Inspection history · 46
17 July 2026
Vessel Attendance · COI Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8436539
5 June 2026
Deficiency Check · In-Service Inspection · Vessel Attendance
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8391433
20 May 2026
Vessel Attendance · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8375000
22 January 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8299855
18 November 2025
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8270817
8 October 2025
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8249172
22 April 2025
In-Service Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8116658
19 March 2025
Internal Structural Exam · Deficiency Check · Drydock Extension
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8095931
6 November 2024
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8031669
2 October 2024
Annual Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8012921
4 May 2024
Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7906402
13 October 2023
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7807851
5 October 2023
Examination of Repairs · Annual Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7806427
20 July 2023
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7869059
8 July 2022
Initial Certification · Deficiency Check · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7500454
29 December 2021
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7373361
12 November 2021
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7375264
9 August 2021
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7280889
29 March 2021
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7169352
28 March 2021
Administrative Inspection · Damage Survey
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7166671
18 December 2020
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7113654
29 July 2020
Examination of Repairs · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7018867
26 July 2020
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7017027
2 March 2020
Examination of Repairs · In-Service Inspection · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6919308
27 February 2020
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6917245
7 November 2017
Uninspected Other
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6326350
8 July 2016
In-Service Inspection · Examination of Repairs
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5934621
12 February 2014
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4799090
8 August 2013
DAPI Audit
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4683434
13 September 2012
Examination of Repairs · Damage Survey · Administration
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4440488
12 September 2012
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4467330
4 September 2012
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4432543
7 December 2011
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4203942
16 November 2011
MTSA Verification · Industry Initiated Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4190291
23 November 2010
MTSA Verification · Industry Initiated Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3897771
14 August 2009
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3606577
20 September 2007
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3061675
23 April 2007
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2913344
10 January 2005
Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2271615
18 November 2004
Uninspected Other
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2243279
2 November 2004
MTSA Verification
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2232755
23 July 2004
MTSA Verification · Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2142160
21 November 2003
Excursion Permit
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1946639
30 March 1999
Excursion Permit
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1115759
10 March 1999
Excursion Permit
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 808924
12 August 1998
Excursion Permit
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1131646
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 26 May 2026
Resolved
A drydock and internal structural examination performed for a towing vessel to maintain a valid load line certificate issued in accordance with subchapter E of this chapter would count as an examination required under § 137.300. During the annual inspection, objective evidence revealed that multiple structural and machinery worklist items identified during the 28NOV2025 drydock inspection, that were cleared by the Recognized Organization (RINA) class report and ILLC endorsement survey, were not rectified as identified by RINA report 06FEB2026. The following conditions were found onboard during annual inspection: Wasted steering room vents on stern deck, wasted fuel vents on aft deck, wasted engine room intake vents, wasted port watertight door bulkhead, temporary epoxy repairs on bulkhead deck in berthing, temporary epoxy repairs on bilge piping, wasted bosn locker hatch coaming and hinges, broken engine room porthole, wasted bulwark and gussets, missing watertight door cotter pins, wasted port hull plate behind forward fender rail, starboard side aft deck plate is missing studs and fasteners, port side aft day tank missing studs and fasteners.
Action required: 30 - Ship detained
Due 26 May 2026
Resolved 2 July 2026
Resolution: All loadline related items have been rectified.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 26 May 2026
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted... (d) The valve must be operable from a safe place outside the space. The remote fuel shut-off valve pull cables for the day tanks snapped during operational testing, completely disabling the ability to secure fuel remotely in an emergency. Repair the broken remote fuel shut-off pull cables to the satisfaction of the MI.
46 CFR 143.260(b) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 2 July 2026
Resolution: Remote fuel shut-off cables renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 May 2026
Resolved
Equipment must be installed and maintained to minimize the potential for fire and explosions. The starboard main engine was found with significant smoking at the exhaust manifold connections to cylinders no. 5 and no. 6. Repair to the satisfaction of the MI.
46 CFR 143.220(a) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 2 July 2026
Resolution: Oily residue removed from cylinder heads.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 May 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The remote stopping from the pilot house for the main engines were found to be inoperable.
46 CFR 143.205(a) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 9 June 2026
Resolution: Remote stops tested from pilothouse in presence of attending MI after electrical connections were renewed by O/O. Tested satisfactorily.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 May 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Starboard ME local lube oil pressure gauge was found inoperable. Replace as needed.
46 CFR 143.205(a) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 9 June 2026
Resolution: Local gauge was replaced in kind with new, engine was running at the time of attendance by MI, temp gauge relfects appropriate L/O temp.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 May 2026
Resolved
Table 143.245(b) requires Pressure vessel relief valves to be tested twice every 5 years, with no more than 3 years elapsing since last test. No records or test dates for the 03 pressure relief valves associated with the start air receivers. Test or replace with new.
46 CFR 143.245(b) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 1 June 2026
Resolution: 03 relief valve tested. report SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 May 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Soft patch found on the starboard main engine cooling water line (outboard side).
46 CFR 143.205(a) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 12 August 2026
Resolution: Engine inspected with no soft patch identified on cooling lines. Engine was not run at the dock. Deficiency considered cleared.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 26 May 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The actuator fitting for the starboard hydraulic z-drive system was found with a significant hydraulic fluid leak. Repair to satisfaction of MI.
46 CFR 143.205(a) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 2 July 2026
Resolution: Hydraulic system was cleaned of excess fluid, no leaks found.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 26 May 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The battery bank for the SSDG start power supply was not permanently installed and battery bank for ships power secured with wing nut.
46 CFR 143.205(a) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 May 2026
Resolved 2 July 2026
Resolution: Battery bank is now secured.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 29 November 2025
Resolved
A drydock and internal structural examination performed for a towing vessel to maintain a valid load line certificate issued in accordance with subchapter E of this chapter would count as an examination required under § 137.300.
46 CFR 137.320
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 February 2026
Resolution: Received RINA ILLC. Class reviewed all CG-835 worklist items.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 March 2025
Resolved
Each towing vessel certificated under the provisions of this subchapter must be in full compliance with the terms of the COI. Identified deterioration of the hull in way of the starboard exhaust piping which terminates at the transom. Multiple wastage penetrations exist in the exhaust piping which created a noticeable exhaust leak in the steering space and presents a down-flooding risk as piping terminates at the freeboard. Affect repairs to the satisfaction of attending Marine Inspector.
46 CFR 136.200(b) - 17 c.
Action required: 705 - Other - as specified
Due 19 March 2025
Resolved 2 July 2026
Resolution: Repairs were completed at drydock and verified during detention clearance.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 2 October 2024
Resolved
Each towing vessel must be equipped with navigation lights, shapes, and sound signals in accordance with the International Regulations for Prevention of Collisions at Sea (COLREGS) or 33 CFR part 84 as appropriate to its area of operation. The stbd side running light fixture found with broken base separating from bracket.
46 CFR 140.720 - 50 c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2024
Resolved 6 November 2024
Resolution: Attended, verified mounting of light fixture and fresnell lense, tested all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The stbd steering gear box is leaking hydraulic oil.
46 CFR 143.205 (a) - 50 c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2024
Resolved 6 November 2024
Resolution: Verified new seal installed and no leaks present after running shaft for 5 min, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 2 October 2024
Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings in such spaces. The engine room's port side exhaust dampener does not close in an event of an emergency.
46 CFR 144.605 - 50 c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2024
Resolved 6 November 2024
Resolution: Dampener found freed and actuated both port and stbd dampeners to close position, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 May 2024
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems must be maintained to ensure proper operation. Be suitable for route and service. Have suitable propulsion controls to provide the operator full control at each operating station. The vessel reported bearing failure to the stbd main engine. Demonstrate proper operation of the stbd main engine to the satisfaction of the attending marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 July 2024
05 - Radio Communications › N/A - No Subsystem › Reserve source of energy
Issued 19 October 2023
Resolved
The reserve power supply must be independent of the propelling power of the ship and of any other electrical system, and must simultaneously energize the radiotelephone transmitter at its required antenna power, the required receivers, the emergency light and the automatic radiotelephone alarm signal generator. The reserve power supply must be available at all times. VHF radio does not have a reserve source of power.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2023
Resolved 20 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 October 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for the safe operation of the towing vessel and safety of persons onboard under normal and emergency condition. Make repairs to the hydraulic leak discovered on the port duckpeller hydraulic motor to the approval of the attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 October 2023
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 5 October 2023
Resolved
A fire pump must be capable of: Being energized remotely
from a safe place outside the engine room. Inoperative.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 October 2023
Resolved
A fixed fire pump must be capable of: delivering water simultaneously from the two highest hydrants at a pitot-tube pressure of at least 50 pounds per square inch. Fire pump was unable to attain required pressure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 5 October 2023
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention; Alarms must: (1) Be visible and audible at each operating station. The alarm located at the operating station may be a summary alarm. Alarms at the operating stations have no indication that they are machinery related.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 5 October 2023
Resolved
Towing vessels must be equipped with the following equipment, as applicable to the area of operation:Illuminated magnetic compass. The compass must be readable from each operating station. Prove operation and submit proof of calibration.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 January 2024
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 5 October 2023
Resolved
The load line certificate shall certify the correctness of the load line marks assigned to the vessel that the vessel is in compliance with applicable requirements. The load line certificate onboard was expired beyond its expiration and extension dates. Vessel is restricted to operations within the boundary line.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 20 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 October 2023
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems must be maintained to ensure proper operation. The port main engine low lube oil pressure shutdown switch is not operable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 October 2023
Resolved
Electrical components that pose an electrical hazard must be in an enclosure. The main switchboard in the engine room does not have a cover on the back or restricting access for personnel being shocked if touched.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 5 October 2023
Resolved
Sufficient lighting suitable for the marine environment must be provided within crew working and living spaces. Found multiple extinguished light bulbs in the engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 20 October 2023
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 5 October 2023
Resolved
Towing vessel more than 65 feet in length must carry at least the minimum number of portable fire extinguishers set forth in table 142.230(b). Found wrong type of portable extinguisher in the engine room, fire extinguisher not properly mounted and not serviced since 2001, and fire extinguisher on the bridge that has been discharged.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 5 October 2023
Resolved
The frame or support of any semi-portable fire extinguisher fitted with wheels must be welded or otherwise permanently attached to a steel bulkhead of deck to prevent it from rolling under heavy seas condition. The semi-portable fire extinguisher in the upper level engine room is not properly secured.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 5 October 2023
Resolved
All towing vessels must be operated in a manner that minimizes the risk of down flooding and progressive flooding. The access cover for stbd void down in chain locker space was left open and not fastened.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 October 2023
Resolved
Each towing vessel must be equipped with navigation lights, shapes, and sound signals in accordance with 33 CFR Part 84. The port and stbd running lights are obstructed from the pilot platform.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2023
Resolved 22 November 2023
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 October 2023
Resolved
Rails or equivalent protection must be installed near the periphery of all decks accessible to the crew. Equivalent protection must include lifelines, wire rope, chains, and bulwarks that provide strength and support equivalent to fixed rails. The rail in the port forward of the wheel house is wasted. In addition, the port side engine room upper level is missing rails.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 28 October 2023
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 5 October 2023
Resolved
Each towing vessel must be maintained and operated as to minimize fire hazards and to ensure all bilges, voids, spaces are kept free from accumulation of combustible and flammable materials and liquids as practicable. The steering gear room has excessive oil leaks through the entire space making it a unsafe condition for personnel and fire hazard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2023
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 11 July 2022
Resolved
A fire pump must be capable of: Being energized remotely
from a safe place outside the engine room. Remote pump start/stop controler is inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 July 2022
Resolved 12 July 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 11 July 2022
Resolved
Closure devices must be provided for deck house or hull penetrations, which open to the exterior of the vessel and may allow water to enter the vessel. These devices must be suitable for the expected route. The forward quick acting watertight doors main deck are unable to secure and be watertight as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 30 November 2023
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 11 July 2022
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space. The emergency lighting for crew berthing areas is insufficient for egress.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 19 July 2022
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 11 July 2022
Resolved
The following vessels must have a properly installed, operational, type approved AIS: Towing vessels of 26 feet or more in length and more than 600 horsepower, in commercial service. Installed AIS is not operational. Vessel is restricted to daylight operations within Apra Harbor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 19 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 July 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The following items were found to be out of compliance:
1. port sea chest vent has an unapproved repair and leaking.
2. Hydraulic pump and motor missing rotating guards.
3. Oil in engine room bilge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 24 August 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 July 2022
Resolved
All machinery and equipment that is not in proper working order (including missing or malfunctioning guards or safety devices) must be removed; made safe through marking, tagging, or covering; or otherwise made unusable. The machinery space bench grinder is missing its safety shield.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 24 August 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 July 2022
Resolved
Towing vessels of more than 65 feet in length must carry at least the minimum number of portable fire extinguishers set forth in table 142.230(b) and one 40-B portable fire extinguisher fitted in the engine room for each 1,000 brake horsepower of the main engines. The aft steering space is missing a portable fire extinguisher.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 13 December 2022
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 11 July 2022
Resolved
Each towing vessel must be fitted with a communication system between the pilot house and engine room. The sound power phone between the pilot house and engine room is inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 13 December 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 11 July 2022
Resolved
Closure devices must be provided for deck house or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. The engine room’s overhead portlight glass is cracked and aft steering port side soft patch is leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 13 December 2022
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 11 July 2022
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The engine control room alarm panel has 1 extinguished alarm light for #2 generator low oil psi.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2022
Resolved 30 November 2023
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 11 July 2022
Resolved
Fire detection systems on a towing vessel must be certified and inspected by a professional engineer with experience in fire detection design, by a technician with qualifications NICET lvl IV fire alarm engineering technician, or by a classification society with equivalent experience. Installed fire detection system has not been certified as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 August 2022
Resolved 13 December 2022
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 29 July 2020
Resolved
Pilothouse deck was found to have severe wastage. Crop wasted material and renew plating. Provide gauging report 6 inches outward from affected areas, at 4 inch intervals.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 September 2020
Resolution: All steel repairs completed, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 March 2020
Resolved
Installed electrical power sources must be capable of carrying the electrical load of the towing vessel under normal operating conditions. The port generator while running has an active alarm/fault. 46 CFR 143.400(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 March 2020
Stability › Watertight Integrity › Weathertight Enclosure
Issued 7 November 2017
Resolved
Multiple watertight doors on house and deck hatch for engine room compartment with holes and wasted edges. Replace with new and install watertight gaskets found missing on multiple wateright doors.
Action required: 705 - Other - as specified
Resolved 30 January 2018
Resolution: Class report attached under Documents attesting to repairs addressed per USCG issued worklist.
Electrical › Electric Generation Source (service) › Generator
Issued 11 July 2016
Resolved
Missing cylinder head temperature sensor for No. 4 and rpm gauge for port generator.
Action required: 705 - Other - as specified
Due 30 July 2016
Resolved 3 September 2020
Fire Fighting › Fire Hoses › Condition
Issued 18 November 2004
Resolved
Replace firehose and fittings in engine room.
Due 15 December 2004
Resolved 10 January 2005
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 18 November 2004
Resolved
Install rubber matting by switchboard.
Due 15 December 2004
Resolved 10 January 2005
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 18 November 2004
Resolved
Hydro test releasing mechanism on liferaft.
Due 15 December 2004
Resolved 10 January 2005
Lifesaving › Lifebuoys › Serviceable
Issued 18 November 2004
Resolved
Replace retro tape on liferings.
Due 15 December 2004
Resolved 10 January 2005
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 18 November 2004
Resolved
Demonstrate operation of tow lights.
Due 15 December 2004
Resolved 10 January 2005