Records from 2016 to 2026. Most recent: inspection, 11 May 2026.
Documentation record
Registered dimensions (L × B × D)61.6 ft × 17.0 ft × 5.8 ft
Registered tonnagegross 66 / net 45
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE, LA, UNITED STATES · built 1973
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portVENICE, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 23 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it66 - Regulatory (Subpart C or D), Gross Ton
45 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
11 May 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8371215
24 March 2025
Internal Structural Exam · Annual Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8088937
7 May 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7908262
27 April 2023
Annual Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7676704
24 August 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7542279
23 March 2022
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7417424
13 April 2021
Annual Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7163394
4 May 2020
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6947879
28 April 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6938596
14 May 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6675139
21 May 2018
Annual Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6417343
27 April 2017
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6131351
12 May 2016
Deficiency Check · Internal Structural Exam · Examination of Repairs · Annual Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5873272
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 May 2023
Resolved
Marine inspector shall examine all accessible parts of the exterior and interior of the hull, watertight bulkheads, and weather deck. Cracked welds found on the interior of exhaust through hull of doubler plate in lazarette. Additional cracked weld found on aft stiffener within lazarette. Grind and renew welds.
46 CFR 176.25-5(a)(1)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 16 June 2023
Resolution: Welds were renewed accordingly.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 May 2023
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: (2) A machinery space bilge, bilge well, shaft alley bilge, or other spaces subject to flooding from sea water piping within the space. Inoperable audible and visual alarm at operating station for center void space. Repair or replace.
46 CFR 182.530
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 16 June 2023
Resolution: New alarm installed in operating station. Tested satisfactorily.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 May 2023
Resolved
Provision shall be made by means of plugs, covers, etc., to prevent the admission of air into the space protected. Missing gasket material found for engine room hatch cover openings. Install appropriate gasket material.
46 CFR 181.20-35
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 16 June 2023
Resolution: New gasket material installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 May 2023
Resolved
At each initial and subsequent inspection for certification the marine inspector shall examine and test: (6) Sea valves and bulkhead closure valves. All overboard discharge and intake valves shall be checked. Bilge overboard discharge valve found missing. Install value to original operation.
46 CFR 176.23-10(a)(6)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 16 June 2023
Resolution: New valve installed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 May 2023
Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaced and machinery spaces. An interconnected fire detection system ahs not been installed on-board the vessel. Install an interconnected fire detection system and prove proper operation to satisfaction of the attending Marine Inspector.
46 CFR 181.450(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 16 June 2023
Resolution: UL 217 interconnected fire detection system installed.
10 - Safety of Navigation › N/A - No Subsystem › Record of drills and steering gear tests
Issued 16 May 2023
Resolved
The master shall conduct drills and give instructions as necessary to ensure that all crew members are familiar with their duties. Master to conduct adequate drills with crew prior to placing vessel into service. Provide documentation showing completion of drills to satisfaction of attending Marine Inspector prior to passengers.
46 CFR 185.25-10
Action required: 705 - Other - as specified
Due 16 May 2023
Resolved 16 June 2023
Resolution: Drills were satisfactorily completed. Documentation showing completion provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 April 2022
Resolved
Water Light lanyard is not secured properly.
Action required: 10 - Deficiency Rectified
Due 26 April 2022
Resolved 12 April 2022
Resolution: Lanyard was attached to the body of the ring life buoy.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 April 2022
Resolved
Vessel not equipped with adequate fire protection required for carriage of hazardous material.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 30 January 2023
Resolution: Removed endorsement from COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2022
Resolved
Cracks found in the welds where exhaust meets the bulkhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 6 June 2022
Resolution: Welds were repaire.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2022
Resolved
Hydraulic lines are showing signs of chaffing.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 18 April 2022
Resolution: Installed chafing gear to prevent chafing.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 April 2022
Resolved
Guard is missing for the the light in the Laz.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 2 May 2022
Resolution: Guard was installed over the light.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 April 2022
Resolved
Marine inspector observed dead end wiring coming from port forward bulkhead and port main engine starter. Additionally, at the time of inspection, non secured electrical connectors from both main engine magnetic pickup’s, heat damaged wiring at the battery selector switch, exposed battery terminals due to an improperly installed battery box were observed.
46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 2 May 2022
Resolution: Battery cable to selector switch was repaired, electrical connectors from both main engine magnetic pickup’s wire nuts were secured, battery box lid was installed and port forward bulkhead dead end wiring was secured in junction box.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 April 2022
Resolved
The incorrect battery was installed.
Action required: 10 - Deficiency Rectified
Due 26 April 2022
Resolved 12 April 2022
Resolution: Vsl rep replaced with the correct battery.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 13 April 2021
Resolved
A vessel required to have Type I or II subdivision must have enough main transverse watertight bulkheads to separate the machinery space from the remainder of the vessel. All portions of these bulkheads must be watertight below the bulkhead deck.
Observed crack in watertight bulkhead that separates the engine room and steering gear room in the area of the stbd engine exhaust. Back gouge and repair crack.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 13 May 2021
Resolution: MI witnessed satisfactory insert and dye pen NDT of the repair. All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 April 2021
Resolved
Each major generator and motor shall be fitted with a nameplate of corrosion-resistant material.
Generator nameplate missing. Provide new nameplate and affix to generator
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 13 May 2021
Resolution: Generator Data plate attached to generator.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 April 2021
Resolved
When the flexible section of fuel fill piping is a nonconductor of electricity, the metallic sections of the filling pipe separated thereby shall be joined by a conductor for protection against static spark when filling.
Observed broken conductor on fuel fill piping. Conductor was repaired during inspection.
Action required: 10 - Deficiency Rectified
Due 13 April 2021
Resolved 13 April 2021
Resolution: Conductor repaired
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 13 April 2021
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the spaces noted in 46 CFR 182.530(a)(1-3).
Accommodation space bilge alarm did not provide audible alarm. Alarm was repaired during inspection.
Action required: 10 - Deficiency Rectified
Due 13 April 2021
Resolved 13 April 2021
Resolution: Audible alarm repaired
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 14 May 2019
Resolved
GPS wasn't wired into VHF-DSC radio and the MMSI number wasn't programmed in.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2019
Resolved 15 May 2019
Resolution: 3rd party radio technician wired the GPS to the VHF radio and programmed in the MMSI.