CAPE FAREWELL is a 1973 freight ship. The Coast Guard has recorded 71 inspections since 1981, most recently in August 2021, along with 75 deficiencies and 2 casualty investigations between 2005 and 2021.

Records from 1981 to 2021. Most recent: inspection, 3 August 2021.

Built
1973
Last inspected
3 August 2021
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7304792 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
366059000 (licence lapsed)
Maury page id
psix-47565

Inspections, by type

…with no type recorded27
Years with a record 25 calendar years (1981–2021)
The 71 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Registered dimensions (L × B × D)811.7 ft × 100.2 ft × 55.4 ft
Registered tonnagegross 29,508 / net 21,983
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderAVONDALE SHIPYARDS, INC · AVONDALE, LA, UNITED STATES · built 1973
Hull materialSteel
PropulsionSteam Turbine
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNORFOLK, VA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it29508 - Regulatory (Subpart C or D), Gross Ton
21983 - Regulatory (Subpart C or D), Net Ton
83250 - Dead Weight, Ton
57150 - Displacement, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

KICFMMSI 366059000 · expired · compulsorily equipped · granted 22 March 1995, cancelled 30 July 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 8

Inspection history · 71

3 August 2021 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7283568
25 July 2011 Internal Structural Exam · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4104607
13 February 2007 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2869904
12 July 2006 MARPOL Annex V Examination · MTSA/ISPS Verification · Internal Structural Exam · In-Service Inspection · Examination of Repairs · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2710093
29 June 2006 Load Line/Change of Employment
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2703283
26 April 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2634074
10 January 2006 Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2564012
24 September 2005 Type not recorded
No type recorded · Commandant (CG-INV) · Activity 2960541
1 April 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2324598
14 December 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2259353
22 October 2004 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2226172
4 October 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2213457
6 August 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2158334
3 June 2004 MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2087490
7 May 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2061953
1 May 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2056906
23 March 2004 Periodic Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2029565
28 January 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1995586
20 July 2002 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1648134
13 June 2002 In-Service Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1630073
3 July 2000 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1436362
19 January 1999 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 114474
10 August 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 54962
1 July 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1130263
4 May 1998 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1466512
11 March 1998 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1122569
7 November 1997 Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 483017
11 September 1997 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1108131
25 August 1997 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1120034
14 August 1997 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1409732
4 August 1997 Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 479939
21 April 1997 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1121518
17 March 1997 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1448874
13 June 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1404179
13 June 1996 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1428636
29 April 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1439725
28 August 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1425543
6 March 1995 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1040407
29 October 1993 Examination of Repairs
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1163257
13 July 1993 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1445997
7 June 1993 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1440705
11 December 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429692
16 April 1992 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 955153
23 September 1991 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001885
5 September 1991 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 938259
23 August 1991 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 470257
9 August 1991 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 935945
15 July 1991 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 937516
25 June 1991 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 481674
7 June 1991 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1246045
9 May 1991 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1250680
3 October 1990 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 929726
10 September 1990 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1220307
21 August 1990 Hull Examination · Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1212975
3 May 1989 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1340313
17 May 1988 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1037333
20 May 1987 COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1333137
6 April 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1331150
11 November 1986 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1323066
14 August 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 999653
11 August 1986 Credit Drydock
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1293029
1 April 1986 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1003191
24 January 1986 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1303101
17 November 1985 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 985162
5 September 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 454794
9 May 1985 Deficiency Check · Credit Drydock
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1288358
27 April 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1294667
4 November 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971107
18 October 1982 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 967420
10 June 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964668
27 June 1981 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966814

Deficiency record · 75

Operations/Management › Drills/Instruction › Not Conducted
Issued 15 March 2007 Resolved
Conduct all required drills prior to activation.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 April 2007
Resolved 11 June 2009
Engineering › Steam Turbine (propulsion) › Astern Turbine
Issued 15 March 2007 Resolved
Demonstrate proper operation of high temperature and low pressure turbine over speeds ahead and astern.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 April 2007
Resolved 11 June 2009
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 15 March 2007 Resolved
Provide steam gauge and all vital gauge calibration certificates.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 April 2007
Resolved 11 June 2009
Construction/Loadline › Markings › Load Line Mark
Issued 23 March 2004 Resolved
At next drydock, permanently install plimsoll marks.
Action required: 705 - Other - as specified
Resolved 8 September 2006
Navigation › Piloting/Steering › Compass Deviation Table
Issued 23 March 2004 Resolved
Update deviation table.
Due 26 April 2004
Resolved 11 June 2009
Construction/Loadline
Issued 3 July 2000 Resolved
IN WAY OF STORES CONTAINER STORAGE COMPARTMENT, MAKE REPAIRS TO WASTED FRAMES, DECK AND HULL PLATE TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR AND COGNIZANT OCMI.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Deck/Cargo
Issued 3 July 2000 Resolved
DURING NEXT DRYDOCK, REPLACE DETACHABLE LINK ON STARBOARD ANCHOR DEVILS PAW.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Deck/Cargo
Issued 3 July 2000 Resolved
DURING NEXT DRYDOCK, REPLACE/REPAIR THIRD LINK, FIRST SHOT STARBOARD ANCHOR.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Electrical
Issued 3 July 2000 Resolved
DURING NEXT DRYDOCK, REPLACE INOPERABLE/DETERIORATED LIGHT SOCKETS IN CARGOHOLDS AND PIPE TUNNEL.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Construction/Loadline
Issued 3 July 2000 Resolved
IN WAY OF STORES CONTAINER STORAGE COMPARTMENT, 2ND DECK, CONDUCT THICKNESSGAUGING OF FRAMES 20-45 DECK AND HULL PLATING WHERE WASTED. PROVIDE TEST RESULTS TO COGNIZANT OCMI AT NEXT DRY DOCK.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Construction/Loadline
Issued 3 July 2000 Resolved
REPLACE ALL MISSING DOGS ON CARGO HATCHES.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Construction/Loadline
Issued 3 July 2000 Resolved
IN WAY OF GARBAGE ROOM, 2ND DECK, MAKE REPAIRS TO FRACTURE AT TOP FWD CORNER OF DOOR FRAME.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Navigation
Issued 3 July 2000 Resolved
RENEW PUMP CONTROL VALVE HAYDRAULIC HOSES ON STEERING GEAR, ONE ON PORT SIDE AND ONE ON STARBOARD SIDE.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Unknown
Issued 3 July 2000 Resolved
PROVIDE COMPLETED COPY OF CHEMICAL TESTING PROGRAM AUDIT TO COGNIZANT OCMI.
Condition: Unknown
Due 3 July 2000
Resolved 3 July 2000
Engineering
Issued 3 July 2000 Resolved
PROVE PROPER OPERATION OF OILY WATER SEPERATOR.
Condition: Unknown
Due 3 September 2000
Resolved 20 July 2002
Resolution: Observed proper operation during course of COI.
Lifesaving
Issued 4 May 1998 Resolved
PROVIDE 6 MAN LIFERAFT TO BRING TOTAL TO 48. VESSEL IS NOT ALLOWED TO SAILWITH MORE THAN 36 PERSONS UNTIL CORRECTED.
Condition: Unknown
Due 4 May 1998
Resolved 4 May 1998
Electrical
Issued 17 March 1997 Resolved
FIX EXHAUST FAN IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 17 April 1997
Resolved 24 April 1997
Engineering
Issued 17 March 1997 Resolved
TEST & LOG DC HEATER SAFETY RELIEF VLV. SEND COPY OF LOG TO COGNIZANT OCMI.
Condition: Unknown
Due 17 April 1997
Resolved 24 April 1997
Accommodation/Occupational Safety
Issued 17 March 1997 Resolved
FULLY STOCK HOSPITAL SPACE PRIOR TO MISSION ACTIVATION.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Engineering
Issued 17 March 1997 Resolved
TEST & LOG OVERSPEED TRIP ON MAIN STEAM ENGINE. SEND COPY OF LOG TO COGNIZANT OCMI.
Condition: Unknown
Due 17 April 1997
Resolved 24 April 1997
Electrical
Issued 17 March 1997 Resolved
FIND AND FIX RADIATOR LEAK ON EMERGENCY GENERATOR.
Condition: Unknown
Due 17 April 1997
Resolved 24 April 1997
Construction/Loadline
Issued 13 June 1996 Resolved
GAUGE HULL OF SHIP AND PROVIDE COPY OF REPORT TO USCG INSPECTOR._x001C_
Condition: Unknown
Due 31 July 1996
Resolved 31 July 1996
Engineering
Issued 13 June 1996 Resolved
GAUGE PORT SIDE MAIN CONDENSOR OVERBOARD IN AREA OF RED HAND REPAIR AND PROVIDE COPY OF REPORT TO USCG INSPECTOR._x001C_
Condition: Unknown
Due 31 July 1996
Resolved 31 July 1996
Fire Fighting
Issued 29 April 1996 Resolved
PRIOR TO PLACING VESSEL IN OPERATION, OBTAIN APPROVAL FOR SMOKE DETECTING SYSTEM ALTERATION FROM THE U.S. COAST GUARD MARINE SAFETY CENTER.
Condition: Unknown
Due 29 April 1996
Resolved 29 April 1996
Lifesaving
Issued 13 July 1993 Resolved
CONDUCT FIRE AND BOAT DRILL WITH ENTIRE CREW IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 14 July 1993
Resolved 14 July 1993
Fire Fighting
Issued 11 December 1992 Resolved
CONDUCT FIRE AND BOAT DRILL IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 11 December 1992
Resolved 11 December 1992
Lifesaving
Issued 16 April 1992 Resolved
CONDUCT WEIGHT TEST OF PORT & STBD LIFEBOATS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR AS PER 46 CFR 91.25-15(2)
Condition: Unknown
Due 16 April 1992
Resolved 16 April 1992
Engineering
Issued 16 April 1992 Resolved
PROVE PROPER OPERATION OF THE REMOTE SHUTOFFS (CABLE) TO THE #6 F/O WING TANKS HIGH SUCTION VALVES PORT AND STBD.
Condition: Unknown
Due 16 April 1992
Resolved 16 April 1992
Engineering
Issued 16 April 1992 Resolved
CONDUCT TEST AND PROVE PROPER OPERATION OF THE THROTTLE CONTROL SYSTEM WRONG DIRECTION ALARM.
Condition: Unknown
Due 16 April 1992
Resolved 16 April 1992
Fire Fighting
Issued 5 September 1991 Resolved
MODIFY THE EMERGENCY DIESEL GENERATOR SPACE AND FIRE EXTINGUISHING SYSTEM TO PROVIDE CONTAINMENT AND ALARM WITH TIME DELAY PER 46CFR 95.15-10(F) AND 46CFR 95.15-30.
Condition: Unknown
Due 5 September 1991
Resolved 5 September 1991
Construction/Loadline
Issued 9 August 1991 Resolved
MUCK OUT, CLEAN AND MAKE REPAIRS AS REQUIRED TO BALLAST STRAINERS AND PIPING IN WAY OF #2 PORT AND STBD WING TANKS (S.W. BALLAST). BOTH TANKS PRESENTLY CONTAIN APPROXIMATELY 6" OF RUST/MUD WHICH INHIBIT ABILITY TO PUMP AND THEREBY TRIM/BALLAST AND DEBALLAST VESSEL. _x001C_
Condition: Unknown
Due 9 September 1991
Resolved 29 August 1991
Deck/Cargo
Issued 9 May 1991 Resolved
PRIOR TO COMMENCING CARGO OPERATIONS, A SATISFACTORY ABS SURVEY REPORT SHALL BE SUBMITTED IN REGARDS TO REPAIRS MADE TO THE MAIN CARGO CRANE.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Fire Fighting
Issued 9 May 1991 Resolved
TWO (2) APPROVED 2 1/2" FIRE HOSES AND ONE (1) APPROVED 1 1/2" FIRE HOSE SHALL BE PLACED ABOARD THE VESSEL IAW THE COI.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Lifesaving
Issued 9 May 1991 Resolved
APPROVED ILLUMINATING AND STORM OIL SHALL BE PLACED ABOARD BOTH LIFEBOATS IAW 46CFR 94.20-10(a).
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Fire Fighting
Issued 9 May 1991 Resolved
PROPERLY REPAIR FIRE DAMPERS AT FIRE STATIONS #14 & #17.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Lifesaving
Issued 9 May 1991 Resolved
PRIOR TO 01 JULY 91 ENSURE FULL COMPLIANCE WITH THE 1983 SOLAS AMENDMENTS ON LIFESAVING APPLIANCES AND ARRANGEMENTS.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Lifesaving
Issued 9 May 1991 Resolved
REPAIR OR REPLACE THE BILGE PUMP IN THE PORT LIFEBOAT.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Lifesaving
Issued 9 May 1991 Resolved
IN ACCORDANCE WITH SOLAS 74,III.19.4, END FOR END REPLACE OR PROVIDE PROPERDOCUMENTATION IN REGARDS TO THE LIFEBOAT FALLS.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Lifesaving
Issued 9 May 1991 Resolved
FOUR (4) APPROVED LIFE RINGBUOYS,TWO (2) WITH APPROVED WATER LIGHTS, SHALL BE PLAED THE VESSEL IAW TVE COI.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Fire Fighting
Issued 9 May 1991 Resolved
SUBMIT A SATISFACTORY SERVICING REPORT IN REGARDS TO ALL FIXED, SEMI- PORTABLE, AND PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Fire Fighting
Issued 9 May 1991 Resolved
ONE (1) APPROVED FIRE BLANKET SHALL BE PLACED IN GALLEY.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Fire Fighting
Issued 9 May 1991 Resolved
REPAIR (3) GENERAL ALARM FLASHING LIGHTS ON LOWER LEVEL OF MACHINREY SPACE.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Construction/Loadline
Issued 9 May 1991 Resolved
SURVEY BY GAGING OF THICKNESS, OR REPLACE, RUSTED BILGE/BALLAST PIPING ON STARBOARD SIDE, LOWER LEVEL OF MACHINERY SPACE.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Construction/Loadline
Issued 9 May 1991 Resolved
DEMONSTRATE OPERATION OF REMOTE CLOSING DEVICES FOR BOTH MACHINERY SPACE CLASS III WATERTIGHT DOORS ON MAIN DECK.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Electrical
Issued 9 May 1991 Resolved
DEMONSTRATE OVERSPEED TRIPS OF STEAM, DIESEL AND EMERGENCY GENERATORS.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Navigation
Issued 9 May 1991 Resolved
INSTALL LOW LEVEL ALARMS IN BOTH STEERING RESERVOIRS PER 46 CFR 11.93- 13(a).
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Engineering
Issued 9 May 1991 Resolved
TEST HIGH PRESSURE OF LOW PRESSURE TURBINE OVERSPEEDS. [name withheld] OF COMPLETION OF TEST WILL SATISFY THIS REQUIREMENT.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Lifesaving
Issued 9 May 1991 Resolved
CLEAN, REMOVE WATER AND MAKE STBD LIFEBOAT WINCH CONTROLLER WATERTIGHT.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Fire Fighting
Issued 9 May 1991 Resolved
HYDROSTATICALLY TEST ONE (1) CO2-BII FIRE EXTINGUISHER IN MACHINERY SPACE.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Construction/Loadline
Issued 9 May 1991 Resolved
DEMONSTRATE CAPABILITY TO DE-BALLAST THE VESSEL'S WING AND DOUBLE BOTTOM BALLAST TANKS. AS A MINIMUM THE FOLLOWING TANKS ARE KNOWN TO HAVE DEBALLASTING PROBLEMS:#2 DB P/S, #3DB P; #4DB P/S, #4 WING P.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Construction/Loadline
Issued 9 May 1991 Resolved
DEMONSTRATE PROPER OPERATION OF REMOTELY OPERATED SUCTION AND DISCHARGE VALVES TO #7 PORT BALLAST TANK.
Condition: Unknown
Due 9 May 1991
Resolved 9 May 1991
Lifesaving
Issued 9 May 1991 Resolved
ALL EXPOSURE SUITS SHALL BE PROPERLY MARKED WITH THE VESSELS NAME, AND APPROVED LIGHTS SHALL BE AFFIXED TO EACH.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Accommodation/Occupational Safety
Issued 21 August 1990 Resolved
TEST RELIEF VALVES FOR SHIP'S SERVICE(2), CONTROL(1) AND WHISTLE(1) AIR RECEIVERS, AT THEIR LIFT PRESSURE.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Lifesaving
Issued 21 August 1990 Resolved
PROVIDE LIGHTS FOR IMMERSION SUITS.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Documentation
Issued 21 August 1990 Resolved
UPDATE AND SUBMIT REVISED FIRE CONTROL PLAN TO [name withheld].
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Navigation
Issued 21 August 1990 Resolved
RENEW GAUGE GLASS AND GUARDS FOR STEERING HYDRAULIC TANKS.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Accommodation/Occupational Safety
Issued 21 August 1990 Resolved
DEMONSTRATE REMOTE SHUTDOWN OF ENGINE ROOM VENT FANS FROM PORT/STBD TUNNEL.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Unknown
Issued 21 August 1990 Resolved
DEMONSTRATE PROPER OPERATION OF OILY WATER SEPARATOR.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Unknown
Issued 21 August 1990 Resolved
PROVIDE CONTAINMENT WITH A CAPACITY OF ONE(1) BARREL AROUND EACH FUEL OIL TANK VENT. SEE 33 CFR 155.320.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Lifesaving
Issued 21 August 1990 Resolved
PROVIDE ORANGE SMOKE FLOATS.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Electrical
Issued 21 August 1990 Resolved
CHECK EMERGENCY LIGHTING SYSTEM USING EMERGENCY GENERATOR.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Engineering
Issued 21 August 1990 Resolved
DEMONSTRATE PROPER OPERATION OF THE FORCED DRAFT FAN FAILURE ALARM LIGHTS AT THE ENGINEER'S CONTROL CONSOLE.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Engineering
Issued 21 August 1990 Resolved
INSTALL STEEL OR EQUIVALENT METALLIC PIPING TO REPLACE THE NON-METALLIC HOSE SUPPLYING D/O TO THE FORWARD BURNERS OF BOTH BOILERS.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Electrical
Issued 21 August 1990 Resolved
REPAIR GROUND DETECTORS AND CLEAR GROUNDS ON: A. AFT 120 VAC DISTRIBUTION LOAD CENTER B. 120 VAC AFT EMERGENCY LIGHTING C. 120 VAC FWD EMERGENCY LIGHTING
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Engineering
Issued 21 August 1990 Resolved
RENEW STEAM RELIEF VALVE ON OUTBOARD MAIN FEED PUMP
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Electrical
Issued 21 August 1990 Resolved
INSTALL AND TEST NEW BATTERIES FOR THE GENERAL ALARM, ENGINEER'S ALARMS ANDIC ALARMS. NEW BATTERIES TO BE NI-CAD OF 125 AMP-HR CAPACITY OR GREATER.
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Documentation
Issued 3 May 1989 Resolved
PRIOR TO ACTIVATION COMPLETE ALL INSPECTION ITEMS FOR INSPECTION FOR CERTIFICATION.
Condition: Unknown
Due 3 May 1989
Resolved 3 May 1989
Fire Fighting
Issued 20 May 1987 Resolved
CONDUCT A FIRE AND BOAT DRILL WHEN THE VESSEL IS ACTIVATED. THE ABOVE ITEM IS TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 20 May 1987
Resolved 20 May 1987
Lifesaving
Issued 17 November 1985 Resolved
OPEN FOAM FLATATION TANKS AND DRY OR REPLACE FOAM REPLACED FOAM WILL BE APPROVED CLOSE CELL REPAIR IN PRESENTCE OF CG MARINE INSPECTOR TO THE SATISFACTION OF COGNIZANT OCMI.
Condition: Unknown
Due 17 November 1985
Resolved 17 November 1985
Construction/Loadline
Issued 17 November 1985 Resolved
REINSTALL ALL MISSING CARGO HATCH (CELL) COVER SECURING DOGS (APPROX. 114 FOR EACH COVER0 ON CELLS 1 THRU 17.
Condition: Unknown
Due 17 November 1985
Resolved 17 November 1985
Construction/Loadline
Issued 17 November 1985 Resolved
CROP AND RENEW WASTED CARGO HATCH COVER SECURING DOG CLIPS PORT AND STBD SIDES OF CELL COVERS 1 THRU 17 TOTAL 08 36 CLIPS.
Condition: Unknown
Due 17 November 1985
Resolved 17 November 1985
Construction/Loadline
Issued 9 May 1985 Resolved
GAS FREE #1 SALTWATER BALLIST, #2 PORT AND STBD WING TANKS AND #7 PORT BALLIST TANK FOR INSPECTION BY COGNIZANT OCMI.
Condition: Unknown
Due 9 May 1985
Resolved 9 May 1985
Unknown
Issued 27 April 1985 Resolved
REPAIR PORT AND STARBOARD HIGH, AND STARBOARD LOW SUCTION REMOTE OPERATED FUEL OIL VALVES FOR #6 TANKS TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO 27JUN85.
Condition: Unknown
Due 27 April 1985
Resolved 27 April 1985
Unknown
Issued 4 November 1983 Resolved
THE FOLLOWING DEFICIENCIES PRETAIN TO THE VESSEL DELTA MAR, DN549153
Condition: Unknown
Due 4 November 1983
Resolved 4 November 1983
Unknown
Issued 18 October 1982 Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN WAY OF PORT FUEL TANK SIDESHELL, FRAMES 116-117 .
Condition: Unknown
Due 18 October 1982
Resolved 18 October 1982

Casualty record · 2

24 September 2005Routine · role: Involved in a Marine Casualty · activity 2960541
3 August 2021Routine · role: Involved in a Marine Casualty · activity 7283568
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record