5 April 2012
Resolved
Main deck: C/R bottom gusset, frame 40, between lane 1-3
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited insert of tripping bracket
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 April 2012
Resolved
Main deck: Properly mount electrical box, frame 50, stbd
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited electrical box in place
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 April 2012
Resolved
3rd Deck: Properly repair rail, lane 10, port side
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited repaired rails
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 5 April 2012
Resolved
Properly repair guard on stbd generator.
Due 5 May 2012
Resolved 3 May 2012
Resolution: Sited new guard on gen set
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 5 April 2012
Resolved
Prove proper operation of ground fault light in port eng room
Due 5 May 2012
Resolved 3 May 2012
Resolution: Ground fault repaired
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 5 April 2012
Resolved
Show proper operation of eng shutdowns, port and stbd
Due 5 May 2012
Resolved 3 May 2012
Resolution: witness operation of engine shut downs
Engineering › Diesel Engine (auxiliary) › Block
Issued 13 May 2010
Resolved
Determine cause and repair Lube Oil leak, properly insulate exhaust lagging, and properly secure and seal fuel soleniod junction box.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Lube oil leak was repaired, exhaust lagging was intalled and the fuel soleniod junction box was properly sealed.
Electrical › Lighting (service) › Conductor
Issued 13 May 2010
Resolved
Properly splice/connect wires located overhead of lanes 2 and 4; frame 41; 2nd deck.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Overhead wires were properly connected.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 13 May 2010
Resolved
Re-Secure ladder to bulkhead on portside, main deck, at frame 25-13.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Ladder was properly resecured to bulkhead
Electrical › Lighting (service) › Lighting Fixture
Issued 13 May 2010
Resolved
Submit plan for approval in regards to non-class 1 Div 2 flood lights installed throughout the vessel. Until such time as approved drawings are provided, lighting system is to be secured when Hazmat is being loaded, unloaded, or on board the vessel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 12 August 2011
Resolved 19 August 2011
Resolution: ABS APPROVED ELECTRICAL INSTALLATION.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 13 May 2010
Resolved
Renew or properly repair watertight covers on main deck stbd side ramp controller and control box for ballast valves.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Watertight covers on ramp controllers and control box for ballast valves were repaired.
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 13 May 2010
Resolved
Replace latch on front panel of the hydraulic tank unit controller.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Latch on the front panel of the hydraulic tank unit controller was replaced.
Electrical › Electric Supply System (service) › Cable
Issued 13 May 2010
Resolved
Replace wire tie cable supports w/ metal straps in stbd generator room on inboard bulkhead.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Wire tie cable supports were replaced w/ metal straps.
Engineering › Freshwater System (air cooling) › Hose
Issued 13 May 2010
Resolved
Renew (2) identified jacket water flexible hoses and properly secure dead end wire on stbd generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2010
Resolved 10 June 2010
Resolution: Two jacket water flexible hoses were renewed and dead end wires secured on stbd generator.
Deck/Cargo › Cargo Stowage › General
Issued 1 January 2010
Resolved
Barge is allowed a 1-time transit from San Juan to Jacksonville to conduct permanent repairs to deck&locking mechanisms (pull mans) on main 7&9/spot 11/deck 3. Rough weather caused containers to detach from deck&lean against safety rail. Additionally observed a 1in fracture on lane 8/spot 11/deck 3. No containers shall be carried on areas of concern and permanent repairs shall be made to class&cg.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 January 2010
Resolved 21 January 2010
Resolution: Repairs completed and ABS verified.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 April 2009
Resolved
Safety railing for ladder on the second deck car deck port side is missing. Install railing or remove car deck.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: railing installed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 April 2009
Resolved
Protective heat guard is missing around the exhaust pipe at 2nd deck; car deck on port side. Install protective guard or remove car deck.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Protective lagging installed.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 16 April 2009
Resolved
Remove all remnants of pre-existing port side generator, including fuel lines, oil lines, filters, radiators, electrical wiring, brackets, and all oil residue.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Generator parts and permanent systems are being modified to allow for future re-install if desired.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 16 April 2009
Resolved
Entire area surrounding the portside generator is covered with oil. Clean up oil from engine and surrounding area.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Leak was discovered in seal. Seal is being replaced.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 16 April 2009
Resolved
Overspeed trip failed to engage/shutdown. Overspeed trip must operate correctly prior to sail.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2009
Resolution: Replaced overspeed component and properly demonstrated operation
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 April 2009
Resolved
Stbd side service air compressor missing belt guard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Belt guard installed.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 16 April 2009
Resolved
Port and stbd fuel service tank remote valves not marked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Remote valves marked.
Operations/Management › Pollution › Control of Discharge of Oil
Issued 16 April 2009
Resolved
Fuel containment burm at fueling deck riser/manifold missing plug.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Plug installed.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 16 April 2009
Resolved
Main Deck fwd compartment inboard of generator room; Ladder is missing lower bracket; bracket was removed during previous work item and not re-installed. Replace bracket or remove ladder.
Light switch cable is wrapped around ladder; remove and re-install switch housing to bulkhead
Lighting on port and stbd side of compartment broken.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Ladders removed, wiring secured, and swtich housing reinstalled.
Electrical › Lighting (service) › Outlet Box
Issued 16 April 2009
Resolved
Renew bracket for electrical box on 1st deck, frame 49, port side
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Bracket renewed.
Electrical › Lighting (service) › Lighting Fixture
Issued 16 April 2009
Resolved
Repair cover for lighting panel L3 on the 1st deck and the handle for the ramp panel on the second deck
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Cover repaired.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 April 2009
Resolved
Repair stanchion at frame 32 and 38 in lane 7/5
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Stanchion repaired.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 April 2009
Resolved
Repair Handrail; 3rd deck, stbd side, 4th handrail from the bow
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Handrail repaired.
Electrical › Lighting (service) › Lighting Fixture
Issued 16 April 2009
Resolved
Repair or replace lights at frame 17 in lanes 6/4 and 1/2
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 14 May 2009
Resolution: Lighting replaced.
Electrical › Lighting (service) › Lighting Fixture
Issued 7 April 2009
Resolved
Repair/renew broken light fixture and bent bracket on lane 6-8, frame 38. Appears to have been hit by truck.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 May 2009
Resolved 29 May 2009
Resolution: Bracket was renewed and light fixture replaced and working properly.
Engineering › Diesel Engine (propulsion-electric) › Crankcase
Issued 7 April 2009
Resolved
Repair/renew seal on new port side generator and clean generator and surrounding areas of oil and residue. Seal is leaking.
Action required: 705 - Other - as specified
Due 29 May 2009
Resolved 29 May 2009
Resolution: Seal was renewed and is no longer leaking. Surrounding area was cleaned of all residue.
Engineering › Diesel Engine (propulsion-electric) › Block
Issued 7 April 2009
Resolved
The following is to be completed on the old port side generator:
- REMOVE hot start system, raycor fuel filter system, and capillary pressure lines.
- CAP OFF fuel lines and oil lines.
- CONTAIN all electrical wiring in secure box.
- LOCK OUT primary fuel filter valves.
- CLEAN existing radiator of all oil and residue and surrounding areas.
Action required: 705 - Other - as specified
Due 29 May 2009
Resolved 29 May 2009
Resolution: All components of the old generator have been removed, contained, or locked out. The surrounding area has been cleaned of all oil and residue.
Construction/Loadline › Penetrations › Gasket
Issued 5 January 2009
Resolved
Properly secure the electrical cable penetration in the port fwd rake.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 9 February 2009
Resolution: Cable penetration sealed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 January 2009
Resolved
Crop and renew three tripped frames (5, 6, 8) in the center fwd rake, stbd side. At next dry-dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 August 2011
Resolved 9 February 2009
Resolution: Frames replaced.
Construction/Loadline › Hull › Hull Plating
Issued 5 January 2009
Resolved
Crop and renew the inset plate approximately 8ft X 12ft stbd side IWO the tripped frames in the center fwd rake. At next dry-dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 August 2011
Resolved 1 February 2011
Resolution: Completed repair satisfactorily examined and pressure box tested by USCG and ABS Veracruz
Construction/Loadline › Hull › Transverse Frame
Issued 5 January 2009
Resolved
In void 5-4 center port, on the port side repair the 3rd transverse frame forward bottom.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 9 February 2009
Resolution: Frames repaired.
Construction/Loadline › Hull › Keel
Issued 5 January 2009
Resolved
In void 5-4 center, on center line forward CVK check for cracks as marked.
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 9 February 2009
Resolution: Some cracks found and repaired.
Construction/Loadline › Hull › Transverse Frame
Issued 5 January 2009
Resolved
In void 5-4 center, on the stbd side the #2 bottom transverse frame. Repair the fracture.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Fracture repaired.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 January 2009
Resolved
In void 3 stbd, re-weld the #12 frame as needed.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Frame is welded.
Construction/Loadline › Hull › Stiffener
Issued 5 January 2009
Resolved
In void 3 center, re-weld the top of frame 11.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 6 February 2009
Resolution: Frame repaired
Construction/Loadline › Hull › Stiffener
Issued 5 January 2009
Resolved
In void center, checkthe top of three diagonals as marked, for cracks.
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: No cracks found
Fire Fighting › Means of Escape › Stairways
Issued 5 January 2009
Resolved
In void #3 center, repair the stbd ladder.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Ladder repaired
Construction/Loadline › Structures › Manhole
Issued 5 January 2009
Resolved
In void 1 port, replace one stud on cover.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Stud replaced
Construction/Loadline › Hull › Transverse Frame
Issued 5 January 2009
Resolved
In void 1 port, repair the fractured weld on frame #7 IWO the in board bulkhead.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: fracture repaired.
Construction/Loadline › Hull › Transverse Frame
Issued 5 January 2009
Resolved
In void #1 port, on frame #7 repair the fracture IWO the hull, 5ft from the top.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Repairs were made
Construction/Loadline › Hull › Transverse Frame
Issued 5 January 2009
Resolved
In void #4 stbd, repair the fracture in the weld on frame 16 IWO the hull.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Repairs were made
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 January 2009
Resolved
In void #4 port, between frames 15 and 16, re-weld the frame the fourth frame from the bottom.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Frames welded
Fire Fighting › Means of Escape › Stairways
Issued 5 January 2009
Resolved
In void 5-6 center, repair the 3rd step from the bottom of the ladder.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 February 2009
Resolved 6 February 2009
Resolution: Ladder repaired
Electrical › Electrical Distribution System (service) › Switch
Issued 6 September 2007
Resolved
Repair or replace the shut off switches and the covers on the ballast pump electrical panel 1&2
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: The switches were replaced.
Construction/Loadline › Structures › Superstructure
Issued 6 September 2007
Resolved
Repair or replace the support stanchion at frame 15 on the 1st deck, stbd side.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: The stanchion was replaced.
Electrical › Lighting (service) › Outlet Box
Issued 6 September 2007
Resolved
Install covers over missing breakers in panel L1, repair the lock on Panel L3
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: The covert was installed and the lock was repaired.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 6 September 2007
Resolved
Remove all dead end wires, in the stbd generator room and on the #3 generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: Dead end wires are removed
Electrical › Electric Generation Source (service) › Panelboard
Issued 6 September 2007
Resolved
On #3 generator, secure the electric panel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: Panel is secured
Deck/Cargo › Holds/Tanks › Scuttle
Issued 6 September 2007
Resolved
Make scuttles operational.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 August 2011
Resolved 12 June 2008
Engineering › Compressed Air System (start air) › Compressor
Issued 6 September 2007
Resolved
Port air compressor, investigate oil leak. Repair as needed.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: The leck was repaired
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 6 September 2007
Resolved
Remove all oil and debris from containment area.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: The containment area is clean
Fire Fighting › Means of Escape › Stairways
Issued 6 September 2007
Resolved
Ensure all safety chains are placed around all ladders.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: Chains are up.
Construction/Loadline › Structures › Door
Issued 6 September 2007
Resolved
On the port side ramp electrical panel cover at frame 49, 2nd deck. Repair the hinge
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: The hinge was repaired.
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 September 2007
Resolved
Between frames 27 and 28 on the 2nd deck. Repair or replace the wire or make connection inside a junction box.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: New wire was installed.
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 6 September 2007
Resolved
Repair the rail on the 3rd deck, stbd side at frame #5. Add strength members to the hand rail on the cat walk.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 October 2007
Resolved 4 October 2007
Resolution: More brackets were added
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 6 September 2007
Resolved
Demonstrate proper operation of the over speed shut downs on diesel engines.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 September 2007
Resolution: Over speed devices were repaired and are working fine.
Construction/Loadline › Structures › Rake
Issued 5 August 2006
Resolved
Ramps originally installed in bottom lanes 3/5, 4/6, and 7/9 are condemned. Prove replacement as per approved drawings, prior to loading cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 September 2006
Resolved 7 September 2006
Resolution: Ramps renewed or repaired satisfactory.
Construction/Loadline › Structures › Rake
Issued 5 August 2006
Resolved
Ramp originally installed on top deck 7/9 lanes has deep pitting. Initial guagings show up to 50% loss of metal. Mechanically clean and guage all pitted areas and submit repair proposal to local [name withheld] approved repairs OR replace deck in kind prior to loading cargo.
Action required: 705 - Other - as specified
Due 5 December 2006
Resolved 29 November 2006
Resolution: Received an approval letter for the proposed ramp inserts from CG MSC, examined ramp repairs, Ramps were repaired as per approved drawings.
Electrical › Lighting (service) › Lighting Fixture
Issued 5 August 2006
Resolved
Prove light globes and protective cages on all lane and bulkhead lighting.
Due 5 October 2006
Resolved 21 November 2006
Resolution: Installed new light covers throughout the vessel.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 August 2006
Resolved
Prove railing spacing on top deck complies with 46 CFR 92.25-5.
Due 5 December 2006
Resolved 22 November 2006
Construction/Loadline › Structures › Rake
Issued 5 August 2006
Resolved
Prove approval by Marine Safety Center concerning ramp design changes made while reconstructing ramps.
Due 5 September 2006
Resolved 10 August 2006
Construction/Loadline › Hull › Bottom Plating
Issued 5 August 2006
Resolved
Provide complete guaging and shipyard repair report.
Action required: 705 - Other - as specified
Due 5 March 2007
Resolved 11 September 2007
Resolution: Received gauging report and shipyard report.
Electrical › Electric Supply System (service) › Cable
Issued 5 August 2006
Resolved
Cover open junction box on main deck starboard side between frames 26-27.
Due 25 August 2006
Resolved 7 September 2006
Resolution: New junction box installed.
Electrical › Electric Supply System (service) › Cable
Issued 5 August 2006
Resolved
Mount electrical plug on mid level starboard side between frames 39-40.
Due 25 August 2006
Resolved 7 September 2006
Resolution: New electric box and plug installed.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 5 August 2006
Resolved
Cover lane lighting junction boxes (2) on mid deck lane 7/9...two lights closest to the ramps.
Due 5 October 2006
Resolved 5 October 2006
Resolution: Boxes were removed and cable run was shortened, and terminated at the next junction box.
Electrical › Lighting (service) › Lighting Fixture
Issued 5 August 2006
Resolved
Cover flourescent light on mid deck lane 1/2 just forward of aft windows between frames 30-31.
Due 5 October 2006
Resolved 5 October 2006
Resolution: Light cover was renewed.
Electrical › Electric Supply System (service) › Cable
Issued 5 August 2006
Resolved
Ensure all wiring is properly mounted and terminates in a junction box or light.
Due 5 November 2006
Resolved 29 November 2006
Resolution: Examined all wiring throughout the vessel and found satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 6 April 2006
Resolved
Make permanent repairs by inserting the hull IWO damaged plating at approx frame 48, starboard side aft. Temp repairs authorized for transit to ship yard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 May 2006
Resolved 28 June 2006
Construction/Loadline › Hull › Weld
Issued 12 January 2006
Resolved
Complete work list repair items issued 1/12/06.
Condition: Unknown
Due 12 April 2006
Resolved 28 June 2006
Construction/Loadline › Hull › Hull Plating
Issued 14 January 2005
Resolved
PROVIDE CLASS REPORT ON DAMAGE IWO #3 PORT SIDE FRAME 15 AND 16 SIDE SHELL RIPPED APROX. 8 INCHES IN 4 SIDE SHELL LONG. K BRACKET ARE IN NEED OF REPLACING.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 February 2005
Resolved 15 January 2005
Resolution: RCVD CONDITION OF CLASS
Construction/Loadline › Structures › Deck Plating
Issued 14 January 2005
Resolved
PRIOR TO DEPARTATURE LOCATE AND REPAIR HOLE IN FRAME 16 AROUND CUT-OUT MAIN DECK WINDOW. LOCATE AND REPAIR HOLE IN MAIN DECK AROUND FRAMES AT WATER TIGHT BULKHEAD IN SPACE TOP COVER
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 January 2005
Resolved 15 January 2005
Resolution: ABS CLEARED REPAIR
Construction/Loadline › Hull › Hull Plating
Issued 14 January 2005
Resolved
Vessel has an Condition of Class (ABS) IT IS RECOMMENDED THAT distorted port side shell and side shell longitudinal in way of frames 15 & 16 be cropped and renewed. Port side shell, 1st strake below main deck, set in over an area 9 x 8 to depth of 6".
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 28 June 2006
Engineering › Compressed Air System (start air)
Issued 13 February 2004
Resolved
Demonstrate proper operation of starboard air receiver relief valve. LEGACY COMPONENT DESC: Receiver/Bottle
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 May 2004
Resolved 23 April 2004
Construction/Loadline
Issued 4 January 2001
Resolved
FRAME 33 CENTER VOID, REPAIR FRACTURE DIAGONAL SUPPORT ON BOTTOM AND PORT DECK STIFFNER BOTTOM GUSSET. FRAME 31 REPAIR FRACTURE IN IN STARBOARD FRACTURE._x001C_ _x001C_
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
VOID 5-3 PORT, FRAME 25-18, C/R #6 BRACKETAT SIDE SHELL, INSERT BULKHEAD ATSIDE SHELL BETWEEN LONGS 6 & 7._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
FRAME 33, CENTER VOID, REPAIR FRACTURE ON DIAG SUPPORT._x001C_
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
FRAME 33, CENTER VOID, REPAIR FRACTURE ON PORT DECK STIFFNER BOTTOM GUSSET.
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
FRAME 25-18 CENTER VOID, REPAIR FRACTURE AT CVK DIAGONAL SUPPORT, FRAME 25-13 REPAIR FRACTURE CVK DIAGONAL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
FRAME 31 CENTER VOID, REPAIR FRACTURE ON STARBOARD BULKHEAD.
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
FRAME 24 CENTER VOID, REPAIR FRACTURE STARBOARD BULKHEAD, WELD TO BE TESTEDUPON REPAIR.
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
VOID 5-6 PORT, C/R BRACKET #5 AT SIDE SHELL BAY 1._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Construction/Loadline
Issued 4 January 2001
Resolved
VOID 9 PORT, FRAME 42, C/R BRACKETS 1 & 2 AT SIDE SHELL, C/R # 1 LONG AT BULKHEAD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 January 2001
Resolved 4 January 2001
Documentation
Issued 17 June 1999
Resolved
Provide a valid IOPP certificate for vessel.
Condition: Unknown
Due 17 June 1999
Resolved 18 June 1999
Electrical
Issued 23 April 1998
Resolved
The #3 SSG was out of service. Required to repair and conduct load test and test of all emergency shutdown systems in presence of Marine Inspector.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Engineering
Issued 23 April 1998
Resolved
Due to time constraints, a test of the pressure reliev valves on the air start compressors was not conducted. Required vessel to conduct test of the relief valves in the presence of a Marine Inspector.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
The low l/o and high jacket water temp shutdowns on the #2 SSG were inoperative. Required to repair and conduct test in presence of Marine Inspector.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 9 May 1996
Resolved
Demonstrate #1 generator under load, prove low lube oil trip, high jacket water temp trip, overspeed trip.
Condition: Unknown
Due 9 May 1996
Resolved 9 May 1996
Engineering
Issued 9 May 1996
Resolved
Demonstrate #2 generator low lube oil trip, high jacket water temp trip, overspeed trip.
Condition: Unknown
Due 9 May 1996
Resolved 9 May 1996
Electrical
Issued 9 May 1996
Resolved
Demonstrate #3 generator under load.
Condition: Unknown
Due 9 May 1996
Resolved 9 May 1996
Accommodation/Occupational Safety
Issued 9 May 1996
Resolved
Prove pressure relief valve on air receiver in stbd engine room.
Condition: Unknown
Due 9 May 1996
Resolved 9 May 1996
Construction/Loadline
Issued 24 January 1996
Resolved
PUMPROOM_x001C_ A.) Center transverse, port side, repair stress fracture at angle bracket, port bulkhead.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#1 STBD VOID_x001C_ A.) FR6, Crop & renew #1 thru 4 flate plate brackets to btm._x001C_ B.) FR7, Crop & renew the btm transverse to original._x001C_ C.) FR8, Crop & renew 48"x24"x6"x1/2" btm transverse from the inboard bhd.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#1 STBD VOID_x001C_ D.) FR9, Drill stop the fracture, gouge and reweld, in way of the btm/lowerinboard long._x001C_ E.) FR10, Crop & renew #1 and 2 sideshell long brackets.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#7 STBD VOID_x001C_ A.) FR33, C/L underdeck long is fractured in way of the diagional._x001C_ B.) FR33, STBD outboard bottom girder fractured in way of the diagonal._x001C_ C.) FR32, C/L underdeck long is fractured in way of the diagonal.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#8 CENTER VOID_x001C_ FR 34, CVK, fracture on port side in way of weld connection to BHD, 28" to 38" above bottom shell plate.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
AFT STBD RAKE, FR 47, gouge and reweld fracture in toe of weld, at bottom_x001C_ of grider._x001C_
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#8 STBD VOID_x001C_ A.) FR38, crop & renew #8 side long where set up._x001C_ B.) FR37, crop & renew #8 side long where set up._x001C_
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#5 STBD VOID_x001C_ Crop & renew the side shell and all associated internals from 10' to 18' level in way of FR 25 & 26.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#4 STBD VOID_x001C_ A.) FR18, in way of #5 & 6 sidelongs, crop and renew the bulkhead 24"w x 36"h, and the sideshell 24"x24"._x001C_ B.) FR20, in way of #7 sidelong, crop & renew 48 inches to FR21.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#4 STBD VOID_x001C_ C.) FR21, in way of #4 sidelong, insert the vertical web.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#3 STBD VOID_x001C_ A.) FR16, crop & renew #4 thru #8 sidelongs, 24"x6"x1/2" angle._x001C_ B.) FR16, crop & renew #6 & #7 sidelongs._x001C_ C.) FR16, crop & renew the upper & lower 6x6x5/8 diagonals.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#3 STBD VOID (cont)_x001C_ D.) FR16, crop & renew the 24"x28"x1/2" flat plate bracket._x001C_ E.) FR15, crop & renew the upper & lower 6x6x5/8 diagonals._x001C_ F.) FR15, crop & renew the 24"x28"x1/2" flat plate bracket.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#3 STBD VOID (cont.)_x001C_ G.) FR14, Crop and renew 24" sidelong with associated bracket._x001C_ H.) FR18, Crop and renew the #5 bulkhead bracket.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
PORT #1 VOID_x001C_ A.) Renew lower 3 corner gussets, aft bulkhead outboard._x001C_ B.) Crop/Insert # 2 & 4, from bottom, sidelongs and center vertical sideshell stiffner, IWO trip.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
FORT FORWARD RAKE A.) Crop/Renew #8 from aft, sideshell frame IWO buckle above intermediate sideshell skirt & below overhead._x001C_ B.) Crop/Renew inboard bulkhead & sideshell buckled between frames 2 & 3 from forward.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
Port #1 VOID (cont)_x001C_ C.) Release/Repair the tripped forward vertical sideshell stiffner and transverse frame, outboard._x001C_ D.) Fracture at forward transverse & inboard bottom long.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
PORT #1 VOID (cont.) E.) Fracture at forward inboard vertical & lower sidelong at both transverse & bulkhead._x001C_ F.) Fracture at center vertical inboard, IWO previous repair lower sidelongand transverse connection.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
FOREPEAK CENTER A.) Fracture at #1 transverse from aft at # 6,7,8,9 bottom longs to STBD from centerline._x001C_ B.) Tripped gussets at aft bulkhead & bottom longs # 1,2,3,4,8,10, 11,12,13 STBD form centerline & # 1,2,3,4,7,8 PORT from centerline.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#1 CENTER VOID A.) Tripped gussets at foreward bulkhead & #6,7,8,9 bottom longs from centerline._x001C_ B.) Reweld Angle Bracket to bottom transverse at #2 transverse from aft PORT of centerline.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#2 PORT VOID A.) Renew tripped attachment plate for angle stiffners 3rd transverse from aft at outboard shell vertical._x001C_ B.) Crop/Renew #6 (from bottom) sidelong between frames 2&3 from aft. Fairor insert sideshell.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#2 PORT VOID (cont.) C.) Repair #2 (from aft) transverse, tripped at outboard bottom long. D.) Crop/Renew # 4,5,6 (from bottom) sidelongs between # 1 & 2 frames from aft. Fair or insert sideshell._x001C_ E.) Fracture inboard lower sidelong aft# 1&2 (from aft) vertical stiffner.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#4 PORT VOID_x001C_ A.) Fracture at inboard lower sidelong at aft & center verticals._x001C_ Fracture at center vertical is at bulkhead & sidelong.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#3 CENTER VOID_x001C_ A.) Fracture in weld, Port side-aft transverse to outboard angle brace._x001C_ B.) CVK tripped at aft bulkhead, crop & insert.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#5 PORT VOID_x001C_ A.) Crop/renew #5 (from bottom) sidelong between # 1 & 2 verticals from forward. Sideshell to be faired or inserted.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#2 STBD VOID_x001C_ A.) FR11, Crop and renew the 24"x28"x1/2" flat plate bracket._x001C_ B.) FR12, Crop and renew the 24"x28"x1/2" flat plate bracket.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
Make ballast tanks 9P, 9S, 10P, 10S, aft rake centers available foe internal exam at next drydock and not later than 31MAY96.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#4 CENTER VOID_x001C_ A.) Fracture in CVK below angle stiffner forward of aft transverse.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
#7 PORT VOID_x001C_ A.) Crop/renew # 6 & 7 (from bottom) sidelongs in forward frame bay, o/b._x001C_ Fair or insert sideshell.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 24 January 1996
Resolved
PORT AFT RAKE A.) At aft vertical stiffner outboard, crop & renew verticalin way of lower sidelong. Crop/renew sideshell setin._x001C_ B.) At aft transverse outboard vertical stiffner crop/renew where tripped at turn of bilge & between # 1,2 (from bottom) sidelongs.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 29 December 1994
Resolved
PERMANENTLY REPAIR TO ORIGINAL THE SECOND INBOARD (FROM STBD. SIDE) VERTICAL STANCHION AND ASSOCIATED STRUCTURAL MEMBERS ADJACENT TO THE MAIN DECK STERN GATE.
Condition: Unknown
Due 29 December 1994
Resolved 29 December 1994
Construction/Loadline
Issued 22 December 1994
Resolved
MAKE APPROPRIATE AND PERMANENT REPAIRS TO STANCHIONS AND ASSOCIATED STRUCTURE AND FITTINGS AT STERN GATES, MAIN DECK.
Condition: Unknown
Due 15 February 1995
Resolved 15 February 1995
Electrical
Issued 9 February 1994
Resolved
INSTALL PROPER SIZE METAL BANDS IN WAY OF ALL PLASTIC TIE-WRAPS FOR ELECTRICAL RUNS.
Condition: Unknown
Due 9 February 1994
Resolved 9 February 1994
Documentation
Issued 9 February 1994
Resolved
PROVIDE A CERTIFICATE OF ALTERNATE COMPLIANCE FOR THE STERN LIGHT LOCATION.
Condition: Unknown
Due 14 February 1994
Resolved 14 February 1994
Construction/Loadline
Issued 9 February 1994
Resolved
WITH THE ASSISTANCE OF THE CLASSIFICATION SOCIETY, DETERMINE CORRECTIVE REPAIR METHOD FOR ALL FRACTURES IN WAY OF DIAGONAL MEMBERS.
Condition: Unknown
Due 4 May 1994
Resolved 4 May 1994
Electrical
Issued 9 February 1994
Resolved
INSTALL BLANK IN CIRCUIT BREAKER PANEL SPD1 WHERE CIRCUIT BREAKER HAS BEEN REMOVED.
Condition: Unknown
Due 4 May 1994
Resolved 4 May 1994
Engineering
Issued 9 February 1994
Resolved
MARK THE FUEL OIL REMOTE SHUT OFF VALVES ON THE 2ND DECK.
Condition: Unknown
Due 4 May 1994
Resolved 4 May 1994
Documentation
Issued 9 February 1994
Resolved
COMPLETE REPAIRS OF ATTACHED 50 ITEM WORK LIST.
Condition: Unknown
Due 4 May 1994
Resolved 4 May 1994
Electrical
Issued 9 February 1994
Resolved
INSTALL GLOBES AND/OR SAFETY GUARDS FOR DECK LIGHTING FIXTURES WHERE MISSING OR BROKEN.
Condition: Unknown
Due 4 May 1994
Resolved 4 May 1994
Engineering
Issued 12 February 1992
Resolved
PROPERLY MARK REMOTE FUEL SHUTDOWN VALVE STATIONS.
Condition: Unknown
Due 26 February 1992
Resolved 27 February 1992
Engineering
Issued 12 February 1992
Resolved
DEMONSTRATE REMOTE FUEL SHUTDOWN VALVES.
Condition: Unknown
Due 26 February 1992
Resolved 27 February 1992
Engineering
Issued 12 February 1992
Resolved
DEMONSTRATE OPERATION OF OVERSPEED TRIP, #3 S/S GENERATOR.
Condition: Unknown
Due 26 February 1992
Resolved 27 February 1992
Construction/Loadline
Issued 10 April 1986
Resolved
PROVIDE MEANS FOR SOUNDING OF ALL TANKS AND VOIDS.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986